CORNERSTONE DESIGN BUILD, LTD. | B= | C | 12/19/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6058081 |
CORNERSTONE DESIGN BUILD, LTD. | B= | P | 12/19/2018 | All Building Department items OK - no need for reinspection. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | RICHB | RICHB | | B= | P | 6057231 |
CORNERSTONE DESIGN BUILD, LTD. | B= | P | 11/30/2018 | Need to complete all other Finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), FRONT RANGE ELECTRIC OF CO. Electrical Final Inspection is not Completed yet, PHOENIX FIRE AND SECURITY Electrical Final Inspection is not Completed yet, SPARROW ENTERPRISES, INC. Mechanical Final Inspection is not Completed yet, SPARROW ENTERPRISES, INC. Plumbing Final Inspection is not Completed yet, THE FURNACE GUY HEATING AND COOLING Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6039127 |
CORNERSTONE DESIGN BUILD, LTD. | B= | R | 11/29/2018 | Bldg temp final inspection / Building not ready. No access to upper level due to concrete pour at open stairway. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), FRONT RANGE ELECTRIC OF CO. Electrical Final Inspection is not Completed yet, PHOENIX FIRE AND SECURITY Electrical Final Inspection is not Completed yet, SPARROW ENTERPRISES, INC. Mechanical Final Inspection is not Completed yet, SPARROW ENTERPRISES, INC. Plumbing Final Inspection is not Completed yet, THE FURNACE GUY HEATING AND COOLING Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | R | 6038824 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 10/31/2018 | (8) holes for trash enclosure OK per plans (see Sheet A-2) | RICHB | RICHB | | BSP | P | 6012211 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 10/10/2018 | Framing OK pending PTO completion - all other items complete - spoke with Contractor onsite | RICHB | RICHB | | BFR | P | 5990728 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 10/05/2018 | Discussed accessible elements - Type B requirements for kitchens, bathrooms and door thresholds // discussed unconditioned riser room and Contractor's concerns about freeze protection - Contractor to resolve with Architect and Plan Review | RICHB | RICHB | | BSP | P | 5987055 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 09/18/2018 | Engineered soffit detail received | RICHB | RICHB | | BFR | P | 5967866 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 08/30/2018 | 2nd layer of sheetrock on ceiling OK | RICHB | RICHB | | BSP | P | 5950590 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 08/29/2018 | NOTE - both lower level units are Type B (per Sheets A-2 and A-3), floor plans on sheet A-6 // RC on ceiling OK per UL L570 - sheetrock has started to be installed, material and fastening pattern OK, need to inspect second layer when ready | RICHB | RICHB | | BSP | P | 5950126 |
CORNERSTONE DESIGN BUILD, LTD. | BIN | P | 08/27/2018 | Thermal in walls OK / need to complete BFR | RICHB | RICHB | | BIN | P | 5947123 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 08/27/2018 | Still need detail for soffit addition at front entry - interrupts rated wall continuity at common wall / still need to complete PTO / firestopping details reviewed onsite - firestopping OK | RICHB | RICHB | | BFR | P | 5947119 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 08/23/2018 | Engineering received for cold air return fix - repair is OK / engineering for truss fix on file / still need all details for penetrations and need a firestopping inspection | RICHB | RICHB | | BFR | P | 5943149 |
CORNERSTONE DESIGN BUILD, LTD. | BIN | R | 08/22/2018 | Firestopping detail not uploaded / Spoke with Joel on site / discussed soffit addition over front entry and continuity of horizontal assembly / discussed stud cavity penetrations through top plates. | RICHB | RICHB | | BIN | R | 5942032 |
