THE GARRETT CONSTRUCTION COMPANY LLC | B= | C | 12/04/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6415365 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 12/03/2019 | final still OK pending other finals. Additional Inspections Required (computer generated): JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6415217 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 11/27/2019 | Temp CO: Okay per Bert ( Expires: 12/27/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6411264 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 11/05/2019 | items corrected. Additional Inspections Required (computer generated): JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6388363 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | T | 10/25/2019 | PAID (REC#1641754): riser room penetration still not fixed. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | T | 6381313 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 10/17/2019 | riser room penetration at floor ceiling assembly of 4" nonmetallic pipe is not protected per the listing FC 2382 - too much annular space between pipe and drywall and listing does not allow for the gap to be filled with FS 1 and then put the collar on - need to replace ceiling rock and fix the penetration per the listing that has been received / fire alarm room at north end OK penetration at cable penetration OK per EJ received / still need to compete all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6372250 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 10/11/2019 | Temp CO: Pending Mechanical/Bulding/Fire Finals ( Expires: 11/10/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6366011 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | P | 09/30/2019 | reinspection of all previous items and inspection both stair enclosures and exterior / riser room at south end of building - need to complete the fix of the penetration of the 4" PVC pipe at the rated floor ceiling assembly / fire alarm room at the north end of the building - need listing for 49 coaxial cables through one penetration of the floor ceiling assembly / west wall is missing the fire tape to the north and south walls and to the ceiling / need to complete all other finals / all other items from previous inspections corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 6352355 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/27/2019 | first time inspection 1st floor including units, storage rooms, garages and corridor / S104 not ready for inspection / missing corridor rating at fire barriers at garage 40 inside of access on wall by door / S85 missing its light and have hole in ceiling / S81 door needs to be self closing and latching / need lock of breaker panel outside of garage 40 / all first floor units OK / all garages OK except for corridor separation at garage 40 / still need to inspect exterior including rooms accessed from exterior on ends of building and both stair enclosures / no re-inspections done this trip - still need to reinspect all outstanding items. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6350899 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/26/2019 | reinspection of level 3 and 4 from inspection dated 9/25 and level 2 reinspection of items from inspection dated 9/20 / still need to fix penetrations at mech rooms in units 212 214 and 215 and need to adjust closer at storage room by door to south stair enclosure and need to fix penetration of line set at corridor mech room ceiling at north end of corridor / all other items from previous inspection dated 9/20 corrected / all items at level 3 and 4 previous inspection corrected / still need to inspect both stair enclosures and all of level 1 units corridor and garages and all of exterior including rooms at north and south ends of building. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6348928 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/25/2019 | reinspection of items at the 3rd floor from inspection dated 9/20 and 4th floor from inspection dated 9/24 / 4th floor - units 405 still missing fire caulking all the way around the flex conduit by the furnace duct in the ceiling of the mech room / all other items corrected at 4th floor / 3rd floor - storage room S117 closer not working properly / door to south stair enclosure is not closing and latching / unit 315 - have 2 conduits in ceiling of mech room that need to be fire caulked and a sprinkler head that is missing its trim / unit 314 - conduit at ceiling behind duct still needs fire caulking - all other items from previous inspection corrected at the 3rd and 4th floor. