NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | B= | C | 05/18/2018 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 5848957 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | B= | P | 05/15/2018 | corrections okay / approved plan splice dated 15MAY18 onsite. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BRIANB | BRIANB | | B= | P | 5845908 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | B= | P | 05/11/2018 | missing panic hardware at both rear exit doors / missing occupant load sign / missing sign " this door to remain unlock when building is occupied" at entry door / need to revise design to reflect DBL main entry doors installed in lieu of single per approved design / need to complete other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, GRANT DRUMMOND II Plumbing Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 5842925 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | BFR | P | 05/10/2018 | corrections okay - see approved plan splice dated 9MAY18 / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 5841811 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | BFR | P | 04/05/2018 | need stamped letter with framing details for steel framing done at soffit shelf and walls above sales area and prep area not on the approved design and inspected / need to inspect 1hr rated demising walls per U419 on approved design or have approved plan splice removing rated assembly / other corrections okay / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 5808621 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | BFR | P | 04/04/2018 | need stamped letter with framing details for steel framing done at soffit shelf and walls above sales area and prep area not on the approved design and inspected / non fire-retardant-treated wood installed at the rear wall in the mens restroom / need to inspect 1hr rated demising walls per U419 on approved design or have approved plan splice removing rated assembly / need to have mechanical inspect hood wall and complete other rough inspections / reviewed accessible elements with project superintendent Andrew | BRIANB | BRIANB | | BFR | P | 5807424 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | BFR | P | 03/27/2018 | 2 pony walls at west demising wall at coke machine counter top OK pending other roughs / half wall around prep room OK pending other roughs / demising wall at west side of unit from north coke machine pony wall to north exterior wall OK pending other roughs / plans call both the east and west demising walls to be 1 hour rated assemblies per the UL 419 - if these walls are not to be rated the plans will need to be changed and spliced in to take away the rated demising wall | DANE | DANE | | BFR | P | 5800709 |
EL PASO ELECTRIC, LLC. | E= | C | 05/11/2018 | rtu's 1, 2, exhaust fan, MUA ok / | MIGUEL | MIGUEL | | E= | C | 5842558 |
EL PASO ELECTRIC, LLC. | ES | C | 04/26/2018 | Commercial Service: 200 amp 4/w ---------OK to set meter | CRAIGS | CRAIGS | | ES | C | 5828007 |
EL PASO ELECTRIC, LLC. | ES | P | 04/12/2018 | Commercial Service: went over service requirements | CRAIGS | CRAIGS | | ES | P | 5815151 |
EL PASO ELECTRIC, LLC. | ER | C | 04/04/2018 | walls and soffit Discussed accessiblity requirements with contractor / | CRAIGS | CRAIGS | | ER | C | 5807525 |
EL PASO ELECTRIC, LLC. | ESL | C | 03/26/2018 | | CRAIGS | CRAIGS | | ESL | C | 5798726 |
AIRTECH MECHANICAL, INC. | H= | C | 05/11/2018 | TEST AND BALANCE RECEIVED. OTHER ITEMS ADDRESSED | MARKB | MARKB | | H= | C | 5842896 |
DRUMMOND PLUMBING LLC | H= | C | 05/11/2018 | CORRECTIONS MADE | MARKB | MARKB | | H= | C | 5842863 |