CORNERSTONE DESIGN BUILD, LTD. | BIN | R | 08/21/2018 | still not ready next canceled on site will receive a trip fee. firestops not completed | NATHAN | NATHAN | | BIN | R | 5940464 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | R | 08/21/2018 | still not ready next canceled on site will receive a trip fee. | NATHAN | NATHAN | | BFR | R | 5940458 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | R | 08/21/2018 | no images attached | NATHAN | NATHAN | | BSP | R | 5940428 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 08/20/2018 | structural pages are by engineer so changes need to be addressed by him, inspections requested for wrong date moved to the aug 21st. | NATHAN | NATHAN | | BFR | P | 5938978 |
CORNERSTONE DESIGN BUILD, LTD. | BIN | P | 08/20/2018 | upload images only | NATHAN | NATHAN | | BIN | P | 5938829 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 08/20/2018 | upload images | NATHAN | NATHAN | | BFR | P | 5938826 |
CORNERSTONE DESIGN BUILD, LTD. | BIN | R | 08/17/2018 | not ready for inspection (rc incomplete) and need to complete frame inspection / inspection cancelled by GC onsite / reviewed details for rated floor ceiling assembly L570 with the site superintendent / still need firestopping details | BRIANB | BRIANB | | BIN | R | 5937406 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 08/15/2018 | All plate penetrations OK / still need firestopping details - OK to review & inspect at BIN / Units 101 & 102 - repair at duct is a double 12" Versa-Lam with 1T EE - need engineering on this repair / Unit 101 - repair is 2x8 glued & nailed to one side of joist - need engineering on this repair / Unit 201 - LS30's OK | RICHB | RICHB | | BFR | P | 5935619 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 08/13/2018 | General Notes - Unit 101 is ANSI Type A and Unit 102 is ANSI Type B, need to seal all plate penetrations, need firestopping details for penetrations through rated separation wall, need to complete other Roughs // Unit 101 - bearing wall is compromised at guest bath (cold air return), top chord joist damage at bathroom // Unit 102 - bearing wall is compromised at guest bath (cold air return) // Unit 201 - need LS30's at J01 and J02 trusses at both corners // Unit 202 - OK expect for General Notes | RICHB | RICHB | | BFR | P | 5932738 |
CORNERSTONE DESIGN BUILD, LTD. | BLA | C | 08/03/2018 | | RICHB | RICHB | | BLA | C | 5923073 |
CORNERSTONE DESIGN BUILD, LTD. | BFR | P | 07/05/2018 | Porch lids OK | RICHB | RICHB | | BFR | P | 5894432 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 06/08/2018 | Met with Boris to discuss rate wall assemblies - framing for separation wall (UL U340) from top-of-wall on 2nd floor to roof sheathing OK, continuity at perpendicular 2nd floor entry walls OK, discussed intersection of rated wall & ceiling assemblies (UL L570) / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5868643 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 05/31/2018 | (4) piers, 18" dia 4'-0" deep observed at front entrance / need pier detail for diameter (not shown on foundation design) | RICHB | RICHB | | BSP | P | 5860495 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 04/26/2018 | Training with Rich - rated assembly continuity, unit separation requirements, plan reading, UL listing requirements | JUSTINL | JUSTINL | | BSP | P | 5828702 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 04/26/2018 | Training with Justin - rated assembly continuity, unit separation requirements, plan reading | RICHB | RICHB | | BSP | P | 5828698 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 04/16/2018 | Crawl space framing OK / framing for rated separation and stairwell OK / plans reviewed onsite ////// UPDATED COMMENT - rated wall framing at time of inspection is only from top of foundation to approx 1' above main level floor sheathing - RB April 16, 2018 | RICHB | RICHB | | BSP | P | 5817388 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 04/11/2018 | Met with Contractor - discussed rated assemblies (UL U305 & UL U340) and inspection sequencing for those walls / mockup for UL U340 OK / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5813601 |
CORNERSTONE DESIGN BUILD, LTD. | BFD | C | 04/06/2018 | Per engineer, conditioned craw space does not need a foundation drain | RICHB | RICHB | | BFD | C | 5809568 |
CORNERSTONE DESIGN BUILD, LTD. | BFN | P | 04/05/2018 | Damp proofing OK / need drain installed per Soils Report (on file) / need to meet with Contractor to discuss Third Party inspections and inspection requirements | RICHB | RICHB | | BFN | P | 5809445 |
