HAMMERS CONSTRUCTION, INC | B= | C | 12/13/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6051430 |
HAMMERS CONSTRUCTION, INC | B= | P | 11/28/2018 | all items corrected / final OK pending other finals. Additional Inspections Required (computer generated): PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6036892 |
HAMMERS CONSTRUCTION, INC | B= | P | 11/13/2018 | Temp CO: Temp CO F= Z= H= B= ( Expires: 12/13/2018 12:00:00 AM) | JANE | JANE | | B= | P | 6024531 |
HAMMERS CONSTRUCTION, INC | B= | P | 10/12/2018 | Temp CO: B=,H=, F=,Z= are partialed ( Expires: 11/11/2018 12:00:00 AM) | GITA | GITA | | B= | P | 5993303 |
HAMMERS CONSTRUCTION, INC | B= | P | 10/11/2018 | still need to add an exit sign at the east wall as you come out of the sanctuary with knock out pointing toward main exits / still need to wall off the south side exterior door to the now abandoned portion of the link at the west side of the building per plan / still need exit signs at both doors at classroom 130 (room at southeast corner of main lobby) / still need knock out at east side of exit sign at junction of reception desk area at office lobby hall that runs south past bathrooms to join hall to east rear exit / ramp at rear of stage still has 35" of rise where a max rise of 30" is allowed / all other items from previous inspection have been corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), PEAK HEATING & AIR COND, INC. Mechani | DANE | DANE | | B= | P | 5992182 |
HAMMERS CONSTRUCTION, INC | BFR | P | 10/11/2018 | welding and bolting observation received | DANE | DANE | | BFR | P | 5992177 |
HAMMERS CONSTRUCTION, INC | B= | R | 10/04/2018 | continuation of previous B= entry / need knock out direction indicator at exit sign at corridor to east rear exit where corridor from main lobby joins it / need to install all occupancy load signs / ramp at rear of stage has a rise of 35" and a run of 36' where a maximum rise of 30" is allowed on any ramp / discussed procedure for obtaining TCO with site Superintendent / still need all engineer observations for welding and bolting and structural changes / training with Dakota B. | DANE | DANE | | B= | R | 5986212 |
HAMMERS CONSTRUCTION, INC | B= | R | 10/04/2018 | need knee protection at loading dock restroom / exit door from rear of stage at south end of loading dock must swing in the direction of egress and needs panic hardware on it and the door to the exterior past it / need rails at the stairs at the front of the stage / need an exit sign on the east wall of the lobby as you come out of the sanctuary with and arrow pointing to the main exits / west existing womens restroom outside of the sanctuary needs a vertical grab bar at the accessible stall / west mens existing rest room needs a shelf at no higher than 48" above the floor / west new women's restroom east accessible toilet rear grab bar is in wrong position / still need to wall of exterior door at "link" to other building that is no longer accessible per plan / need exit signs at both doors at classroom 130 / need to splice in the walling off of the showers in the main east bathrooms at he lower level and have inspections / see next entry for rest of list. Additional Inspections Req | DANE | DANE | | B= | R | 5986192 |
HAMMERS CONSTRUCTION, INC | BSP | P | 10/04/2018 | Training with Dane on A-3/B occupancies -- Discussed change of occupancies permits and requirements -- Discussed final inspection of A-3 and B occupancies including door hardware, path of egress, and accessibility | DAKOTAB | DAKOTAB | | BSP | P | 5986146 |
HAMMERS CONSTRUCTION, INC | B= | R | 09/24/2018 | walked whole building with contractors and discussed all items needed for change of occupancy for final inspection / discussed needs for vertical grab bars in restrooms and coat hooks in restrooms at 48" / discussed need for all bathrooms to comply / discussed need to add several exit signs and add under stair head protection rails at all stairs / discussed need for rails at stairs to stage and discussed all hardware needed throughout and need for stamped letter for structural changes to building (welding and bolting) / discussed need for existing transfer showers to comply with 03 ANSI codes. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), MARTINSON MECHANICAL, LLC Plumbing Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 5974453 |
HAMMERS CONSTRUCTION, INC | BFR | P | 08/14/2018 | 2 New light gauge framing at closets in classroom 104 and 1 closet in 107 OK -- Light gauge framing at 2 kiosk and welcome booth OK, Reviewed accessible elements -- New light gauge frame at sound booth in auditorium OK -- Still need to complete splice for wall heights in nursery -- Training with Chuck | DAKOTAB | DAKOTAB | | BFR | P | 5933283 |
