CASCO ENTERPRISES, INC. | B= | C | 11/27/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6035728 |
CASCO ENTERPRISES, INC. | B= | P | 11/27/2018 | Previous items complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | RICHB | RICHB | | B= | P | 6035296 |
CASCO ENTERPRISES, INC. | B= | P | 11/21/2018 | Need code compliant house numbers (minimum 5" high with minimum 1/2" stroke) / need maximum 18" from grade to bottom rung of egress ladder in window well (currently 21") / no basement, AC installed / wraparound deck -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | RICHB | RICHB | | B= | P | 6032482 |
CASCO ENTERPRISES, INC. | BLA | C | 09/13/2018 | Lath OK / NOTE - finished grade not yet established, Contractor to ensure minimum 4" clearance from weep screed to unpaved surfaces | RICHB | RICHB | | BLA | C | 5964046 |
CASCO ENTERPRISES, INC. | BSP | R | 09/05/2018 | upper south deck missing BC4 cap middle post / upper deck missing post west side / upper deck missing ledger locks / need observation for piers / all other deck framing OK | LONNYS | LONNYS | | BSP | R | 5955017 |
CASCO ENTERPRISES, INC. | BFR | C | 09/05/2018 | | LONNYS | LONNYS | | BFR | C | 5955014 |
CASCO ENTERPRISES, INC. | BTR | C | 09/05/2018 | | LONNYS | LONNYS | | BTR | C | 5955012 |
CASCO ENTERPRISES, INC. | BFR | P | 09/05/2018 | engineer letter for stacked sill plates on file - still need to inspect exterior decks | LONNYS | LONNYS | | BFR | P | 5954876 |
CASCO ENTERPRISES, INC. | BIN | P | 08/30/2018 | insulation OK pending completion of BFR | LONNYS | LONNYS | | BIN | P | 5950897 |
CASCO ENTERPRISES, INC. | BFR | P | 08/30/2018 | still need to address stacked sill plates / still need to inspect all decks | LONNYS | LONNYS | | BFR | P | 5950895 |
CASCO ENTERPRISES, INC. | BIN | P | 08/30/2018 | revised plans for added and moved windows-doors / still need to inspect | LONNYS | LONNYS | | BIN | P | 5950446 |
CASCO ENTERPRISES, INC. | BIN | R | 08/29/2018 | still need to splice in added and moved doors and windows and have inspected before sheet rock / need to complete frame inspections for decks / insulation OK pending completion BFR | LONNYS | LONNYS | | BIN | R | 5949211 |
CASCO ENTERPRISES, INC. | BFR | P | 08/23/2018 | still need to address stacked sill plate 5 plys high / still need to splice in added and relocated windows and doors / still need to inspect all decks / OK to insulate as long as items are not covered | LONNYS | LONNYS | | BFR | P | 5943652 |
CASCO ENTERPRISES, INC. | BFD | C | 08/23/2018 | | LONNYS | LONNYS | | BFD | C | 5943651 |
CASCO ENTERPRISES, INC. | BFI | C | 08/23/2018 | 2" R10 rigid verified on site with site rep pictures | LONNYS | LONNYS | | BFI | C | 5943646 |
CASCO ENTERPRISES, INC. | BFD | P | 08/22/2018 | need to complete BFI / drain observation on file - damp proofing noted | LONNYS | LONNYS | | BFD | P | 5941718 |
CASCO ENTERPRISES, INC. | BFN | C | 08/22/2018 | all foundation paperwork on file | LONNYS | LONNYS | | BFN | C | 5941716 |
CASCO ENTERPRISES, INC. | BFR | P | 08/17/2018 | no site visit needed / need to specify in comments if request is for document upload only | LONNYS | LONNYS | | BFR | P | 5937554 |
CASCO ENTERPRISES, INC. | BSP | P | 08/17/2018 | engineer letter on file for interior headers - hangered floor joists - beam in lieu of BG01 truss - narrow wall hold downs | LONNYS | LONNYS | | BSP | P | 5937223 |
CASCO ENTERPRISES, INC. | BFR | R | 08/15/2018 | need to complete BFD and BFI / tie in top plates all 4 corners upper stair landing / splice in several added and changed windows and doors throughout / beam used in lieu of girder upper level above landing / all interior load bearing walls to be 3 ply headers / bottom plates staked 5 high foundation walls / isolate bottom of stairs / foam and fire block incomplete / missing garage doors to dry in / garage narrow braced wall missing hold downs and straps to be on interior / still need to inspect all decks and deck covers | LONNYS | LONNYS | | BFR | R | 5934721 |
CASCO ENTERPRISES, INC. | BFT | C | 05/22/2018 | soils report on file / foundation design on file (bearing capacity verified) | LONNYS | LONNYS | | BFT | C | 5851593 |
CASCO ENTERPRISES, INC. | BFN | P | 05/21/2018 | need to complete BFT / engineer observation for foundation on file | LONNYS | LONNYS | | BFN | P | 5850204 |
CASCO ENTERPRISES, INC. | BFT | P | 05/21/2018 | need soils report referenced in open hole / need foundation design / open hole on file - 3500PSF - usable / footing observation on file - ufer noted | LONNYS | LONNYS | | BFT | P | 5850198 |
CASCO ENTERPRISES, INC. | BFT | P | 03/14/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 5788452 |
