BRAD HORSLEY CONSTRUCTION, INC | B= | C | 08/30/2019 | All other required Final inspections are complete. (This is a computer generated result) | DALE | DALE | | B= | C | 6319761 |
BRAD HORSLEY CONSTRUCTION, INC | B= | P | 08/26/2019 | complete elevator inspection / finished basement, deck in, no stairs. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | DALE | DALE | | B= | P | 6314207 |
BRAD HORSLEY CONSTRUCTION, INC | BIN | C | 06/07/2018 | Walls OK / verify attic at Final | RICHB | RICHB | | BIN | C | 5867579 |
BRAD HORSLEY CONSTRUCTION, INC | BFR | C | 06/07/2018 | Previous items complete | RICHB | RICHB | | BFR | C | 5867567 |
BRAD HORSLEY CONSTRUCTION, INC | BLA | C | 06/05/2018 | Area called out is going to get stone | SHAUN | SHAUN | | BLA | C | 5864291 |
BRAD HORSLEY CONSTRUCTION, INC | BLA | R | 06/04/2018 | Weep screed to be a minimum of 4" above grade at front porch | SHAUN | SHAUN | | BLA | R | 5863940 |
BRAD HORSLEY CONSTRUCTION, INC | BFR | P | 06/04/2018 | Anchor bolt at plate break S.E. corner of garage / ST18 straps S.W. corner upstairs / Dining room slider calls for 3K's e.e. / Missing hardware one side under landing at stairs | SHAUN | SHAUN | | BFR | P | 5863938 |
BRAD HORSLEY CONSTRUCTION, INC | BSP | P | 05/22/2018 | Narrow wall OK / front entry wall & roof framing OK / plans reviewed onsite | RICHB | RICHB | | BSP | P | 5852417 |
BRAD HORSLEY CONSTRUCTION, INC | BFI | C | 03/23/2018 | 2" R10 ridged ok | NOAH | NOAH | | BFI | C | 5797170 |
BRAD HORSLEY CONSTRUCTION, INC | BFD | C | 03/23/2018 | Drain is usable perimeter / to sump -- Damp proofing OK | NOAH | NOAH | | BFD | C | 5797165 |
BRAD HORSLEY CONSTRUCTION, INC | BFN | C | 03/23/2018 | Engineers observation Letter on file / Eufer noted / Foundation design on file | NOAH | NOAH | | BFN | C | 5797162 |
BRAD HORSLEY CONSTRUCTION, INC | BFT | C | 03/23/2018 | Engineers observation Letter on file / Soils report on file / 1500 PSF - Perimeter usable drain - 10%grade | NOAH | NOAH | | BFT | C | 5797159 |
BRAD HORSLEY CONSTRUCTION, INC | BFD | P | 03/19/2018 | Drain okay, complete BFT. | NOAH | NOAH | | BFD | P | 5792011 |
BRAD HORSLEY CONSTRUCTION, INC | BFT | R | 03/19/2018 | Paperwork dated prior to permit. | NOAH | NOAH | | BFT | R | 5792008 |
BRAD HORSLEY CONSTRUCTION, INC | BFN | R | 03/19/2018 | Paperwork dated prior to permit. | NOAH | NOAH | | BFN | R | 5792002 |
BRAD HORSLEY CONSTRUCTION, INC | BFI | P | 03/16/2018 | 2" R10 ridged ok // Inspected on 3/15/18 when drain was inspected // please complete BFN, BFT and BFD. | NOAH | NOAH | | BFI | P | 5791820 |
BRAD HORSLEY CONSTRUCTION, INC | BFD | P | 03/15/2018 | Perimeter drain -- Damp proofing okay -- to sump pit -- need to complete BFD and BFT | NOAH | NOAH | | BFD | P | 5789876 |
BRAD HORSLEY CONSTRUCTION, INC | BFT | P | 03/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFT | P | 5787003 |
BRAD HORSLEY CONSTRUCTION, INC | BFN | P | 03/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | GITA | GITA | GITA | BFN | P | 5787002 |
SOUTHERN COLORADO ELECTRIC INC. | E= | C | 12/07/2018 | | CRAIGS | CRAIGS | | E= | C | 6046803 |
SOUTHERN COLORADO ELECTRIC INC. | E= | R | 10/31/2018 | Need test lights in oh door recpts / 30/2 AC / | ROB | ROB | | E= | R | 6011947 |
SOUTHERN COLORADO ELECTRIC INC. | ES | C | 05/31/2018 | Residential Underground: 00 amp 3/w new res | CRAIGS | CRAIGS | | ES | C | 5861159 |
SOUTHERN COLORADO ELECTRIC INC. | ER | C | 05/31/2018 | 1--15 ---2--20 multi ----finished basement --- no central vac --- elevator rough --- | CRAIGS | CRAIGS | | ER | C | 5861152 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | C | 03/26/2019 | | LIDO | LIDO | | H= | C | 6144725 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | P | 03/22/2019 | Need to support the B vent/ water heater vent connector in the mechanical room, need to provide the lower level fireplace installation instructions. Note: Finished basement, non direct vent furnace with Hi/Lo grills to the mechanical room. Full A/C and no outside aor to the return. | MARK | MARK | | H= | P | 6141768 |
MILLER HEATING & AIR CONDITIONING, INC. | HC | C | 06/06/2018 | RELEASE METER | PAULO | PAULO | | HC | C | 5866576 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | C | 06/06/2018 | NEEDED BY FINAL-- PROPER SUPPORT TO B-VENT IN MECHANICAL ROOM. note: finished basement, no outside air to return, indirect vent furnace, a/c rough and line set. | PAULO | PAULO | | HRR | C | 5866559 |
MILLER HEATING & AIR CONDITIONING, INC. | HRR | P | 06/05/2018 | need the following-- mechanically fasten and seal 5" S.A. in garage, seal all R.A. penetrations in garage. NEEDED BY FINAL-- PROPER SUPPORT TO B-VENT IN MECHANICAL ROOM. note: finished basement, no outside air to return, indirect vent furnace, a/c rough and line set. PAULO | KYLEW | KYLEW | | HRR | P | 5865349 |
O.M.A.G.M., INC. | HI | C | 05/15/2018 | 10 PSI PRESSURE TEST OK. Note: 1" blk main with 1/2" CSST branches - 1 furnace, 1 water heater, 2 fireplaces & 1 kitchen range | MARKB | MARKB | | HI | C | 5845985 |
CLARK PLUMBING & HEATING | P= | C | 11/29/2018 | Correction made, image from contractor uploaded. | DANR | DANR | | P= | C | 6037417 |
CLARK PLUMBING & HEATING | P= | P | 11/14/2018 | Secure silcock at front of house (photo ok), rest ok. Note: pvb installed | MALYNDA | MALYNDA | | P= | P | 6024798 |
CLARK PLUMBING & HEATING | PTO | C | 05/29/2018 | Test ok, vtr, tempering valve master closet, at final check meter loop and water heater connections. | DANR | DANR | | PTO | C | 5857851 |
CLARK PLUMBING & HEATING | PB | C | 03/23/2018 | | JOHNS | JOHNS | | PB | C | 5797443 |