HAMMERS CONSTRUCTION, INC | BSP | P | 07/18/2018 | courtesy visit to discuss accessible elements of restrooms / restrooms at the nursery are both new restrooms and will need to meet the elements of an accessible restroom / still need to inspect the kiosks and closets that have yet to be framed and still need to splice in the wall height changes at the nursery doors and the height of the closets if they are not built per the plan | DANE | DANE | | BSP | P | 5906661 |
HAMMERS CONSTRUCTION, INC | BFR | P | 06/07/2018 | framing for platform and wall and ramp behind platform OK pending other roughs / still need to build and inspect all closets. kiosks and door walls at nursery / discussed accessible elements with superintendent | DANE | DANE | | BFR | P | 5867432 |
HAMMERS CONSTRUCTION, INC | BFR | P | 05/31/2018 | all framing that has been done is OK pending other roughs / still need to install all closets and kiosks and all framing inside of sanctuary and tall walls with doors at nursery or splice into plans taking out the doors at the nursery / discussed accessible elements with superintendent / need 3rd party stamped engineer letter for all of the heavy steel installation to remove the structural columns in the sanctuary | DANE | DANE | | BFR | P | 5860541 |
HAMMERS CONSTRUCTION, INC | BFR | R | 05/24/2018 | west wall at welcome room 101 is to be framed to bar joists per plan / all east/west running walls at classrooms 104 107 and 109 are to be framed to roof deck / west wall of classroom 107 is to be framed to bar joist / walls at production room are to be framed to roof deck / missing 8' tall walls and door frames at check in room 126 to nurseries 125 127 and 128 / north wall between Santuary and welcome room OK pending other roughs / new restroom walls OK pending other roughs / still need to frame all closets in classrooms and kiosks in welcome room / all other framing at nursery and east classrooms OK pending other roughs / need to splice in the structural changes for removing columns and will need stamped engineer letter of observation for welding and bolting / need to splice in all new wall heights or change walls to match plans/ need to splice in the opening to breeze way to other building at room 104/check all restroom bar backing at next inspection / discussed accessible elements | DANE | DANE | | BFR | R | 5854992 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 09/14/2018 | | BRET | BRET | | E= | C | 5965337 |
ELECTRIC SERVICE OF COLORADO, LLC | EP | C | 09/14/2018 | | BRET | BRET | | EP | C | 5965331 |
ELECTRIC SERVICE OF COLORADO, LLC | EP | P | 09/11/2018 | install main breaker in panel "s" 4 barrel lug for transformer | BRET | BRET | | EP | P | 5961011 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 09/11/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5961000 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | C | 09/11/2018 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 5960999 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | R | 09/11/2018 | not ready | BRET | BRET | | E= | R | 5960993 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/29/2018 | FIRE ALARM INSPECTION: FA ceiling except sanctuary | RANDY | RANDY | | ER | P | 5949735 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/29/2018 | all ceilings except sanctuary | RANDY | RANDY | | ER | P | 5949711 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 08/16/2018 | last of walls---stage and soundbooth | RANDY | RANDY | | ER | P | 5936306 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 06/21/2018 | wall marked on approved plan f/a to be cut in later; need inspection before devices are installed | MATTHEW | MATTHEW | | ER | P | 5882276 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 06/01/2018 | Wall rough in ok for walls high lited on approved prints / GC said there would be no FA in walls, all installed in ceilings / | ROB | ROB | | ER | P | 5862022 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 05/18/2018 | Rough in ok for high lighted walls on E1.1 of approved prints / Discussed accessibility requirements with contractor / | ROB | ROB | | ER | P | 5849959 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 12/13/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6051429 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 09/11/2018 | MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5961501 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/31/2018 | MECHANICAL FINAL PENDING: MISSING RETURN AIR/TRANSFER AIR GRILLE