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6347323 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/24/2019 | 4th floor reinspection of all units and corridor and storage rooms / unit 405 - need fire caulking at flex conduits at ceiling of mech room / corridor mechanical room is missing trim at sprinkler head / door to north end stair enclosure from corridor is not self closing and latching / missing the trim at the electrical box at the drop at the north end of the corridor / storage room S122 need to install smoke alarm on ceiling / all other units and storage rooms at 4th floor now OK. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6345738 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/23/2019 | checked mech room ceilings at 4th floor units to verify the openings around the flexible conduits and number of conduits were done per the EJ that is on file for the repair of the penetrations / units 1 and 2 and 15 are all missing the rock between the bundles of conduits and units 6 and 8 the patches at the conduits are not done correctly and are hanging down from the ceiling and keeping the L metal around the damper from being in contact with the ceiling / all other 4th floor units are OK | DANE | DANE | | BSP | P | 6344323 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFN | C | 09/23/2019 | Engineer letter for footing, foundation, post tension slab, structural slab concrete, open hole and masonry received | DANE | DANE | | BFN | C | 6344317 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFT | C | 09/23/2019 | Engineer letter for footing, foundation, post tension slab, structural slab concrete, open hole and masonry received | DANE | DANE | | BFT | C | 6344313 |
THE GARRETT CONSTRUCTION COMPANY LLC | BBB | C | 09/23/2019 | engineer observation for CMU received | DANE | DANE | | BBB | C | 6344312 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/20/2019 | 2ND FLOOR INSPECTION -- Need to inspect both exit enclosures, mech. room at end of corridor, and all mech. rooms in units -- S108 - Missing smoke seal and door not self closing -- Need to mud and tape drywall at drop lid at corridor -- 204 - Balcony door missing smoke seal and door handle -- S107 - Door not self closing -- S110 - Need to firecaulk penetrations at lid -- Door not self closing -- 208 - Guard rail at balcony not secured -- Need to remove dust covers from smokes and CO detectors -- 207 - Remove dust covers from smokes and COs detector -- S109 - Door not self closing -- S112 - Door not self closing. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6342380 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/20/2019 | 3RD FLOOR RE-INSPECTION -- Still need to inspect both exit enclosures and mech. room at end of corridor -- Need to mud and tape drywall at drop lid in corridor -- Still need to inspect all unit mech. rooms through out floor -- S116 - Door still not self closing -- 310 - Still need to secure guard rail at balcony -- S117 - Door still not self closing -- Other items from previous inspection corrected. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6342367 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/19/2019 | 2nd layer of drywall at drop lids in corridors at 2nd, 3rd, and 4th floors OK -- Updated Hilti listing for flexible steel conduit received -- Reviewed with contractor that Hilti listing is for L500 series floor/ceiling assembly and that a different listing for roof/ceiling assembly | DAKOTAB | DAKOTAB | | BSP | P | 6341046 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/18/2019 | 1st layer of drywall at drop lid in corridor on floors 2nd, 3rd, and 4th OK -- Items from elevator shaft lid inspection corrected -- Elevator shaft lid OK | DAKOTAB | DAKOTAB | | BSP | P | 6339308 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/18/2019 | 3RD FLOOR INSPECTION -- Need to inspect all mech. rooms at all unit balconies -- Need to complete rated assembly installations at drop lid in corridor -- North exit enclosure not ready -- 305 - Front door not self closing -- S116 -- Need to firecaulk penetrations at lid -- Door not self closing -- S113 - Door not self closing -- 308 - Guard rail at balcony not secured -- 310 - Guard rail at balcony not self closing -- 315 -- Front door not self closing -- S117 - Door not self closing -- Need to complete other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6339304 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/18/2019 | 4TH FLOOR RE-INSPECTION -- Still need to inspect all mech. rooms at all unit balonies -- Still need revised EJ for multiple penetrations at all mech. rooms -- North exit enclosure still not ready -- Need to complete rated assembly at drop lid in corridor -- Rest of corridor OK -- Storage rooms on 4th OK -- Other items from previous inspection corrected. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DAKOTAB | DAKOTAB | | B= | R | 6339290 |
