THE CENTURION GROUP, INC. | B= | C | 09/19/2018 | final OK pending other finals | DANE | DANE | | B= | C | 5969336 |
THE CENTURION GROUP, INC. | B= | P | 09/07/2018 | Temp CO: Pending plumbing final ( Expires: 10/7/2018 12:00:00 AM) | RITA | RITA | | B= | P | 5958448 |
THE CENTURION GROUP, INC. | B= | P | 09/07/2018 | Items corrected -- Building final OK pending other finals | DAKOTAB | DAKOTAB | | B= | P | 5958070 |
THE CENTURION GROUP, INC. | B= | R | 09/04/2018 | need single action door latches at all office and conference room doors - currently have either separate dead bolt and lever handle knob or nothing installed - need to remove all thumb turn dead bolts at offices and conference room / need to install suite number outside of entry doors (left voice mail with contractor to make him aware of the need for suite numbers) / need to complete all other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), VALUE PLUMBING & WATER TREATMENT COMPANY Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 5954104 |
THE CENTURION GROUP, INC. | B= | P | 09/04/2018 | fire sprinkler letter on file -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), VALUE PLUMBING & WATER TREATMENT COMPANY Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5953538 |
THE CENTURION GROUP, INC. | BFR | P | 08/24/2018 | stamped letter for shaft repair on file / BFR complete pending other roughs | DANE | DANE | | BFR | P | 5944630 |
THE CENTURION GROUP, INC. | BSP | P | 06/29/2018 | Met architect Zach in Berts office,reviewed repair @ 2 shaft letter revision to comply with intent of code. Also reviewed option for plumbing pipe re routing out of shaft wall. | BERTW | BERTW | | BSP | P | 5889636 |
THE CENTURION GROUP, INC. | BFR | R | 06/20/2018 | the shaft wall has not been repaired back to original condition per the letter from the architect. Will need to know what the original assembly is to know what brand of shaft liner to use - will also need a listing for how to patch the large holes in the outer double layer of 5/8" rock // the plumbing drain line that is coming through the shaft wall can not be run through the shaft as openings other that those necessary for the purpose of the shaft are not permitted in the shaft enclosure | DANE | DANE | | BFR | R | 5880428 |
THE CENTURION GROUP, INC. | BFR | P | 06/15/2018 | architects letter for cut shaft liner wall on file / still need to field verify it is reconstructed to original condition | DANE | DANE | | BFR | P | 5875508 |
THE CENTURION GROUP, INC. | BFR | P | 06/07/2018 | need stamped letter for how to fix 2 hour shaft enclosure or a listed assembly to fix penetrations that has been cut into at break room wall / need to pull mechanical permit and have inspections / all other interior light gauge framing OK pending other roughs / discussed accessible elements | DANE | DANE | | BFR | P | 5868161 |
ROWAN ELECTRIC LLC | E= | C | 08/31/2018 | correction made | RANDY | RANDY | | E= | C | 5952531 |
ROWAN ELECTRIC LLC | E= | P | 08/30/2018 | install ground bushing in water heater disconnect --------- attach pictures to permit ---------- unit 120 ok | CRAIG | CRAIG | | E= | P | 5950998 |
ROWAN ELECTRIC LLC | E= | P | 08/29/2018 | unsure of what areas im looking at for final, would like to meet contractor on site for next inspection | RANDY | RANDY | | E= | P | 5949580 |
ROWAN ELECTRIC LLC | ER | P | 08/24/2018 | Ceilings ok for relocated fixtures / | ROB | ROB | | ER | P | 5945147 |
ROWAN ELECTRIC LLC | ER | P | 05/09/2018 | walls only | BRET | BRET | | ER | P | 5839837 |
ROWAN ELECTRIC LLC | ER | R | 05/08/2018 | receptacle to low, switches to high for accessibility requirements | BRET | BRET | | ER | R | 5838636 |
COMFORT TECHNOLOGIES, INC. | H= | C | 08/28/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5947465 |
COMFORT TECHNOLOGIES, INC. | H= | P | 08/17/2018 | MECHANICAL FINAL OK PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5937942 |
COMFORT TECHNOLOGIES, INC. | HD | P | 06/25/2018 | MEDIUM PRESSURE SUPPLY, LOW PRESSURE SUPPLY TRUNKS AND LATERALS OK, OK TO WRAP. VAV-4 AND VAV-5 OK. NO FLEX AND DIFFUSERS YET. | DUSTINS | DUSTINS | | HD | P | 5884068 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | P= | C | 09/14/2018 | | TAYLOR | TAYLOR | | P= | C | 5965466 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | P= | P | 08/30/2018 | need T&P drain at water heater, install dishwasher to verify hi- loop and hammer arrestor, add water heater to scope of work, rest ok. | TAYLOR | TAYLOR | | P= | P | 5950728 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PTO | C | 08/20/2018 | relocation of break sink drain ok. | TAYLOR | TAYLOR | | PTO | C | 5939009 |
VALUE PLUMBING AND WATER TREATMENT COMPANY, INC | PTO | C | 06/05/2018 | note: by final need to add new water heater to scope of work can check it at final in janitor closet, aav @ sink | JOSEPHD | JOSEPHD | | PTO | C | 5864516 |