D12 HOMES, INC. | B= | C | 12/21/2018 | | NICK | NICK | | B= | C | 6061506 | D12 HOMES, INC. | BLA | C | 07/18/2018 | | NICK | NICK | | BLA | C | 5907023 | D12 HOMES, INC. | BIN | C | 07/18/2018 | Check attic at final | NICK | NICK | | BIN | C | 5907022 | D12 HOMES, INC. | BFR | C | 07/18/2018 | Frame items completed | NICK | NICK | | BFR | C | 5907001 | D12 HOMES, INC. | BFR | P | 07/16/2018 | address framing for insulation at garage drop ceiling, roll block joists at basement beam over stairs, okay to insulate | NATHAN | NATHAN | | BFR | P | 5903474 | D12 HOMES, INC. | BSP | P | 07/11/2018 | all cantilever insulation complete. | NATHAN | NATHAN | | BSP | P | 5899288 | D12 HOMES, INC. | BSP | P | 07/03/2018 | cantilever framing okay | NATHAN | NATHAN | | BSP | P | 5892798 | D12 HOMES, INC. | BSP | P | 06/04/2018 | 2 rear deck piers okay | NATHAN | NATHAN | | BSP | P | 5863595 | D12 HOMES, INC. | BFD | C | 03/26/2018 | drain is entire to sumppit | NATHAN | NATHAN | | BFD | C | 5798884 | D12 HOMES, INC. | BFI | C | 03/26/2018 | 2" rigid 24" deep | NATHAN | NATHAN | | BFI | C | 5798859 | D12 HOMES, INC. | BFD | P | 03/26/2018 | Foundation design on file / drain entire, 10% final grade | NATHAN | NATHAN | | BFD | P | 5798280 | D12 HOMES, INC. | BFN | C | 03/26/2018 | Engineer letter for foundation -- Eufer noted / Eufer OK / Soils report on file / open excavation on file. | NATHAN | NATHAN | | BFN | C | 5798270 | D12 HOMES, INC. | BFT | C | 03/26/2018 | Engineers observation Letter on file | NATHAN | NATHAN | | BFT | C | 5798263 | D12 HOMES, INC. | BFT | P | 03/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 5787446 | D12 HOMES, INC. | BFN | P | 03/13/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5787445 | WINTERS ELECTRIC, INC. | E= | C | 10/18/2018 | -----------------------------25 amp a/c | JOHNN | JOHNN | | E= | C | 5998849 | WINTERS ELECTRIC, INC. | ES | C | 07/13/2018 | Residential Underground: 200 AMP 3-W NEW RES----OK TO SET METER | BRIAN | BRIAN | | ES | C | 5902660 | WINTERS ELECTRIC, INC. | ER | C | 07/13/2018 | FINISHED BASEMENT--NO CV--- | BRIAN | BRIAN | | ER | C | 5902656 | OLYMPIA HEATING & COOLING INC. | H= | C | 12/20/2018 | | RANDYB | RANDYB | | H= | C | 6059799 | OLYMPIA HEATING & COOLING INC. | H= | P | 10/12/2018 | need to address the following-- clearances to combustibles from b-vent, install and complete temp. and press. pipe to proper height, install and complete drain pan drain to floor drain. note: finished basement, louver door to mechanical room, outside air to return, direct vent furnace, a/c complete, mantel ok. | PAULO | PAULO | | H= | P | 5993554 | J & J MECHANICAL, INC | HI | C | 06/26/2018 | 10 lb test ok. Note: 1" main. Furnace, water heater, range and fireplace. | MARK | MARK | | HI | C | 5885502 | OLYMPIA HEATING & COOLING INC. | HC | C | 06/26/2018 | RELEASE METER | MARK | MARK | | HC | C | 5885500 | OLYMPIA HEATING & COOLING INC. | HRR | C | 06/26/2018 | By final you need to provide a coil change letter. Note: Finished basement , line set and coil rough, outside air to the return. | MARK | MARK | | HRR | C | 5885497 | J & J MECHANICAL, INC | HI | R | 06/18/2018 | Unable to size the system with no equipment on size gas system without appliances on site. Note: 1" main, furnace, water heater (Not on site) fireplace and range. | MARK | MARK | | HI | R | 5877486 | WOLVERINE CONSTRUCTION LLC | P= | C | 10/31/2018 | PVB installed | SHANEN | SHANEN | | P= | C | 6011662 | WOLVERINE CONSTRUCTION LLC | PTO | C | 06/20/2018 | Finished basement, irrigation, AAV master lavs | SHANEN | SHANEN | | PTO | C | 5879792 | WOLVERINE CONSTRUCTION LLC | PB | C | 03/23/2018 | | TAYLOR | TAYLOR | | PB | C | 5797970 |
|
|