CASCO ENTERPRISES, INC. | BFN | P | 03/14/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5788451 |
HOME ELECTRIC LLC | E= | C | 11/19/2018 | | GARYL | GARYL | | E= | C | 6029624 |
HOME ELECTRIC LLC | E= | P | 11/15/2018 | a/c's not accessible, a/c #1-30 amps., a/c--#2 -25 amps | GARYL | GARYL | | E= | P | 6027128 |
HOME ELECTRIC LLC | ES | C | 08/10/2018 | Residential Underground: 400 amp,3w, new res, ok to set meter------------------------Gas meter not set,CHECK on final if 3' from gas regulator. | JOHNN | JOHNN | | ES | C | 5930934 |
HOME ELECTRIC LLC | ER | C | 08/07/2018 | Corrections complete--------------Note: Space under stair to be blocked off------------ / | ROB | ROB | | ER | C | 5925993 |
HOME ELECTRIC LLC | ER | R | 08/03/2018 | No disc. on lower furnace--Upper furnace wiring not complete---Fireplaces not installed--walls under stairs on lower level need 6-12 recpt. spacing-------#10 CU to dryer / #6 CU to oven / #6 CU and #10 CU to AC,s / #6CU and #12 CU to upper bath / #6 CU and #12 CU to elevator / Finished Basement / No Cent Vac / no mcc's / | ROB | ROB | | ER | R | 5923440 |
AMERICAN PRIDE PLUMBING | H= | C | 11/19/2018 | attached pdf to images | DAVIDH | DAVIDH | | H= | C | 6028942 |
AMERICAN PRIDE PLUMBING | HSP | C | 11/14/2018 | met with contractor reviewed corrections on condensate and needing equip change letter by final will accept picture of repair and change letter | DAVIDH | DAVIDH | | HSP | C | 6025680 |
AMERICAN PRIDE PLUMBING | H= | R | 11/13/2018 | not ready waived re-inspection fee refer to 2015 IRC 1411.3.1 and follow 1 of 4 options given .Run secondary line on alc coil to drain pan rest ok | DAVIDH | DAVIDH | | H= | R | 6024408 |
AMERICAN PRIDE PLUMBING | H= | R | 11/08/2018 | contractor has not met any of the approved methods of obtaining combustion air. refer to 2015 IRC chapter 24 for approved methods when using all air from inside pg 521. also provide instructions on water alarm in upstairs furn. alarm or kill switch ? | DAVIDH | DAVIDH | | H= | R | 6020377 |
AMERICAN PRIDE PLUMBING | H= | P | 11/07/2018 | downstairs mech rm lacks combustion air also upstairs a/c needs kill switch installed note a/c x 2 , direct vent furnaces. | DAVIDH | DAVIDH | | H= | P | 6019226 |
AMERICAN PRIDE PLUMBING | HI | C | 08/14/2018 | 10 LB TEST OK NOTE 2" MAIN 2 FURN,2 F/P, 1 RANGE AND 1 W/H | DAVIDH | DAVIDH | | HI | C | 5933939 |
AMERICAN PRIDE PLUMBING | HV | C | 08/10/2018 | | DAVIDH | DAVIDH | | HV | C | 5930818 |
AMERICAN PRIDE PLUMBING | HC | C | 08/09/2018 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 5928633 |
AMERICAN PRIDE PLUMBING | HRR | C | 08/09/2018 | | DAVIDH | DAVIDH | | HRR | C | 5928631 |
AMERICAN PRIDE PLUMBING | HRR | P | 08/06/2018 | MAIN FLOOR STILL NEED TO SEAL R/A BAY RIGHT OF F/P ALSO UPPER LEVEL TO THE RIGHT BOOT STRAP BROKEN AND STILL NEED EQUIP CHANGE LETTER BY FINAL NOTE A/C ROUGH X 2 | DAVIDH | DAVIDH | | HRR | P | 5925387 |
AMERICAN PRIDE PLUMBING | HRR | P | 07/25/2018 | Missing fireplaces and venting (2), multiple locations electrical through returns, (check all at re inspection, Verify change letters for both furnaces and coils. 2- can lights in returns need to be relocated to another bay. need to run round pipe for 7" heat run above bedroom #1 wrap T in attic with min R-8 insulation. Note: Finished basement, 2- a/c coil and line set rough, dampered osa to basement return, no osa on upper level. (Varify at re inspection) | MARK | MARK | | HRR | P | 5914292 |
AMERICAN PRIDE PLUMBING | HV | P | 07/02/2018 | fireplace vent not installed furn and w/h vent ok , exhaust fans ok still need hrr inspection once fireplaces and duct complete | DAVIDH | DAVIDH | | HV | P | 5891625 |
AMERICAN PRIDE PLUMBING | P= | C | 11/20/2018 | Correction made | SHANEN | SHANEN | | P= | C | 6031640 |
AMERICAN PRIDE PLUMBING | P= | P | 11/16/2018 | Install steam unit and steam head per manufacturers installation instructions, rest OK, RP installed | SHANEN | SHANEN | | P= | P | 6028433 |
AMERICAN PRIDE PLUMBING | PTO | C | 07/02/2018 | Finished basement, AAV all except master lavs | SHANEN | SHANEN | | PTO | C | 5891563 |
AMERICAN PRIDE PLUMBING | PB | C | 06/07/2018 | Water service under footer | SHANEN | SHANEN | | PB | C | 5867779 |
AMERICAN PRIDE PLUMBING | PB | P | 06/04/2018 | dwv o.k, no h2o | JOEL | JOEL | | PB | P | 5863650 |
CASCO ENTERPRISES, INC. | XBS | T | 09/06/2018 | PAID (REC#1534365) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Add new windows and doors | MICHAELA | MICHAELA | | XBS | T | 5956711 |
CASCO ENTERPRISES, INC. | XBS | T | 07/17/2018 | PAID (REC#1517497) PLAN SPLICE FEE: $50 by: DANM for Construction: Extend deck to wrap around southwest corner of upper level | DANM | DANM | | XBS | T | 5904558 |