THE GARRETT CONSTRUCTION COMPANY LLC | B= | C | 12/10/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6421922 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 12/03/2019 | final OK pending other finals / pool equipment structure on its own permit (pemit # M62625). Additional Inspections Required (computer generated): JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6415220 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 11/27/2019 | Temp CO: Okay per Bert ( Expires: 12/27/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6411261 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 11/12/2019 | still need separate permit for pool mechanical equipment enclosure / all other items corrected / final OK pending opening a separate permit for the pool equipment enclosure and all MEP's associated with it -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 6396080 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 10/22/2019 | Temp CO: Okay per Matt M ( Expires: 11/21/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6376852 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/07/2019 | Met contractors from Garrett Construction on site to discuss pool inspections. Discussed need for permit for equipment enclosure as the only drawing for he enclosure are on the landscaping pages of building 1 permit and those drawing are only stamped by an engineer that is not a Colorado licensed structural engineer. Discussed either splicing onto building 1 permit or getting a separate permit for the enclosure. Discussed all items needed for pool final including accessible elements and exiting and fencing and safety equipment and signs / still need all engineer observations for pool submitted to pool permit | DANE | DANE | | BSP | P | 6359631 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 09/19/2019 | FINAL RE-INSPECTION OF ALL FLOORS, GARAGES, LEASING OFFICES, COMMON AREA, AND EXTERIOR -- Still missing vertical grab bar at both restrooms at leasing office -- All mech. rooms at end of corridors on all floors still need self closing mechanism -- Still need landings outside all doors ways on west exterior -- All other items from previous inspection corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | P | 6341042 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 08/13/2019 | Temp CO: Per Matt M. to extend TCO for another 30 days ( Expires: 9/12/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6299175 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 07/12/2019 | Temp CO: Per Bert - ok to reopen if progress has been made ( Expires: 8/11/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6262399 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/25/2019 | site canceled / items not ready for inspection per superintendent -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection UWS by CSUREVIEW is not Completed yet (Contact: 668-3524), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6242856 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/17/2019 | revised stamped engineer letter of compliance received for footing and PT slab and open hole and structural steel / revised on 6/13/19 to include structural steel | DANE | DANE | | BSP | P | 6233587 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/14/2019 | Temp CO: TCO pending All finals ( Expires: 7/14/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6231959 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/13/2019 | final inspection at all garages and 1st floor storage rooms and leasing offices and common areas at 1st floor and exterior / exterior - need to complete siding and cap at parapet at southwest corner at curved wall - need to complete fascia and post siding over east entry at south end - need to seal all exterior penetrations to make weather resistant - need to install all splach blocks so that water will flow away from foundation - need landings outside of all doors at west side of building at pool end (south end) / garages and storage rooms at first floor corridor - garage 2 has hole in exterior wall on south side of garage door - garage 16 need to install rated access at north end of west wall - all garages and storage room doors need to be self closing and latching - all mechanical room doors at all 4 levels at north ends of corridors all need to be self closing and latching / all doors from both exit stair enclosures need to have smoke seals installed / leasing and public areas - need to install knee protection at both restrooms - need single action locks at all toilet compartments and missing vertical grab bars at both accessible toilets - missing all grab bars and seats and clear floor space for transfer showers in both restrooms - need restroom signs (no mirrors in at this time) / need knee protection at sinks in community room and break room / still need all units to have code compliant dead bolts at all type A and B units / unit 217 still needs all items corrected from previous inspection from 6/6/19 / still need engineer observations for structural steel -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6230943 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/12/2019 | courtesy walk at leasing offices and exercise room and all other A occ. / not ready for inspection at this time / transfer showers are lacking clear floor space outside of them - need all restroom signs / need to splice in the design change at the office on the east wall / need to install rated access at the mech room / need knee space at al sinks / need complete reinspection / inspection of all storage rooms and garages stopped as not ready - still need to install all smoke seals and fix all penetrations / need complete reinspection of these areas / discussed accessible elements / discussed need for its own permit for the pool heater house / still need to inspect all accessible locks at all units -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6228694 |
KIMBEL MECHANICAL SYSTEMS, INC. | BSP | T | 06/11/2019 | PAID (REC#1605784) PAID (REC#1605783) ADDITIONAL PLAN REVIEW TIME: $50 From: BECKYA Revised wall ratings / See A & M in images | BECKYA | BECKYA | | BSP | T | 6226652 |
KIMBEL MECHANICAL SYSTEMS, INC. | BSP | T | 06/11/2019 | PAID (REC#1605784) PAID (REC#1605783) ADDITIONAL PLAN REVIEW TIME: $50 From: BECKYA delta 16 and 17 per Dale | BECKYA | BECKYA | | BSP | T | 6226650 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/10/2019 | items from previous inspections for 2nd and 3rd floor corrected except, need complete inspection unit 217 type A unit and need code compliant dead bolts for all type B units throughout / units 101 - 105 okay, still need to inspect all garages, club house, public rest rooms and exterior -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6226440 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFT | C | 06/10/2019 | open hole on file -- 2000 PSF -- usable -- 10% / footing and foundation observation on file - ufer noted / foundation design on file (bearing capacity verified) / | BOBF | BOBF | | BFT | C | 6225206 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/10/2019 | letter approving shaftliner installation from for elevator shaft on file | BOBF | BOBF | | BSP | P | 6225196 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/07/2019 | pending completion of other required inspections units 401 - 417 okay including mech rooms, still need to inspect corridor -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6224445 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 06/06/2019 | 2nd floor final inspection at all units and storage rooms / still need to fix all penetrations inside of all mechanical rooms including around all A/C condensers through exterior walls / 204 - bath fan at north bathroom not working / 206 - bath fan at south bathroom not working / storage room S30 - need to fire caulk at conduits through ceiling assembly / 209 - bath fan at south bathroom is not working / 216 - door to deck is missing weather stripping / unit 217 (type A unit) - grab bars that have been installed in the accessible hall bath are the wrong size and in the wrong position / all grab bars are missing from the bath tub / missing the hand held shower head with the non-positive shut off valve and minimum 59" long hose - dead bolts at deck door and main entry do not have the proper offset lever / all units in whole building need offset levers on all deadbolts at main entries / still need to inspect all of 1st level and reinspect levels 2 3 and 4. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6222698 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/06/2019 | penetrations above new drops in main corridors at north ends OK at 1st 2nd 3rd and 4th levels / still need to inspect penetrations inside of all mechanical rooms by new drops | DANE | DANE | | BSP | P | 6222668 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/05/2019 | level 3 building final at all units and corridor between exit enclosures / need to seal the penetration of all of the A/C condenser units in all mech rooms and need to seal all other penetrations in all mech rooms in all units - need to reinspect all mechanical rooms in all units / need to complete the fire caulking of the wires into the rated assemblies at the new ceiling drop at the north end of the main corridor / need to install smoke seals at north storage room / all other parts of units 301 through 317 and the 2 center storage rooms and the south end storage room are OK pending other roughs / discussed need for all stamped footing and foundation and open hole paperwork and engineer observations for welding and bolting of steel structural components -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6221122 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 06/04/2019 | site canceled / not ready. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6219103 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 06/03/2019 | final inspection at unit 402 404 406 408 410 412 and 414 / need to complete fire caulking at all mechanical rooms (all need sprinkler pipes fire caulked at inside of room) and need to remove spray foam around A/C condensing units in all exterior walls and seal with a non-combustible method / interior of all 4th floor units OK pending other finals / met contractor and did courtesy walk on unit 217 for accessibility as it is a type A unit and all others at type B -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6217919 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 05/31/2019 | met with contractor and discussed final inspection process and TCO process / discussed need to complete BFN. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6216484 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/28/2019 | last layer of type C rock at 2 hour ceiling assembly UL L577 OK at ceilings of garages 6 and 7 | DANE | DANE | | BSP | P | 6211469 |
THE GARRETT CONSTRUCTION COMPANY LLC | B16 | P | 05/23/2019 | Discussed fire resistance rated assemblies in 1st floor corridor - met with Contractor and Mech Inspector Lido, discussed Spliced changes in wall types and UL Listings for walls outside Exercise (including corridor and door outside of Exercise) | RICHB | RICHB | | B16 | P | 6209348 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/23/2019 | 1st additional layer of sheetrock on ceiling assembly in both garages OK per Splice / additional layer of sheetrock on both faces of wall in garages OK per Splice / discussed UL U301 and UL L577 with Contractor | RICHB | RICHB | | BSP | P | 6209340 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/22/2019 | Discussed fire resistance rated assembly changes in Splice - UL U301 and L577 reviewed onsite, garage ceiling RC in both garage OK per listing | RICHB | RICHB | | BSP | P | 6207594 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 05/20/2019 | Need all third party paperwork to complete BFT and BFN / 4th Floor - Units 401, 403, 405, 407, 409, 411 and 415 are OK pending third party observations and other Finals /. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet, WESTERN FIREPLACE SUPPLY INC Mechanical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | R | 6205397 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/13/2019 | Reviewed framing at 2nd floor elevator door infill which matches UL U529 - need design change Spliced into plans | RICHB | RICHB | | BSP | P | 6197162 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 05/10/2019 | elevator infill inspection site canceled / not ready per superintendent | DANE | DANE | | BSP | R | 6195679 |
THE GARRETT CONSTRUCTION COMPANY LLC | B16 | P | 05/03/2019 | Consult added per field request - discussed infill between elevator CMU wall and door frame, reviewed UL U529 on engineer-stamped design onsite, will need any UL Listing changes Spliced into drawings prior to inspection requests | RICHB | RICHB | | B16 | P | 6187043 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 05/02/2019 | Elevator door openings - field cancelled | RICHB | RICHB | | BSP | R | 6185657 |
THE GARRETT CONSTRUCTION COMPANY LLC | B16 | P | 04/30/2019 | Discussed ANSI Type A bathroom requirements | RICHB | RICHB | | B16 | P | 6182894 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/17/2019 | Elevator shaft ceiling - 2nd layer OK per UL U511 / discussed penetration firestopping in stairwells | RICHB | RICHB | | BSP | P | 6168718 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/17/2019 | Elevator shaft ceiling - 1st layer of sheetrock and RC OK per UL U511, inspection was performed on Apr 16 per field request by Ed (with Garrett) | RICHB | RICHB | | BSP | P | 6168075 |
