THOMPSON THRIFT CONSTRUCTION, INC | B= | C | 09/19/2019 | Items corrected | DAKOTAB | DAKOTAB | | B= | C | 6340508 |
THOMPSON THRIFT CONSTRUCTION, INC | B= | R | 09/18/2019 | Engineer letter is for plumbing inspection, needs to be submitted as plumbing inspection. Additional Inspections Required (computer generated): G & M MECHANICAL. LLC Plumbing Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6338861 |
THOMPSON THRIFT CONSTRUCTION, INC | B= | P | 09/06/2019 | Building final OK pending other finals. Additional Inspections Required (computer generated): G & M MECHANICAL. LLC Plumbing Final Inspection is not Completed yet, PATRIOT AIR CO Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6326814 |
THOMPSON THRIFT CONSTRUCTION, INC | B= | P | 09/05/2019 | Items corrected. Additional Inspections Required (computer generated): G & M MECHANICAL. LLC Plumbing Final Inspection is not Completed yet, PATRIOT AIR CO Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6325391 |
THOMPSON THRIFT CONSTRUCTION, INC | B= | P | 08/29/2019 | restroom rear grab bar is in wrong position again - has been moved too far toward the corner now - rear grab bar is to be minimum 12" toward the corner from the center line of the toilet and minimum 24" toward the open side (sink side) from the center line of the toiled / missing smooth hard nonabsorbent wall covering around the toilet -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): G & M MECHANICAL. LLC Plumbing Final Inspection is not Completed yet, PATRIOT AIR CO Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6319427 |
THOMPSON THRIFT CONSTRUCTION, INC | B= | P | 08/28/2019 | Grab bars at maintenance restroom not in corrected position -- Still need to complete other finals -- Other items from previous inspection corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): G & M MECHANICAL. LLC Plumbing Final Inspection is not Completed yet, PATRIOT AIR CO Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6317342 |
THOMPSON THRIFT CONSTRUCTION, INC | B= | P | 08/21/2019 | Need to complete exterior covering at north elevation and west elevations -- Need to install grab bar backing at maintenance restroom -- Need accessible dead bolts on doors to accessible garage unit and dog wash -- Need to complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), G & M MECHANICAL. LLC Plumbing Final Inspection is not Completed yet, PATRIOT AIR CO Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6309435 |
THOMPSON THRIFT CONSTRUCTION, INC | BFT | C | 07/23/2019 | Engineer letter for footing/foundation on file -- Open hole on file | DAKOTAB | DAKOTAB | | BFT | C | 6272950 |
THOMPSON THRIFT CONSTRUCTION, INC | BSP | P | 07/17/2019 | Drywall nailing per UL 305 OK | DAKOTAB | DAKOTAB | | BSP | P | 6266883 |
THOMPSON THRIFT CONSTRUCTION, INC | BSP | R | 07/16/2019 | Field cancelled by contractor | DAKOTAB | DAKOTAB | | BSP | R | 6264947 |
THOMPSON THRIFT CONSTRUCTION, INC | BIN | P | 07/12/2019 | R/C at lid of maintenance room OK | DAKOTAB | DAKOTAB | | BIN | P | 6261560 |
THOMPSON THRIFT CONSTRUCTION, INC | BIN | R | 07/05/2019 | site canceled per superintendent - not ready / discussed need for roof rating 4' from ASW1000 on both sides | DANE | DANE | | BIN | R | 6254345 |
THOMPSON THRIFT CONSTRUCTION, INC | BFR | P | 06/28/2019 | Garage frame OK -- Still need to inspect insulation and gypsum installation at ASW 1000 rated assembly -- Reviewed Accessible Elements | DAKOTAB | DAKOTAB | | BFR | P | 6248457 |
THOMPSON THRIFT CONSTRUCTION, INC | BSP | P | 05/21/2019 | Engineer letter for plywood shear walls in lieu of gypsum shear on file | DAKOTAB | DAKOTAB | | BSP | P | 6205546 |
