HOMEOWNER | B= | C | 08/20/2019 | | BERTW | BERTW | | B= | C | 6307405 |
HOMEOWNER | B= | P | 08/20/2019 | Fall protection guards installed on window wells and patio adjacent to retaining walls / Owner has hired contractor to construct CMU/stone wood burning fireplace and natural gas grill station on concrete patio adjacent to house. Permit is required for new work. -- Schedule a new Building Final when above items are complete. | CHUCK | CHUCK | | B= | P | 6307069 |
HOMEOWNER | B= | R | 08/19/2019 | 1. Missing fall protection at window wells right elevation within 36 inches of walking surface / 2. Missing guard at each side of exterior fireplace at retaining wall // Finished basement / Rear deck | JUSTINL | JUSTINL | | B= | R | 6305750 |
BUILTRITE BUILDERS | BLA | C | 02/14/2019 | | DALE | DALE | | BLA | C | 6107665 |
BUILTRITE BUILDERS | BIN | C | 02/06/2019 | | BOBF | BOBF | | BIN | C | 6100023 |
BUILTRITE BUILDERS | BFR | C | 02/06/2019 | | BOBF | BOBF | | BFR | C | 6100010 |
BUILTRITE BUILDERS | BFR | P | 01/16/2019 | still need straps at shear wall and portal walls per circle note 4 / missing headers at interior wall in line with shear wall / okay to insulate | BOBF | BOBF | | BFR | P | 6080554 |
BUILTRITE BUILDERS | BFR | T | 12/17/2018 | PAID (REC#1564316): missing LUS 24'sat lower roof outriggers / provide eng letter for added LVL post supporting girder BG04 in interior wall next to shear wall strap plate breaks in interior wall / h2.5 at midpoint bearing of T06 trusses A-F / provide eng letters for all damaged trusses / strapping per circle notes not done at shear wall, and portal walls, strap at plate breaks at LVL posts to be 24" long, plans call for steel channel to support steel beam on south side basement, block joists above steel beam supporting bearing wall above, provide letter approving welds where steel beams were welded instead of bolting / still need to review truss laterals | BOBF | BOBF | | BFR | T | 6055625 |
BUILTRITE BUILDERS | BFR | R | 11/09/2018 | inspection stopped still too many items to list, reviewed framing with Mark, still need to check lateral bracing, need to check circled notes for specific strapping, missing pipe jacks missing hardware at out riggers throughout, winder stair in garage not to code blocking between floor joists under floor on south side oh house, isolate monoposts | BOBF | BOBF | | BFR | R | 6022368 |
BUILTRITE BUILDERS | BFR | R | 11/06/2018 | inspection stopped, house not ready / missing hardware, shear walls not nailed per plan, too many items | BOBF | BOBF | | BFR | R | 6017894 |
BUILTRITE BUILDERS | BSP | P | 11/06/2018 | eng letter for hardware and post substitution on file | BOBF | BOBF | | BSP | P | 6016733 |
BUILTRITE BUILDERS | BSP | P | 11/06/2018 | revised posting for stairs and beam in basement on file | BOBF | BOBF | | BSP | P | 6016652 |
BUILTRITE BUILDERS | BSP | P | 11/06/2018 | revised foundation repair design , revised trusses and revised header at pantry on file | BOBF | BOBF | | BSP | P | 6016646 |
BUILTRITE BUILDERS | BFI | C | 05/09/2018 | R10 installed / | BOBF | BOBF | | BFI | C | 5840485 |
BUILTRITE BUILDERS | BFD | C | 05/09/2018 | exterior / usable | BOBF | BOBF | | BFD | C | 5840484 |
BUILTRITE BUILDERS | BFN | C | 05/09/2018 | | BOBF | BOBF | | BFN | C | 5840482 |
BUILTRITE BUILDERS | BFT | C | 05/09/2018 | OPen hole 2400#, design 2400# and letter for footing steel and eufer on file | BOBF | BOBF | | BFT | C | 5840479 |
POSITIVE ELECTRIC, LLC | E= | C | 08/15/2019 | 50 amp a/c , 20 amp a/c | TOMC | TOMC | | E= | C | 6302628 |
POSITIVE ELECTRIC, LLC | ES | C | 10/30/2018 | Residential Underground: 200-amp 3 Wire service, ok NEED METER SEAL / | GREGM | GREGM | | ES | C | 6010106 |
POSITIVE ELECTRIC, LLC | ER | C | 10/30/2018 | ER OK ---PREWIRE FOR FUTURE JETTA TUB MST---UNDER CAB LIGHTING FEED IN PANTRY---4/0 TO SUB PANEL | GREGM | GREGM | | ER | C | 6010097 |
POSITIVE ELECTRIC, LLC | EUG | C | 07/26/2018 | 3/w 4/0 al | CRAIG | CRAIG | | EUG | C | 5915685 |
ADVANTAGE HEATING AND COOLING | H= | C | 08/16/2019 | Corrections made. | JEFFL | JEFFL | | H= | C | 6304416 |
HOMEOWNER | H= | R | 08/16/2019 | Furnace vent terminations not complete and mechanical room lacks combustion air. Rest ok. Note-- kitchen hood is rated at 300 cfm.