THE GARRETT CONSTRUCTION COMPANY LLC | B16 | P | 04/16/2019 | Discussed continuity of fire barriers in 1st floor corridors including locations where Mechanical re-routing will require additional dampers | RICHB | RICHB | | B16 | P | 6167843 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/05/2019 | Clubhouse restrooms, fire resistance rated ceilings - Face layer OK per UL L577 // still need to inspect face layer in Fitness (repaired areas only) | RICHB | RICHB | | BSP | P | 6156443 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 04/04/2019 | Field cancelled by Ed (with Garrett) | RICHB | RICHB | | BSP | R | 6155643 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/03/2019 | Clubhouse restrooms, fire resistance rated ceilings - 2nd layer OK per UL L577, need to inspect face layer // Fitness, ceiling - 2nd layer (in repaired areas from yesterday) OK per UL L577, need to inspect face layer // discussed continuity of fire resistance rated wall at elevator openings | RICHB | RICHB | | BSP | P | 6154099 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/02/2019 | Clubhouse restrooms, fire resistance rated ceilings - first layer and RC OK per UL L577, need to inspect both remaining layers // Fitness, ceiling - first layer and RC where fire dampers and associated ductwork was removed (due to redesign in Splice) OK per UL L577, need to inspect both remaining layers | RICHB | RICHB | | BSP | P | 6152786 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/02/2019 | Frame & Firestop, 1st floor - clubhouse bathrooms OK | RICHB | RICHB | | BFR | P | 6152785 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 03/12/2019 | West window wall insulation OK at first floor | JEREMYA | JEREMYA | | BIN | P | 6131131 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 03/11/2019 | Thermal - Mail Room (adjacent to Leasing) OK | RICHB | RICHB | | BIN | P | 6130394 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 03/08/2019 | Thermal, Clubhouse - walls OK | RICHB | RICHB | | BIN | P | 6128650 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/08/2019 | Clubhouse ceiling - Face layer & fasteners OK per UL L577 | RICHB | RICHB | | BSP | P | 6128648 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 03/07/2019 | Clubhouse - Framing & firestop is now complete | RICHB | RICHB | | BFR | P | 6127353 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/07/2019 | Leasing ceiling - Face layer of sheetrock & fasteners OK | RICHB | RICHB | | BSP | P | 6127341 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/06/2019 | Clubhouse - 2nd layer of sheetrock (base layer on RC) OK per UL L577, verified fastener type & length, discussed fastener requirements for face layer of sheetrock | RICHB | RICHB | | BSP | P | 6126168 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/05/2019 | Clubhouse - 1st layer and RC on ceiling OK per UL L577, verified fastener type & length, discussed fastener requirements for remaining layers of sheetrock | RICHB | RICHB | | BSP | P | 6124770 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 03/04/2019 | Clubhouse - framing & firestop OK except for several plate penetrations on North wall | RICHB | RICHB | | BFR | P | 6123679 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/04/2019 | Exercise 115 ceiling -Rest of face layer (on RC) OK // Leasing ceiling -Discussed 2nd layer of sheetrock & fasteners | RICHB | RICHB | | BSP | P | 6123678 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 03/01/2019 | Thermal, 1st floor - Leasing area (including upper area) OK | RICHB | RICHB | | BIN | P | 6121903 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/01/2019 | Exercise 115 ceiling -Rest of 1st layer (on RC) OK, face layer of sheetrock (which is the 2nd layer applied to RC) OK on West half only, still need to inspect the East half // Leasing ceiling - 1st layer of sheetrock & fasteners OK | RICHB | RICHB | | BSP | P | 6121898 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/28/2019 | Exercise 115 - 2nd layer of sheetrock (which is the first layer applied to RC) OK on West half only, still need to inspect the East half and all of the face layer // discussed status of the correction for the window concern in Exercise 115 (first noted on Jan 29) | RICHB | RICHB | | BSP | P | 6120650 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/27/2019 | Exercise 115 - first layer of drywall and RC on rest of ceiling OK, reviewed UL L577 onsite, discussed fasteners and inspections required for additional 2 layers | RICHB | RICHB | | BSP | P | 6119523 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/22/2019 | All unit with tub valves in fire resistance rated assemblies have been addressed | RICHB | RICHB | | BSP | P | 6114674 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 02/21/2019 | Tub valves at fire resistance rated walls, 1st floor - none ready | RICHB | RICHB | | BSP | R | 6113303 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 02/20/2019 | Clubhouse - ceiling OK pending other Roughs, exterior walls OK pending other Roughs // Restrooms 113 & 114 - ceilings OK pending other Roughs | RICHB | RICHB | | BFR | P | 6111823 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/15/2019 | Exercise 115 - first layer of drywall and RC on ceiling (borders only, above soffit) OK, reviewed UL L577 onsite | RICHB | RICHB | | BSP | P | 6108828 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 02/14/2019 | Thermal, 1st floor - clubhouse OK at NE corner only (behind framing for mechanical chase), Exercise Room OK above windows only (behind soffit framing) | RICHB | RICHB | | BIN | P | 6107503 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/07/2019 | Firestopping in bathrooms (behind cabinets) - 1st & 2nd floor units all OK | RICHB | RICHB | | BSP | P | 6101188 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/04/2019 | Firestopping at bathrooms (behind cabinets), 3rd floor - Need Units 301, 302, 314 & 316, all other units on this floor OK | RICHB | RICHB | | BSP | P | 6097284 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 01/31/2019 | Firestopping, 3rd floor - cancelled by Ed | RICHB | RICHB | | BSP | R | 6094102 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/29/2019 | Training with Rich - Accessible elements - differences between type A and type B units / Protection of openings in rated assemblies / Plan reading / code interpretation and application / Safety glazing in commercial | JUSTINL | JUSTINL | | BSP | P | 6091546 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/29/2019 | Firestopping at bathrooms (behind cabinets), 4th floor - Still need Units 404, 405, 415 & 416 where shower valves are penetrating the assembly // need clarification on (3) windows in Exercise 111 corridor wall where plans do not indicate any rating (wall is a 2-hour fire resistance rated assembly) // training with Justin - fire-resistance rated walls (including membrane penetrations and opening protection), ANSI accessibility (including Type A & Type B clearances, operable parts and heights), plan reading (including elevation views of bathrooms) and safety glazing | RICHB | RICHB | | BSP | P | 6091544 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/25/2019 | Firestopping at bathrooms (behind cabinets), 4th floor - Need Units 404, 404, 405, 414 and 415, all other units on this floor OK /// discussed ANSI compliance with Contractor - building has Type A, Type B Option A and Type B Option B units | RICHB | RICHB | | BSP | P | 6088620 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/24/2019 | Interior gyp shear - garage and Unit 108 are now OK, all shear on this level is OK | RICHB | RICHB | | BSP | P | 6087486 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/23/2019 | Training with Rich - Interior Gyp shear | JUSTINL | JUSTINL | | BSP | P | 6086460 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/23/2019 | Interior gyp shear - garages OK EXCEPT north garage at exterior wall, all units OK (units are only on North end, West side) // training with Justin - drywall shear, OSB shear, walls with both shear and fire-resistance rating | RICHB | RICHB | | BSP | P | 6086430 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/22/2019 | 1st layer of sheetrock, inside of stairwells - North stairwell material & fasteners OK / 2nd layer of sheetrock on West side of corridor, 1st floor at Exercise room OK | RICHB | RICHB | | BSP | P | 6084615 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/18/2019 | 1st layer of sheetrock, inside of stairwells - South stairwell material & fasteners OK, discussed stagger for 2nd layer, still need North stairwell both layers | RICHB | RICHB | | BSP | P | 6082995 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 01/17/2019 | Cancelled via phone call by Ed | RICHB | RICHB | | BSP | R | 6081311 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 01/16/2019 | Interior gyp shear, 1st floor - Field cancelled by Ed | RICHB | RICHB | | BSP | R | 6080526 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/15/2019 | Training with Rich - drywall shear fastening requirements - over driven fasteners at shear walls | JUSTINL | JUSTINL | | BSP | P | 6079253 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 01/15/2019 | Field cancelled by Ed / Training with Justin - drywall shear fastening requirements | RICHB | RICHB | | BSP | R | 6079103 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/14/2019 | Sheetrock on West side of corridor, 1st floor (at Exercise Room) - material and fasteners on corridor-side in this are only is OK per Wall Type W6 (UL U305) | RICHB | RICHB | | BSP | P | 6077492 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 01/14/2019 | Framing for entry arches (at South end) OK per plans | RICHB | RICHB | | BFR | P | 6077486 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/14/2019 | RC, stairwells - both stairwells now complete | RICHB | RICHB | | BSP | P | 6077473 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/14/2019 | Interior gyp shear - 2nd floor is now complete | RICHB | RICHB | | BSP | P | 6077469 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/09/2019 | Interior gyp shear - 2nd floor need units 205, 206, 208, 210, 214... all other units on this floor OK //// discussed rated floor ceiling assembly (UL L577) being used in several areas, need inspection for each layer of sheetrock and RC/hat after 1st layer //// reviewed requirement for FRTW faux beams on ceiling (see Sheet A6.14) | RICHB | RICHB | | BSP | P | 6073860 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 01/08/2019 | Interior gyp shear - field cancelled due to GypCrete pour | RICHB | RICHB | | BSP | R | 6071781 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 01/07/2019 | Thermal, stairwells - both stairwells OK, RC on North stair ceiling OK, need to inspect RC on South stir ceiling when ready | RICHB | RICHB | | BIN | P | 6070360 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 01/07/2019 | Interior gyp shear, 2nd floor - not ready, reviewed shear wall fastening requirements onsite | RICHB | RICHB | | BSP | R | 6070352 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/21/2018 | 3rd floor gypsum shear nailing OK / first floor thermal insulation OK at all dwelling units and garages only | DANE | DANE | | BSP | P | 6061065 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/19/2018 | Interior OSB shear, 2nd floor - all units on this floor are OK //// Interior OSB shear, 1std floor - all units on this floor are OK | RICHB | RICHB | | BSP | P | 6058670 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/18/2018 | RC, 1st floor - corridor ceilings OK | RICHB | RICHB | | BSP | P | 6056835 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 12/14/2018 | Thermal - All units on 2nd, 3rd and 4th floor are now OK, still need 1st floor | RICHB | RICHB | | BIN | P | 6053507 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/14/2018 | Interior shear, 4th floor - All units on this floor are now OK, still need all other floors | RICHB | RICHB | | BSP | P | 6053502 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/13/2018 | Frame & firestop, 2nd floor - Corridor OK pending other Roughs, this floor is now complete pending other Roughs //// Frame & firestop, 1st floor - all units and garages OK pending other Roughs, still need corridors and clubhouse area inspected | RICHB | RICHB | | BFR | P | 6052338 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/13/2018 | Frame & firestop - both stairwells OK pending other Roughs, reviewed listed assemblies and firestopping listings | RICHB | RICHB | | BFR | P | 6052334 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 12/13/2018 | Thermal, 2nd floor - all units on this floor OK | RICHB | RICHB | | BIN | P | 6052328 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/12/2018 | Frame & firestop, 3rd floor -Unit 306 truss repair OK per engineering, all units on this floor now OK //// Frame & firestop 2nd floor - Units 203 & 205 repairs complete, Unit 215 OK, all units on this floor now OK | RICHB | RICHB | | BFR | P | 6050769 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | R | 12/12/2018 | Thermal, 2nd floor - No units ready | RICHB | RICHB | | BIN | R | 6050768 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 12/11/2018 | Thermal, 3rd floor - Unit 317 OK, all units on this floor now OK | RICHB | RICHB | | BIN | P | 6049465 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/11/2018 | Frame & firestop, 2nd floor - Unit 211 OK, still need Unit 215 and bearing wall repairs on 203 & 205 | RICHB | RICHB | | BFR | P | 6049459 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/11/2018 | Frame & Firestop 3rd floor - Unit 306 truss fix reviewed onsite, repairs not per engineering, all other 3rd floor units OK per previous inspections //// Frame & firestop, stair towers - South stair OK on 3rd & 4th floors, still need 1st & 2nd floor on this tower and all other floors on North tower | RICHB | RICHB | | BFR | P | 6049457 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/10/2018 | Frame & firestop, 2nd floor - Still need units 211 & 215, need bearing wall repairs in Units 203 & 205 where studs were cut for 3" PVC, all other units on this floor OK | RICHB | RICHB | | BFR | P | 6047883 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 12/10/2018 | Thermal, 3rd floor - Still need 317, all other units on this floor OK | RICHB | RICHB | | BIN | P | 6047879 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/07/2018 | Frame & firestop, 2nd floor - Units 209 through 212 OK, Units 214, 216 & 217 OK, still need all other units and corridor | RICHB | RICHB | | BFR | P | 6046791 