HAMMERS CONSTRUCTION, INC | B= | C | 10/30/2018 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6011129 |
HAMMERS CONSTRUCTION, INC | B= | P | 10/04/2018 | 3rd party paperwork on file. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), External Agency Inspection UBS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org), External Agency Inspection UWS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org). | SCOTTS | SCOTTS | | B= | P | 5985256 |
HAMMERS CONSTRUCTION, INC | BFN | C | 10/04/2018 | | SCOTTS | SCOTTS | | BFN | C | 5985255 |
HAMMERS CONSTRUCTION, INC | BFT | C | 10/04/2018 | 3rd party summary letter on file for footing/foundation/open ex | SCOTTS | SCOTTS | | BFT | C | 5985254 |
HAMMERS CONSTRUCTION, INC | B= | P | 10/03/2018 | still need to complete 3rd party paperwork/other corrections complete/complete outside entity inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), External Agency Inspection UBS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org), External Agency Inspection UWS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org). | SCOTTS | SCOTTS | | B= | P | 5984002 |
HAMMERS CONSTRUCTION, INC | B= | P | 10/01/2018 | complete 3rd party paperwork -- mirror in women's bathroom over 40" to bottom reflective surface/door hardware in women's bathroom does not meet accessibility requirements for locking mechanism -- complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), External Agency Inspection UBS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org), External Agency Inspection UWS by CHEROKEE is not Completed yet (Contact: jsmith@cherokeemetro.org), PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 5981194 |
HAMMERS CONSTRUCTION, INC | BIN | R | 07/10/2018 | Thermal OK in all areas - pre-insulated box headers and jambs observed / need all third party paperwork to complete BFT, BFN, BFR and BIN (Open Hole, footing, foundation and ufer observations) | RICHB | RICHB | | BIN | R | 5897601 |
HAMMERS CONSTRUCTION, INC | BLA | C | 07/09/2018 | BLA added per Contractor field request / lath OK | RICHB | RICHB | | BLA | C | 5897082 |
HAMMERS CONSTRUCTION, INC | BFR | P | 07/09/2018 | Framing OK pending other Roughs / discussed accessible elements / still need BFT & BFN paperwork (engineer observations for footing, foundation, ufer, etc) | RICHB | RICHB | | BFR | P | 5897062 |
HAMMERS CONSTRUCTION, INC | BFR | P | 05/29/2018 | Still need engineer observations for BFT & BFN / metal building framing OK - need to inspect all light gauge metal framing when other Roughs and dry-in are complete / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5857279 |
HAMMERS CONSTRUCTION, INC | BFR | P | 05/25/2018 | only inspected Exterior Wall (not a fire wall)W1 north wall rated for lot line 2' proximity, generic WP-1072 exterior facing layer type X 5/8" ok | BERTW | BERTW | | BFR | P | 5855893 |
HAMMERS CONSTRUCTION, INC | BFI | P | 03/28/2018 | Need to complete BFT and BFN - discussed this with Contractor / 2" R-10 on inside of foundation wall OK / plans reviewed electronically | RICHB | RICHB | | BFI | P | 5801498 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 09/21/2018 | garage door on switch disconnect ok sign disconnect above main door to the right ok | CRAIG | CRAIG | | E= | C | 5972477 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 09/20/2018 | gfi plugs for both garage doors --------- install disconnect for signs and label too ------------- inside ac disconnect can' t have multipliable grd wire under one lug --------- ac ok 50 amp | CRAIG | CRAIG | | E= | P | 5971149 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 09/12/2018 | | CRAIG | CRAIG | | ER | P | 5963136 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | R | 09/11/2018 | get low volt wire and mc cable off of grid | CRAIG | CRAIG | | ER | R | 5961287 |
ELECTRIC SERVICE OF COLORADO, LLC | ES | C | 09/10/2018 | Commercial Service: okay to set meter | CHIPO | CHIPO | | ES | C | 5959542 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 07/05/2018 | WALLS OK-------- CHECK PIC OF UFFER GROUND AT ES | GREGM | GREGM | | ER | P | 5893954 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 10/03/2018 | Test And Balance Received - see images | MARKB | MARKB | | H= | C | 5983913 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 10/01/2018 | FINAL PENDING - Test And Balance Report | MARKB | MARKB | | H= | P | 5981124 |
MARTINSON MECHANICAL, INC | H= | C | 09/28/2018 | ALL AS CONNECTIONS ARE COMPLETE. | MARKB | MARKB | | H= | C | 5980171 |
MARTINSON MECHANICAL, INC | H= | L | 09/27/2018 | Call ahead at 2:00, no access provided at 2:41 | MARKB | MARKB | | H= | L | 5979058 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 09/19/2018 | Need ceiling tiles around furnace removed to inspect secondary protection and support. Provide Test And Balance Report | MARKB | MARKB | | H= | P | 5970582 |
PEAK HEATING & AIR CONDITIONING, INC. | HRP | C | 09/19/2018 | 350 PSI PRESSURE TEST OK. | MARKB | MARKB | | HRP | C | 5970574 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 09/04/2018 | AT FINAL - Need a good pressure test on lineset. Secondary protection for A/C coil. Support condensate line at furnace. Provide Test And Balance Report. ABOVE CEILING DUCT - OUTSIDE AIR TO RETURN AND EXHAUST FANS COMPLETE. ALL FLEX, DIFFUSERS AND THERMOSTAT INSTALLED. | MARKB | MARKB | | HD | C | 5954063 |
PEAK HEATING & AIR CONDITIONING, INC. | HV | C | 09/04/2018 | Corrections made | MARKB | MARKB | | HV | C | 5954046 |
PEAK HEATING & AIR CONDITIONING, INC. | HV | P | 07/10/2018 | West unit heater not connected to vent, furnace vent lacks support and can not reduce vent on horizontal section of vent. | MARKB | MARKB | | HV | P | 5897922 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/10/2018 | Still Need: Outside air tied in with motorized damper and volume damper. Exhaust fans not installed. Condensate lacks strapping in wall. Need "HRP" inspection (lineset concealed in wall without inspection). ABOVE CEILING DUCT - SUPPLY/RETURN MAINS/BRANCHES INSTALLED PER PLAN. NO FLEX OR DIFFUSERS. | MARKB | MARKB | | HD | P | 5897914 |
MARTINSON MECHANICAL, INC | HC | C | 07/03/2018 | RELEASE METER | MARKB | MARKB | | HC | C | 5892554 |
MARTINSON MECHANICAL, INC | HI | C | 07/03/2018 | 10 PSI PRESSURE TEST OK, PIPING PER PLAN. NOTE: LOW PRESSURE PER DESIGN. | MARKB | MARKB | | HI | C | 5892546 |
MARTINSON MECHANICAL, INC | P= | C | 09/26/2018 | R.P. irrigation backflow | TED | TED | | P= | C | 5976736 |
MARTINSON MECHANICAL, INC | PTO | C | 07/02/2018 | Test ok. Note: check water heater and irrigation tie in at final. | DANR | DANR | | PTO | C | 5891083 |
MARTINSON MECHANICAL, INC | PB | C | 04/06/2018 | test and design ok, water for maim and irrigation run under footer | TED | TED | | PB | C | 5809712 |