STAUFFER AND SONS CONSTRUCTION | B= | C | 01/17/2019 | All other required Final inspections are complete. (This is a computer generated result) | SHAUN | SHAUN | | B= | C | 6080976 |
STAUFFER AND SONS CONSTRUCTION | B= | P | 01/11/2019 | Address posted. Additional Inspections Required (computer generated): External Agency Inspection N= by WP ENGINEERING is not Completed yet. | SHAUN | SHAUN | | B= | P | 6075997 |
STAUFFER AND SONS CONSTRUCTION | B= | P | 01/11/2019 | Post address on home -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by WP ENGINEERING is not Completed yet. | SHAUN | SHAUN | | B= | P | 6075704 |
STAUFFER AND SONS CONSTRUCTION | BLA | C | 10/22/2018 | | NATHAN | NATHAN | | BLA | C | 6002257 |
STAUFFER AND SONS CONSTRUCTION | BFI | C | 10/02/2018 | 3rd party observation on file for R-10 at 2' for walk out | NICK | NICK | | BFI | C | 5982801 |
STAUFFER AND SONS CONSTRUCTION | BFD | C | 10/02/2018 | 3rd party observation letter on file for foundation drain | NICK | NICK | | BFD | C | 5982799 |
STAUFFER AND SONS CONSTRUCTION | BIN | C | 10/01/2018 | Check attic insulation at final | NICK | NICK | | BIN | C | 5981462 |
STAUFFER AND SONS CONSTRUCTION | BFD | P | 10/01/2018 | Need 3rd party observation for foundation drain, not inspected by RBD | NICK | NICK | | BFD | P | 5981455 |
STAUFFER AND SONS CONSTRUCTION | BFR | C | 09/26/2018 | Details on file from architect for framing items / All framing items completed | NICK | NICK | | BFR | C | 5976797 |
STAUFFER AND SONS CONSTRUCTION | BFR | P | 09/24/2018 | Need to install lateral bracing for T08E / Need to complete dry in of roof / Need to install H2.5T hangers for all M trusses in mud room / Need to install lateral bracing for T10 and T09 / Need to install double H2.5T for all T11 through T09 trusses both ends / Need to strap top plate break at peak of balloon frame wall / Need to open up front porch lid for inspection, covered prior to inspection / Need to install lateral bracing for T04A / Need to finish nailing all LUS hanger for T04 trusses / Need to install TBE6 per manufacture specs for T02G girder over header / Need to install timberlocks for upper deck joist to beam connection / Need Eng for double LVL not sitting in beam pocket in basement / Approved plans call for double LVL full length of basement and to sit in beam pocket, only half way installed at time of inspection / Approved plans call for H3 connection from joist to beam for back lower deck, H2.5T installed | NICK | NICK | | BFR | P | 5973917 |
STAUFFER AND SONS CONSTRUCTION | BFT | C | 05/21/2018 | | NICK | NICK | | BFT | C | 5850337 |
STAUFFER AND SONS CONSTRUCTION | BFN | C | 05/21/2018 | Observation report on file for piers | NICK | NICK | | BFN | C | 5850335 |
STAUFFER AND SONS CONSTRUCTION | BSP | P | 04/13/2018 | Soils report received | SHAUN | SHAUN | | BSP | P | 5816062 |
STAUFFER AND SONS CONSTRUCTION | BFN | P | 04/12/2018 | Please provide soils report / Open hole report on file / Footing, Foundation observations with eufer noted / Foundation design 3,000 psf in plan imaging | SHAUN | SHAUN | | BFN | P | 5814804 |
STAUFFER AND SONS CONSTRUCTION | BFT | P | 04/12/2018 | Please provide soils report / Open hole report on file / Footing, Foundation observations with eufer noted / Foundation design 3,000 psf in plan imaging | SHAUN | SHAUN | | BFT | P | 5814803 |
ROWAN ELECTRIC LLC | E= | C | 01/10/2019 | | JOHNN | JOHNN | | E= | C | 6075165 |
ROWAN ELECTRIC LLC | E= | R | 01/09/2019 | correction not made: basement sub panel door is missing latch. | JOHNN | JOHNN | | E= | R | 6073844 |