THOMPSON THRIFT CONSTRUCTION, INC | BFT | P | 02/15/2019 | Engineer letter for footing/foundation observation and eufer observation on file | DAKOTAB | DAKOTAB | | BFT | P | 6108123 |
THOMPSON THRIFT CONSTRUCTION, INC | BFR | R | 11/02/2018 | No frame inspections without trusses being spliced in to plans | DAKOTAB | DAKOTAB | | BFR | R | 6013901 |
THOMPSON THRIFT CONSTRUCTION, INC | BSP | P | 05/07/2018 | Plans call for (2) sill plate bolts per plate, several garage returns have only (1) MASA clip installed -- Exterior shear nailing OK | DAKOTAB | DAKOTAB | | BSP | P | 5837698 |
VANKIRK ELECTRIC, INC. | E= | C | 08/08/2019 | | RANDY | RANDY | | E= | C | 6293469 |
VANKIRK ELECTRIC, INC. | ER | P | 07/11/2019 | maintenance garage ok | RANDY | RANDY | | ER | P | 6260322 |
VANKIRK ELECTRIC, INC. | ER | P | 10/31/2018 | maintenance garage only | RANDY | RANDY | | ER | P | 6011560 |
PATRIOT AIR CO. LLC | H= | C | 09/10/2019 | SCOPE OF WORK CORRECTED. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6329139 |
PATRIOT AIR CO. LLC | H= | P | 08/06/2019 | MECHANICAL FINAL OK PENDING: NEED TO CORRECT SCOPE OF WORK TO CLAIM THE TWO EXHAUST FANS AND TWO ELECTRIC HEATERS. | DUSTINS | DUSTINS | | H= | P | 6290962 |
PATRIOT AIR CO. LLC | HD | P | 07/26/2019 | NEED TO CORRECT SCOPE OF WORK TO CLAIM THE TWO EXHAUST FANS AND THE TWO ELECTRIC HEATER. EXHAUST DUCTS OK. | DUSTINS | DUSTINS | | HD | P | 6278821 |
G&M MECHANICAL, LLC | P= | C | 09/18/2019 | corrections made, engineer letter for pex received and sent to scanning | JOSEPHD | JOSEPHD | | P= | C | 6340075 |
G&M MECHANICAL, LLC | P= | P | 09/10/2019 | missing trap guards at floor drains, need engineers letter for pex piping. | TAYLOR | TAYLOR | | P= | P | 6329417 |
G&M MECHANICAL, LLC | P= | P | 08/23/2019 | not ready. | TAYLOR | TAYLOR | | P= | P | 6312008 |
G&M MECHANICAL, LLC | P= | L | 08/21/2019 | cancelled by contractor. | TAYLOR | TAYLOR | | P= | L | 6308292 |
G&M MECHANICAL, LLC | PTO | C | 08/16/2019 | | TAYLOR | TAYLOR | | PTO | C | 6303701 |
G&M MECHANICAL, LLC | PTO | L | 08/09/2019 | field cancelled. | TAYLOR | TAYLOR | | PTO | L | 6294961 |
G&M MECHANICAL, LLC | PTO | P | 07/24/2019 | no correction made. | TAYLOR | TAYLOR | | PTO | P | 6275063 |
G&M MECHANICAL, LLC | PTO | P | 06/27/2019 | lost test DWV and H2O, missing nail protection at vent for mop sink, need vent termination, rest ok, check water heater and RP by final, note: need engineers letter for pex 3/4 inch and larger. | TAYLOR | TAYLOR | | PTO | P | 6246244 |
G&M MECHANICAL, LLC | PTO | L | 05/09/2019 | field cancelled. | TAYLOR | TAYLOR | | PTO | L | 6193724 |
G&M MECHANICAL, LLC | PTO | L | 05/07/2019 | cancelled by contractor. | TAYLOR | TAYLOR | | PTO | L | 6190657 |
ELLISON PLUMBING, LLC. | PB | P | 04/06/2018 | dwv ok test ok need to see water depth | JOSEPHD | JOSEPHD | | PB | P | 5810009 |
ELLISON PLUMBING, LLC. | PB | P | 04/06/2018 | getting photo in images | JOSEPHD | JOSEPHD | | PB | P | 5809609 |
VANKIRK ELECTRIC, INC. | XES | T | 11/25/2019 | PAID (REC#1646793) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Feeding Panel G5 from Panel M | BERTHA | BERTHA | | XES | T | 6410172 |
THOMPSON THRIFT CONSTRUCTION, INC | XBS | T | 07/15/2019 | PAID (REC#1614044) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise roof sheathing at fire wall | MICHAELA | MICHAELA | | XBS | T | 6263269 |
THOMPSON THRIFT CONSTRUCTION, INC | XBS | T | 11/08/2018 | PAID (REC#1576449): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 6019957 |
THOMPSON THRIFT CONSTRUCTION, INC | XMS | P | 08/03/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED SCHEDULES AND FLOOR PLAN TO SHOW DELETED EBB AND REPLACE WITH ELECTRI WALL HEAT | JUSTINC | JUSTINC | | XMS | P | 5923128 |