THE GARRETT CONSTRUCTION COMPANY LLC | B16 | P | 09/16/2019 | met contractor on site to go over an EJ that he had received fro 3M for the multiple flex conduits in one opening penetrations in the mechanical rooms / EJ needs to be revised to state that the metal flat panel can be split and joined together to go around the conduits as it currently reads that it will have to slide over the conduits with no more than 1/4" annular space / also discussed needs for completing the final at building 1 and 2 and discussed the pool house being on the permit for building 1 and the pool permit being held by the pool contractor / also discussed the need to splice in the design change for the framed wall on top of the CMU wall at the trash compactor area at the south end of the garages betwene buildings 2 and 3 / no inspection done on this permit today as not ready | DANE | DANE | | B16 | P | 6336282 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/12/2019 | met contractor in site office to discuss rated assemblies and products for fixing the multiple flex conduit penetrations in mech rooms and showed them the Hilti listing generator and discussed need for listing for whatever is decided to be used / top of elevator shaft fire taping and fire caulking not ready for inspection | DANE | DANE | | BSP | P | 6332979 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | T | 09/11/2019 | PAID (REC#1629240) 4th floor units still not ready for inspection / still need listing for multiple flexible conduits through one opening in all of the mechanical room and then all of the penetrations will need to be corrected to match the listing / unit 409 - south bath fan is not working / 410 - missing light or blank plate at ceiling light box in bathroom closet - bath fans not working - missing gypcrete on floor of the mech room / 411 - need to fix hole in ceiling of mech room north of damper / 412 - need to fix all penetrations in rated assemblies in mech room including the single flex conduit / 414 - PVC pipe in southeast corner of mech room is 1/2 in wall and 1/2 out of wall / 415 - PVC in corner of mech room is 1/2 in wall and 1/2 out of wall at top of pipe / all storage rooms not ready / all of corridor not ready / noth exit enclosures not ready / still need to complete inspections of top of elevator shaft. Additional Inspections Required (computer generated): External Agen | DANE | DANE | | B= | T | 6331939 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/06/2019 | final layer of UL L511 assembly and UL U301 assemblies at top of elevator shaft rock and attachments OK / still need to inspect the fire tape and fixes of all penetrations once completed (beam and UL U301 wall assemblies and conduit in southeast corner of UL L511 ceiling assembly) | DANE | DANE | | BSP | P | 6327039 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 09/05/2019 | inspection stopped / need complete reinspection / need to compete sprinkler trim / need to install room numbers / need listing for multiple flex conduits through one hole in mech rooms / need to install all weather stripping / need to install all fire alarms / need to complete all corridors / need to make all entry doors self-closing / need to remove all dust covers on all smoke alarms. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), JR HOBBS CO - ATLANTA, LLC Mechanical Final Inspection is not Completed yet, KIMBEL MECHANICAL SYSTEMS, INC. Plumbing Final Inspection is not Completed yet, SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet, STILSON ELECTRIC SYSTEMS, INC. Electrical Final Inspection is not Completed yet, THYSSENKRUPP ELEVATOR CORP. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6325885 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/03/2019 | final layer of rock at 2nd floor elevator door infill OK / first layer of rock and RC at elevator shaft lid still OK | DANE | DANE | | BSP | P | 6322686 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 08/30/2019 | first layer of rock and attachments at top of elevator shaft ceiling attachments and rock and RC OK per UL L511 | DANE | DANE | | BSP | P | 6319972 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 08/30/2019 | shaft liner layer of assembly UL U529 at level 2 elevator door infill OK | DANE | DANE | | BSP | P | 6319968 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 08/29/2019 | 2x10 joists and