CMG CORP | B= | C | 06/04/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5863969 |
CMG CORP | B= | P | 06/01/2018 | No B= reinspection required, just need to complete other Finals. Additional Inspections Required (computer generated): LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5861347 |
CMG CORP | B= | P | 05/24/2018 | Complete pending other Finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5855183 |
CMG CORP | BFR | P | 04/04/2018 | Need Mechanical to review hood wall / framing OK pending other Roughs / restroom is existing / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5807568 |
EL PASO ELECTRIC, LLC. | E= | C | 05/30/2018 | corrections completed | CRAIGS | CRAIGS | | E= | C | 5859733 |
EL PASO ELECTRIC, LLC. | E= | R | 05/25/2018 | 1) revise prints as to what was done for electric service, 2) install bond correctly in main panel, NOTES! roof equipment inspected-roof work in done, NEED signs inspected | GARYL | GARYL | | E= | R | 5856869 |
EL PASO ELECTRIC, LLC. | ER | P | 05/11/2018 | ceilings ok / | MIGUEL | MIGUEL | | ER | P | 5842945 |
EL PASO ELECTRIC, LLC. | ER | P | 04/04/2018 | please have the original stamped drawing on site for the service inspection | CRAIGS | CRAIGS | | ER | P | 5808195 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 06/04/2018 | LOW PRESSURE GAS PIPING PER PLAN SPLICE. WATER HEATER VENTING COMPLETE. | MARKB | MARKB | | H= | C | 5863968 |
LANDMARK PLUMBING AND HEATING, INC. | HV | C | 06/04/2018 | APPROVED GLUE, PRIMER AND STRAPPING COMPLETE. | MARKB | MARKB | | HV | C | 5863966 |
LANDMARK PLUMBING AND HEATING, INC. | H= | L | 06/01/2018 | CALL AHEAD SENT AT 4:00, BUILDING LOCKED AT 4:34 | MARKB | MARKB | | H= | L | 5862672 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 06/01/2018 | Test And Balance Received | MARKB | MARKB | | H= | C | 5861469 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/25/2018 | Altered notes (LM) 5/29/18 EF-1 shows on plans as existing . SUPPLY AND RETURN GRD FINAL CONNECTIONS OK . PIZZA OVEN INTERLOCKS VERIFIED .THERMOSTAT IN PLACE . ROOF OK . STEEL END PLATES IN PLACE FOR GREASE DUCT CLEAN OUT .NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5856258 |
LANDMARK PLUMBING AND HEATING, INC. | HV | P | 05/25/2018 | CONTRACTOR WILL NEED TO SHOW GLUE USED IS ASTM-D25654 FOR WATER HEATER VENT / I DONT SEE THAT PRIMER WAS USED .WAS PRIMER USED ? SEE PAGE 15 AND 16 FOR CORRECT VENT AND INTAKE CONNECTION TO WATER HEATER .SUPPORT VENT AND INTAKE EVERY 4ft . | LIDO | LIDO | | HV | P | 5856248 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 05/25/2018 | Added to notes 5/29/18 (LM) need to verify gas pipe was increased in size per splice . SPLICE NOW SHOWS GAS AS LOW PRESSURE GAS . FINAL GAS CONNECTIONS OK / RESTRAINTS ARE IN PLACE. CONTRACTOR WILL NEED TO SHOW GLUE USED IS ASTM-D2564 FOR WATER HEATER VENT / I DON'T SEE THAT PRIMER WAS USED .WAS PRIMER USED ? SEE PAGE 15 AND 16 FOR CORRECT VENT AND INTAKE CONNECTION TO WATER HEATER .SUPPORT VENT AND INTAKE EVERY 4ft . ( NEED CONSULT WITH PREVIOUS INSPECTOR ) | LIDO | LIDO | | H= | P | 5856238 |
ALNOR INC. | H= | C | 05/18/2018 | Correction made | MARKB | MARKB | | H= | C | 5848748 |
ALNOR INC. | H= | P | 05/11/2018 | Extend condensate line to drain. Rest OK. | MARKB | MARKB | | H= | P | 5843050 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/03/2018 | STILL NEED - Steel end plates on clean outs for grease duct. GREASE DUCT WRAP AND BANDS INSTALLED PER MANUFACTURER INSTRUCTIONS FROM CURB TO HOOD. | MARKB | MARKB | | HD | P | 5835618 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/02/2018 | ABOVE CEILING DUCT - SUPPLY/RETURN MAINS/BRANCHES INSTALLED PER PLAN OK TO WRAP. NO FLEX OR DIFFUSERS.