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 12/07/2018 | Thermal, 3rd floor - Need Units 301, 302 and 317, all other units on this floor OK //// 4th floor units are all OK per previous inspections | RICHB | RICHB | | BIN | P | 6046771 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/07/2018 | Frame & firestop, 3rd floor - Need updated truss fix for F03A in Unit 306 (both chords broken, fix on file is for top chord only), all other units OK, still need corridor //// 4th floor including corridor OK per previous inspections | RICHB | RICHB | | BFR | P | 6046758 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/06/2018 | Frame & firestop, 3rd floor - Units 301, 302, 305 & 317 OK, still need stamped copy of truss fir for Unit 306, all other units on this floor OK | RICHB | RICHB | | BFR | P | 6044843 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/06/2018 | RC, 3rd floor ceilings - Units 301, 302, 305 & 317 OK - all units on 3rd floor now OK | RICHB | RICHB | | BSP | P | 6044837 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/04/2018 | Interior gyp shear inspection, 4th floor - Units 409, 411 & 412 OK, still need 401 through 408 and 410 //// Training with Justin - drywall shear including panel orientation and edge blocking requirements | RICHB | RICHB | | BSP | P | 6042574 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/04/2018 | RC, 3rd floor ceilings - Units 303, 304, 306, 307 & 308 OK per plans & UL Listings (L546 & L577 reviewed onsite) still need 301, 302, 305 & 317 /// Training with Justin - fire resistance rated floor-ceiling assemblies, RC installation, fire damper framing requirements | RICHB | RICHB | | BFR | P | 6042563 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/04/2018 | Frame & firestop, 3rd floor - Units 303, 304, 307 & 308 OK, still need 301, 302, 305 and 317, need stamped copy of truss fix for T03A in 306 (OK otherwise) //// Training with Justin - firestopping, fire resistance rated assemblies (including floor-ceiling) | RICHB | RICHB | | BFR | P | 6042543 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/04/2018 | Training with Rich - Approved firestop methods / RC channel installation and overlap per listing / Ceiling dampers in relation to RC channel installation / Interior drywall shear fastening | JUSTINL | JUSTINL | | BSP | P | 6042532 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 12/03/2018 | Frame & firestop, 3rd floor - Units 309 through 316 OK, still need Units 317 and 301 through 308 //// RC, 3rd floor ceilings - Units 309 through 316 OK, still need Units 317 and 301 through 308 | RICHB | RICHB | | BFR | P | 6041295 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 12/03/2018 | Interior gyp shear inspection / 4th floor units - no additional units ready, discussed fastener spacing and edge blocking | RICHB | RICHB | | BSP | R | 6041282 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/29/2018 | Interior gyp shear inspection / 4th floor units - 414 - 415 - 416 - 417 okay only | BRIANB | BRIANB | | BSP | P | 6038658 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 11/27/2018 | 4th floor interior shear - field cancelled by Contractor | RICHB | RICHB | | BSP | R | 6035713 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 11/21/2018 | Thermal, 4th floor - remainder of units OK | RICHB | RICHB | | BIN | P | 6032749 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 11/21/2018 | 4th floor frame & firestop - corridors OK //// 4th floor RC - corridor ceiling OK | RICHB | RICHB | | BFR | P | 6032748 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 11/20/2018 | 4th floor frame & firestop - Unit 402 OK, Unit 407 OK, all units on this floor now OK, still need 4th floor corridor insepcted | RICHB | RICHB | | BFR | P | 6030961 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 11/20/2018 | Thermal, 4th floor - Units 409 through 417 OK, still need all other units | RICHB | RICHB | | BIN | P | 6030960 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 11/20/2018 | RC channel - not ready | RICHB | RICHB | | BSP | R | 6030959 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 11/16/2018 | 4th floor frame & firestop - Unit 401 OK / still need Unit 402 dried-in and still need Unit 407 repaired / firetaping and fasteners complete per UL U301 on outside of 4th floor North Stairwell only - still need South Stairwell and all other floors | RICHB | RICHB | | BFR | P | 6028298 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 11/15/2018 | 4th floor frame & firestop --- Unit 401- not dried in / Unit 402 - not dried in / Unit 407 - need 4" hole in bottom plate in bathroom repaired / framing & firestopping OK in all other 4th floor rooms / still need to inspect corridors, common areas and stairwells / still need to inspect taping & mudding of face layer on outside of stairwells // reviewed UL U305, U341, U356, P522 and L546 onsite | RICHB | RICHB | | BFR | P | 6026893 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/12/2018 | 2nd layer of sheetrock on outside of stairwells - OK at truss elevation in attic // discussed RC inspection and fire damper requirements at RC | RICHB | RICHB | | BSP | P | 6023126 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/09/2018 | Roof trusses - trusses & connections OK, reviewed fix at stairwells (all truss corrections made in order to preserve fire resistance rated wall continuity) // 1st layer of sheetrock on outside of stairwells at truss elevation OK, need to inspect 2nd layer | RICHB | RICHB | | BSP | P | 6022190 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 11/07/2018 | Field cancelled by Contractor | RICHB | RICHB | | BSP | R | 6018850 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/02/2018 | Reviewed truss fixes on file in field office - truss repairs to date are OK, need copy of all truss fixes for RBD records / discussed truss changes at stair walls (previously noted) | RICHB | RICHB | | BSP | P | 6014654 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/31/2018 | 2nd layer of sheetrock in stairwells - material & fastening OK on outside of stairwell OK with the exception of the roof truss penetrations at the top of both stairwells, truss tails stick 3"+ through the first layer which interrupts the UL U301 continuity, still need to inspect sheetrock on inside of stairwells | RICHB | RICHB | | BSP | P | 6011997 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/25/2018 | 1st layer of sheetrock in stairwells - material & fastening OK on outside of stairwell OK with the exception of the roof truss penetrations at the top of both stairwells, truss tails stick 3"+ through the first layer which interrupts the UL U301 continuity, still need to inspect sheetrock on inside of stairwells /// discussed ANSI Type B Option A bathroom requirements with regards to units shown on A2.16 and A2.17 | RICHB | RICHB | | BSP | P | 6006062 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 10/23/2018 | 1st layer of sheetrock in fire resistance rated stairwells - need fasteners at all required locations (missing at several studs, all floor spaces at trusses and several panel edges), need to address continuity issue at intersecting roof trusses where truss tails protrude into or through sheetrock, full reinspection of 1st layer needed // discussed accessible items including shower controls and bathroom layout | RICHB | RICHB | | BSP | R | 6003617 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/17/2018 | Exterior shear // clubhouse area OK, all areas now OK, discussed hold-down inspection which is still needed in all areas | RICHB | RICHB | | BSP | P | 5997727 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/17/2018 | Pre-rock inspection // remainder of tubs & mechanical closets OK on all floors | RICHB | RICHB | | BSP | P | 5997722 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/09/2018 | Exterior shear - still need to inspect Clubhouse (South end of building), all other areas, all floors OK // training with Justin - shear details, pre-rocking and fire resistance rate floor penetrations | RICHB | RICHB | | BSP | P | 5990320 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/04/2018 | Pre-rock inspection // janitor closets in hallways - 2nd & 3rd floor OK, other not ready // tubs - 116, 204, 207, 216, 217, 304, 305, 307, 308, 314, 316, 317 & 405 OK, others not ready // mechanical closets - 203 through 211, 215, 216, 303, 304, 305, 307, 308, 309, 310, 312, 314 through 317, 403, 404, 405, 407, 409, 411, 415 OK, others not ready //// training with Justin - firestopping, framing details, fire resistance rated assemblies (including floor/ceiling listings) | RICHB | RICHB | | BSP | P | 5986540 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/04/2018 | Training with Rich - unit separation walls - Construction type - electrical receptacles in separation walls - Fireblock materials and applications - floor-ceiling assembles | JUSTINL | JUSTINL | | BSP | P | 5986520 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/20/2018 | Discussed (with Contractor) pre-rock areas and sequencing of inspections prior to gyp-crete / discussed (with Contractor and Electrician) rated assemblies in several areas where electrical feeders will need to be located | RICHB | RICHB | | BSP | P | 5971627 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/14/2018 | Site visit with Inspector Lonny - met with Contractor to discuss progress and UL Listings / inspected exterior gyp on clubhouse walls (approximate gridlines 2.7 and B.7) - material and nailing OK on these areas | RICHB | RICHB | | BSP | P | 5965261 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/14/2018 | site visit with inspector Rich / meet and greet as well as update on progress and previous inspections | LONNYS | LONNYS | | BSP | P | 5965244 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 08/24/2018 | Site visit with site rep Kent - reviewed U301 2 hour rated wall for stair enclosure / verified gyp typ. panel ray S A MDX / discussed detail for stair beam hanger attachment to rim and prerock for stair landings | LONNYS | LONNYS | | BSP | P | 5945247 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/23/2018 | training with inspector Lonny S. / met at job trailer with site superintendent and discussed inspection process and job progression. discussed accessible elements and need for stamped engineer observations for footing, foundation, CMU, foundation insulation, welding and bolting and intumescent paint. Discussed pool and permits for pool and trash enclosure and retaining wall. Discussed rated assemblies and listings for penetrations in rated assemblies | DANE | DANE | | BSP | P | 5911027 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/23/2018 | inspection request changed to BSP / training and site visit with inspector Dane S. and site rep Lee / discussed inspection scheduling and 3rd party inspections/ reviewed accessibility - fire rated assemblies - listings and engineer judgments / reviewed additional permits needed for over all site | LONNYS | LONNYS | | BSP | P | 5911017 |
STILSON ELECTRIC SYSTEMS, INC. | E= | C | 12/04/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 6415309 |
SOUTH CENTRAL ELECTRIC LLC | E= | C | 06/18/2019 | corrections made | GARYL | GARYL | | E= | C | 6235664 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 06/14/2019 | apartments ok, club house still needs gfci for disposal and PLATE and ???? | GARYL | GARYL | | E= | P | 6231864 |
SOUTH CENTRAL ELECTRIC LLC | E= | T | 06/13/2019 | PAID (REC#1606455) recept's mentioned before, still not gfci protected | GARYL | GARYL | | E= | T | 6230465 |
STILSON ELECTRIC SYSTEMS, INC. | E= | P | 06/10/2019 | FIRE ALARM INSPECTION: final on this building only | GARYL | GARYL | | E= | P | 6225695 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 06/06/2019 | club house only, gfci recept's within 6' of sink, several areas, water cooler recept -- access | GARYL | GARYL | | E= | P | 6222915 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 05/28/2019 | Units: 108, 110, 112, 114, 116 | GARYL | GARYL | | E= | P | 6211586 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 05/24/2019 | 203 -204-205-206-207-208-209 OK -- 2 br-a/c 30--- 1br--20 | CRAIGS | CRAIGS | | E= | P | 6210253 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 05/23/2019 | #417--check paperwork on hood wiring, all functions of fan to be controlled from wall switches, UNITS 210, 211, 212, 214, 215 , 216 okay | GARYL | GARYL | | E= | R | 6208580 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 05/22/2019 | 301-317 okay NOTE! a/c units 2-br=30 amps, 1-br=20 amps | GARYL | GARYL | | E= | P | 6207105 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 05/20/2019 | 301 - bad afci breaker --- 303-- no power in the bathroom 304 -- missing bathroom receptacle in the bathroom off the kitchen 302 ---- OK | CRAIGS | CRAIGS | | E= | R | 6204851 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 05/17/2019 | 409--410---411--412--414--415---- a/c 's OK | CRAIGS | CRAIGS | | E= | P | 6203086 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 05/16/2019 | need a/c max/min posted on all units, 2-br are 30a, 1-br are 20a, 417 and 416 are okay, today I went thru 401-408 | GARYL | GARYL | | E= | R | 6201665 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 05/15/2019 | 417 still has broken flex ---- 416 needs tr in 3 gang in the kitchen | CRAIGS | CRAIGS | | E= | R | 6200506 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 04/26/2019 | APT 417 / Need working clearance for HWH disconnect / Unit heater needs 2 pole breaker and disconnect at unit / Repair broken flex at top of AHU / Need rating of Heat Coil in AHU / | ROB | ROB | | E= | R | 6180173 |
SOUTH CENTRAL ELECTRIC LLC | ER | C | 02/25/2019 | Rough on this building is complete | GARYL | GARYL | | ER | C | 6116123 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 02/06/2019 | soffitt area only in mail and exercise room | GARYL | GARYL | | ER | P | 6099690 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 01/24/2019 | lid partial 3 foot from common wall and bath area first floor | BRET | BRET | | ER | P | 6087197 |
