BRECKEN CONSTRUCTION, INC | B= | C | 10/19/2018 | | RICHB | RICHB | | B= | C | 5999762 |
BRECKEN CONSTRUCTION, INC | B= | P | 09/06/2018 | Temp CO: Pending fire, mechanical and plumbing finals ( Expires: 10/6/2018 12:00:00 AM) | RITA | RITA | | B= | P | 5957447 |
BRECKEN CONSTRUCTION, INC | B= | P | 09/05/2018 | Previous items all complete / Interior Finish OK pending other Finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ALLIED PLUMBING AND HEAT, LLC. Mechanical Final Inspection is not Completed yet, ALLIED PLUMBING AND HEAT, LLC. Plumbing Final Inspection is not Completed yet, WILSON ELECTRIC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5955878 |
BRECKEN CONSTRUCTION, INC | B= | P | 08/31/2018 | Need suite number posted / need toilet handles on open side in both restrooms / bottom of reflective surfaces for mirrors in restrooms is too high (41"+ where 40" max is allowed) / need undersink protection installed throughout / need to complete other Finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), ALLIED PLUMBING AND HEAT, LLC. Mechanical Final Inspection is not Completed yet, ALLIED PLUMBING AND HEAT, LLC. Plumbing Final Inspection is not Completed yet, OLYMPIA HEATING & COOLING INC. Mechanical Final Inspection is not Completed yet, WILSON ELECTRIC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5953075 |
BRECKEN CONSTRUCTION, INC | BSP | P | 06/29/2018 | letter on file for ceiling system | SCOTTS | SCOTTS | | BSP | P | 5889907 |
BRECKEN CONSTRUCTION, INC | BFR | P | 05/23/2018 | PARTIAL - WALLS ONLY / still need to inspect framing for all hard lids and framing for knee walls at pedicure 3 area / all other light gauge stl. wall framing okay / pending other rough inspections / reviewed accessible elements with site rep | BRIANB | BRIANB | | BFR | P | 5853907 |
BRECKEN CONSTRUCTION, INC | BFR | R | 04/20/2018 | not ready for inspection - light gauge steel framing not installed at time of inspection / reviewed approved design and went over accessible elements with Brecken rep Andrew / demising walls are pre-existing | BRIANB | BRIANB | | BFR | R | 5823405 |
WILSON ELECTRIC | E= | C | 09/05/2018 | | CHIPO | CHIPO | | E= | C | 5956025 |
WILSON ELECTRIC | ER | P | 06/12/2018 | hard lids ok / | MIGUEL | MIGUEL | | ER | P | 5872106 |
WILSON ELECTRIC | ER | P | 05/24/2018 | walls ok / | MIGUEL | MIGUEL | | ER | P | 5855443 |
WILSON ELECTRIC | ER | P | 04/19/2018 | two demising walls OK --- gfci on south wall cant be there for final , cant be over 5'6" to be readily accessible | CRAIGS | CRAIGS | | ER | P | 5822155 |
WILSON ELECTRIC | EUG | C | 04/13/2018 | under slab conduits to the work stations OK | CRAIGS | CRAIGS | | EUG | C | 5816334 |
WILSON ELECTRIC | ES | C | 03/30/2018 | Commercial Service: unit 120 a and 120 b --- 200 amp 4/w each ---------OK to set meters ------ contractor to change brass tags from 130 /140 to 120 a/ 120b as per CSU and numerations | CRAIGS | CRAIGS | | ES | C | 5803431 |
WILSON ELECTRIC | ES | P | 03/26/2018 | Commercial Service: 200 amp -- 4/w each OK to set meters for unit 130 and 140 | CRAIGS | CRAIGS | | ES | P | 5799474 |
ALLIED PLUMBING AND HEAT, LLC. | H= | C | 09/10/2018 | PVC VENT WRAPPED WITH PLENUM RATED MATERIALS. | MARKB | MARKB | | H= | C | 5959167 |
