A. R. MAYS CONSTRUCTION, INC. | B= | C | 01/08/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6071230 |
A. R. MAYS CONSTRUCTION, INC. | B= | P | 08/16/2018 | stamped letters of observation for welding and bolting and rods and turn buckles received. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5935817 |
A. R. MAYS CONSTRUCTION, INC. | B= | P | 07/30/2018 | still need engineer observations for welding and bolting - for bolting of ledger for landing at south wall and for the installation of the welding and bolting for the rods and turn buckles that are at the rear of the projection room floor to ceiling / all other items corrected / final OK pending observation letter described above and all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5917448 |
A. R. MAYS CONSTRUCTION, INC. | B= | P | 07/26/2018 | still need engineer letters of observation for welding and bolting of ledger at south wall for small landing added at stairs and for rods and turn buckles for the rear of the floor of the projection room / need to complete all pathway lighting at the stairs on the north and south sides of the lower auditorium below the main crosswalk / need to complete the pathway lighting at the corridors to the exits / need continuous rail along the wall through the landing on the upper stairs on the south side of the auditorium / engineer observations received for speaker installation and all concrete work / engineer designs received for speaker installation and attachment of jury box walls -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5914981 |
A. R. MAYS CONSTRUCTION, INC. | BSP | P | 06/29/2018 | need stamped copy of engineering for speaker hangers / OK to use 3rd party engineer for inspections of speaker hangers and screen scaffolding / need stamped letter of compliance at final inspection | DANE | DANE | | BSP | P | 5889804 |
A. R. MAYS CONSTRUCTION, INC. | BFR | P | 06/21/2018 | interior light gauge non-bearing framing at north west corner of theater OK / engineering received for put back of walls at northeast corner of theater - installed OK | DANE | DANE | | BFR | P | 5882129 |
A. R. MAYS CONSTRUCTION, INC. | BFR | P | 06/18/2018 | all low wall framing at the front of all seating tiers OK pending other roughs | DANE | DANE | | BFR | P | 5877082 |
A. R. MAYS CONSTRUCTION, INC. | BFR | P | 06/04/2018 | new hard lid framing at entry corridor OK / new opening for projection window at projector room to theater wall OK | DANE | DANE | | BFR | P | 5863325 |
A. R. MAYS CONSTRUCTION, INC. | BFR | P | 04/30/2018 | need to attach mechanical permit / framing of entry portal walls OK pending other roughs / south vomitory wall framing OK pending other roughs / new section of floor over the south entry light gauge framing OK pending other roughs - need stamped letter for angle iron connection to wall at new floor / OK to use engineer for structural rods and turn buckles at projector room and all welding - engineer letter to follow / need engineer letter for all structural welding and bolting | DANE | DANE | | BFR | P | 5830686 |
BIBLE ELECTRIC, INC. | E= | C | 07/19/2018 | Electrical complete /Panel ok | ROB | ROB | | E= | C | 5908046 |
BIBLE ELECTRIC, INC. | E= | P | 07/17/2018 | Need fault current labels per 110.24 and phasing on new panels added / | ROB | ROB | | E= | P | 5904599 |
BIBLE ELECTRIC, INC. | E= | P | 07/16/2018 | Need to check roof / | ROB | ROB | | E= | P | 5904101 |
BIBLE ELECTRIC, INC. | E= | P | 07/12/2018 | All seat recpts ok except top row---Projection room racks and wall recpts ok---Recpts. ok in rack at SE exit ok / | ROB | ROB | | E= | P | 5900801 |
BIBLE ELECTRIC, INC. | ER | P | 06/19/2018 | Rough in ok for ceiling in projection room--FA existing and all seating walls in theater area / | ROB | ROB | | ER | P | 5878347 |
BIBLE ELECTRIC, INC. | ESL | P | 06/11/2018 | ESL ok for 7th,8th,9th, and10th rows / | ROB | ROB | | ESL | P | 5870118 |
BIBLE ELECTRIC, INC. | ESL | P | 06/04/2018 | ESL ok for 4th, 5th, and 6th, level seating tiers ok | ROB | ROB | | ESL | P | 5863368 |