SOUTH CENTRAL ELECTRIC LLC | ES | C | 12/11/2018 | Commercial Service: 1-2000 amp., 120/208-4-wire, 1-800 amp., 120/208, 4-wire Okay to set all meters, tagged and marked | GARYL | GARYL | | ES | C | 6049074 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 12/07/2018 | FIRE ALARM INSPECTION: units 108,110,112,114,116 + corridors | RANDY | RANDY | | ER | P | 6046701 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 12/07/2018 | unit panels 108,110,112,114,116,118 | RANDY | RANDY | | EP | P | 6046700 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 12/07/2018 | units 108,110,112,114,116,-----corridors---- garages | RANDY | RANDY | | ER | P | 6046691 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 12/06/2018 | sub panels units 203,205,207,209,211,213,215 | BRET | BRET | | EP | P | 6044503 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 12/06/2018 | FIRE ALARM INSPECTION: 2nd floor units only | BRET | BRET | | ER | P | 6044501 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 12/06/2018 | units 203,205,207,209,211,213,215, 217 note secure se cable thru out corridor and to east unit panels, cable stubs to all mechanical closet ceiling. | BRET | BRET | | ER | P | 6044499 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 12/05/2018 | 2104,206,208,210,212,214,216,and 217 sub panels ok | BRET | BRET | | EP | P | 6043337 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 12/05/2018 | FIRE ALARM INSPECTION: 204,206,208,210,212,214,216,217 | BRET | BRET | | ER | P | 6043336 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 12/05/2018 | 204,206,208,210,212,214,216 and 217 need cables secured master closet | BRET | BRET | | ER | P | 6043335 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 11/14/2018 | Panels in 301-308 | GARYL | GARYL | | EP | P | 6025473 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 11/14/2018 | Units: 301-308 | GARYL | GARYL | | ER | P | 6025472 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 11/14/2018 | FIRE ALARM INSPECTION: All of 3rd floor, 301-317, NOTE! there is not a 313 | GARYL | GARYL | | ER | P | 6025469 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 11/13/2018 | Panels in: 309, 311, 313, 315, 317 | GARYL | GARYL | | EP | P | 6023852 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 11/13/2018 | UNITS: 309, 311, 313, 315, and 310, 316,, | GARYL | GARYL | | ER | P | 6023813 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 11/07/2018 | Panels okay in units: 310, 312, 314, 31 | GARYL | GARYL | | EP | P | 6018705 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 11/07/2018 | UNITS: 310, 312, 314 okay for rough, NOTE! Unit 310 is rejected, need critical windows installed for "dried in", | GARYL | GARYL | | ER | P | 6018679 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 11/01/2018 | Panels in units # 401 thru 408 okay | GARYL | GARYL | | EP | P | 6012987 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 11/01/2018 | Units: 401 thru 408 | GARYL | GARYL | | ER | P | 6012986 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 11/01/2018 | FIRE ALARM INSPECTION: UNITS: 401 thru 408 | GARYL | GARYL | | ER | P | 6012974 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 10/31/2018 | panels in units 409-410-411-412--414--415-416-417---ok | BRIAN | BRIAN | | EP | P | 6011747 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 10/31/2018 | FIRE ALARM INSPECTION: units--409-410-411-412-414--415-416-417- | BRIAN | BRIAN | | ER | P | 6011743 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 10/31/2018 | Discussed accessibility requirements with contractor / units--409-410-411-412-414-415-416-417---ok--------fire alarm needs to be called in at same time as ER | BRIAN | BRIAN | | ER | P | 6011736 |
J & B ELECTRIC OF COLORADO LLC | EUG | P | 08/09/2018 | Underground from transformer to building was already buried / J with CSU verified trenching and pipe met requirements / | ROB | ROB | | EUG | P | 5929453 |
J & B ELECTRIC OF COLORADO LLC | EST | R | 06/25/2018 | Not ready and contractor is getting Temp Power Permit / | ROB | ROB | | EST | R | 5884201 |
J & B ELECTRIC OF COLORADO LLC | EUG | P | 06/06/2018 | Ufer ground ok---#4 copper on north side of building / | ROB | ROB | | EUG | P | 5866746 |
J & B ELECTRIC OF COLORADO LLC | EUG | P | 06/05/2018 | Kitchen island PVC ok on ground level northwest corner / Talked to GC & EC about Ufer ground / | ROB | ROB | | EUG | P | 5864770 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | C | 12/10/2019 | GAS HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6421921 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | L | 12/05/2019 | GAS HEAT FINAL OK. PARTIAL PENDING: CONTRACTOR REQUESTING A FINAL INSPECTION. | LIDO | LIDO | | H= | L | 6417085 |
JR HOBBS CO - ATLANTA, LLC | H= | C | 12/04/2019 | HEAT FINAL OK ( TEST AND BALANCE REPORT RECEIVED SEE IMAGES) | LIDO | LIDO | | H= | C | 6415330 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 12/03/2019 | TEST AND BALANCE REPORT REVIEW : CLUBHOUSE AREA - GRILL # 8 OUTSIDE +/-10 % ALLOWED FROM THE DESIGN CFM'S . RESTROOM GRILL # 8 OUTSIDE +/-10 % ALLOWED. LEVEL 1,2,3,4 CORRIDOR - GRILL # 8 OUTSIDE +/-10 % ALLOWED. NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS. | LIDO | LIDO | | H= | P | 6413888 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/27/2019 | REVISED TEST AND BALANCE REPORT REVIEW - MULTIPLE OUTSIDE AIR AND SUPPLY AIR READINGS ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. MISSING RETURN AIR READINGS. CONTRACTOR MUST REVIEW TEST AND BALANCE REPORT BEFORE SUBMITTING. NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS. | LIDO | LIDO | | H= | P | 6410964 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/17/2019 | PARTIAL PENDING : REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS. ( REQUIRED SPLICES ARE IN THE SYSTEM) | LIDO | LIDO | | H= | P | 6401675 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/17/2019 | TEST AND BALANCE REPORT REVIEW: MISSING OUTSIDE ARE READINGS / MISSING RETURN AIR READINGS. MULTIPLE SUPPLY AIR READING ARE OUTSIDE 10 % PLUS OR MINUS ALLOWED.NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING REPORT READINGS. | LIDO | LIDO | | H= | P | 6401674 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/12/2019 | TEST AND BALANCE REPORT IS BEING REVIEWED | LIDO | LIDO | | H= | P | 6395656 |
KIMBEL MECHANICAL SYSTEMS, INC. | HSP | P | 09/18/2019 | ((GAS FOR POOL AREA IS ON THIS PERMIT )) | LIDO | LIDO | | HSP | P | 6340327 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 09/18/2019 | REFER TO PERMIT M00954 FOR POOL HEATERS / BOILERS. | LIDO | LIDO | | HSP | P | 6340326 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/18/2019 | ((GAS FOR POOL AREA IS ON THIS PERMIT )) PARTIAL PENDING : BUILDING -1- M-5.00 ( BDA 830) -MECHANICAL PLAN SPLICE DATED 8/13/19 SHOWS A DUCT SMOKE DETECTOR TO BE INSTALLED IN THE CORRIDOR AND COMMON AREA MECHANICAL ROOMS AIR HANDLERS RETURN AIR / INSTALL PER PLAN OR REVISED AND APPROVED PLANS ARE REQUIRED. 1ST FLOOR M3.01A ( BDA 824)THE SAME SPLICE SHOWS A FIRE DAMPER INSTALLED IN THE WALL FOR THE OUTSIDE AIR FOR AHU-1-1 / IT HAS BEEN DETERMINED THROUGH SITE INSPECTION AND PLAN REVISIONS THAT THIS DAMPER IS NOT REQUIRED AND WILL NEED TO BE REMOVED FROM THE MECHANICAL PLANS / NEED REVISED AND APPROVED PLANS REMOVING THIS FIRE DAMPER. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6339427 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/17/2019 | NEED TO REVIEW PERMIT TO SEE WHAT'S LEFT TO BE INSPECTED. (NEED WATER ENTRY ELECTRIC UNIT HEATER INSPECTED. NEED TEST AND BALANCE REPORT.)HEAT FINAL OK FOR THE FOLLOWING - COMMON AREA , LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS. | LIDO | LIDO | | H= | P | 6337806 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/16/2019 | BUILDING -1- M-5.00 ( BDA 830) -MECHANICAL PLAN SPLICE DATED 8/13/19 SHOWS A DUCT SMOKE DETECTOR TO BE INSTALLED IN THE CORRIDOR AND COMMON AREA MECHANICAL ROOMS AIR HANDLERS RETURN AIR / INSTALL PER PLAN OR REVISED AND APPROVED PLANS ARE REQUIRED. 1ST FLOOR M3.01A ( BDA 824)THE SAME SPLICE SHOWS A FIRE DAMPER INSTALLED IN THE WALL FOR THE OUTSIDE AIR FOR AHU-1-1 / IT HAS BEEN DETERMINED THROUGH SITE INSPECTION AND PLAN REVISIONS THAT THIS DAMPER IS NOT REQUIRED AND WILL NEED TO BE REMOVED FROM THE MECHANICAL PLANS / NEED REVISED AND APPROVED PLANS REMOVING THIS FIRE DAMPER. LEVEL 1 - M3.21 ( BDA 806) M5.00 ( BDA 830) - COMMON AREA AHU-C2 NOT READY / AHU-C-3 COMPLETE LOW VOLTAGE WIRES , SUPPORT CONDENSATE DRAIN . WATER ENTRY ELECTRIC HEATER NOT READY. LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS NOT READY. COMMON AREA AHU-C-1 OK . NEED TEST AND BALANCE REPORT BY FINAL. | LIDO | LIDO | | H= | P | 6336197 |
KIMBEL MECHANICAL SYSTEMS, INC. | HC | C | 08/09/2019 | OK TO RELEASE 2 lb METER. | LIDO | LIDO | | HC | C | 6294630 |
KIMBEL MECHANICAL SYSTEMS, INC. | HO | C | 08/09/2019 | GAS SPLICE IS IN THE SYSTEM. | LIDO | LIDO | | HO | C | 6294627 |
KIMBEL MECHANICAL SYSTEMS, INC. | HO | P | 08/06/2019 | WILL RELEASE METER AFTER REVISED / APPROVED SPLICE HAS GONE THROUGH PLANS AND REVIEW . REFER TO NOTES DATED 7/8/19 FOR ISSUES WITH UNDER GROUND GAS PIPE SIZING. COMMUNICATED TO ME BY GAS CONTRACTOR THAT GAS IS BEING CHANGED TO MEDIUM PRESSURE / A SPLICE IS REQUIRED FOR GAS PRESSURE CHANGE AND SPLICE WILL NEED TO SHOW MATERIAL USED FOR GAS PIPE INSTALL. ((10 lb TEST OK / GAS PIPE INSTALLED PER PLAN DATED 6/27/19 . COVER AT OWN RISK.)) | LIDO | LIDO | | HO | P | 6289745 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 07/09/2019 | ELEVATOR COMPLETE | ERIC | ERIC | | HE= | C | 6257790 |
JR HOBBS CO - ATLANTA, LLC | HO | P | 07/08/2019 | CHANGED TO (HO) LM. ((STILL NEED GAS INSPECTION FOR UNDERGROUND GAS TO EQUIPMENT IN POOL AREA.)) TABLE 402.4(2) WAS USED FOR SIZING THE UNDER GROUND GAS PIPE THAT SUPPLIES GAS FOR THE EQUIPMENT IN THE POOL AREA AND ABOVE GROUND GAS TO THE FIRE PLACE IN THE CLUB HOUSE .THIS TABLE IS FOR SCHEDULE 40 BLACK PIPE. POLYETHYLENE IS BEING INSTALLED - TABLE 402.4(19) WILL NEED TO BE USED WHEN SIZING THE GAS FOR THIS INSTALL, PER TABLE 402.4(19 )THE TOTAL BTU LOAD OF 1,150,000 AT 100 FEET DOES NOT WORK. INSTALL GAS PIPE PER SPLICE OR A REVISED AND APPROVED PLAN SPLICE WILL BE REQUIRED. | LIDO | LIDO | | HO | P | 6255201 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/25/2019 | BUILDING -1- ALL DWELLING UNITS 1,2,3,4 FLOOR - AIR HANDLER UNIT (AHU) SHUT DOWN WHEN SMOKE DETECTOR IS ACTIVATED OK. | LIDO | LIDO | | H= | P | 6243679 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/18/2019 | BUILDING -1- DWELLING UNIT AIR HANDLER UNIT (AHU) SHUT DOWN WHEN SMOKE DETECTOR IS ACTIVATED: 2ND FLOOR OK . 1ST FLOOR STILL NEED UNIT # 112 / REST OK. | LIDO | LIDO | | H= | P | 6235575 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/14/2019 | BUILDING -1- DWELLING UNIT AIR HANDLER UNIT (AHU) SHUT DOWN WHEN SMOKE DETECTOR IS ACTIVATED: 4TH , 3RD FLOOR OK . 2ND FLOOR- UNIT 205 NOT OK. 1ST FLOOR NOT READY. ALL AC CONDENSERS WEST SIDE OF BUILDING OK / STILL NEED TO LABEL FOR AREA SERVED . NORTH AND SOUTH STAIRWELL ALL FOUR ELECTRIC UNIT HEATERS OK. | LIDO | LIDO | | H= | P | 6232314 |
KIMBEL MECHANICAL SYSTEMS, INC. | HC | C | 06/14/2019 | METER RELEASE / METER WILL ALSO SUPPLY GAS FOR PERMIT # M00954. | LIDO | LIDO | | HC | C | 6231033 |
KIMBEL MECHANICAL SYSTEMS, INC. | H= | P | 06/14/2019 | PARTIAL PENDING : STILL NEED REVISED / APPROVED GAS PLANS FOR 3/4 CSST INSTALLED AND REROUTED UP WALL ABOVE CEILING AND DOWN TO FIRE PLACE . ((REFER TO (HI ) GAS NOTES DATED 3/1/19 FOR REFERENCE)) | LIDO | LIDO | | H= | P | 6231025 |
WESTERN FIREPLACE SUPPLY, INC. | H= | C | 06/14/2019 | FIREPLACE HEAT FINAL OK. | LIDO | LIDO | | H= | C | 6231019 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/13/2019 | BUILDING -1- DWELLING UNIT AIR HANDLER UNIT (AHU) SHUT DOWN WHEN SMOKE DETECTOR IS ACTIVATED: 4TH FLOOR - UNIT 416 NOT OK / REST OF UNITS OK. 3RD FLOOR - UNIT 307, 314 NOT OK / REST OF UNITS OK. 2ND FLOOR - UNIT 205, 206, 207, 209, 210, 211 NOT OK / REST OF UNITS OK. 1ST FLOOR- UNIT 116 OK / REST OF UNITS NOT READY. | LIDO | LIDO | | H= | P | 6230976 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 06/13/2019 | ELEVATOR COMPLETE. FIRE FINAL FOR ELEVATOR COMPLETE BUT REST OF BUILDING DID NOT PASS FIRE, PER RHONDA AT CSFD ELEVATOR CAN NOT BE USED. | ERIC | ERIC | | HE= | P | 6229812 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/12/2019 | BUILDING - 1- SUPPLY DUCT IN CORRIDOR SOFFIT ONLY FOR CORRIDOR MECHANICAL ROOMS LEVEL 1,2,3,4 OK. | LIDO | LIDO | | HD | P | 6229332 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/12/2019 | BUILDING -1- LEVEL 1 : MISSING MINI SPLIT IN SOUTH STAIRWELL.TOP OF ELECTRIC UNIT HEATER IN SOUTH STAIRWELL NEEDS TO BE 36" FROM CEILING . CLUBHOUSE / COMMON AREA : NEED TO LABEL THERMOSTAT FOR AHU-C-1 AND AHU-C-2 . NEED NEED FILTER FOR AHU-C-1 AND AHU-C-2. OUTSIDE AIR FOR AHU-C-1 IS MISSING THE MANUAL VOLUME DAMPER AND THE BACK DRAFT DAMPER. FOR THE OUTSIDE AIR TO AHU-C-2 NEED TO INSTALL ONE OF THE FOLLOWING - MOTORIZED DAMPER , BAROMETRIC DAMPER OR APPROVED SPRING LOADED DAMPER / DAMPER WILL NEED TO BE ACCESSIBLE AND LABELED. WATER ENTRY : EXHAUST OK / STILL NEED TO INSPECT ELECTRIC HEATER / NEED INSTALLATION INSTRUCTIONS .CLUB HOUSE MEN'S AND WOMEN'S RESTROOMS : HEAT FINAL OK . COMMON AREA CORRIDOR : HEAT FINAL OK. COMMON AREA OFFICES : HEAT FINAL OK . | LIDO | LIDO | | H= | P | 6229326 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 06/11/2019 | BUILDING -1- CORRIDOR MECHANICAL ROOMS : CEILING RADIATION DAMPER ( CRD) IS REQUIRED IN THE SUPPLY AIR DUCT PENETRATION THROUGH THE RATED CEILING IN THE CORRIDOR / REFER TO SPLICE PAGE M5.00 DATED 4/25/19. | LIDO | LIDO | | HSP | P | 6228030 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/11/2019 | BUILDING -1- CLUB HOUSE COMMON AREA : EXPOSED DUCT AND SUPPLY AND RETURN GRILLS OK . | LIDO | LIDO | | H= | P | 6227728 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/11/2019 | BUILDING -1- 1ST FLOOR CORRIDOR MECHANICAL ROOM : THE DUCT BOARD CONNECTED TO THE SUPPLY FIRE DAMPERS IS STILL DONE IN A MANNER THAT WILL RESTRICT THE AIR FLOW. THE DUCT BOARD INSTALLED IS NOT THE REQUIRED 24 X 10 ( ID )/ THE DUCT BOARD INSTALLATION WILL NEED TO BE PER THE MANUFACTURE REQUIREMENTS AND ALL YELLOW EXPOSED INSULATION WILL NEED TO BE SEALED. NEED TO RE-INSPECT | LIDO | LIDO | | HD | P | 6227725 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/10/2019 | 1ST FLOOR PLAN PAGE M3.21 ( BDA 775) COMMUNITY ROOM EXPOSED DUCT ROUGH OK/ STILL NEED TO COMPLETE SUPPLY REGISTERS. | LIDO | LIDO | | H= | P | 6226537 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/10/2019 | BUILDING -1- 1ST AND 2ND FLOOR CORRIDOR MECHANICAL ROOMS : THE DUCT BOARD CONNECTED TO THE SUPPLY FIRE DAMPERS IS DONE IN A MANNER THAT WILL RESTRICT THE AIR FLOW. THE DUCT BOARD INSTALLED IS NOT THE REQUIRED 24 X 10 ( ID )/ THE DUCT BOARD INSTALLATION WILL NEED TO BE PER THE MANUFACTURE REQUIREMENTS AND ALL YELLOW EXPOSED INSULATION WILL NEED TO BE SEALED. NEED TO RE-INSPECT.