ROWAN ELECTRIC LLC | E= | R | 01/07/2019 | dishwasher needs gfci, basement: unfinished room has capped off nm cable in ceiling, needs box,blank plate/missing frig outlet and plate/ strap sump pump flex/ add outlet to left of wet bar per spacing/ basement sub panel is missing latch/ no a/c or prewire. | JOHNN | JOHNN | | E= | R | 6070836 |
ROWAN ELECTRIC LLC | ES | C | 09/11/2018 | Residential Underground: 200-amp 3 Wire service, new res, meter is set, no action needed. | JOHNN | JOHNN | | ES | C | 5962050 |
ROWAN ELECTRIC LLC | ER | C | 09/11/2018 | basement sub panel is missing latch on door, rough,ok------------------200 amp,no mcc,1#6al,rev ufer, 100 amp sub panel,no mcc,------------------no floor heat,3 rooms in basement are unfinished, | JOHNN | JOHNN | | ER | C | 5962049 |
ROWAN ELECTRIC LLC | EUG | C | 05/25/2018 | 4/0,al,4w | JOHNN | JOHNN | | EUG | C | 5856897 |
THE FURNACE GUY HEATING & COOLING | H= | C | 01/04/2019 | partial finished basement direct vent furn , no a/c | DAVIDH | DAVIDH | | H= | C | 6068391 |
THE FURNACE GUY HEATING & COOLING | HC | C | 09/24/2018 | RELEASE METER | RANDYB | RANDYB | | HC | C | 5973656 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 09/24/2018 | BY FINAL: Verify updated splice has been attached to permit and no longer shows 7" round serving basement hallway by bedrooms. Outside air to furnace returns to be dampered per plans. Inspect water heater venting within mechanical room. Obtain 1" clearance from wiring to b-vent in mechanical room. | RANDYB | RANDYB | | HRR | C | 5973655 |
ALPHALETE MECHANICAL LLC | HI | C | 09/14/2018 | 10 lb test ok note 1 1/2" main, 2 furn,2 w/h, 1 bbq,1 range ,1 fireplace and 1 future f/p downstairs not to excess 56,000 | DAVIDH | DAVIDH | | HI | C | 5965308 |
THE FURNACE GUY HEATING & COOLING | HRR | P | 09/06/2018 | Missing 7" down serving basement hallway to bedrooms. BY FINAL: Outside air to furnace returns to be dampered per plans. Inspect water heater venting within mechanical room. Obtain 1" clearance from wiring to b-vent in mechanical room. NOTES: Finished basement. Outside air to furnace return x2. Direct vent furnace x2. NO A/C. | RANDYB | RANDYB | | HRR | P | 5957166 |
ALPHALETE MECHANICAL LLC | P= | C | 01/07/2019 | correction made | JOSEPHD | JOSEPHD | | P= | C | 6070227 |
ALPHALETE MECHANICAL LLC | P= | P | 12/31/2018 | crossed water lines at master tub, install T&P drains at water heaters, need hi- loop and hammer arrestor at dishwasher, can not use slip joint fitting on the horizontal at left master lav, need isolation valves at both cold inlets at water heaters, missing expansion device, connect recirculating pump, rest ok, finished basement, no irrigation. | TAYLOR | TAYLOR | | P= | P | 6066174 |
ALPHALETE MECHANICAL LLC | PTO | C | 09/07/2018 | Finished basement, AAV quad drain, all sinks and lavs in basement | SHANEN | SHANEN | | PTO | C | 5958161 |
ALPHALETE MECHANICAL LLC | PB | C | 05/16/2018 | Basement plumbing only to lift station | SHANEN | SHANEN | | PB | C | 5846535 |
STAUFFER AND SONS CONSTRUCTION | XMS | T | 09/21/2018 | PAID (REC#1540186) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised duct designs and both heatloss calculations for revised lower level floor plan | JUSTINC | JUSTINC | | XMS | T | 5973462 |
STAUFFER AND SONS CONSTRUCTION | XBS | P | 09/21/2018 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: IECC | SHELLEY | SHELLEY | | XBS | P | 5972510 |
STAUFFER AND SONS CONSTRUCTION | XBS | T | 04/03/2018 | PAID (REC#1491364) PLAN SPLICE FEE: $50 by: DANM for Construction: Conditioned crawlspace changed to basement with wet bar area and unfinished storage | DANM | DANM | | XBS | T | 5806046 |