blocking between joist and both layers of 3/4" flooring on top of assembly OK at top of elevator shaft | DANE | DANE | | BSP | P | 6318373 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 08/29/2019 | 2nd floor door infill / angle installed around block wall OK and 1/2" type C rock installed to angle at block OK and 1st vertical joint is 1' from north side of CMU | DANE | DANE | | BSP | P | 6318348 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 08/27/2019 | UL L511 assembly at the top of the elevator shaft / no framing inspection ever done for the top of the shaft and could not confirm that there is 2x10 joists that are to be 16" OC and cross braced or the of structural flooring on the top of the 2x10 joists / rock installed on bottom of assembly has been taped and can not verify the Type C rock that is required in the assembly / rock is to be attached to each joist at 1" 6" and 21" from the edges of the sheets in the field and 1" 6" 15" and 21" at 1/2" in from but joints and currently there is not that many screws attaching the rock to the joists | DANE | DANE | | BSP | R | 6315604 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 08/22/2019 | infill wall at level 2 elevator not ready for inspection / all existing rock and shaft liner has been removed and wrong metal used at edges of assembly and missing at top of assembly and not attached per assembly / discussed inspection process with contractor and need for correct angle to be installed with mechanical fasteners installed at correct positions and inner layer of 1/2" type C rock installed with the correct fasteners in the correct positions for first inspection and then inspection process for the remainder of the assembly | DANE | DANE | | BSP | R | 6310471 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 08/20/2019 | can not verify joint staggers or angle attachments or direction of installation of shaft liner or whether or not joint compound was installed between sheets or verify screws at the inside of the assembly at UL U529 at door infill at level 2 elevator door | DANE | DANE | | BSP | R | 6307963 |
JR HOBBS CO - ATLANTA, LLC | BSP | T | 08/16/2019 | PAID (REC#1624296) ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH clouded revisions | DALEH | DALEH | | BSP | T | 6303140 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/25/2019 | 2nd floor elevator infill -- 5/8" Type C installed -- Items from previous inspection corrected | DAKOTAB | DAKOTAB | | BSP | P | 6277528 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/22/2019 | 2nd layer of rock OK at ceiling of center garages per splice | DANE | DANE | | BSP | P | 6271623 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 07/19/2019 | 2nd floor elevator door infill (UL U529) / assembly calls for joints to stagger 12" between layers and for 5/8" type C rock to be used on both sides outside of shaft liner and 1/2" light rock has been used | DANE | DANE | | BSP | R | 6269946 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/17/2019 | 2nd layer of drywall at 2 middle garage units OK | DAKOTAB | DAKOTAB | | BSP | P | 6267545 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/16/2019 | R/C at (2) middle garages OK -- R/C at corridors OK | DAKOTAB | DAKOTAB | | BSP | P | 6265726 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 07/15/2019 | RC in garages not ready / RC in corridors missing fasteners and continuity at ceiling boxes/obstructions - NOTE: top plate penetrations missing fire stopping in corridor walls and fireblocking missing around stairway shaft to floor assembly. | CHUCK | CHUCK | | BSP | R | 6263236 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/09/2019 | met with contractor and drywall contractor to discuss RC in garages for 2 hr assembly on the ceiling and the need for it to be perpendicular to the joists per the spliced in detail | DANE | DANE | | BSP | P | 6257108 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/03/2019 | ceiling RC at level 1 corridor OK except at mech room at north end and at janitor closet at south end where R30 insulation still needs to be installed / RC at both center garages ceilings is running the wrong way and needs to be re-installed | DANE | DANE | | BSP | P | 6253472 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/25/2019 | 1st floor wall penetrations at spaces where cabinets will set - all pex pipes and PVC drains OK at all rated assemblies where cabinets will set on the 1st floor / still need to inspect all clean out penetrations when ready | DANE | DANE | | BSP | P | 6242926 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/20/2019 | protection of