| LIDO | LIDO | | HD | P | 6226536 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/07/2019 | BUILDING -1- LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOM SUPPLY FIRE DAMPER ANGLES OK / NEED BREAKAWAY CONNECTIONS AND ACCESS DOORS AND LABELS . NEED TO LEVEL CONDENSERS WEST SIDE OF BUILDING. | LIDO | LIDO | | HD | P | 6224738 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 06/07/2019 | BEFORE METER CAN BE RELEASED PLANS WILL NEED TO BE REVISED / APPROVED FOR 3/4 CSST INSTALLED AND REROUTED UP WALL ABOVE CEILING AND DOWN TO FIRE PLACE . ((REFER TO (HI ) GAS NOTES DATED 3/1/19 FOR REFERENCE)) | LIDO | LIDO | | HI | P | 6223659 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/06/2019 | BUILDING -1- CORRIDOR MECHANICAL ROOMS RETURN AIR FIRE DAMPER ANGLES LEVEL 3 AND 4 OK. | LIDO | LIDO | | HD | P | 6222157 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/05/2019 | BUILDING -1- NEED REVISED AND APPROVED PLANS FOR SOFFIT RATING CHANGES IN CORRIDOR OUTSIDE MECHANICAL ROOMS FOR THE SUPPLY AIR / LEVEL 1 THROUGH 4 . LEVEL 1 AND 2 : CORRIDOR MECHANICAL ROOM RETURN AIR DAMPER ANGLE OK. LEVEL -1 - ALL DWELLING UNIT HEAT FINAL OK. | LIDO | LIDO | | H= | P | 6221310 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/03/2019 | CORRIDOR MECHANICAL ROOM OUTSIDE AIR DAMPERS AT CEILINGS: LEVELS 1 THROUGH 4: DAMPERS OK. | NANCY | NANCY | | HD | P | 6218281 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 06/03/2019 | Note added 6/5/19 by NS: Condensers on ground are for corridor and club house units. BUILDING 1. NO INSPECTION OF CONDENSERS YET. CONDENSERS TO BE LEVEL, PROPERLY SPACED AND LABELED WITH CORRECT APARTMENT NUMBER BEFORE CALLING FOR FINAL INSPECTION. LEVEL 1 - ALL APARTMENTS: PROPERLY INSTALL ARMAFLEX AROUND CONDENSATE DRAIN PIPES IN AIR HANDLER UNIT. REST OF FIRST FLOOR APARTMENTS OK. SECOND, THIRD AND FOURTH FLOOR APARMENTS ALL OK. | NANCY | NANCY | | H= | P | 6218280 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/30/2019 | BUILDING 1. CORRIDOR MECHANICAL ROOMS ALL FLOORS: OUTSIDE AIR CEILING RADIATION DAMPERS OK. SUPPLY/RETURN DAMPER OPENINGS THROUGH CORRIDOR WALLS OK, OK TO INSTALL DAMPERS. | NANCY | NANCY | | HD | P | 6215062 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 05/30/2019 | BUILDING 1. THIRD FLOOR APARTMENTS - 304: INSTALL MISSING SUPPLY IN BATHROOM. 308: INSTALL MISSING SUPPLY IN BEDROOM. REST OF THIRD FLOOR APARTMENTS OK. SECOND FLOOR APARTMENTS - 207, 208, 211, 212 AND 215: PROPERLY REPAIR AND SEAL SUPPLY PLENUM ABOVE AIR HANDLER. | NANCY | NANCY | | H= | P | 6215061 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 05/29/2019 | (ELEVATOR #1) - NEED SMOKE DETECTOR INSIDE 2ND FLOOR HOISTWAY MOTOR CONTROLLER TO INITIATE PHASE I RECALL W/ FLASHING HAT. CIRCUIT VOLTAGE FOR SUMP PUMP IS INCORRECT, COULD NOT TEST SUMP PUMP. NEED UL DESIGN CHANGE FOR 2ND FLOOR HOISTWAY OPENING SHAFT LINER FROM ENGINEER AS NOTED IN BUILDING INSPECTORS COMMENTS DATED 5/13/2019. NEED TO EXTEND CMU INTO ELEVATOR DOOR JAMBS AT 1ST FLOOR. ELEVATOR PIT, LANDING SEALS AND CAR TOP NEED TO BE CLEANED. NEED CSFD OK BEFORE ELEVATOR CAN BE USED BY PUBLIC. NEED OWNER INSPECTION ACCOUNT INFORMATION BEFORE FINAL. | ROBERTV | ROBERTV | | HE= | P | 6212674 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 05/28/2019 | BUILDING 1 SECOND FLOOR APARTMENTS. ALL APARTMENTS: SEAL ALL CUT CORNERS AND EDGES OF DUCT BOARD SUPPLY PLENUM ON INSIDE OF PLENUM AT FAN COIL. SECURE ALL PRIMARY CONDENSATE DRAINS TO STRUCTURE SO DRAIN PIPE IS PROPERLY SUPPORTED AND TERMINATES OVER HUB DRAIN. 206: INSTALL SECONDARY DRAIN. TAPE ARMAFLEX AT AIR HANDLER. 208: SEAL RETURN AIR DUCT TO AIR HANDLER. 209: INSTALL DAMPER ACCESS DOOR. 216: INSTALL CONDENSATE DRAINS AND DAMPER ACCESS DOOR. 217: REINSPECT ALL. REST OF APARTMENTS ON SECOND FLOOR OK. | NANCY | NANCY | | H= | P | 6212119 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/24/2019 | NEED REVISED AND APPROVED MECHANICAL SCHEDULE OR ENGINEERED APPROVED SUBMITTAL FOR NATIONAL COMFORT PRODUCTS ( AIR HANDLER UNITS) INSTALLED IN DWELLING UNIT MECHANICAL ROOMS INSTEAD OF APPROVED ALTERNATES / REFER TO MECHANICAL SCHEDULE. 4TH FLOOR : ALL DWELLING UNIT HEAT FINAL OK. | LIDO | LIDO | | HD | P | 6210168 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/24/2019 | HAD CONVERSATION WITH MECHANICAL CONTRACTOR ( JESSY ) ABOUT THE FOLLOWING - 1ST FLOOR PLAN PAGE M3.01B ( BDA 146) : PER PLANS A FIRE DAMPER IS REQUIRED IN THE FIRE BARRIER ABOVE THE CORRIDOR DOOR BY THE ELEVATOR. BUILDING IS WORKING WITH THE ARCHITECT AND THE RATING OF THIS WALL MAY CHANGE. IF THE WALL RATING CHANGES AND A FIRE DAMPER IS NO LONGER REQUIRED A MECHANICAL SPLICE WILL BE REQUIRED REMOVING THE FIRE DAMPER FROM THE PLANS . | LIDO | LIDO | | HD | P | 6209647 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/23/2019 | BUILDING -1- 1ST, 2ND, 3RD FLOOR CORRIDOR MECHANICAL ROOMS : SUPPLY AND RETURN FIRE DAMPER FRAMING OK / OK TO SHEET ROCK OPENING. 4TH FLOOR DWELLING UNIT FINAL ROOM # 409,410,411,412,414,415,416,417 OK | LIDO | LIDO | | HD | P | 6209336 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/22/2019 | BUILDING -1 - 1ST, 2ND, 3RD FLOOR CORRIDOR MECHANICAL ROOMS : SUPPLY, RETURN FIRE DAMPERS : DAMPER OPENINGS ARE STILL NOT FRAMED PER INSTALLATION INSTRUCTIONS . OUTSIDE AIR CEILING RADIATION DAMPERS THAT ARE BEING USED FOR THE CORRIDOR MECHANICAL ROOMS ARE NOT THE CORRECT DAMPERS, THEY ARE FOR A GRILL MOUNT APPLICATION. THE DESIGN CALLS FOR DUCT TO BE INSTALLED DOWN FROM THE DAMPER AND TIED INTO THE RETURN AIR FOR THE HANDLER UNIT IN THE MECHANICAL ROOM. | LIDO | LIDO | | HD | P | 6207860 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/21/2019 | BUILDING -1- 1ST, 2ND, 3RD FLOOR CORRIDOR MECHANICAL ROOMS / SUPPLY, RETURN FIRE DAMPER FRAMING IS NOT PER INSTALLATION INSTRUCTIONS. 1ST FLOOR COMMON AREA M3.21 ( BDA 782) 3 FIRE DAMPERS INSTALL AND BREAKAWAY CONNECTIONS IN EXERCISE ROOM OK / STILL NEED BREAKAWAY CONNECTIONS IN MEN'S PUBLIC RESTROOMS , ACCESS DOORS AND LABELS. EXERCISE ROOM: DUCT IN SOUTH SOFFIT OK. CHASE ABOVE AHU-C2 : SUPPLY, RETURN, OUTSIDE AIR AND EXHAUST DUCT IN CHASE ON MEZZANINE LEVEL INSTALLED PER PLAN / DO NOT COVER CHASE UNTIL PLANS FOR CHANGES TO FIRE DAMPERS HAVE BEEN REVISED /APPROVED AND INSPECTED PER THE SPLICE. | LIDO | LIDO | | HD | P | 6206368 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/20/2019 | BUILDING - 1- M3.21 ( BDA 752) 1ST FLOOR PUBLIC RESTROOMS / MEN'S - 3 FIRE DAMPER SHEET ROCK LINE OPENINGS OK / CONTRACTOR WILL NEED TO HAVE INSTALLATION INSTRUCTION READY AT TIME OF INSPECTION. 4TH FLOOR M3.04 A ( BDA 752 ) CORRIDOR MECHANICAL ROOM SUPPLY AND RETURN FIRE DAMPER FAME OK / OK TO SHEET ROCK OPENING / MECHANICAL ROOM DETAIL ON PAGE M5.00 ( BDA756) | LIDO | LIDO | | HD | P | 6204737 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/17/2019 | BUILDING -1- ADDED TO NOTES 5/20/19 INFORMED MECHANICAL CONTRACTOR OF THE ADDED NOTES .PVC WAS INSTALLED IN THE AIR HANDLER PLENUM RETURNS THROUGH OUT 4TH FLOOR / PVC IS NOT PLENUM RATED., MATERIALS WITHIN A PLENUM SHALL BE NON COMBUSTIBLE / REFER TO 2009 IMC CODE SECTION 602.2.1. 4TH FLOOR DWELLING UNIT FINAL INSPECTION : UNIT 401 - REMOVE INSULATION ABOVE SUPPLY GRILL IN BATHROOM INTERFERING WITH CEILING RADIATION DAMPER. SEAL PRIMARY AND SECONDARY CONDENSATE PIPING EXITING THE AIR HANDLER UNIT AT THE CABINET. UNIT 402- BATHROOM TO THE LEFT AFTER ENTRY, THE EXHAUST FAN IS COVERED UP BY SHEET ROCK .SEAL PRIMARY AND SECONDARY CONDENSATE PIPING EXITING THE AIR HANDLER UNIT AT THE CABINET. UNIT -404 NEED A TRANSITION DUCT CONNECTING THE TOP OF THE AIR HANDLER TO THE CEILING RADIATION DAMPER. SEAL PRIMARY AND SECONDARY CONDENSATE PIPING EXITING THE AIR HANDLER UNIT AT THE CABINET. UNIT 403, 405 , 406 -SEAL PRIMARY AND SECONDARY CONDENSATE PIPING EXITING THE AIR HANDLER UNIT AT THE CABINET.
| LIDO | LIDO | | HD | P | 6203609 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/15/2019 | BUILDING -1- 2ND FLOOR UNIT #207 MOCK-UP INSPECTION : NEED WET SWITCH FOR SECONDARY PROTECTION WIRED. NEED TO USE METAL WHEN PANNING OFF THE RETURN AIR OPENING ON THE BOTTOM OF THE AIR HANDLER UNIT.NEED FILTER RACK DOOR IN PLACE. | LIDO | LIDO | | HD | P | 6200060 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/14/2019 | BUILDING -1- 1ST FLOOR COMMON AREA PUBLIC BATHROOM : THREE FIRE DAMPER FRAMES OK / OK TO SHEET ROCK INSIDE OPENING. | LIDO | LIDO | | HD | P | 6198545 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/13/2019 | BUILDING #1 - PUBLIC BATHROOMS 1ST FLOOR :NEED FIRE DAMPER INSTALLATION INSTRUCTION TO INSPECT FIRE DAMPER FRAMING . | LIDO | LIDO | | HD | P | 6197420 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 05/10/2019 | BUILDING #1 -3RD FLOOR CORRIDOR MECHANICAL ROOM FIRE DAMPER FRAMING CONSULT : FRAMING IS NOT PER THE INSTALLATION INSTRUCTIONS, WENT OVER FRAMING INSTALLATION INSTRUCTIONS WITH MECHANICAL CONTRACTOR . | LIDO | LIDO | | HSP | P | 6195431 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/08/2019 | FIELD CANCELED BY CONTRACTOR ( JESSY) NO SPLICE FOR CORRIDOR MECHANICAL ROOMS. | LIDO | LIDO | | HD | P | 6193009 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/22/2019 | BUILDING # 1 - 1ST FLOOR : ALL DWELLING UNIT MECHANICAL ROOM CEILING RADIATION ANGLES OK . | LIDO | LIDO | | HD | P | 6174371 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/18/2019 | BUILDING #1 -1ST FLOOR DWELLING UNIT MECHANICAL ROOM PRE CEILING RADIATION DAMPER ANGLE INSPECTION OK / OK TO INSTALL ANGLES. | LIDO | LIDO | | HD | P | 6170285 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/16/2019 | 1ST FLOOR COMMON AREA CORRIDOR M3.01 ( BDA146) FIRE DAMPER IS REQUIRED IN WALL NORTH OF ELEVATOR ABOVE DOORWAY / THIS IS A 1 HOUR FIRE BARRIER , NEED STAMPED ENGINEER DETAIL FOR HOW DAMPER IS TO BE FRAMED ABOVE A DOOR AND A STAMPED ENGINEER LETTER VERIFYING THE FRAMING MEETS THE INTENT OF THE INSTALLATION INSTRUCTION FOR SUPPORT OF THE FIRE DAMPER. | LIDO | LIDO | | HD | P | 6167525 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 04/16/2019 | Met with Eric Shultz from Garret Construction LLC for on site consult , Viewed and discussed mechanical plans, with multiple changes that General contractor will be submitting to plans and review. MET WITH MECHANICAL CONTRACTOR TO REVIEW FIRE DAMPER INSTALLATION INSTRUCTIONS / CONTRACTOR WILL NEED TO HAVE THE COMPLETE SET OF INSTALLATION INSTRUCTION FOR FIRE DAMPERS . | LIDO | LIDO | | HSP | P | 6167483 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/15/2019 | 1ST FLOOR PLAN PAGE M3.22 ( BDA 155) COMMON / CLUBHOUSE AREA , DUCT ROUGH IN SOFFIT NORTH OF MAIN LOBBY OK. | LIDO | LIDO | | HD | P | 6166455 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/12/2019 | BUILDING -1 - LEVEL 1 CEILING RADIATION PRE DAMPERS ANGLE INSPECTION FOR ALL DWELLING UNIT MECHANICAL ROOMS : The maximum clearance between the damper sleeve and the edges of the cutout in the ceiling material shall not exceed 1/8" on any side. (Re-inspect all ) 1ST LEVEL COMMON / CLUBHOUSE AREA :DUCT ROUGH IN CHASE EAST OF MAIN LOBBY ABOVE MAIL ROOM OK . | LIDO | LIDO | | HD | P | 6164414 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 04/10/2019 | 1ST LEVEL -SPLICE PLAN M3.01A ( BDA 757) FIELD CONSULT FOR OUTSIDE AIR PENETRATING MULTIPLE 1 HOUR FIRE BARRIER WALLS : REFER TO NOTES FROM PREVIOUS CONSULT ON SAME ISSUE DATED 12/31/18. | LIDO | LIDO | | HSP | P | 6161697 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/10/2019 | BUILDING -1 - LEVEL 2 CEILING RADIATION DAMPERS ANGLE INSPECTION FOR ALL DWELLING UNIT MECHANICAL ROOMS : ANGLES OK, STILL NEED ACCESS AND LABELS. | LIDO | LIDO | | HD | P | 6161675 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/09/2019 | ((1ST FLOOR COMMON / CLUBHOUSE AREA NOT READY)) .3RD FLOOR CEILING RADIATION DAMPERS ANGLE INSPECTION FOR ALL DWELLING UNIT MECHANICAL ROOMS : ANGLES OK, STILL NEED ACCESS AND LABELS. | LIDO | LIDO | | HD | P | 6160895 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/08/2019 | 4TH FLOOR CEILING RADIATION DAMPERS ANGLE INSPECTION FOR DWELLING UNIT MECHANICAL ROOMS : ANGLES OK, STILL NEED ACCESS AND LABELS. | LIDO | LIDO | | HD | P | 6159463 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/01/2019 | 1ST LEVEL - PLAN PAGE M3,21 (BDA732) CLUBHOUSE : WEST OF MAIN LOBBY ABOVE CEILING DUCT ROUGH FOR HALLWAY, WORK STATION, OFFICE. EXERCISE ROOM : DUCT ROUGH IN WEST AND EAST SOFFIT ONLY OK. | LIDO | LIDO | | HD | P | 6150747 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 03/29/2019 | VENT AND FRAME OK. | LIDO | LIDO | | HV | C | 6149653 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/29/2019 | BUILDING # 1 -PLAN PAGE M3.21 (BDA 732) / M3.22 ( BDA 155) CLUB HOUSE COMMUNITY ROOM .( .EXERCISE ROOM IS NOT READY FOR INSPECTION .) SUPPLY AND RETURN DUCT DUCT FOR AHU-C2 IS BEING RE-ROUTED AND IS PENETRATING A 1 HOUR PARTITION ( W-2 WALL ) SHEET ROCK INSTALLED WILL NEED TO BE REMOVED AND FRAMED OPENING INSPECTED PER THE FIRE DAMPER INSTALLATION INSTRUCTIONS / NEED REVISED AND APPROVED PLANS FOR RE-ROUTED DUCT AND FIRE DAMPER LOCATIONS AHU-C1 DUCT ROUGH EAST OF MAIN LOBBY: OUTSIDE AIR IS NOT CONNECTED TO DUCT AND IS MISSING MANUAL VOLUME DAMPER .10" OUTSIDE AIR AND 6" EXHAUST AIR DUCT IN EAST CHASE OK SUPPLY AND RETURN DUCT ROUGH FOR OFFICE AND MANAGERS SPACE OK .