ALLIED PLUMBING AND HEAT, LLC. | H= | P | 09/05/2018 | FOR FINAL - PVC water heater vent/combustion air needs to be covered in plenum rated material. | MARKB | MARKB | | H= | P | 5956174 |
ALLIED PLUMBING AND HEAT, LLC. | HV | C | 09/05/2018 | Correction made | MARKB | MARKB | | HV | C | 5956173 |
OLYMPIA HEATING & COOLING INC. | H= | C | 09/05/2018 | TEST AND BALANCE REPORT RECEIVED | MARKB | MARKB | | H= | C | 5954827 |
OLYMPIA HEATING & COOLING INC. | H= | P | 08/31/2018 | FINAL PENDING - Test And Balance Report | MARKB | MARKB | | H= | P | 5953448 |
ALLIED PLUMBING AND HEAT, LLC. | HV | P | 08/31/2018 | Water heater vent needs to be put together using purple primer inside the joints of the fittings - contractor just wiped primer on the out side of the fittings and pipe. | MARKB | MARKB | | HV | P | 5953346 |
OLYMPIA HEATING & COOLING INC. | H= | P | 08/29/2018 | FOR Final - Need proper size duct on bath exhaust fans, bird screen on bath exhaust termination, and further research required on test and balance report provided on site. NOTE ADDED 8/30: Test and balance report needs to be put on company letter head and signed by licensee, report also needs to include outside air readings per ventilation schedule and bath exhaust fan readings. ALL FLEX AND DIFFUSERS INSTALLED. DRYER DUCTS COMPLETE. EXHAUST FAN AND RTU INTERLOCKS CONFIRMED. | MARKB | MARKB | | H= | P | 5950066 |
ALLIED PLUMBING AND HEAT, LLC. | HV | R | 08/29/2018 | No purple primer used on water heater vent REDO venting using purple primer. Vent lacks support. PVC 45 and fernco between tank and exhaust elbow were added in and not shown as an approved method in install instructions (Fernco has to be approved venting material and is not even tighten down on exhaust outlet). After vent is re inspected and approved, vent will need to be covered with plenum rated material. | MARKB | MARKB | | HV | R | 5950052 |
ALLIED PLUMBING AND HEAT, LLC. | HC | C | 08/23/2018 | Adding 400k to meter | MARKB | MARKB | | HC | C | 5944221 |
ALLIED PLUMBING AND HEAT, LLC. | HI | C | 08/23/2018 | STILL NEED - To see tie in at meter. 10 PSI PRESSURE TEST OK. PIPING PER PLAN. | MARKB | MARKB | | HI | C | 5944199 |
OLYMPIA HEATING & COOLING INC. | HD | P | 06/26/2018 | ABOVE CEILING DUCT - PIPING HAS BEEN COVERED WITH PLENUM RATED INSULATION - STILL NEED DRYER DUCT, BATH EXHAUST AND DIFFUSERS INSTALLED. | MARKB | MARKB | | HD | P | 5886158 |
OLYMPIA HEATING & COOLING INC. | HD | P | 06/11/2018 | NEED DRYER VENT INSTALLED IN WALL BEFORE SHEET ROCK AND PROTECT ALL MATERIALS IN PLENUM TO 25 / 50 FLAME SPREAD | JERRYF | JERRYF | | HD | P | 5870524 |
OLYMPIA HEATING & COOLING INC. | HD | P | 04/13/2018 | UNDERGROUND EXHAUST DUCT - EXHAUST DUCT HAS BEEN REINSTALLED USING MATERIAL AND FITTINGS APPROVED BY MECHANICAL CHIEF AND SENIOR INSPECTORS. PIPING IS SLOPED BACK TO EACH 12" 90 AT VERTICAL STACK. | MARKB | MARKB | | HD | P | 5816528 |
OLYMPIA HEATING & COOLING INC. | HD | R | 04/10/2018 | SEE NOTES ENTERED BY SENIOR INSPECTOR ON 4/10/18 | MARKB | MARKB | | HD | R | 5813311 |
OLYMPIA HEATING & COOLING INC. | HSP | P | 04/10/2018 | Worked with building contractor to find acceptable fittings for under ground PVC exhaust system. Approval of these fittings to be through chief or senior inspector prior to installation. | JON | JON | | HSP | P | 5812496 |
