PROJECT BUILDERS, INC. | B= | C | 12/12/2018 | Stamped observation received | RICHB | RICHB | | B= | C | 6050893 |
PROJECT BUILDERS, INC. | B= | P | 11/02/2018 | Temp CO: All finals ar complete or partial ( Expires: 12/2/2018 12:00:00 AM) | GITA | GITA | | B= | P | 6014834 |
PROJECT BUILDERS, INC. | B= | P | 11/02/2018 | Reviewed observation - need stamped copy for RBD records - Final OK otherwise -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), COLORADO COMMERCIAL REFRIG. Mechanical Final Inspection is not Completed yet, M W MECHANICAL INC Mechanical Final Inspection is not Completed yet, SECURITY TECHNOLOGY SERVICES LLC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6014018 |
PROJECT BUILDERS, INC. | B= | R | 10/26/2018 | Still need all third party paperwork - need to complete other Finals - Building Final OK otherwise. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, COLORADO COMMERCIAL REFRIG. Mechanical Final Inspection is not Completed yet, M W MECHANICAL INC Mechanical Final Inspection is not Completed yet, SECURITY TECHNOLOGY SERVICES LLC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | R | 6006954 |
PROJECT BUILDERS, INC. | BSP | P | 10/25/2018 | Discussed outstanding third party observations including Open Hole, footing/foundation, ufer and structural steel | RICHB | RICHB | | BSP | P | 6005828 |
PROJECT BUILDERS, INC. | BSP | P | 10/11/2018 | Railing to mezzanine OK | RICHB | RICHB | | BSP | P | 5992631 |
PROJECT BUILDERS, INC. | BSP | P | 10/01/2018 | Acoustic ceiling suspension OK per manufacturer's installation guide / discussed outstanding inspection items and requirements for B= | RICHB | RICHB | | BSP | P | 5982003 |
PROJECT BUILDERS, INC. | BIN | P | 09/07/2018 | Continuous R-13.1 (EnergyShield 2" rigid) on all exterior walls observed | RICHB | RICHB | | BIN | P | 5958613 |
PROJECT BUILDERS, INC. | BFR | P | 09/07/2018 | Remainder of framing including entry & soffits OK pending other Roughs / discussed third party inspections | RICHB | RICHB | | BFR | P | 5958596 |
PROJECT BUILDERS, INC. | BFR | P | 09/05/2018 | West wall furr-out OK pending other Roughs / restrooms & corridor walls & hard lids OK pending other Roughs / discussed accessible elements and third party inspections | RICHB | RICHB | | BFR | P | 5956115 |
PROJECT BUILDERS, INC. | BFR | P | 08/31/2018 | Framing on mezzanine OK pending other Roughs / discussed BFR requirements and third party inspections | RICHB | RICHB | | BFR | P | 5953237 |
PROJECT BUILDERS, INC. | BSP | P | 08/31/2018 | Need Mechanical contractor attached to permit for Gas piping and call for inspections. | MARKB | MARKB | | BSP | P | 5951959 |
PROJECT BUILDERS, INC. | BFR | P | 08/29/2018 | Site visit with Ed and Jon (Project Builders) - discussed the need for all third party paperwork and also inspection schedule, framing in corner at hoistway OK pending other Roughs | RICHB | RICHB | | BFR | P | 5949685 |
PROJECT BUILDERS, INC. | B16 | P | 07/03/2018 | Site meeting with Ed Larsen (Superintendent) - discussed inspection requirements, third party observations and inspection sequencing | RICHB | RICHB | | B16 | P | 5892516 |
