ELDER CONSTRUCTION, INC. | B= | C | 08/29/2018 | All other required Final inspections are complete. (This is a computer generated result) | NATHAN | NATHAN | | B= | C | 5949631 |
ELDER CONSTRUCTION, INC. | B= | P | 08/29/2018 | smoke seal installed. Additional Inspections Required (computer generated): PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5949505 |
ELDER CONSTRUCTION, INC. | B= | P | 08/28/2018 | need smoke seals at lobby corridor doors, -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5948052 |
ELDER CONSTRUCTION, INC. | BFR | P | 04/24/2018 | with completed required inspection frame okay Reviewed Accessible Elements / 2 layers drywall at office side of elevator lobby rated wall okay. | NATHAN | NATHAN | | BFR | P | 5825439 |
EL PASO ELECTRIC, LLC. | E= | C | 07/23/2018 | | GARYL | GARYL | | E= | C | 5910996 |
EL PASO ELECTRIC, LLC. | E= | C | 06/11/2018 | FIRE ALARM INSPECTION: did not find red card on site | GARYL | GARYL | | E= | C | 5870279 |
EL PASO ELECTRIC, LLC. | ER | R | 06/08/2018 | fire alarm not called in, NOTE! ceiings are okay, went over with TODD | GARYL | GARYL | | ER | R | 5869087 |
EL PASO ELECTRIC, LLC. | ER | P | 04/26/2018 | all hard lids | GARYL | GARYL | | ER | P | 5828394 |
EL PASO ELECTRIC, LLC. | ER | R | 04/25/2018 | called 3:56, left message, stopped by, no one available, couldn't see any hard lid area ready for inspection | GARYL | GARYL | | ER | R | 5827610 |
EL PASO ELECTRIC, LLC. | ER | P | 04/23/2018 | walls only, | GARYL | GARYL | | ER | P | 5824174 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 08/29/2018 | ALL SA / RA GRILLES ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5949630 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 08/29/2018 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | P | 5949049 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 08/06/2018 | | JERRYF | JERRYF | | H= | C | 5924911 |
FRONTIER MECHANICAL SYSTEMS INC | HWP | C | 08/06/2018 | ALL PIPING AND CONNECTIONS ARE COMPLETE OK TO INSULATE | JERRYF | JERRYF | | HWP | C | 5924894 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 06/27/2018 | ABOVE CEILING BOXES AND MEDIUM PRESSURE MAINS AND TIE INS OK TO WRAP - NEED ALL RA GRILLES INSTALLED FOR FINAL AND TAB REPORT NOTES: ALL SA GRILLES ARE COMPLETE | JERRYF | JERRYF | | HD | P | 5887188 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 05/10/2018 | ABOVE CEILING LOW MAINS AND RUN OUTS OK - STILL NEED ALL BOXES AND MEDIUM PRESSURE TIE INS - TRANSFER DUCTS - VERIFY THERMOSTATS AT FINAL | JERRYF | JERRYF | | HD | P | 5841335 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 07/20/2018 | | SHANEN | SHANEN | | P= | C | 5908959 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 04/27/2018 | water heater ok. | TAYLOR | TAYLOR | | PTO | C | 5829235 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 04/24/2018 | DWV and H2O in walls and above ceiling ok, note: VTR. | TAYLOR | TAYLOR | | PTO | P | 5825132 |
PEAK HEATING & AIR CONDITIONING, INC. | XMS | P | 08/02/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised kitchen to break room from kitchen | JUSTINC | JUSTINC | | XMS | P | 5922368 |