plumbing penetrations at 3rd floor units where cabinets will be set are now OK / still need to inspect all 1st floor penetrations / still need all engineer observations for footing and foundation and open hole | DANE | DANE | | BSP | P | 6237745 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/19/2019 | fire caulking at all plumbing penetrations where cabinets will be set in all 2nd floor rated assemblies inside of all units OK - fire caulking at plumbing pipes at vanity areas in units 411 and 412 now OK / still need to inspect 3rd and 1st floor penetrations before cabinets go in | DANE | DANE | | BSP | P | 6236325 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/17/2019 | garage drywall reinspection - items from inspection dated 6/12/19 corrected OK / remainder of drywall sheer OK at all garage walls / items in 7th and 8th garages from north end now OK / drywall and attachments of drywall OK at first garage from north end / rock and attachments OK at 3rd from north end at beam area now / still need to inspect RC and remainder of layers at 9th and 10th garages from the south end | DANE | DANE | | BSP | P | 6233614 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/17/2019 | 2nd layer of rock at interior side of north and south stair enclosure walls OK | DANE | DANE | | BSP | P | 6233593 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/12/2019 | 9th and 10th garages from south end 1st layer of rock OK / 7th and 8th garages from north end -7th - missing RC at joint at northeast corner of ceiling - 8th still need to complete walls / 3rd garage from north end need to complete ceiling at beam (stamped no repair letter received for holes drilled in beam) / 1st garage from north end RC and insulation Ok - OK to hang rock pending other roughs / all other garages OK for rock and attachments of rock at rated assemblies | DANE | DANE | | BSP | P | 6228680 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 06/12/2019 | RC and insulation OK at all storage closets and halls from main corridor to garages between both stair towers all others not ready | DANE | DANE | | BIN | P | 6228669 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 06/06/2019 | rock and screws at garage rated assemblies / inspection stopped - too many items - RC at butt joints is not 3" back from both ends of butt joints / type X on ceilings in several locations | DANE | DANE | | BSP | R | 6222663 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 06/05/2019 | 1st floor units only drywall and attachments of rock at rated assemblies are now OK in all 1st floor units only - still need to inspect the garages and storage areas and corridor when ready | DANE | DANE | | BSP | P | 6221128 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 06/04/2019 | 1st floor units rated assemblies / unit 104 - type X rock on ceiling of southeast bedroom by north wall / unit 106 - type X on ceiling of southeast bedroom in northeast corner / unit 112 - still missing RC 3" back from butt joint ends / unit 114 - Type X on ceiling of north bathroom / all units exterior walls joints are not breaking on studs above and below windows and doors / floor ceiling asssembly UL L546 - unit separation walls UL U431 - exterior walls UL U356 | DANE | DANE | | BSP | R | 6219101 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 06/03/2019 | fire caulk at plumbing where cabinets will set not ready at levels 1 2 3 and unit 411 and 412 | DANE | DANE | | BSP | R | 6217907 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/31/2019 | drywall sheer at 5th garage from north end now OK and gyp sheer in unit 110 now OK / still need to install at 7th garage from north end | DANE | DANE | | BSP | P | 6216516 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/31/2019 | RC at ceilings at storage rooms at west side of corridor behind garages OK from 5th garage from south end to north stair enclosure / still need to install in all rooms at both ends of this area and whole corridor | DANE | DANE | | BSP | P | 6216508 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 05/31/2019 | 1st floor dwelling units screws and rock at rated assemblies / need to fix all butt joints at assembly calls for all butt joints to be attached 6" apart on 2 separate pieces of RC / multiple assemblies are missing screws / need complete reinspection of all units | DANE | DANE | | BSP | R | 6216503 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/31/2019 | 4th floor penetrations where cabinets will go / units 11 and 12 still need to fire caulk plumbing at rated walls where cabinets will be set - all other 4th floor units OK | DANE | DANE | | BSP | P | 6216495 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/29/2019 | 1st floor gypsum sheer / still need to inspect the gyp sheer at the 5th and 7th garages from the north end and unit 110 sheer nailing is to be on the bedroom side of the wall at the interior wall sheer not the living room side / all other 1st floor gyp sheer OK / still need to inspect all drywall and attachments at all rated assemblies / still need all engineer observations for footing and foundation and open hole | DANE | DANE | | BSP | P | 6212840 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/23/2019 | Discussed firestopping in garages at PVC | RICHB | RICHB | | BSP | P | 6209345 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 05/16/2019 | truss fix for unit 106 F02 received and correction complete / this completes BFR for 1st floor units / still need to complete BFR for garages - still need fix for items in 3rd garage from north end | DANE | DANE | | BFR | P | 6202217 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/14/2019 | RC, 1st floor ceilings - all water heater closets OK, all garages EXCEPT farthest-North one are OK, still need corridors (including storage room) | RICHB | RICHB | | BSP | P | 6198623 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/10/2019 | remainder of first floor OSB sheer complete | DANE | DANE | | BSP | P | 6195665 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/09/2019 | OSB interior shear, 1st floor - corridors OK, still need all other areas // discussed outstanding framing items including truss fix, RC and remaining shear // discussed accessible items // discussed continuity of fire-resistance rated assemblies including new penetrations through walls | RICHB | RICHB | | BSP | P | 6194372 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 05/06/2019 | RC and insulation at units only / no garages ready at this time / still need RC at all water heater closets and at corridor and storage rooms in corridor / RC and thermal insulation OK at all dwelling units including unit 106 pending stamped fix for F02 floor truss | DANE | DANE | | BIN | P | 6190170 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 05/06/2019 | level 1 units frame re-inspection / still need engineer fix for F02 broken bottom cord over coat closet and fix for 2x scabbed in 2 pieces on west side of truss and a notch for the PVC pipe on both sides (repair still on site) / unit 114 now OK / still need to re-inspect garages | DANE | DANE | | BFR | P | 6190154 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 05/03/2019 | Frame & Firestop, garages - 3rd garage from North end has (2) holes drilled diagonally through beam, all other garages OK | RICHB | RICHB | | BFR | P | 6187059 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/02/2019 | RC, 1st floor unit ceilings - Unit 106 OK, still need all other units | RICHB | RICHB | | BSP | P | 6185669 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/30/2019 | OSB Interior shear, 2nd floor - All units now OK // RC, stairwell ceilings - both stairs OK // Frame & Firestop, stairwells - both stairwells OK // Frame & Firestop, garages - South 6 OK, still need all other garages // Drywall shear - Units 201 through 205 OK, still need all other units | RICHB | RICHB | | BSP | P | 6182898 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/29/2019 | Frame & Firestop, 1st floor - Unit 106 need truss fix for F02 at entry // Unit 114 need nails in MSH422 hanger by laundry // all other units OK // still need garage framing and RC in all areas | RICHB | RICHB | | BFR | P | 6181939 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 04/29/2019 | Drywall shear, 2nd floor - field cancelled | RICHB | RICHB | | BSP | R | 6181931 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/26/2019 | Drywall shear, 3rd floor - all remaining units OK | RICHB | RICHB | | BSP | P | 6179962 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/25/2019 | INTERIOR DRYWALL SHEAR INSPECTION -- 3RD AND 4TH FLOOR -- 3RD FLOOR - Units 302,303,304,305,and 306 only OK --