CORNERSTONE DESIGN BUILD, LTD. | BFT | C | 04/05/2018 | Open Hole received - 1500 psf | RICHB | RICHB | | BFT | C | 5808252 |
CORNERSTONE DESIGN BUILD, LTD. | BSP | P | 04/05/2018 | Foundation densities received | RICHB | RICHB | | BSP | P | 5808245 |
CORNERSTONE DESIGN BUILD, LTD. | BFN | P | 04/04/2018 | Foundation wall observation received / need to complete BFT | RICHB | RICHB | | BFN | P | 5806986 |
CORNERSTONE DESIGN BUILD, LTD. | BFT | P | 04/04/2018 | Need meeting with Contractor to discuss requirements for Third Party inspections / footing observation received / need copy of stamped Open Hole Observation | RICHB | RICHB | | BFT | P | 5806984 |
FRONT RANGE ELECTRIC OF CO, LLC | E= | C | 12/04/2018 | Finaled by CraigS on 12/03/18 | CHIPO | CHIPO | | E= | C | 6042005 |
FRONT RANGE ELECTRIC OF CO, LLC | E= | C | 12/03/2018 | | CRAIGS | CRAIGS | | E= | C | 6040785 |
PHOENIX FIRE AND SECURITY, LLC | E= | C | 12/03/2018 | FIRE ALARM INSPECTION: signed red card | CRAIGS | CRAIGS | | E= | C | 6040780 |
PHOENIX FIRE AND SECURITY, LLC | ER | C | 12/03/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 6040774 |
PHOENIX FIRE AND SECURITY, LLC | E= | C | 12/03/2018 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | E= | C | 6040775 |
FRONT RANGE ELECTRIC OF CO, LLC | E= | P | 11/29/2018 | pending fire alarm units 101 , 102 , 201 , 202 --- 20 amp a/c units -- 30 amp water heaters | CRAIGS | CRAIGS | | E= | P | 6037613 |
FRONT RANGE ELECTRIC OF CO, LLC | ES | C | 11/27/2018 | Commercial Service: splice complete---60 amp 3 wire service for house panel / four 100 amp 3 wire services for apartments / okay to set meters | CHIPO | CHIPO | | ES | C | 6034808 |
FRONT RANGE ELECTRIC OF CO, LLC | ES | P | 11/12/2018 | Commercial Service: four 100-amp 3 Wire services plus house, ok to set four meters for units but not house, new apartments, 4 units and house / non- Irreversible UFER connection accessible through 2 gang blank in bedroom-------need splice on plans for house meter | CHIPO | CHIPO | | ES | P | 6022977 |
FRONT RANGE ELECTRIC OF CO, LLC | ES | R | 11/09/2018 | Commercial Service: have the meter stacks open and some on site to show the ufer | CRAIGS | CRAIGS | | ES | R | 6021285 |
PHOENIX FIRE AND SECURITY, LLC | ER | C | 08/16/2018 | FIRE ALARM INSPECTION: | MIGUEL | MIGUEL | | ER | C | 5937012 |
FRONT RANGE ELECTRIC OF CO, LLC | ER | C | 08/07/2018 | UNIT 101 IS TYPE A, CHECK FOR HOOD CONTROL ON FINAL---LEAVE WALL IN UNIT 102 OPEN WHERE SE FEEDERS WILL TERMINATE INTO SERVICE GEAR----1/0 AL FEEDERS RAN TO PANELS / | MIGUEL | MIGUEL | | ER | C | 5926944 |
FRONT RANGE ELECTRIC OF CO, LLC | ER | R | 08/03/2018 | 2 lower apartment are B accessible, don not meet ADA requirements , no feeders pulled to panels---2 upper apartments, no feeders pulled to panels, needs lights in room w/ water heater, south apartment needs nm secure to box in furnace, in wall going through ma adapter / | MIGUEL | MIGUEL | | ER | R | 5924085 |
THE FURNACE GUY HEATING & COOLING | H= | C | 12/12/2018 | | JERRYF | JERRYF | | H= | C | 6050995 |
THE FURNACE GUY HEATING & COOLING | H= | P | 12/11/2018 | MISSING CONCENTRIC VENT TERMINATION AT 2ND FLOOR SOUTH UNIT | JERRYF | JERRYF | | H= | P | 6049604 |
THE FURNACE GUY HEATING & COOLING | H= | P | 12/06/2018 | NEED CONCENTRIC INSTALLED AT BOTH 2ND FLOOR FURNACE VENTS - CONDITIONED CRAWLSPACE | JERRYF | JERRYF | | H= | P | 6045132 |
THE FURNACE GUY HEATING & COOLING | H= | P | 12/06/2018 | EQUIPMENT CHANGE LETTER RECEIVED | JERRYF | JERRYF | | H= | P | 6044264 |
SPARROW ENTERPRISES, INC. | H= | C | 12/05/2018 | OK PER REVISED PLAN | JERRYF | JERRYF | | H= | C | 6043617 |
THE FURNACE GUY HEATING & COOLING | H= | P | 12/04/2018 | THIS IS AN APARTMENT EQUIPMENT CHANGE LETTER MUST COME FROM MECHANICAL ENGINEER WITH STAMP - STILL NEED OTHER ITEMS ADDRESSED | JERRYF | JERRYF | | H= | P | 6041757 |
SPARROW ENTERPRISES, INC. | HC | C | 08/06/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5924990 |