| JEFFL | JEFFL | | H= | R | 6303719 |
ADVANTAGE HEATING AND COOLING | H= | R | 08/16/2019 | Furnace vent terminations not complete and mechanical room lacks combustion air. Rest ok. Note-- kitchen hood is rated at 300 cfm.
| JEFFL | JEFFL | | H= | R | 6303718 |
ADVANTAGE HEATING AND COOLING | H= | P | 08/15/2019 | Secondary drain needed for upper AC unit. Armaflex not complete at basement AC and at exterior. Freon lines required to be isolated from coil cabinet in basement. Mechanical room lacks combustion air. Unable to determine CFM rating on kitchen hood with paperwork provided, Please provide CFM rating on kitchen exhaust hood. Notes-- AC complete x 2. Direct vent furnace x 2. Outside air to return. Finished basement. | JEFFL | JEFFL | | H= | P | 6302256 |
RIDGEVIEW PLUMBING | HC | C | 02/19/2019 | Release meter | JEFFL | JEFFL | | HC | C | 6110204 |
BARE TUB & STOVE | HO | C | 12/27/2018 | New line will carry 200K BTU's at low pressure. | JEFFL | JEFFL | | HO | C | 6063748 |
BARE TUB & STOVE | HO | P | 12/21/2018 | GAUGE IS TOO BIG NEED A 30 LB GAUGE WITH THE PRESSURE BEING 10 PSI AT INSPECTION, IS THIS MEDIUM PRESSURE? 1/1/4" POLY @ 300 FEET IS GOOD FOR 200K IF IT IS LOW PRESSURE | BENH | BENH | | HO | P | 6061666 |
ADVANTAGE HEATING AND COOLING | HRR | C | 11/01/2018 | ***Water heater vents in mechanical room must be completed for gas meter release***. | JEFFL | JEFFL | | HRR | C | 6013477 |
RIDGEVIEW PLUMBING | HI | C | 10/05/2018 | 10 lb test ok 1 1/2'' main.. 2 furnace.. 2 water heater.. 3 fireplace.. 1 bbq.. 1 range.. 2 dryer.. 2 stubs to rear patio for future use. | JEFFL | JEFFL | | HI | C | 5987363 |
ADVANTAGE HEATING AND COOLING | HRR | P | 09/07/2018 | Back framing not complete around b vent on main level. Water heater vent not complete. Notes-- finished basement. Outside air to return. Direct vent furnace x2. AC rough coil and line set x 2. | JEFFL | JEFFL | | HRR | P | 5958000 |
HOMEOWNER | PWO | C | 08/08/2019 | | TAYLOR | TAYLOR | | PWO | C | 6293429 |
RIDGEVIEW PLUMBING | P= | C | 08/08/2019 | | TAYLOR | TAYLOR | | P= | C | 6293385 |
RIDGEVIEW PLUMBING | P= | P | 08/08/2019 | certificate of potable water to scanning | TED | TED | | P= | P | 6292715 |
RIDGEVIEW PLUMBING | P= | R | 07/30/2019 | install water hammer on all 3 dishwasher supplies, install high loop on basement dishwasher drain, missing aav LH basement bathroom lav, need certificate of potable water note: finished basement, 3/4 pvb installed | TED | TED | | P= | R | 6282093 |
HOMEOWNER | PWO | P | 12/13/2018 | ok to cover by house still need to see connection at well, if there are any yard hydrants they will need to be backflow protected | JOSEPHD | JOSEPHD | | PWO | P | 6052074 |
RIDGEVIEW PLUMBING | PTO | C | 10/05/2018 | note: finished basement, check well connections at final, tempering for master tub below tub in basement, aav @ veg sink, laundry sink, wet bar, both master lavs, both upstairs lavs, washer box in basement, LH basement bathroom lav, still need PWO inspection | JOSEPHD | JOSEPHD | | PTO | C | 5987481 |
RIDGEVIEW PLUMBING | PB | C | 05/14/2018 | | JOSEPHD | JOSEPHD | | PB | C | 5843873 |