4TH FLOOR -- Units 403 and 405 OK | DAKOTAB | DAKOTAB | | BSP | P | 6178778 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/23/2019 | Drywall shear, 4th floor - Need units 403 & 405, all other units OK | RICHB | RICHB | | BSP | P | 6175667 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/16/2019 | OSB interior shear, 3rd floor - All units now OK // OSB interior shear, 2nd floor - Need Unit 215, all other units OK // UPON FURTHER REVIEW Unit 215 does not require OSB shear | RICHB | RICHB | | BSP | P | 6167832 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/12/2019 | RC, 2nd floor unit ceilings - all units OK | RICHB | RICHB | | BSP | P | 6164317 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 04/12/2019 | Thermal, 2nd floor - all units OK | RICHB | RICHB | | BIN | P | 6164316 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/10/2019 | OSB shear, 3rd floor units - Unit 301 needs nails at 8" in field (currently up to 13") in many areas, all other units on this floor OK | RICHB | RICHB | | BSP | P | 6161478 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 04/09/2019 | Cancelled via phone by Ed (with Garrett) | RICHB | RICHB | | BSP | R | 6160354 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/08/2019 | Frame & Firestop, 2nd floor - Unit 215 needs straps nailed (in SW bedroom), all other units on this floor OK pending other Roughs | RICHB | RICHB | | BFR | P | 6159398 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | R | 04/05/2019 | Frame & Firestop, 2nd floor - Field cancelled by Ed (with Garrett) | RICHB | RICHB | | BFR | R | 6156435 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 04/04/2019 | Thermal, 3rd floor - All units on this floor OK | RICHB | RICHB | | BIN | P | 6155650 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/04/2019 | Frame & Firestop, 2nd floor - Units 201 through 207 OK, still need all other units and corridors on this floor | RICHB | RICHB | | BFR | P | 6155649 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/03/2019 | RC, 3rd floor ceilings - all units and corridors OK per UL L546 | RICHB | RICHB | | BSP | P | 6154115 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/03/2019 | Frame & Firestop, 3rd floor - all remaining units OK | RICHB | RICHB | | BFR | P | 6154114 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/02/2019 | Frame & Firestop, 3rd floor - Units 301 through 308 OK pending other Roughs, still need 309 through 314, discussed accessible elements including differences between ANSI Type B Options A & B | RICHB | RICHB | | BFR | P | 6152788 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 04/02/2019 | Frame & Firestop, 4th floor - Unit 414, all items corrected, truss repairs OK per engineering / Unit 415 OK | RICHB | RICHB | | BFR | P | 6152787 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | R | 04/01/2019 | inspection site canceled - not ready | DANE | DANE | | BFR | R | 6151426 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | R | 03/25/2019 | truss framing inspection units 414 and 4145 - unit 415 not inspected as inspection stopped / unit 414 - need fix for broken R52D over living room missing gusset in hanger - need fix for R52B with bottom cord broken and hanger not installed correctly because of broken bottom cord - Girder R32 is to have LUGT3-SDS2.5 at south end and is missing HTT4 at north end - R46 missing 2 HTW30's at west end - need truss fix for R24 with broken bottom cord over south bedroom - R23 missng 2 HTW30's at south end and 2 RT7A's at north end - need truss fix for R23 over unit separation wall with cut out vertical at north end - missing lateral braces at R24 R25 R26 R27 R28 and R29 over west end of unit / still need to inspect trusses in unit 415 and RC and insulation in units 414 and 415 | DANE | DANE | | BFR | R | 6143956 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 03/25/2019 | RC at units 414 and 415 not inspected as frame and insulation not complete in these 2 units | DANE | DANE | | BSP | R | 6143950 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 03/25/2019 | thermal wall insulation OK at units 409 through 412 - still need to inspect 414 and 415 as frame inspections not complete in these 2 units | DANE | DANE | | BIN | P | 6143948 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | R | 03/22/2019 | Trusses, 4th floor - Unit 401 needs truss connectors in corner, Unit 414 & 415 still need trusses inspected (too many deficiencies to inspect), all other units OK | RICHB | RICHB | | BFR | R | 6141796 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 03/22/2019 | RC on units ceilings, 4th floor - Still need Units 414 & 415 (too many missing screws to inspect) | RICHB | RICHB | | BSP | R | 6141787 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 03/21/2019 | RC on unit ceilings, 4th floor - Still need Units 414 & 415, all other units OK | RICHB | RICHB | | BSP | P | 6140015 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 03/20/2019 | Frame & Firestop, 4th floor - All interior walls and truss connections OK per plans, exterior walls already inspected | RICHB | RICHB | | BFR | P | 6139025 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | R | 03/19/2019 | 4th floor Frame & Firestop - cancelled y Ed | RICHB | RICHB | | BFR | R | 6137108 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 03/18/2019 | framing and fire stop 4th floor EXTERIOR WALLS AND UNIT SEPARATION WALLS ONLY at units 410 through 415 only / framing and fire stop at 4th floor exterior walls only OK / OK to insulate exterior walls and unit separation walls / Still need to inspect all trusses and attachments to walls and all interior bearing and non-bearing walls | DANE | DANE | | BFR | P | 6136194 |