AIRTECH MECHANICAL, INC. | H= | P | 05/09/2018 | High-temp gasket installed. | MARKB | MARKB | | H= | P | 5839528 |
AIRTECH MECHANICAL, INC. | H= | R | 05/08/2018 | FOR PARTIAL FINAL - Need High-temp gasket installed on Type 1 fan FOR FINAL - Provide plan splice for moved RTU #1, Install missing supply grill for RTU #3 and provide Test And Balance Report | MARKB | MARKB | | H= | R | 5839301 |
AIRTECH MECHANICAL, INC. | HD | C | 05/08/2018 | | MARKB | MARKB | | HD | C | 5839299 |
DRUMMOND PLUMBING LLC | H= | P | 05/07/2018 | Sleeve gas line through concrete wall and seal penetration. Tag gas stub at meter with suite number. Rest OK. | MARKB | MARKB | | H= | P | 5837882 |
DRUMMOND PLUMBING LLC | HV | C | 05/07/2018 | Water heater vent installed per manufacturer instructions. | MARKB | MARKB | | HV | C | 5837881 |
AIRTECH MECHANICAL, INC. | HD | P | 05/07/2018 | NEED TO COMPLETE DUCT INSPECTION - All 3 RTU'S need return ducts to ceiling diffusers and diffusers in place. Finish installing diffusers in back of house and rest rooms. GREASE DUCT WRAP FOR 2 LAYERS AND BANDS COMPLETE. FOR FINAL - Complete duct inspection, need missing supply for RTU 3 installed, Install high-temp gasket on grease fan curb, install grease cups on hood, still need to confirm hood interlocks and provide test and balance report. | MARKB | MARKB | | HD | P | 5837879 |
DRUMMOND PLUMBING LLC | HI | C | 04/18/2018 | 10 PSI PRESSURE TEST ON COOK LINE OK - PIPING PER PLAN. Still need ANSUL valve and water heater vent. | MARKB | MARKB | | HI | C | 5820693 |
AIRTECH MECHANICAL, INC. | HD | P | 04/11/2018 | ABOVE CEILING DUCT - WILL NEED A PLAN SPLICE FOR MOVED RTU-1. SUPPLY MAIN/BRANCHES FOR RTU1 OK TO WRAP. No flex or diffusers. GREASE DUCT LIGHT TEST - LIGHT TEST FROM HOOD TO CURB DROP COMPLETE - OK TO FINISH WRAP ON ALL GREASE DUCT. | MARKB | MARKB | | HD | P | 5814254 |
AIRTECH MECHANICAL, INC. | HD | P | 04/10/2018 | GREASE DUCT LIGHT TEST - CURB DROP DOWN TO FIRST BUTT JOINT OK TO WRAP AND DROP. | MARKB | MARKB | | HD | P | 5813253 |
AIRTECH MECHANICAL, INC. | HD | P | 04/04/2018 | HOOD WALL OK, NO COMBUSTIBLES IN WALL. | NANCY | NANCY | | HD | P | 5807997 |
DRUMMOND PLUMBING LLC | HC | C | 04/04/2018 | OK TO SET METER. | NANCY | NANCY | | HC | C | 5807976 |
DRUMMOND PLUMBING LLC | HI | P | 04/04/2018 | STILL NEED TO SEE GAS FOR COOK LINE INSTALLED AND UNDER TEST. 10 LB TEST OK FOR GAS ON ROOF AND DROP TO WATER HEATER. INSTALLED AS PER PRINT EXCEPT 1 1/2 INCH ON ROOF INCREASED TO 2 INCH. | NANCY | NANCY | | HI | P | 5807975 |
DRUMMOND PLUMBING LLC | P= | C | 05/14/2018 | correction made | TED | TED | | P= | C | 5843538 |
DRUMMOND PLUMBING LLC | P= | P | 05/07/2018 | still need plan revised, install aav on rear hand sink, install or have front BUNN water heater on site, rest ok | TED | TED | | P= | P | 5837139 |
DRUMMOND PLUMBING LLC | PTO | C | 04/03/2018 | test and design ok | TED | TED | | PTO | C | 5806056 |
DRUMMOND PLUMBING LLC | PB | C | 03/22/2018 | grease and sanitary test and design ok, revise plan by final on changes, water line under floor to front area | TED | TED | | PB | C | 5796030 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | XBS | T | 05/15/2018 | PAID (REC#1500304) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised door and hardware | SHELLEY | SHELLEY | | XBS | T | 5844767 |
DRUMMOND PLUMBING LLC | XMS | P | 05/11/2018 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: splice to relocate rtu | DALEH | DALEH | | XMS | P | 5842155 |
NORTHSTAR CONSTRUCTION MANAGEMENT COMPANY, INC. | XBS | T | 05/09/2018 | PAID (REC#1499193) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Removed note regarding existing rated demising walls. | SHELLEY | SHELLEY | | XBS | T | 5839547 |