IN MEN'S RESTROOM. MISSING RETURN AIR/TRANSFER AIR GRILLE IN WOMEN'S RESTROOM. MISSING RETURN AIR GRILLE IN CLASSROOM 104. MISSING FOUR RETURN AIR GRILLES IN CLASSROOM 109. PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5953203 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 07/30/2018 | ALL ABOVE CEILING SUPPLY/RETURN/EXHAUST DUCTS OK. OK TO WRAP. STILL NEED TO SEE FLEX AND DIFFUSERS AND THERMOSTATS. PROVIDE TEST AND BALANCE REPORT FOR FINAL. | DUSTINS | DUSTINS | | HD | C | 5918031 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/13/2018 | VAV- 3,4,6,7,18 MEDIUM/LOW PRESSURE SUPPLY AIR OK, OK TO WRAP, NO FLEX AND DIFFUSERS. VAV- 17 MEDIUM/LOW PRESSURE SUPPLY AIR OK, OK TO WRAP, FLEX AND DIFFUSERS OK. EXHAUST AIR FROM NURSERY BATHROOMS 122 AND 125 OK. FPVAV-NN TO PRODUCTION 117 MEDIUM PRESSURE OK, OK TO WRAP, COMPLETE LOW PRESSURE. FPVAV-NN FOR CLASSROOM 107, 104 (X3) AND WELCOME 101 MEDIUM/LOW PRESSURE SUPPLY AIR OK, OK TO WRAP, NO FLEX AND DIFFUSERS. FPVAV-NN AT PLATFORM 115 (X2) MEDIUM/LOW PRESSURE SUPPLY AIR OK, OK TO WRAP. | DUSTINS | DUSTINS | | HD | P | 5902408 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/27/2018 | VAV'S 8, 10, 11, 12, 13, 15 AND 16 ALL OK, FLEX AND DIFFUSERS OK. STILL NEED THERMOSTATS. | DUSTINS | DUSTINS | | HD | P | 5887568 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 04/20/2018 | SUPPLIES ABOVE ALL NURSERIES AND NURSING OK, OK TO WRAP. NO NEW VAV'S YET. DUCTS ON SHEET M-7 OK, OK TO WRAP. PLEASE START CALLING MORE FREQUENT INSPECTIONS FOR THIS JOB. | NANCY | NANCY | | HD | P | 5823162 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | L | 04/19/2018 | LOCKED AT 4:55 PM. COULD NOT GET LOCK BOX TO OPEN FOR ACCESS TO KEY. | NANCY | NANCY | | HD | L | 5822195 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/22/2018 | CONTRACTOR INSTALLING ELECTRICAL MUST ATTACH TO PERMIT. INSTALL DAMPERS IN RATED WALLS AS PER PLAN OR NEED REVISED/APPROVED PRINT. ALSO NEED REVISED PRINT IF RELOCATING 40 X 30 RETURN AIR DUCT. ERTU-1: SUPPLY TRUNK LINES AND LATERALS OK. OK TO WRAP. VAV'S 8, 13 AND 17 TRUNK LINES AND LATERALS OK, OK TO WRAP. 40 X 30 SUPPLY TRUNK THAT STARTS IN CLASS ROOM CEILING OK TO END OF DUCT, OK TO WRAP. PLEASE CALL MORE FREQUENT INSPECTIONS. | NANCY | NANCY | | HD | P | 5796878 |
MARTINSON MECHANICAL, INC | P= | C | 09/25/2018 | engineers letter ok, see images. | TAYLOR | TAYLOR | | P= | C | 5975031 |
MARTINSON MECHANICAL, INC | P= | P | 09/21/2018 | still need engineers letter, rest ok. | TAYLOR | TAYLOR | | P= | P | 5972423 |
MARTINSON MECHANICAL, INC | P= | P | 09/18/2018 | can not have aav's in return air plenum at restroom 123 and 124, lip of urinal exceeds 17 inches from floor, toilet handle needs to be on the open side at restroom 124, need to insulate all combustible material in return air plenum, still need to revise plans as previously noted, rest ok. | TAYLOR | TAYLOR | | P= | P | 5968001 |
MARTINSON MECHANICAL, INC | PTO | C | 09/18/2018 | revise plans or need engineers letter for aav's at restrooms 123 and 124 by final. | TAYLOR | TAYLOR | | PTO | C | 5967995 |
MARTINSON MECHANICAL, INC | PTO | P | 05/03/2018 | In-wall DWV and water distribution test OK, | SHANEN | SHANEN | | PTO | P | 5834590 |
MARTINSON MECHANICAL, INC | PB | C | 04/02/2018 | DWV test OK | SHANEN | SHANEN | | PB | C | 5805591 |
HAMMERS CONSTRUCTION, INC | XBS | T | 11/13/2018 | PAID (REC#1556000) PLAN SPLICE FEE: $50 by: DANM for Construction: Add landing to ramp | DANM | DANM | | XBS | T | 6024380 |
HAMMERS CONSTRUCTION, INC | XBS | T | 10/11/2018 | PAID (REC#1556000) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Covered door with steel plate in lieu of framing. | SHELLEY | SHELLEY | | XBS | T | 5991937 |
HAMMERS CONSTRUCTION, INC | XBS | T | 10/10/2018 | PAID (REC#1546218) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Clarified singing risers, and blocked off showers. | SHELLEY | SHELLEY | | XBS | T | 5991099 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | T | 09/07/2018 | PAID (REC#1534985) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 2 | DALEH | DALEH | | XMS | T | 5958104 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | P | 05/30/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 5859633 |
HAMMERS CONSTRUCTION, INC | XBS | T | 05/30/2018 | PAID (REC#1503743) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised wall heights, types and ceiling | SHELLEY | SHELLEY | | XBS | T | 5859573 |
ELECTRIC SERVICE OF COLORADO, LLC | XES | T | 05/04/2018 | PAID (REC#1498273) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised Panel LC to 100A. | BERTHA | BERTHA | | XES | T | 5836066 |