PROJECT BUILDERS, INC. | BFT | P | 07/03/2018 | Spoke with Contractor on phone - OK to use third party for observations for open hole, footing, foundation, foundation insulation and structural steel | RICHB | RICHB | | BFT | P | 5892057 |
SECURITY TECHNOLOGY SERVICES LLC | E= | C | 11/02/2018 | FIRE ALARM INSPECTION: fire alarm install complete | CHIPO | CHIPO | | E= | C | 6014304 |
FOSTER ELECTRIC CORPORATION | E= | C | 10/17/2018 | | BRIAN | BRIAN | | E= | C | 5997742 |
FOSTER ELECTRIC CORPORATION | E= | R | 10/16/2018 | hot and neutral reversed in the factory re lock system , general use circuit | CRAIGS | CRAIGS | | E= | R | 5995808 |
FOSTER ELECTRIC CORPORATION | E= | P | 10/12/2018 | need documentation showing 10K breakers in panels A & B are listed to work with 65K rated breakers in MDP / need to inspect final hook up of furniture / all else okay for TCO | CHIPO | CHIPO | | E= | P | 5993366 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/12/2018 | need to upload documentation showing 10K breakers in panel A & B are listed to work with 65K main breakers in MDP/ need to inspect final hook up of furniture / all else okay for TCO | CHIPO | CHIPO | | ER | P | 5993365 |
FOSTER ELECTRIC CORPORATION | ER | P | 10/01/2018 | electric above ceiling OK except the front sign and one light in the pharmacy --- low voltage laying on the grid and FIRE ALARM not complete and called in for inspection --- DO NOT PLACE CEILING TILES | CRAIGS | CRAIGS | | ER | P | 5981271 |
FOSTER ELECTRIC CORPORATION | ES | C | 09/26/2018 | Commercial Service: 600 amp service 3 phase 4 wire, parallel sets of 350 / okay to set meter | CHIPO | CHIPO | | ES | C | 5976967 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/25/2018 | UFER with #4 bare copper and supplemental ground rod okay | CHIPO | CHIPO | | ER | P | 5975537 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/18/2018 | underground for north side and remainder of west side pole lights okay / still need to check home run tie in on pole lights / okay to back fill home run trench across roadway | CHIPO | CHIPO | | ER | P | 5968165 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/17/2018 | south and west side pole light trenching okay | CHIPO | CHIPO | | ER | P | 5967427 |
FOSTER ELECTRIC CORPORATION | EUG | C | 09/14/2018 | okay to pour caissons for parking lot site lights | CHIPO | CHIPO | | EUG | C | 5966094 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/14/2018 | last exterior cove lights / high-lighted prints | CHIPO | CHIPO | | ER | P | 5966084 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/11/2018 | east and west exterior cove lights okay / interior vestibule walls okay-----stamped set of prints not on site to hi-lite, to be marked on next visit | CHIPO | CHIPO | | ER | P | 5961281 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/10/2018 | NW and SE exterior soffits ok / | MIGUEL | MIGUEL | | ER | P | 5960040 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/07/2018 | walls marked on plans / | MIGUEL | MIGUEL | | ER | P | 5958116 |
