COLARELLI CONSTRUCTION, INC. | B= | C | 06/08/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5869269 |
COLARELLI CONSTRUCTION, INC. | B= | P | 05/15/2018 | items corrected / final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CROWN SERVICES INC. Plumbing Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5845343 |
COLARELLI CONSTRUCTION, INC. | B= | P | 05/08/2018 | need to post suite numbers / need single action at one of the two doors with double key dead bolts / missing side wall grab bar in bathroom / rear grab bar is in wrong position / bathroom mirror is higher than 40" above the floor to the reflective surface / need to install the restroom sign / need to complete all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CROWN SERVICES INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5839293 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 04/09/2018 | Need to pull mechanical and electrical permits and have attached to this permit -- Interior light gauge framing OK pending other rough inspections -- Reviewed accessible elements with contractor on site | DAKOTAB | DAKOTAB | | BFR | P | 5811222 |
COPPER SMITH ELECTRIC INC | E= | C | 05/03/2018 | | BRET | BRET | | E= | C | 5835074 |
COPPER SMITH ELECTRIC INC | ES | C | 05/03/2018 | Commercial Service: 200 amp service for unit 130 need meter set | BRET | BRET | | ES | C | 5835062 |
COPPER SMITH ELECTRIC INC | ER | C | 04/19/2018 | bath lid and panel wall, rough complete open ceiling | BRET | BRET | | ER | C | 5821284 |
COPPER SMITH ELECTRIC INC | ER | P | 04/11/2018 | Rough in ok for exterior walls--- Discussed accessibility requirements with contractor / No FA per contractor / | ROB | ROB | | ER | P | 5814470 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 05/21/2018 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5851407 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 05/21/2018 | OK TO SET METER FOR UNIT 130. CORRECT LINE TESTED TODAY. | NANCY | NANCY | | HC | C | 5851405 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 05/21/2018 | 10 LB TEST OK ON CORRECT GAS LINE TO UNIT 130. | NANCY | NANCY | | HI | C | 5851402 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 05/17/2018 | Changed from complete to partial by NS 5/21/18. 130 tag on wrong gas line per CSU, need test on correct gas line. LETTER OF APPROVAL FOR 2 LB SYSTEM ATTACHED, SEE IMAGES | BENH | BENH | | H= | P | 5847524 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 05/10/2018 | FOR FINAL NEED LETTER FROM CSU APPROVING MEDIUM PRESSURE GAS FOR SUITE 130. NOTE: THIS WAS A PRESSURE TEST FOR METER RELEASE ONLY. | NANCY | NANCY | | H= | P | 5841421 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 05/10/2018 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 5841415 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 05/10/2018 | Changed to partial 5/21/18 by NS. Gas line inspected was incorrectly labeled, did not go unite 130. 10 LB TEST OK. NOTE: THIS WAS A PRESSURE TEST FOR METER RELEASE ONLY. | NANCY | NANCY | | HI | P | 5841381 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 05/10/2018 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. | NANCY | NANCY | | H= | C | 5840691 |
RIAL HEATING AND AIR CONDITIONING, INC. | HSP | P | 05/09/2018 | TO GET METER SET WILL NEED GAS CONTRACTOR ATTACHED TO PERMIT AND A PRESSURE TEST ON EXISTING GAS LINE. SHELL COMPLETED IN 2016 WITH NO METER SET FOR THIS SUITE. | NANCY | NANCY | | HSP | P | 5839504 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 05/03/2018 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5834880 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 04/16/2018 | SUPPLY AND EXHAUST ABOVE BATHROOM CEILING OK. EXPOSED DUCTS OK. BY FINAL NEED REMOTE INDICATOR FOR SMOKE DETECTOR INSTALLED IN UNIT. NO ROOF TODAY. | NANCY | NANCY | | HD | P | 5818300 |
CROWN SERVICES INC. | P= | C | 05/24/2018 | | TAYLOR | TAYLOR | | P= | C | 5854294 |
CROWN SERVICES INC. | P= | P | 05/22/2018 | still need to correct scope of work, rest ok, note: engineers letter sent to scanning. | TAYLOR | TAYLOR | | P= | P | 5851944 |
CROWN SERVICES INC. | P= | P | 05/17/2018 | need mixing valve at lav, still need engineers letter for PB, add drinking fountain and water heater to scope of work. | TAYLOR | TAYLOR | | P= | P | 5848081 |
CROWN SERVICES INC. | P= | R | 05/02/2018 | No hot water, need vacuum relief valve for water heater, need trap guard in rest room floor drain, lavatory too low, need flush lever on open side of water closet | SHANEN | SHANEN | | P= | R | 5833951 |
CROWN SERVICES INC. | PTO | P | 04/10/2018 | Changed to PTO, DWV and water distribution test OK, still need revisions for base to complete PTO | SHANEN | SHANEN | | PTO | P | 5812476 |
CROWN SERVICES INC. | PB | P | 04/02/2018 | Plans reflect 4" to water closet ( 3" installed ) re-plumb, revise plans or submit engineers letter approving change to plans, test OK | SHANEN | SHANEN | | PB | P | 5805446 |