BIBLE ELECTRIC, INC. | ESL | P | 05/30/2018 | 1st, 2nd, 3rd level seating tiers ok / | ROB | ROB | | ESL | P | 5859191 |
BIBLE ELECTRIC, INC. | ER | P | 05/30/2018 | Rough in for walls in projection room ok /walls | ROB | ROB | | ER | P | 5859190 |
BIBLE ELECTRIC, INC. | ER | P | 05/10/2018 | rough in ok for walls and ceilings in Vestibule---NOTE: Contractor getting verification for correct address 1710 or 1770 / | ROB | ROB | | ER | P | 5840823 |
BIBLE ELECTRIC, INC. | ER | P | 05/01/2018 | Piping from projector booth for L.V. Lights, Line Voltage and transducers to seating area / | ROB | ROB | | ER | P | 5832889 |
COLORADO SHEET METAL CO., INC. | H= | C | 01/08/2019 | | LIDO | LIDO | | H= | C | 6071229 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/27/2018 | RECEIVED TEST AND BALANCE REPORT / CORRECTIONS MADE ( SEE IMAGES ) RFI ATTACHED TO PERMIT IS STATING THAT ONE OF THE TRANSFER AIR OPENINGS MAY NOT BE CAPPED IN THE AUDITORIUM WALL IF SO THIS WILL REQUIRE A REVISED AND APPROVED SPLICE . | LIDO | LIDO | | H= | P | 5915727 |
COLORADO SHEET METAL CO., INC. | HSP | P | 07/26/2018 | RECEIVED RFI TO CLARIFICATION THE TEMP CENSOR MEASURING 5 DEGREES OR LESS TIED INTO THE DAMPER INTAKE HOOD AND VERIFICATION FOR INTERNAL SECONDARY PROTECTION FOR BC-1 AND BC-2 ( SEE IMAGES ) PLAN SHOWS THE TWO TRANSFER AIR OPENINGS TO BE CAPPED / RFI ATTACHED TO PERMIT IS STATING THAT ONE MAY NOT BE CAPPED IN THE AUDITORIUM WALL IF SO THIS WILL REQUIRE A REVISED AND APPROVED SPLICE .NEED EQUIPMENT ON ROOF LABELED , NEED TEST AND BALANCE REPORT .THERMOSTATS OK . | LIDO | LIDO | | HSP | P | 5914325 |
COLORADO SHEET METAL CO., INC. | H= | P | 07/20/2018 | NEED TO HAVE CLARIFICATION ON TEMP CENSOR MEASURING 5 DEGREES OR LESS TIED INTO THE DAMPER INTAKE HOOD WHAT AREA IS THIS MEASURING / NEED TO CONSULT WITH TEAM MONDAY . NEED INTERNAL SECONDARY PROTECTION VERIFIED FOR BC-1 AND BC-2 BY CONTRACTOR .THERMOSTATS ARE REQUIRED TO BE 48" OF FINISHED FLOOR . REFER TO NOTE 13 PLAN PAGE M1 CAP TRANSFER DUCTWORK T WALL AND SHALL MAINTAIN WALL RATING . LABEL ALL ROOF TOP EQUIPMENT , NEED TEST AND BALANCE REPORT . | LIDO | LIDO | | H= | P | 5909366 |
COLORADO SHEET METAL CO., INC. | HRP | P | 06/01/2018 | TWO 450lb TEST OK ON LINE SETS TO BC-1 AND BC- 2 . LINE SET CONNECTION TO UNITS OK / Need to complete insulation on line sets and have secondary protection in place . | LIDO | LIDO | | HRP | P | 5862298 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/24/2018 | The distance between exhaust fan and intake hood will be ok due to how the dampers are interlocked and design of the system. . Equipment on roof will not require routine maintenance and a guard rail will not be required (Need to have clarification on the temp sensor measuring 5 degrees or less tied into to the damper for the intake hood . what area is this sensor measuring) ABOVE CEILING DUCT ROUGH OK - OK TO WRAP . BC UNITS INSTALLED . | LIDO | LIDO | | HD | P | 5854424 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/23/2018 | EQUIPMENT ON ROOF IS LESS THAN 10 FT FROM EDGE OF ROOF A GUARDS SHALL BE PROVIDED REFER TO IMC CODE BOOK SECTION 304.11 .FRESH AIR INTAKE HOODS ARE LESS THAN 10 ft FROM FROM THE EXHAUST FANS ON THE ROOF REFER TO IMC CODE SECTION 501.2.1 LOCATION OF EXHAUST OUTLETS . NEED TO CONSULT WITH TEAM IN THE MORNING ON SYSTEM DESIGN WILL ADD TO NOTES IN THE MORNING . | LIDO | LIDO | | HD | P | 5853384 |
COLORADO SHEET METAL CO., INC. | XMS | T | 07/30/2018 | PAID (REC#1522075) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 5 | DALEH | DALEH | | XMS | T | 5917728 |
A. R. MAYS CONSTRUCTION, INC. | XES | P | 03/19/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revise lighting and lighting controlls. | SHELBY | SHELBY | | XES | P | 5792131 |
A. R. MAYS CONSTRUCTION, INC. | XBS | T | 03/19/2018 | PAID (REC#1491352) PLAN SPLICE FEE: $50 by: DANM for Construction: Revision to auditorium entry and other minor revisions throughout | DANM | DANM | | XBS | T | 5792040 |