| LIDO | LIDO | | HD | P | 6149645 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/28/2019 | BUILDING # 1 M3.21 (BDA 732) MEN'S AND WOMEN'S RESTROOMS : NO DUCT IS BEING INSTALLED ABOVE THE FLOOR / CEILING ASSEMBLY / NO CEILING RADIATION DAMPERS ARE BEING INSTALLED IN THIS LISTING ( UL L577).NEED REVISED AND APPROVED PLANS FOR ALL CHANGES BEING MADE IN CLUB HOUSE AREA. MAIN LOBBY AREA 1ST LEVEL AND 2ND LEVEL : THIS AREA IS NOT READY FOR DUCT ROUGH INSPECTION. | LIDO | LIDO | | HD | P | 6148252 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/26/2019 | COMMON AREA LEVEL- 2 / M3.22 ( BDA 155) ANY FIRE DAMPERS INSTALL WILL REQUIRE FIRE DAMPER FRAMING AND INSTALL INSPECTION PER THE INSTALLATION INSTRUCTIONS / INSTALLATION INSTRUCTION WILL NEED TO BE ON SITE FOR INSPECTION / ANY FIRE DAMPER LOCATION CHANGE REQUIRES A REVISED AND APPROVED SPLICE AHU-C-1 SUPPLY AND RETURN DUCT IN SOFFIT AND IN CHASE OK. LEVEL -1 / M3.21 ( BDA 732) AHU-C-1 MISSING TWO SUPPLY AIR DROPS AND TWO RETURN AIR DROPS -SUPPLY AND RETURN AIR MAIN TRUNK LINE DUCT ON LID OF OFFICE AND WORK STATION OK. | LIDO | LIDO | | HD | P | 6144510 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/26/2019 | BUILDING #1 COMMON AREA PLAN PAGE M3.21 ( BDA 761.) Met with General contractor and mechanical contractor .Went over all items listed on HSP notes dated 3/24/19 . | LIDO | LIDO | | HSP | P | 6144065 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/24/2019 | BUILDING #1 COMMON AREA PLAN PAGE M3.21 ( BDA 761.) HAD CONSULT WITH BUILDING INSPECTOR TO DETERMINE THE UL LISTING FOR THE FLOOR / CEILING ASSEMBLIES, FOR THE EXERCISE ROOM AND THE MEN'S, WOMEN'S RESTROOM'S. THE UL LISTED ASSEMBLY IS(L577). (MULTIPLE DAMPERS ARE BEING INSTALLED IN THE UL LISTED (L577) FLOOR /CEILING ASSEMBLIES IN THE EXERCISE ROOM AND THE MEN'S , WOMEN'S RESTROOMS. NO DAMPER WAS SHOWN TO HAVE BEEN TESTED IN THIS RATED ASSEMBLY UL L577.) (THEIR ARE MULTIPLE DUCT PENETRATIONS THROUGH A 1 hr FIRE BARRIER WALL BETWEEN THE EXERCISE ROOM AND MEN'S REST ROOM WITH NO PROTECTION, HOW ARE THESE PENETRATIONS GOING TO BE PROTECTED ? REFER TO 2009 IMC SECTION 6075.2. )ALL FIRE DAMPER LOCATION WILL NEED TO BE CLEARLY SHOWN ON THE PLANS FOR THEIR LOCATIONS. ALL THE NOTED ISSUES WILL NEED TO BE ADDRESSED BY THE ENGINEER AND DESIGN TEAM. | LIDO | LIDO | | HSP | P | 6142484 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/20/2019 | BUILDING #1 -PLAN PAGE M3.21 ( BDA 761) AFTER FURTHER RESEARCH OF FIRE DAMPER (MODEL LAU CPDR25) INSTALLED IN THE EXERCISE ROOM CEILING IS ONLY FOR VERTICAL INSTALL ONLY. | LIDO | LIDO | | HSP | P | 6139057 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/20/2019 | PLAN PAGE M3.21 ( BDA 761) BUILDING #1 .CLUB HOUSE AREA : HAD CONSULT WITH MECHANICAL CONTRACTOR -DISCUSSED DUCT PENETRATIONS THROUGH RATED WALLS / AND THE INSPECTION PROCESS . WENT OVER OUTSIDE AND EXHAUST AIR TERMINATIONS AND LOCATIONS , | LIDO | LIDO | | HSP | P | 6138739 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/20/2019 | BUILDING #1 -PLAN PAGE M3.21 ( BDA 761) NEED TO CONSULT WITH BUILDING INSPECTOR - WILL ADD TO NOTES AFTER . ENGINEER TO ADDRESS THE FOLLOWING ISSUES- DUCT IS PENETRATING WALL BETWEEN EXERCISE ROOM AND MEN'S REST ROOM WITH NO PROTECTION , THIS IS A 1 hr FIRE BARRIER. FIRE DAMPER LOCATION WILL NEED TO BE CLARIFIED ON PLANS FOR THE LOCATIONS. IS THE FIRE DAMPER INSTALLED IN THE CEILING IN THE EXERCISE ROOM APPROVED FOR THIS LISTING ? NO INSTALLATION INSTRUCTION ON SITE FOR THIS DAMPER. MEN'S AND WOMEN'S RESTROOMS NOT READY. | LIDO | LIDO | | HD | P | 6138709 |
JR HOBBS CO - ATLANTA, LLC | HRP | P | 03/07/2019 | 250 lb TEST FOR THREE AC LINE SETS IN CLUBHOUSE OK .PLAN PAGE M3.21 ( BDA 761) | LIDO | LIDO | | HRP | P | 6126694 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/04/2019 | POOL HEATERS / BOILERS - REFER TO PERMIT M00954 | LIDO | LIDO | | HSP | P | 6123128 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/01/2019 | ((NEED TO RESEARCH POOL HEATER .NEED FIREPLACE CONTRACTOR ATTACHED TO PERMIT.)) HAD CONSULT WITH MECHANICAL CONTRACTOR. WENT OVER DWELLING UNIT MECHANICAL ROOMS AND WHAT IS REQUIRED PER CEILING RADIATION FIRE DAMPER INSTALLATION INSTRUCTIONS WHEN THE ANGLES ARE ATTACHED TO DAMPER BELOW CEILING. WENT OVER DUCT BOARD REQUIREMENTS TO BE A MINIMUM OF 4" ABOVE FLOOR IN MECHANICAL ROOM .WENT OVER CONDENSATE DISPOSAL AND SECONDARY PROTECTION. | LIDO | LIDO | | HSP | P | 6121407 |
KIMBEL MECHANICAL SYSTEMS, INC. | HI | P | 03/01/2019 | NEED TO RESEARCH POOL HEATER .NEED FIREPLACE CONTRACTOR ATTACHED TO PERMIT. NEED SCOPE OF WORK CORRECTED TO MATCH ALL GAS OUTLETS. NEED PLANS REVISED / APPROVED FOR 3/4 CSST INSTALLED AND REROUTED UP WALL ABOVE CEILING AND DOWN TO FIRE PLACE . 10 LB TEST OK . | LIDO | LIDO | | HI | P | 6121393 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 01/25/2019 | LEVEL 1 CLUBHOUSE PLAN M3.21 ( BDA-761) AHU-C2 / AHU-C3 SHOWS 10"OUTSIDE AIR GOING UP, WERE IS THIS OUTSIDE AIR GOING TO BE ROUTED? IF THIS IS GOING THROUGH THE RATED FLOOR CEILING ASSEMBLY ABOVE THIS WILL BE A ISSUE AND THE ENGINEER WILL NEED TO ADDRESS . | LIDO | LIDO | | HSP | P | 6087818 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 01/23/2019 | 6" EXHAUST DUCT FOR EF-C3 IS PENETRATING A RATED FLOOR / CEILING ASSEMBLY FROM THE CLUBHOUSE UP THROUGH 3RD FLOOR AND 4TH FLOORS THEN PENETRATES THE ROOF CEILING ASSEMBLY INTO THE ATTIC . WILL NEED TO CONSULT WITH BUILDING INSPECTOR .CONTRACTOR WILL NEED TO CONSULT WITH GENERAL CONTRACTOR AND ADDRESS THIS ISSUE .PLAN PAGE M3.21 (BDA153 / M3.03B ( BDA 150) / M3.04B (BDA 152) | LIDO | LIDO | | HSP | P | 6085459 |
JR HOBBS CO - ATLANTA, LLC | HRP | P | 01/09/2019 | LEVEL -1 M.301 A ( BDA 145) FOUR AC LINE SET OK / STILL NEED TEST. LEVEL -1 M.301 B( BDA 146) THREE LINE SETS FOR CU-1,2,3 : NEED TO SUPPORT, NEED TO COMPLETE INSULATION, NEED TEST. | LIDO | LIDO | | HRP | P | 6073154 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 01/07/2019 | CANCELED BY CONTRACTOR. | NANCY | NANCY | | HD | P | 6070086 |
JR HOBBS CO - ATLANTA, LLC | HRP | P | 01/07/2019 | CANCELED BY CONTRACTOR. | NANCY | NANCY | | HRP | P | 6070085 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 12/31/2018 | LEVEL -1 M3.01A ( BDA 145) NEED REVISED AND APPROVED PLANS FOR REROUTED 8" OUTSIDE AIR TO RETURN AIR FOR AHU-1-1 THIS RUN TERMINATED OUT THE NORTH SIDE OF THE BUILDING NOW, THIS 8" OUTSIDE AIR PENETRATES TWO WALLS THAT ARE 1 - HOUR RATED FIRE BARRIERS ,THE PLANS SHOW FIRE DAMPER TO BE INSTALLED BUT NO DAMPERS ARE INSTALLED, HOW ARE THESE PENETRATIONS GOING TO BE PROTECTED? FURTHERMORE THE OUTSIDE AIR TERMINATION IS 7 FEET AWAY FROM THE BATHROOM EXHAUST, PER 2009 IMC SECTIONS 501.2.1 TEN FEET DISTANCE IS REQUIRED BETWEEN THE ENVIRONMENTAL EXHAUST AND MECHANICAL OUTSIDE AIR INTAKE. ( PLEASE CALL ME WITH ANY QUESTIONS (LM - 719-327-2928 ) | LIDO | LIDO | | HSP | P | 6066243 |
JR HOBBS CO - ATLANTA, LLC | HRP | P | 12/31/2018 | FIELD CANCELED BY CONTRACTOR. | LIDO | LIDO | | HRP | P | 6065952 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/28/2018 | 1ST FLOOR M301A ( BDA 145) NEED TO RESEARCH OUTSIDE AIR TO AHU-1-1 : PLANS SHOW FIRE DAMPER IN WALL / DAMPER WAS NOT INSTALLED.NEED TO SEE ALL RECENTLY INSTALLED AC LINE SETS , CONTRACTOR WILL NEED TO BE SURE ALL INSULATION ON LINE SETS ARE COMPLETE AND LINE SETS ARE SUPPORTED . 1ST FLOOR M301A ( BDA 145) M301B ( BDA146) CORRIDOR SUPPLY DUCT AND CEILING RADIATION DAMPER OK . | LIDO | LIDO | | HD | P | 6065468 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/27/2018 | 1ST FLOOR AREA (A) M3.01A ( BDA 145)AND (B) M3.01B ( BDA146) ALL DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK . | LIDO | LIDO | | HD | P | 6063927 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 12/11/2018 | RECEIVED LETTER FROM GARRET CONSTRUCTION REGARDING THE MODEL OF DRYERS USED - LONG DRYER VENT MODEL (WED4985EW) PER LETTER WILL BE INSTALLED IN B-5 DWELLING UNITS ONLY / CONTRACTOR CAN USE THE LONG VENT TABLE . A-DWELLING UNITS WILL HAVE DRYER MODEL (WED75HEF) SHORT VENT / STAND DWELLING UNITS -DRYER MODEL NED4655E SHORT VENT INSTALLED PER LETTER. ( SEE IMAGES FOR LETTER AND DRYER INSTALLATION INSTRUCTIONS) | LIDO | LIDO | | HSP | P | 6048644 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/10/2018 | LEVEL 1 AREA- A - M3.01A ( BDA145) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK EXCEPT FOR 116 NEED FACTORY SUPPORT FOR DAMPER IN BATHROOM #1. LEVEL 1 AREA- B- M3.01B ( BDA146) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK. 2ND FLOOR AREA (A) AND (B) M3.02B ( BDA148) M3.02A ( BDA 147) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK , CORRIDOR SUPPLY TRUNK LINE, BRANCH LINES AND CEILING RADIATION DAMPERS OK /STILL NEED RETURN AIR DAMPER INSTALLED. | LIDO | LIDO | | HD | P | 6047800 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/07/2018 | CONTINUATION OF NOTES FOR INSPECTION -1ST FLOOR AREA -A M3.01A (BDA145) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH -UNIT 116 NEED TO USE FACTORY SUPPORT FOR DAMPER IN BATHROOM 1 , UNIT 114 DAMPER IN BATH 2 IS NOT SQUARE , 112 DAMPER IN BEDROOM 1 IS NOT SQUARE. | LIDO | LIDO | | HD | P | 6046579 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/07/2018 | 2ND FLOOR M3.02B ( BDA148) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK 2ND FLOOR AREA - A -M3.02A DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH - UNIT 216 DRYER VENT INSTALLED IS PAST THE MANUFACTURE ALLOWED LENGTH OF 44' AND 2 ELBOWS REFER TO PLAN DETAIL M5.01 (BDA159) TO USE THE LONG VENT TABLE FROM THE INSTALLATION INSTRUCTION DOCUMENTATION WILL NEED TO BE PROVIDED THAT THE DRYERS TO BE INSTALLED ARE THE LONG VENT MODELS, 1ST FLOOR AREA -A M3.01A (BDA145) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH -UNIT 116 DRYER VENT INSTALLED IS PAST THE MANUFACTURE ALLOWED LENGTH OF 44' AND 2 ELBOWS REFER TO PLAN DETAIL M5.01 (BDA159) TO USE THE LONG VENT SUPPORT TABLE FROM THE INSTALLATION INSTRUCTION DOCUMENTATION WILL NEED TO BE PROVIDED THAT THE DRYERS TO BE INSTALLED ARE THE LONG VENT MODELS, ONE SUPPLY IN LIVING ROOM AND ONE DAMPER IN KITCHEN IS NOT SQUARE, | LIDO | LIDO | | HD | P | 6046561 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/06/2018 | LEVEL -2 - M3.02 B ( BDA148) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH - 217 OK / OK TO WRAP OUTSIDE AIR, 205 NOT READY. 203,204,206,207,208,209,215 OK . SUPPLY TRUNK LINE, BRANCH LINES AND CEILING RADIATION DAMPERS OK /STILL NEED RETURN AIR DAMPER INSTALLED. | LIDO | LIDO | | HD | P | 6045117 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/05/2018 | LEVEL -2 M3.02A DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH - UNIT 216 DRYER VENT INSTALLED IS PAST THE MANUFACTURE ALLOWED LENGTH OF 44' AND 2 ELBOWS REFER TO PLAN DETAIL M5.01 (BDA159) TO USE THE LONG VENT TABLE FROM THE INSTALLATION INSTRUCTION DOCUMENTATION WILL NEED TO BE PROVIDED THAT THE DRYERS TO BE INSTALLED ARE THE LONG VENT MODELS, EXHAUST AND DRYER VENT IS NOT COMPLETE. UNIT 209 DAMPER IN BEDROOM IS NOT SQUARE.UNIT 215 NOT READY. UNIT # 210, 211, 212, 214, 217 OK. LEVEL 3 M3.03A UNIT 317 - OUTSIDE AIR OK OK TO WRAP. ARE- B- SOUTH CORRIDOR MISSING 1 SUPPLY AIR. | LIDO | LIDO | | HD | P | 6043492 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 12/03/2018 | LEVEL 2 AREA -A- M3.02A ( BDA 147) ALL EXHAUST VENT PENETRATION TO OUTSIDE OK .DWELLING UNIT 214 - MISSING CEILING RADIATION DAMPER IN BATH # 2/ REST OK. DWELLING UNIT 215 - MISSING CEILING RADIATION DAMPER IN BATH # 1 / DRYER VENT NEEDS TO BE SUPPORTED EVERY 4 FEET.CEILING RADIATION DAMPER IN KITCHEN - BEND STARTING COLLAR TABS BEHIND SLEEVE SO THEY WILL NOT IMPINGE ON THE DAMPER BLADES . 2ND FLOOR NOT READY STOPPED INSPECTION , CONTRACTOR WILL NEED TO WALK AREA'S TO BE INSPECTED PRIOR TO INSPECTION TO MAKE SURE THERE READY. | LIDO | LIDO | | HD | P | 6041162 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 12/03/2018 | 4TH FLOOR M3.04A ( BDA 151) THE RETURN AIR HORIZONTAL DUCT FOR AHU 1-4 DOES NOT PASS THROUGH A FIRE PARTITION / NO PROTECTION REQUIRED. | LIDO | LIDO | | HSP | P | 6040730 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/30/2018 | 3RD FLOOR AREA B. M3.03B/BDA150, ALL DWELLING UNITS ABOVE RATED CEILING DUCT ROUGH OK | BILLS | BILLS | | HD | P | 6039131 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/29/2018 | ( TRAINING WITH BILL S FOR 45 MINUTES )4th FLOOR M3.04 A / M3.04 B ( BDA 151 / BDA 152)) ALL DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK . IN CORRIDOR SUPPLY DUCT - BRANCH LINES AND CEILING RADIATION DAMPERS OK / MISSING RETURN AIR CEILING RADIATION DAMPER. 3RD FLOOR AREA -A M3.03 A ( BDA 149) DWELLING UNIT ABOVE RATED CEILING DUCT ROUGH OK / EXCEPT FOR UNIT 317 NOT READY REFER TO PREVIOUS NOTES. | LIDO | LIDO | | HD | P | 6037687 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 11/28/2018 | 4TH FLOOR M3.04A ( BDA 151) QUESTIONS REGARDING THE RETURN AIR DUCT FOR AHU 1-4 PASSING THROUGH A FIRE PARTITION , HOW IS THIS DUCT PENETRATION BEING PROTECTED. | LIDO | LIDO | | HSP | P | 6036094 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 11/27/2018 | HAD ON SITE MEETING WITH PROJECT MANAGER AND FOREMAN FROM JR HOBBS CO MECHANICAL CONTRACTOR / INSPECTED ONE DWELLING UNIT. 3RD FLOOR M3.03A (BDA 149)DWELLING UNIT 317 ONLY - ABOVE RATED CEILING DUCT ROUGH , MISSING OUTSIDE AIR FOR AHU-1-3 , 5" SUPPLY INSTALLED FOR BATHROOM 1 AND 2 PLAN SHOWS 6" ,MISSING SHIELD PLATE FOR DRYER VENT, IN DINING AND KITCHEN BEND STARTING COLLAR TABS AWAY FROM DAMPER BLADES. REST OK . | LIDO | LIDO | | HSP | P | 6034896 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/27/2018 | (TRAINING WITH BILL S -1 HOUR .)4TH FLOOR M3.04B ( BDA 152) DWELLING UNIT DUCT ROUGH - DWELLING UNIT DUCT ROUGH IN ALL UNITS OK / EXCEPT FOR UNIT 402 - DRYER VENT LENGTH PAST THE MAX ,UNIT 401 INSULATE 6"EXHAUST AIR IN ATTIC - WILL EXCEPT PICTURES FOR THIS UNIT. 4TH FLOOR CORRIDOR - 22 X 22 RETURN AIR OPENING IN CORRIDOR FOR AHU 1-4 IS GREATER THAN THE MAX NOM AREA 256 sq INCHES ALLOWED PER UL LISTING UL P522 / THIS CEILING RADIATION DAMPER IS NOT INSTALLED INSTALLATION WILL NEED TO BE PER INSTALLATION INSTRUCTIONS/ SUPPLY DAMPER SOUTH OF CORRIDOR BY STAIRS IS RACKED, ABOVE CEILING DUCT ROUGH AND REST OF DAMPERS IN CORRIDOR OK.