| MARKB | MARKB | | HD | P | 5834324 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 05/01/2018 | GREASE DUCT LIGHT TEST - COMPLETE FROM CURB TO HOOD AND OK TO WRAP. | MARKB | MARKB | | HD | P | 5833021 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/27/2018 | GREASE DUCT LIGHT TEST ON GROUND - Angled duct has 1 hole in corner of butt joint - marked with arrow. 2 STRAIGHT PIECES WITH 90 DEGREE FITTING OK - SIGNED AND DATED. OK TO WRAP CURB DROP. STILL NEED - Butt joints before pieces. | MARKB | MARKB | | HD | P | 5830060 |
ALNOR INC. | HRP | C | 04/24/2018 | 300 PSI PRESSURE TEST FOR REFRIGERATION PIPING TO WALK IN COOLER OK. NO REFRIGERATION ALARMS REQUIRED PER CODE AND CALC'S ON PLANS. | MARKB | MARKB | | HRP | C | 5826035 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/05/2018 | PIZZA OVEN HOOD WALL OK, NO COMBUSTIBLES IN WALL. | NANCY | NANCY | | HD | P | 5809029 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 04/05/2018 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 5809024 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 04/05/2018 | NEED REFRIGERATION CONTRACTOR ATTACHED TO PERMIT. BY FINAL NEED LETTER FROM CSU APPROVING MEDIUM PRESSURE GAS FOR THIS ADDRESS. 10 LB TEST OK. INSTALLED AS PER PRINT. STILL NEED TO SEE MANIFOLD AT PIZZA OVEN, REGULATORS, LABELS, ROOF AND CONNECTION TO ALL EQUIPMENT. | NANCY | NANCY | | HI | P | 5809022 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/01/2018 | Corrections made. | DANR | DANR | | P= | C | 5862075 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 05/25/2018 | Need backflow protection chemical feed 3 comp sink, 3 comp sink floor sink needs grate, need domestic water piping insulation per drawing P1 note 5 or engineer change letter, rest ok. | DANR | DANR | | P= | P | 5856442 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/03/2018 | need to add 5 under sink water htrs, 1 water softner, and 1 fill and drain kit to scope of work, need fill and drain kit for MAU installed, rest ok, per plan. note: vtr (2) existing, check water htrs, final water connections @ water mtr, and water softner @ final, by final NEED SHUT OFF AT WALL HYDRANT AND NEED TO INSULATE ALL PLBG PIPES @ PLENUM CEILING | JOHNS | JOHNS | | PTO | P | 5806357 |
LANDMARK PLUMBING AND HEATING, INC. | P= | L | 03/23/2018 | not ready for p= yet, still in rough stage | JOHNS | JOHNS | | P= | L | 5797749 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 03/23/2018 | gc to attach elec permit, correct scope of work to show all plbg related items **FILL AND DRAIN KIT IN THIS UNIT** | JOHNS | JOHNS | | PB | C | 5797729 |
EL PASO ELECTRIC, LLC. | XES | T | 05/29/2018 | PAID (REC#1503421): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line | SHELBY | SHELBY | | XES | T | 5858012 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 04/30/2018 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: REVISED GAS TO LOW PRESSURE | JUSTINC | JUSTINC | | XMS | P | 5830730 |