OLYMPIA HEATING & COOLING INC. | HD | R | 03/30/2018 | NEED PLUMBING CONTRACTOR ATTACHED TO PERMIT. BELOW GROUND EXHAUST DUCT INSPECTION - PVC PIE IS BEING USED BUT DOES NOT FOLLOW MANUFACTURER INSTRUCTIONS. PIPE TAPS WERE DRILLED INTO PIE AND SEALED WITH SILICON. ENGINEER TO ADDRESS INSTALL WITH A PLAN SPLICE WITH A PICTURE DESCRIBING PROCESS AND MATERIALS USED. ALSO WILL NEED TO REVISE NAIL STATION LAY OUT AND ABOVE CEILING DUCT CHANGES. HAD THIS DISCUSSION WITH CONTRACTOR ON SITE. | MARKB | MARKB | | HD | R | 5804501 |
ALLIED PLUMBING AND HEAT, LLC. | P= | C | 09/12/2018 | Corrections made. | DANR | DANR | | P= | C | 5962795 |
ALLIED PLUMBING AND HEAT, LLC. | P= | P | 09/07/2018 | Need to inspect chair drains and trap guards, rest ok. | DANR | DANR | | P= | P | 5958383 |
ALLIED PLUMBING AND HEAT, LLC. | P= | P | 09/05/2018 | Drinking fountain needs proper side clearance, mop sink needs hot on left cold on right,, trap guards installed, need engineer approval and splice for added sink at entry - changed S-1sink to laundry tub - and added soda line ( need back flow protection), drain line for nail chairs air gap and proper drain piping, rest ok. | DANR | DANR | | P= | P | 5955724 |
ALLIED PLUMBING AND HEAT, LLC. | P= | P | 08/31/2018 | NEED CONTRACTOR ON SITE NEXT INSPECTION, check valve on wrong side of expansion tank, need floor drain access by water heater, both toilets need to flush to open side of room, pump line stand off clamps need copper pipe separation, hammer arrestors for washer lines, mop sink needs installed properly, S-1 sink needs engineer change letter to laundry sink, need plans revised and spliced for sink change - add new sink and water heater to scope- need piped per code, RE-INSPECT ALL. | DANR | DANR | | P= | P | 5953003 |
ALLIED PLUMBING AND HEAT, LLC. | PTO | P | 06/22/2018 | Test on venting ok, need toilet flanges set and pvc in plenum insulated (pictures uploaded from contractor ok). | DANR | DANR | | PTO | P | 5883048 |
ALLIED PLUMBING AND HEAT, LLC. | PTO | P | 06/19/2018 | Dwv needs test, set and anchor toilet flanges, rest ok. discussed accessibility requirements. Note: check washer box - mop sink - and water heater at final. | DANR | DANR | | PTO | P | 5878571 |
ALLIED PLUMBING AND HEAT, LLC. | PTO | P | 06/06/2018 | In wall dwv and domestic water ok. | DANR | DANR | | PTO | P | 5866821 |
ALLIED PLUMBING AND HEAT, LLC. | PTO | P | 04/20/2018 | NEED TO SUPPORT PEX @ VERTICAL DROPS (SHOW INSPECTOR PICTURES @ NEXT INSPECTION OF THESE CORRECTIONS), REVISE PLANS TO SHOW DELETION OF FACIAL WAX SINK 1, rest ok for in wall dwv and water @ north and south side walls only. note: vtr (existing) @ other unit for facial wax sinks 1 and 2 | JOHNS | JOHNS | | PTO | P | 5823468 |
ALLIED PLUMBING AND HEAT, LLC. | PB | C | 04/13/2018 | per plan | JOHNS | JOHNS | | PB | C | 5816526 |
OLYMPIA HEATING & COOLING INC. | XMS | T | 09/06/2018 | PAID (REC#1534526) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 2 | DALEH | DALEH | | XMS | T | 5957375 |
ALLIED PLUMBING AND HEAT, LLC. | XPS | T | 04/12/2018 | PAID (REC#1493402) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 4-12-13 | TCRIPPEN | TCRIPPEN | | XPS | T | 5814849 |
OLYMPIA HEATING & COOLING INC. | XMS | T | 04/06/2018 | PAID (REC#1492232) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice 4-6-18 | TCRIPPEN | TCRIPPEN | | XMS | T | 5810067 |