KTK GENERAL CONTRACTING LIMITED | B= | C | 08/21/2018 | All external deps. complete | GITA | GITA | | B= | C | 5940282 |
KTK GENERAL CONTRACTING LIMITED | B= | P | 05/15/2018 | Temp CO: pending finals ( Expires: 6/14/2018 12:00:00 AM) | RITA | RITA | | B= | P | 5845232 |
KTK GENERAL CONTRACTING LIMITED | B= | P | 05/14/2018 | Complete pending other Finals / plans reviewed onsite. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, BRUNO'S MECHANICAL INC. Plumbing Final Inspection is not Completed yet, MECHANICAL RESOURCES LLC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5843740 |
KTK GENERAL CONTRACTING LIMITED | BFR | P | 05/02/2018 | Framing OK pending other Roughs / NOTE - reflected ceiling plan does not show roof access opening that was previously hidden above ceiling in North corner of building / discussed accessible elements / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5833859 |
MD ELECTRICAL SERVICES, INC. | E= | C | 05/10/2018 | | CRAIGS | CRAIGS | | E= | C | 5841499 |
MD ELECTRICAL SERVICES, INC. | EUG | C | 05/04/2018 | conduits to the menu boards | CRAIGS | CRAIGS | | EUG | C | 5836552 |
MD ELECTRICAL SERVICES, INC. | ER | C | 05/01/2018 | above ceiling OK | CRAIGS | CRAIGS | | ER | C | 5832599 |
MD ELECTRICAL SERVICES, INC. | ESL | C | 04/27/2018 | conduits from wall to service counter OK | CRAIGS | CRAIGS | | ESL | C | 5829972 |
MD ELECTRICAL SERVICES, INC. | ER | P | 04/27/2018 | hard lid between the bathrooms --bathrooms --- back bar wall -- drive up window area OK | CRAIGS | CRAIGS | | ER | P | 5829968 |
MECHANICAL RESOURCES LLC | H= | C | 08/01/2018 | TAB WITH OSA READINGS RECEIVED | MARKB | MARKB | | H= | C | 5920091 |
MECHANICAL RESOURCES LLC | H= | P | 05/30/2018 | Can not find Outside air reading on TAB report. | MARKB | MARKB | | H= | P | 5858405 |
MECHANICAL RESOURCES LLC | H= | P | 05/25/2018 | BALANCE REPORT ATTACHED IS NOT THE CORRECT ONE FOR THIS PERMIT . | LIDO | LIDO | | H= | P | 5855712 |
MECHANICAL RESOURCES LLC | H= | P | 05/09/2018 | FINAL PENDING - Test And Balance Report | MARKB | MARKB | | H= | P | 5840514 |
MECHANICAL RESOURCES LLC | HD | P | 05/03/2018 | ABOVE CEILING DUCT - EXISTING RETURN AIR DUCT REUSED NEEDS TO BE PROPERLY MECHANICALLY FASTENED TOGETHER AND SEAL. STILL NEED - Relocated diffusers installed, return air corrections and TAB report. | MARKB | MARKB | | HD | P | 5835621 |
BRUNO'S MECHANICAL INC. | P= | C | 05/14/2018 | Corrections made. | DANR | DANR | | P= | C | 5843712 |
BRUNO'S MECHANICAL INC. | P= | P | 05/11/2018 | Need backflow protection per engineers drawing at equipment, no hot water, need tempering valves at sinks per engineer drawing, indirect drains need run over floor sink so no splash back. | DANR | DANR | | P= | P | 5842416 |
BRUNO'S MECHANICAL INC. | P= | P | 05/09/2018 | Field cancel not ready. | DANR | DANR | | P= | P | 5839772 |
BRUNO'S MECHANICAL INC. | PTO | C | 05/02/2018 | correction made. NOTE: THERE IS INSULATION INSIDE CINDER BLOCK WALL | JOHNS | JOHNS | | PTO | C | 5833225 |
BRUNO'S MECHANICAL INC. | PTO | P | 05/01/2018 | still need mech permit attached, low test @ dwv, can complete w/ uploaded image, rest ok, per plan. note: vtr (existing) | JOHNS | JOHNS | | PTO | P | 5833044 |
BRUNO'S MECHANICAL INC. | PB | C | 04/26/2018 | NEED TO ATTACH ELEC AND MECH PERMITS, rest ok, per plan. note: waters looped underground | JOHNS | JOHNS | | PB | C | 5828468 |
BRUNO'S MECHANICAL INC. | XPS | T | 05/14/2018 | PAID (REC#1499964) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 5-14-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5843422 |
BRUNO'S MECHANICAL INC. | XPS | T | 05/09/2018 | PAID (REC#1499053) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 5-9-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5839529 |