SECURITY TECHNOLOGY SERVICES LLC | ER | C | 09/07/2018 | FIRE ALARM INSPECTION: FA rough ok ---box at front entry and cable over head / | MIGUEL | MIGUEL | | ER | C | 5958111 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/06/2018 | plans highlighted ----still w/ out FA permit / | MIGUEL | MIGUEL | | ER | P | 5956635 |
FOSTER ELECTRIC CORPORATION | ER | P | 09/05/2018 | walls and hard lids in the restrooms -- see stamped drawings ---- need fire alarm permit pulled if walls are closed up sheet rock may have to come off | CRAIGS | CRAIGS | | ER | P | 5955679 |
FOSTER ELECTRIC CORPORATION | ER | P | 08/31/2018 | WALLS MARKED IN PINK ON PLANS / | MIGUEL | MIGUEL | | ER | P | 5952942 |
FOSTER ELECTRIC CORPORATION | EUG | R | 08/28/2018 | NEED INSPECTION FROM CSU-----SECONDARIES LEAVING TRANSFORMER BELONG TO CSU | MIGUEL | MIGUEL | | EUG | R | 5948364 |
FOSTER ELECTRIC CORPORATION | ESL | C | 07/19/2018 | all runs complete / | MIGUEL | MIGUEL | | ESL | C | 5908483 |
COLORADO COMMERCIAL REFRIGERATION, INC | H= | C | 11/02/2018 | | MARKB | MARKB | | H= | C | 6014781 |
M W MECHANICAL INC | H= | C | 11/02/2018 | Contractor claiming scope for Colorado Commercial and Parker and has inspections under contractor I.D. - Inspections complete | MARKB | MARKB | | H= | C | 6014777 |
BRUNO'S MECHANICAL INC. | H= | C | 10/15/2018 | TEST AND BALANCE RECEIVED | MARKB | MARKB | | H= | C | 5994172 |
COLORADO COMMERCIAL REFRIGERATION, INC | HRP | P | 10/12/2018 | CORRECTIONS MADE . HAVE MULTIPLE CONTRACTORS CLAIMING THE SAME SCOPE OF WORK, NEED TO CONSULT WITH CHIEF. | LIDO | LIDO | | HRP | P | 5993064 |
BRUNO'S MECHANICAL INC. | H= | P | 10/12/2018 | PARTIAL PENDING FOR- NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5993041 |
COLORADO COMMERCIAL REFRIGERATION, INC | HRP | P | 10/10/2018 | THE WALK IN FREEZER COOLER IS ON M W MECHANICAL INC SCOPE OF WORK AND LINE SET WAS ALREADY INSPECTED / CORRECTIONS STILL NEED TO BE DONE PER INSPECTION DATED 10/3/2018 . | LIDO | LIDO | | HRP | P | 5991533 |
BRUNO'S MECHANICAL INC. | H= | P | 10/09/2018 | RT-1,2,3,4 THERMOSTATS ARE TEMPORARY WILL BE CHANGED TO CENSORS / WILL NEED TO BE VERIFIED. RTU-1,2 MISSING CO2 CENSORS. NEED TO INSTALL CONDENSATE DISPOSAL FOR AHU-1/ THERMOSTAT IS OVER 48" OF FINISHED FLOOR LOWER TO 48". ALL REMOTE SMOKE INDICATORS INSTALLED , DUCT DETECTORS IN PLACE, ROOF OK . NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5989825 |
PARKER PLUMBING AND HEATING, INC | H= | C | 10/04/2018 | | MARKB | MARKB | | H= | C | 5986371 |
M W MECHANICAL INC | HRP | C | 10/03/2018 | FOR FINAL - Contractor t address steel claps supporting copper condensate line and provide access in wall for indirect drain. Still need to see condensate disposal for self-contained units. NO PRESSURE TEST REQUIRED - NO CONCEAL FITTINGS. REFRIGERATION LINES COMPLETE TO EVAP COLS AND CONDENSER ON ROOF COMPLETE FOR REACH IN COOLER. | MARKB | MARKB | | HRP | C | 5984487 |
BRUNO'S MECHANICAL INC. | HD | P | 10/02/2018 | ----NEED REFRIGERATION CONTRACTOR ATTACHED TO PERMIT AND INSPECTIONS CALLED---- ABOVE CEILING DUCT - SUPPLY/RETURN MAINS/BRANCHES FOR RTU-4 OK TO WRAP. FLEX/DIFFUSERS FOR RTU'S 1, 2, 3 COMPLETE - OK TO CONCEAL DUCT. ALL TRANSFER DUCTS INSTALLED. | MARKB | MARKB | | HD | P | 5983348 |