| LIDO | LIDO | | HD | P | 6034874 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/26/2018 | NOT READY -FIELD CANCELED BY CONTRACTOR . | LIDO | LIDO | | HD | P | 6033468 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 11/26/2018 | CORRIDOR MECHANICAL ROOMS FOR ALL FLOORS -THE COMBINED SUPPLY, RETURN AND OUTSIDE AIR CEILING RADIATION DAMPER OPENINGS ARE GREATER THAN WHAT IS ALLOWED FOR THE AGGREGATE OPENINGS PER THE UL LISTING UL L546 AND UL P522 - Aggregate damper openings shall not exceed 128 sq in. per 100 sq ft of ceiling area. for POTTORFF — Models CFD-521-IP, CFD-521-NP | LIDO | LIDO | | HSP | P | 6033326 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/21/2018 | 4TH FLOOR M3.04B ( BDA152) DWELLING UNIT # 402 DRYER VENT INSTALLED IS PAST THE MANUFACTURE ALLOWED LENGTH OF 44' AND 2 ELBOWS REFER TO PLAN DETAIL M5.01 (BDA159) RE-INSPECT UNIT UNIT 401 DAMPERS ARE RACKED AND SUPPORT BRACKETS ARE DAMAGED , NEED TO INSTALL SHIELD PLATE FOR DRYER VENT ,RE-INSPECT UNIT, UNIT 404 SUPPLY AIR DAMPER IS RACKED IN BATHROOM # 1 UNIT 408 SUPPLY DAMPER IN BATHROOM # 1 IS RACKED EXHAUST DAMPER BRACKET IS DAMAGED- RE-INSPECT ALL DAMPERS. DWELLING UNIT ABOVE CEILING DUCT ROUGH OK FORT UNIT # 403, 405, 406, 407
| LIDO | LIDO | | HD | P | 6032503 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/20/2018 | 4TH FLOOR NORTH END M3.04A DWELLING UNIT # 409,410,411,412,414,416,417 ABOVE CEILING DUCT ROUGH INCLUDING MECHANICAL ROOM CEILING RADIATION DAMPER INSTALL OK, DUCT PENETRATION THROUGH OUTSIDE SOFFIT OK. 4TH FLOOR SOUTH END M3.04B ALL EXHAUST DUCT PENETRATIONS THROUGH OUTSIDE SOFFIT OK / STILL NEED DWELLING UNIT DUCT ROUGH . | LIDO | LIDO | | HD | P | 6031767 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/19/2018 | (TRAINING WITH BILL S 45 MINUTES.)4TH FLOOR M3.04A UNIT # 409,410,411,412,414,416 ABOVE CEILING DUCT ROUGH OK/ STILL NEED TO INSPECT FURNACE CLOSETS CEILING RADIATION DAMPER TO BE SUPPORTED PER INSTALLATION INSTRUCTIONS . UNIT 417 NEED OUTSIDE AIR RAN THROUGH UNIT FOR CORRIDOR FURNACE TO PENETRATE OUTSIDE SOFFIT AND INSULATED,STILL NEED TO INSPECT FURNACE CLOSETS CEILING RADIATION DAMPER TO BE SUPPORTED PER INSTALLATION INSTRUCTIONS . | LIDO | LIDO | | HD | P | 6029220 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/16/2018 | 4TH FLOOR DWELLING DUCT ROUGH NOT READY . UNIT 417 - WHERE ARE THE DRY VENT TERMINATION , TERMINATION CAPS ARE NOT INSTALLED AND VENTS ARE NOT STUBBED THROUGH TO THE OUTSIDE, PLAN M3.04A (BDA151) SHOW THE DRYER AND THE BATHROOM EXHAUST TERMINATING OUT THE SIDE ,MECHANICAL CONTRACTOR IS GOING TO INSTALL AT THE BOTTOM OF THE SOFFIT POINTING DOWN / CONTRACTOR WILL NEED TO PROVIDE CUT SHEETS FOR THE TERMINATION CAPS TO SEE IF THEY ARE THE APPROVED TYPE FOR THIS INSTALL . PLANS WILL NEED TO BE REVISED AND APPROVED FOR THE DRYER AND THE BATHROOM EXHAUST TERMINATION LOCATION. ((STOPPED INSPECTION DUCT ROUGH IN UNITS NOT COMPLETE.)) | LIDO | LIDO | | HD | P | 6027981 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/15/2018 | 4TH FLOOR DWELLING UNIT# 417 - FIRE DAMPER IN MECHANICAL ROOM CEILING IS NOT INSTALLED PER INSTALLATION INSTRUCTIONS ,NEED TO RE-INSPECT SUPPLY AIR RADIATION DAMPER / SHORT SCREWS WERE USED 2" ARE REQUIRED PER INSTALLATION INSTRUCTIONS, 6 " SUPPLY INSTALLED TO ENTRY WAY PLAN SHOWS 7", OFFSET UP EXHAUST DUCT CLOSER TO THE EXTERIOR WALL SO NOT TO INFRINGE ON THE R - VALUE OF THE INSULATION IN THE ATTIC . EXHAUST FANS AND FIRE DAMPERS IN BATHROOMS OK . | LIDO | LIDO | | HD | P | 6026567 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/07/2018 | CONTINUATION OF NOTES FOR INSPECTION -CEILING RADIATION FIRE DAMPERS ARE NOT DYNAMIC , THESE DAMPERS ARE BEING INSTALLED ABOVE A FAN COIL OR FURNACE WHERE THE SUPPLY AIR COULD CAUSE THE DAMPER TO NOT FUNCTION AS TESTED THE ENGINEER WILL HAVE TO PROVIDE A STAMPED LETTER. IF THE AIR HANDLING EQUIPMENT SHUT DOWN VIA SMOKE DETECTOR . THIS MUST SHOW ON THE PLANS . | LIDO | LIDO | | HD | P | 6019281 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 11/07/2018 | 4TH FLOOR UNIT # 417 - POTTORFF SUPPLY PLENUM BOXES FOR THE RADIATION CEILING DAMPERS HAVE BEEN EXTENDED THIS IS NOT PERMITTED BY THE MANUFACTURE / THIS WAS CONFIRMED BY POTTORFF BY PHONE CALL . NEED INSTALLATION INSTRUCTION ON SITE FOR THE EXHAUST FANS AND FIRE DAMPERS , THE SUPPLY MAIN TRUNK LINE AND MULTIPLE SUPPLY FLEX DUCT BRANCH LINES ARE INFRINGING ON THE INSULATION R-VALUE , ALL BATHROOM EXHAUST DUCT AND DRYER VENT DUCT IS INFRINGING ON THE INSULATION R-VALUE .THIS UNIT WILL NEED TO BE RE-INSPECTED. 3RD FLOOR ROOM # 317 -5" WAS INSTALLED TO BATHROOM # 1 AND #2 PLAN SHOWS 6" , NEED SHIELD PLATE AT TOP OF WALL FOR DRYER VENT, NEED INSTALLATION INSTRUCTION ON SITE FOR THE EXHAUST FANS AND FIRE DAMPERS . DRYER VENT AND BATHROOM EXHAUST IN CEILING OK, SUPPLY TRUNK LINE AND BRANCH LINES OK , CEILING RADIATION DAMPERS FOR SUPPLY OK . | LIDO | LIDO | | HD | P | 6019280 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 11/05/2018 | CEILING RADIATION FIRE DAMPERS ARE NOT DYNAMIC , IF THESE DAMPERS ARE INSTALLED ABOVE A FAN COIL OR FURNACE WHERE THE SUPPLY AIR COULD CAUSE THE DAMPER TO NOT FUNCTION AS TESTED THEN THE ENGINEER WILL HAVE TO PROVIDE A STAMPED LETTER. IF THE AIR HANDLING EQUIPMENT SHUT DOWN VIA SMOKE DETECTOR . THIS MUST SHOW ON THE PLANS . ANY DUCT AND OR FIRE DAMPER REGISTER BOXES THAT PROHIBIT OR INFRINGE ON THE INSULATION R-VALUE OF THE ATTIC WILL HAVE TO BE ADDRESSED. | LIDO | LIDO | | HSP | P | 6015354 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 11/02/2018 | MET WITH MECHANICAL CONTRACTOR ON SITE- THE FIRE DAMPER BEING INSTALLED OVER THE AHU'S IN THE MECHANICAL ROOM IS A STATIC DAMPER , THIS IS A DYNAMIC SYSTEM ENGINEER WILL NEED TO ADDRESS THIS. THE SCREWS USED FOR THE INSTALL FOR TH CEILING RADIATION DAMPERS ARE NOT LONG ENOUGH THEY NEED TO BE MINIMUM 2" LONG PER INSTALLATION INSTRUCTIONS. CONTRACTOR WILL NEED TO HAVE INSTALLATION INSTRUCTIONS FOR EXHAUST FANS AND FIRE DAMPERS ON SITE FOR INSPECTIONS . | LIDO | LIDO | | HSP | P | 6015044 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 10/08/2018 | OFFICE CONSULTATION WITH TODD KIRK FROM JR HOBBS. WENT OVER FIRE DAMPERS APPROVALS, INSPECTIONS, AND DAMPER INSTRUCTIONS. WENT OVER UL LISTED ASSEMBLIES AND DAMPER APPROVALS. WENT OVER MECHANICAL SPLICES. APPEARS TO HAVE NEW DRAWINGS THAT ARE NOT CURRENT WITH RBD APPROVED PLANS. WENT OVER INSPECTION PROCESS. | JON | JON | | HSP | P | 5988568 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 12/06/2019 | | SAMH | SAMH | | P= | C | 6419693 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 12/06/2019 | Complete pending attachment of Plumbing permit to pool house. | SAMH | SAMH | | P= | P | 6419369 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 12/06/2019 | All areas complete. | SAMH | SAMH | | PTO | C | 6419360 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 12/06/2019 | Water line out to pool ok. | SAMH | SAMH | | PB | C | 6419351 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | T | 12/03/2019 | PAID (REC#1648638): Need Engineered plans for pool house. No PB inspection prior to finishing concrete floor. Re-inspect all. Need to attach Plumbing permit to pool house. Need all plumbing inspected at pool house. | SAMH | SAMH | | P= | T | 6413871 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 07/23/2019 | Not ready. | DANR | DANR | | P= | P | 6273251 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/14/2019 | Units 112 - 116 - 208 - 212 - 216 ok. This completes all the living units in this building. elevator pump ok. Note: Need 6" trap guard for elevator discharge floor sink and grate opening at floor sink. need PTO clubhouse restrooms last inspection 2/21/2019, need PB ( 5/01/2019 inspection) - PTO - plans splice pool house, need final inspection water entry (need pool backflow) - all clubhouse and fitness area. | DANR | DANR | | P= | P | 6231584 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | L | 06/13/2019 | Cancel inspection per request from contractor via e-mail. | SAMH | SAMH | | P= | L | 6230857 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/12/2019 | Units 112 and 116 no hot water re-inspect all. Unit 208 S-trap kitchen sink and loose shower arm, rest ok this unit - 212 no hot water re-inspect all - 217 ok. Note: Need PTO clubhouse restrooms last inspection 2/21/2019, need PB ( 5/01/2019 inspection) - PTO - plans splice pool house, need final inspection water entry (need pool backflow) - all clubhouse and fitness area - elevator pump and discharge ( need 6" trap guard at floor sink for pump drain) | DANR | DANR | | P= | P | 6229373 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/11/2019 | Units 108 ok - 112 no hot water - 114 ok - 116 not ready. Units 208 s-trap kitchen sink, loose shower arm master, rest ok this unit - 210 ok - 212 no hot water re-inspect all - 217 both toilets lacking side clearance, rest ok this unit. | DANR | DANR | | P= | P | 6227035 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/10/2019 | 214 ok 108 need dishwasher high loop, rest ok this unit. | DANR | DANR | | P= | P | 6225645 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/07/2019 | 205 ok - 207 ok - 211 ok - 215 0k - 216 support water lines mechnaicval closet, rest ok this unit - seal hub drain at floor mechanical closet in corridor. 3rd floor seal hub drain mechanical closet in corridor, rest ok 3rd including units. 4th floor seal hub drain mechanical closet in corridor, rest ok 4th floor including units.