SPARROW ENTERPRISES, INC. | HI | C | 08/06/2018 | BY FINAL REVISE PLAN TO SHOW ACTUAL METER LOCATION AND DELETING GAS WATER HEATERS - REMOVE 4 FURNACES FROM PERMIT NOTES: 4 PRESSURE TESTS OK - PIPING OK | JERRYF | JERRYF | | HI | C | 5924974 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 07/19/2018 | 2 DRYER VENTS FRAMED IN AND OK - AT FINAL VERIFY ALL OTHER NOTES FROM HRR INSPECTION DATED 7/10/18 | JERRYF | JERRYF | | HRR | C | 5908727 |
THE FURNACE GUY HEATING & COOLING | HRR | P | 07/10/2018 | NEED BOTH DRYER VENTS FRAMED IN ON LOWER LEVEL UNITS TO VERIFY NAIL PROTECTION - BY FINAL NEED THE FOLLOWING - VERIFY CONDITIONED CRAWLSPACE - PROPER SUPPORT ON ALL FURNACE VENTING IN CRAWLSPACE PER INSTALL MANUAL - DRYER BOOSTER FANS INSTALLED CORRECTLY WITH ALL MANUFACTURES PIPING AND CLAMPS - LEAK TEST FOR ALL ATTIC SYSTEMS - EQUIPMENT CHANGE LETTERS FOR ALL FURNACES / COILS AND CONDENSERS NOTES: DIRECT VENT FURNACE - AC COIL AND LINE SET - OSA TO FURNACE | JERRYF | JERRYF | | HRR | P | 5898353 |
THE FURNACE GUY HEATING & COOLING | HRR | R | 07/03/2018 | NOT READY - WAIVED TRIP FEE -THIS TRIP- SOME ITEMS FOUND - MISSING ALL FANS IN CRAWL SPACES PER PLAN - MISSING EXHAUST DUCTS ON 1ST FLOOR - DRYER VENTS NOT COMPLETE INCLUDING FANS ALL FLOORS - RETURN ON 1ST FLOOR DAMAGED BY PLUMBING - 2ND FLOOR UNITS INSULATE SUPPLY DUCT AT TRANSITION ABOVE FURNACE - STOPPED INSPECTION - RE INSPECT AL BY FINAL NEED APPROVAL LETTER FROM ENGINEER FOR EQUIPMENT CHANGE - LEAK TESTS FOR ALL 2ND FLOOR | JERRYF | JERRYF | | HRR | R | 5892835 |
SPARROW ENTERPRISES, INC. | P= | C | 12/11/2018 | Corrections made, images from contractor uploaded. | DANR | DANR | | P= | C | 6048390 |
SPARROW ENTERPRISES, INC. | P= | P | 12/10/2018 | Support T&P drain line unit 101 and 102 pictures ok, rest ok for this building. | DANR | DANR | | P= | P | 6047338 |
SPARROW ENTERPRISES, INC. | P= | P | 12/05/2018 | All unit dishwashers need high loops and sub meters set, no water 1st floor units - cannot use condenser pad to support water heater ( need solid base pavers or concrete) - run t&p to approved location - support expansion tanks, need aav water entry, unit 201 secure pex water heater room - master lav leak, 202 master toilet not working - loose shower arm - secure pex water heater room. | DANR | DANR | | P= | P | 6043070 |
SPARROW ENTERPRISES, INC. | P= | P | 11/30/2018 | Left list with G.C. re-inspect all. | DANR | DANR | | P= | P | 6039477 |
SPARROW ENTERPRISES, INC. | PTO | P | 08/14/2018 | Need pex support every 32", need to run drains for Kansas city floor drains and test. | DANR | DANR | | PTO | P | 5933240 |
SPARROW ENTERPRISES, INC. | PTO | P | 08/10/2018 | support pex South unit 1st floor and crawler, run piping for crawler Kansas City drains (aav), rest ok. Note: aav flooor drain water entry - 2 - crawler floor drains, check water heaters (4) and expansion devises at final, check sub meters (4) water heater closets at final | DANR | DANR | | PTO | P | 5930258 |
SPARROW ENTERPRISES, INC. | PTO | P | 08/06/2018 | This inspection for North 2 units only, need floor drain for meter, need to run water heater pan drain, check floor drain in crawler, nail protection, hangers pex and dwv crawler and 1st floor, need fixture tee back to back toilets, will need test on any new piping, rest ok. Note: check water heaters at final. | DANR | DANR | | PTO | P | 5924341 |
SPARROW ENTERPRISES, INC. | PB | C | 04/06/2018 | crawl space. note: WILL CATCH CRAWL SPACE FLOOR DRAIN ON VERTICAL STACK WITH AAV @ PTO **ALL TYPE B UNITS @ 1ST FLOOR** | JOHNS | JOHNS | | PB | C | 5809733 |
PHOENIX FIRE AND SECURITY, LLC | XES | T | 11/15/2018 | PAID (REC#1556747) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised one-line to include House Panel - HP. | BERTHA | BERTHA | | XES | T | 6027098 |
THE FURNACE GUY HEATING & COOLING | XMS | T | 10/08/2018 | PAID (REC#1556607) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 10-8-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5989175 |
CORNERSTONE DESIGN BUILD, LTD. | XBS | T | 07/27/2018 | PAID (REC#1521637) PLAN SPLICE FEE: $50 by: BECKYA for Construction: Revised plans - one-line revised - Building 1253 will have a house panel. | BECKYA | BECKYA | | XBS | T | 5916754 |