BRUNO'S MECHANICAL INC. | HV | C | 10/02/2018 | UNIT HEATER VENT COMPLETE AND DOOR STOP INSTALLED ON OVERHEAD DOOR. | MARKB | MARKB | | HV | C | 5983327 |
PARKER PLUMBING AND HEATING, INC | H= | P | 09/20/2018 | FOR FINAL - Need line sleeved at meter through block wall and final equipment connections. | MARKB | MARKB | | H= | P | 5971990 |
PARKER PLUMBING AND HEATING, INC | HC | C | 09/20/2018 | RELEASE METER | PAULO | PAULO | | HC | C | 5972063 |
PARKER PLUMBING AND HEATING, INC | HI | C | 09/20/2018 | NEEDED BY FINAL-- SLEEVE 2 1/2" GAS LINE THROUGH EXTERIOR WALL, CONNECTIONS TO ALL EQUIPMENT. 65# test ok to complete system, gas line per plan. note: design 7" w.c. | PAULO | PAULO | | HI | C | 5971980 |
M W MECHANICAL INC | HI | P | 09/17/2018 | GAS PIPING INSTALLED PER PLAN BUT NEED PIPING RAN TO SERVICE SIDE OF RTU'S AND RETESTED AT 65 PSI. | MARKB | MARKB | | HI | P | 5967681 |
BRUNO'S MECHANICAL INC. | HD | P | 09/17/2018 | NEED A CONTRACTOR TO CLAIM REFRIGERATION. ABOVE CEILING DUCT - SUPPLY/RETURN MAINS/BRANCHES FOR RTU'S 1, 2 &3 INSTALLED PER PLAN OK TO WRAP. No flex or diffusers installed at this time. | MARKB | MARKB | | HD | P | 5967680 |
BRUNO'S MECHANICAL INC. | HD | P | 09/07/2018 | Need a gas contractor attached to permit. ABOVE CEILING DUCT - SUPPLY/RETURN/EXHAUST MAINS AND BRANCHES ABOVE HARD LIDS FOR BATHROOMS AND HALL INSTALLED PER PLAN OK TO WRAP. No flex or diffusers. | MARKB | MARKB | | HD | P | 5959071 |
PARKER PLUMBING AND HEATING, INC | P= | C | 10/11/2018 | Corrections made. | DANR | DANR | | P= | C | 5991796 |
PARKER PLUMBING AND HEATING, INC | P= | P | 10/04/2018 | Accessible drinking fountain lacking knee clearance (at 26-1/2"), sink in consult room no hot water, rest ok. | DANR | DANR | | P= | P | 5985626 |
PARKER PLUMBING AND HEATING, INC | PTO | P | 08/31/2018 | Need permit and inspection for gas piping. Ok for plumbing top out. | DANR | DANR | | PTO | P | 5953107 |
PARKER PLUMBING AND HEATING, INC | PTO | P | 08/28/2018 | Need nail protection, run hose bibs, rest ok. Note: check water heater and water entry at final. | DANR | DANR | | PTO | P | 5948519 |
PARKER PLUMBING AND HEATING, INC | PRD | C | 08/28/2018 | Ok. | DANR | DANR | | PRD | C | 5948513 |
PARKER PLUMBING AND HEATING, INC | PB | C | 07/19/2018 | corrections made, test ok, | DANR | DANR | | PB | C | 5907908 |
PARKER PLUMBING AND HEATING, INC | PRD | P | 07/19/2018 | Test ok for 8" and 3" storm lines underground, need plans revised for 3" roof drain by drive through moved inside of building, cover at own risk. | DANR | DANR | | PRD | P | 5907907 |
PARKER PLUMBING AND HEATING, INC | PB | P | 07/16/2018 | Need fixture tee for back to back toilets with test , need engineer letter for cell core pvc pipe, rest ok, cover at own risk. | DANR | DANR | | PB | P | 5903333 |
FOSTER ELECTRIC CORPORATION | XES | P | 08/30/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: System is series rated. A letter from the engineer was accepted. Model # for series rated breakers must be available at time of inspection. | BERTHA | BERTHA | | XES | P | 5951736 |