| DANR | DANR | | P= | P | 6223929 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 06/03/2019 | Unit 405 needs dishwasher high loop, rest ok this unit. Units 302 - 304 - 306 - 308 - 310 - 312 - 314 - 406 - 414 OK. | DANR | DANR | | P= | P | 6217891 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/31/2019 | Units 401 - 404 - 410 - 412 ok. | DANR | DANR | | P= | P | 6216400 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/30/2019 | Unit 110 ok - unit 112 aav kitchen over 15 degree angle, rest ok, 114 no hot water, re-inspect all. | DANR | DANR | | P= | P | 6214600 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/29/2019 | Unit 214 hall toilet over 18" off side wall , rest ok - unit 218 loose shower arm hall bath, master toilet over 18" off side wall, rest ok - units 204 and 206 ok. | DANR | DANR | | P= | P | 6213122 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/28/2019 | 203 ok - 205 - T&P needs to drain to pan, rest ok - 207 hot / cold flipped master shower, rest ok - 209 ok - 211 loose shower arm , rest ok - 215 loose shower arm, rest ok. | DANR | DANR | | P= | P | 6211459 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/24/2019 | Unit 302 support water lines in mechanical closet - 304 loose shower arm hall bath, rest ok - 306 no hot water re-inspect all - 308 need listing on aav at sink, rest ok - 310 dish washer hammer arrestor, rest ok - 312 need aav listing, rest ok - 314 no hot water re-inspect all - 317 not ready. The following units ok: 301-303-305-3-7-309-311-315 -316. | DANR | DANR | | P= | P | 6209869 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/23/2019 | 3rd floor following units ok except T&P air gap: 301-303-305-307-309-311-315. | DANR | DANR | | P= | P | 6208519 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/22/2019 | 402 need kitchen sink rest ok - 404 loose shower arm bath, master bathroom not ready, rest ok - 406 need kitchen sink, leak left hall lav, rest ok - 410 no kitchen sink, rest ok - units 403, 407, 408, 409, 411, 415, 416 ok. | DANR | DANR | | P= | P | 6207025 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 05/21/2019 | This inspection 4th floor the following units, all units need expansion tank support - t&p air gap above pan - and other notes by unit number: 401 and 405- no hot water re-inspect all. 403 - 407 ( RH master lav hot / cold flipped and master shower) - 409 - 411 - 414( need kitchen sink installed - master shower hot and cold flipped) - 415 - 416 (need dishwasher high loop). | DANR | DANR | | P= | P | 6205877 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 05/01/2019 | Need engineer drawings and plans splice for plumbing at pool house. | DANR | DANR | | PB | P | 6183790 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/27/2019 | will need to conduct more research on RPZ will update in the morning, still need to see backflow for pool installed
3/28/19 UPDATE will need contractor to provide info on how drain on installed RP works, engineer is calling for a RPZ have RP installed, and cannot connect with the ductile iron with copper, and lacking pressure gauges per engineer drawing | JOSEPHD | JOSEPHD | | PTO | P | 6146443 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 02/21/2019 | This inspection Club house area: Need more information on accessible transfer showers wall type, women's accessible toilet 19-1/2" off frame (need accessible side clearance off finish wall at final), need further review on lavatory in wall faucets, further review on water lines by electrical breaker boxes, discussed accessible elements, rest ok this area. Note: need inspection water stub to pool (will need back flow protection), need inspection on elevator pump discharge piping and access to 6" floor sink, check water heater - water entry at final | DANR | DANR | | PTO | P | 6113139 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 02/19/2019 | Field cancel. | DANR | DANR | | PTO | L | 6110347 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 12/20/2018 | Field cancel | DANR | DANR | | PTO | L | 6059335 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/19/2018 | Unit 217 ok dwv and domestic water. | DANR | DANR | | PTO | P | 6057602 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 12/17/2018 | 1st floor domestic mains ok. | DANR | DANR | | PTO | P | 6055197 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/29/2018 | This inspection anchored toilet flanges 1st floor ok for units 108, 112, 116. Units 110 need Type B toilet clearance at final. Unit 114 need to anchor master toilet flange. | DANR | DANR | | PTO | P | 6037731 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 11/28/2018 | Filed cancel - call from Wayne. | DANR | DANR | | PTO | L | 6036025 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/27/2018 | Domestic water and dwv ok for the following units except as noted: All units need toilet flanges anchored, need inspection on all overhead mains and in wall to hose bibs( need valves and access), unit 116 needs plan splice for wet wall changes at tub. Unit 108, 110, 112, 114, 116. Note: need inspection club house - hall domestic mains, elevator pump discharge, room 217 shower dwv and domestic, water entry, water heater. | DANR | DANR | | PTO | P | 6034753 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/26/2018 | Units 208-209-210-211-212-214-215-216 (216 needs plan splice on tub and wet wall flipping)- ok for dwv and domestic water. Unit 217 need accessible shower and valve installed per 2003 ANSI 1003.11.9, check toilet flanges unit 217. | DANR | DANR | | PTO | P | 6033534 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/21/2018 | Domestic water and dwv units 203-204-205-206-207 ok. | DANR | DANR | | PTO | P | 6032355 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 11/20/2018 | Field cancel. | DANR | DANR | | PTO | L | 6030855 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/19/2018 | OK for DWV and domestic water units, 303-305-307-309-311-315-317. | DANR | DANR | | PTO | P | 6029535 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/16/2018 | DWV and domestic water units 301-302-304-306-308-310-312-314-316 ok. | DANR | DANR | | PTO | P | 6027750 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/15/2018 | Domestic water in wall units and under floor ok (except pipe support 3rd floor ceiling) 401-402-403-404-405-406-407-408409-410-411-412. | DANR | DANR | | PTO | P | 6026529 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/14/2018 | Units 414-415-416-417 ok for domestic water and dwv. | DANR | DANR | | PTO | P | 6024969 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/13/2018 | Field cancel not ready for domestic water test 4th floor. | DANR | DANR | | PTO | P | 6023690 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/09/2018 | Notes only for the following units dwv only ( need engineer approval and splice on dwv changes), need showers completed, cover at own risk: Unit 403 correction made. Unit 302 ok. Unit 401 and 402 hanger support. | DANR | DANR | | PTO | P | 6021396 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/08/2018 | Notes only for the following units dwv only ( need engineer approval and splice on dwv changes) cover at own risk: 203-303-405 ok., 205 - 303 pipe support., 403 s-trap on tub.
| DANR | DANR | | PTO | P | 6020362 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/07/2018 | Notes only for the following units dwv only ( need engineer approval and splice on dwv changes) cover at own risk: Public restroom in wall dwv and over head ok. need showers and toilet flanges completed. Unit 204 stub kitchen sink and nail protection. Unit 304 pipe support. Units 206-306-404-406 ok.
| DANR | DANR | | PTO | P | 6018634 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 11/06/2018 | Notes only for the following units dwv only ( need engineer approval and splice on dwv changes) cover at own risk: Need all showers installed and piping tested. 108 - 110 both need toilet flanges set. 207 - 309 - 310 - 408-409-410 ok. 208 -209-210-307-308-407 need pipe grading, nail protection, pipe support. | DANR | DANR | | PTO | P | 6017270 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 10/30/2018 | This inspection DWV only units 112, 212, 211, 311, 312, 411, 412, all domestic water undersized all units, need toilet flanges set, need showers installed, Note: all piping changes on dwv need engineer approval and splice. | DANR | DANR | | PTO | P | 6010042 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 10/29/2018 | All units listed below need pex support - need toilet flanges set and anchored - domestic water test all units water piping undersized - hub drain water entry room stack leaking - all shower drains need installed and tested. units 116 - 216 -316 - 416 do not meet accessible requirements in bath tub room, unit 217 conflicting drawings room layouts, this inspection for units 114 - 116 - 214-215-216-217-314-315-316-317-414-416-417. Note: all piping changes on dwv need engineer approval and splice. | DANR | DANR | | PTO | P | 6008655 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 10/19/2018 | Field consult, discussed accessible elements and drawings. | DANR | DANR | | PTO | P | 6000296 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 05/17/2018 | All piping changes on drains and stacks need engineer drawings, plans review, and spliced in, cover at own risk. | DANR | DANR | | PB | P | 5847771 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 05/16/2018 | Cannot use test caps for capping unused lines, re-grade all tub and shower changes for venting, need engineer approval for branch and stack changes. | DANR | DANR | | PB | P | 5846448 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 05/15/2018 | Fix hydraulic jump issues - remove and re-pipe horizontal dry vents on tubs and showers, need engineer approval on piping changes, rest ok. | DANR | DANR | | PB | P | 5845266 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | T | 11/07/2019 | PAID (REC#1643339): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Adjusted CFM | TCRIPPEN | TCRIPPEN | | XMS | T | 6392276 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | T | 09/26/2019 | PAID (REC#1634710): PLAN SPLICE FEE: $100 by: TCRIPPEN for Mechanical: okay removed Fire Damper , added return and Fire Damper | TCRIPPEN | TCRIPPEN | | XMS | T | 6348714 |
KIMBEL MECHANICAL SYSTEMS, INC. | XPS | P | 09/25/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: 9/25/19: Delta R20 revisions MP1.02 ,P3.21 note 4, 3/4" pool water service, P500 adjust water entry detail | SHANEN | SHANEN | | XPS | P | 6348083 |
STILSON ELECTRIC SYSTEMS, INC. | XES | P | 08/13/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Add unit heaters ( four) | SHELBY | SHELBY | | XES | P | 6298884 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | T | 08/13/2019 | PAID (REC#1632905): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouded revisions | DALEH | DALEH | | XMS | T | 6298040 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | T | 08/07/2019 | PAID (REC#1635309): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice page revised gas system | TCRIPPEN | TCRIPPEN | | XMS | T | 6291329 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | P | 06/27/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas to fireplace | JUSTINC | JUSTINC | | XMS | P | 6246267 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 06/24/2019 | PAID (REC#1608882): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise roof layout | MICHAELA | MICHAELA | | XBS | T | 6241003 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 06/13/2019 | PAID (REC#1606356) PLAN SPLICE FEE: $50 by: DANM for Construction: Remove door and glass wall from office to make waiting area | DANM | DANM | | XBS | T | 6230564 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 06/12/2019 | PAID (REC#1605798) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided assembly for corridor ceiling. | BPHILLIPS | BPHILLIPS | | XBS | T | 6228289 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 05/31/2019 | PAID (REC#1603096) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Re-work location of assemblies for mixed use at lower level | MICHAELA | MICHAELA | | XBS | T | 6215939 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 05/22/2019 | PAID (REC#1600792) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised wall between Community room and office/work station/janitor spaces to non-rated. | SHELLEY | SHELLEY | | XBS | T | 6206860 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 05/15/2019 | PAID (REC#1598807) PLAN SPLICE FEE: $50 by: DANM for Construction: Alternate Materials and Methods - 2 hr rated wall at garages with 2-hr rated flr/clg above; new listed assembly at elevator opening | DANM | DANM | | XBS | T | 6200481 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 04/25/2019 | PAID (REC#1593543) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised corridor ceiling (for revised duct layout) | LBENNETT | LBENNETT | | XBS | T | 6178650 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | P | 04/25/2019 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: As built revisions | TCRIPPEN | TCRIPPEN | | XMS | P | 6178567 |
STILSON ELECTRIC SYSTEMS, INC. | XES | T | 04/25/2019 | PAID (REC#1593544) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add fire alarm interlock for air handler | SHELBY | SHELBY | | XES | T | 6178471 |
STILSON ELECTRIC SYSTEMS, INC. | XES | T | 04/10/2019 | PAID (REC#1590730) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised power, lighting and schedules. | BERTHA | BERTHA | | XES | T | 6161151 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 04/08/2019 | PAID (REC#1590732) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Drop corridor ceiling for duct | MICHAELA | MICHAELA | | XBS | T | 6158275 |
STILSON ELECTRIC SYSTEMS, INC. | XES | T | 03/04/2019 | PAID (REC#1580173) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised conductor 2000. | BERTHA | BERTHA | | XES | T | 6123729 |
STILSON ELECTRIC SYSTEMS, INC. | XES | T | 01/23/2019 | PAID (REC#1580173) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added Duct Temperature Limit Switch. | BERTHA | BERTHA | | XES | T | 6086465 |
THYSSENKRUPP ELEVATOR CORPORATION | XMS | T | 01/18/2019 | PAID (REC#1580174) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta R9 | DALEH | DALEH | | XMS | T | 6082325 |
KIMBEL MECHANICAL SYSTEMS, INC. | XPS | T | 12/20/2018 | PAID (REC#1565208): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice added risers 12-20-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6058823 |
STILSON ELECTRIC SYSTEMS, INC. | XES | P | 10/24/2018 | PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Addition of pool panel on site plan, one line and panel schedule. | BERTHA | BERTHA | | XES | P | 6004456 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 09/07/2018 | PAID (REC#1536804) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Clarify architectural and structural details | MICHAELA | MICHAELA | | XBS | T | 5958853 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 09/05/2018 | PAID (REC#1536804) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Floor and roof trusses - see structural notes for uplift hardware | MICHAELA | MICHAELA | | XBS | T | 5955153 |