THE GARRETT CONSTRUCTION COMPANY LLC | BIN | P | 03/18/2019 | 4th floor thermal wall insulation OK in units 401 through 408 / still need to inspect all other units | DANE | DANE | | BIN | P | 6136188 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 03/13/2019 | 4th floor frame & insulation cancelled due to weather by Ed - jobsite is shutting down | RICHB | RICHB | | BSP | R | 6132792 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 03/11/2019 | Framing & Firestop, 4th floor - EXTERIOR WALLS ONLY in 401 through 408 OK pending other Roughs, still need all interior walls in these units and all walls in all other units. | RICHB | RICHB | | BFR | P | 6130406 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | R | 03/08/2019 | 4th Floor - field cancelled by Ed | RICHB | RICHB | | BFR | R | 6128643 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 02/11/2019 | 4th floor stairwells - drywall repair & fasteners above doorway to corridor OK | RICHB | RICHB | | BSP | P | 6103605 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 02/08/2019 | Stairwell sheetrock - field cancelled by Ed | RICHB | RICHB | | BSP | R | 6101992 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/15/2019 | Training with Rich - fire resistance rated wall continuity - fastener requirements and penetrations | JUSTINL | JUSTINL | | BSP | P | 6079249 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/15/2019 | 4th floor stairwells - 2nd layer attachment has been corrected, all levels on outside of stairwells now OK // Training with Justin - fire resistance rated wall continuity, fastener requirements and penetrations | RICHB | RICHB | | BSP | P | 6079109 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/08/2019 | Exterior shear - all floors, all elevations now OK | RICHB | RICHB | | BSP | P | 6071792 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/08/2019 | Attic space above stairwells - 1st layer of sheetrock on outside of stairwells OK per UL U301, reviewed fastener requirement for second layer and reinspections required | RICHB | RICHB | | BSP | P | 6071791 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 01/04/2019 | Exterior shear inspection added per field request (Ed with Garrett) - 1st floor, North elevation only is OK, requested to allow for electrical gear to get mounted | RICHB | RICHB | | BSP | P | 6069185 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 12/20/2018 | 2nd layer of rock at U301 assembly at outsides of stair enclosures at 4th floor are attached with wrong nails as assembly calls for 2 3/8" long 8D cement coated nails and 1 3/4" long roofing nails being used | DANE | DANE | | BSP | R | 6059748 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/18/2018 | 4th floor stairwells - 1st layer of sheetrock (including stagger & fasteners) on outside of stairwells OK per UL U301 | RICHB | RICHB | | BSP | P | 6056833 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/04/2018 | Training with Rich - 2 Hour wall gyp fastening per UL U301 | JUSTINL | JUSTINL | | BSP | P | 6042535 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 12/04/2018 | 3rd floor stairwells - 2nd layer of sheetrock (including stagger & fasteners) on outside of stairwells OK per UL U301 - still need to inspect both layer on inside of stairwells //// Training with Justin - fire resistance rated walls for exit stairways | RICHB | RICHB | | BSP | P | 6042537 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/30/2018 | 3rd floor stairwells - 1st layer of sheetrock (including stagger & fasteners) on outside of stairwells OK per UL U301 - still need to install both layer on inside of stairwells | RICHB | RICHB | | BSP | P | 6039792 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | R | 11/29/2018 | gyp inspection cancelled onsite per Garrett superintendent Ed | BRIANB | BRIANB | | BSP | R | 6038644 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/09/2018 | Inspection added per field request by Contractor - 2nd floor stairwells - framing & 1st layer of sheetrock on outside OK per UL U301 | RICHB | RICHB | | BSP | P | 6022191 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 11/08/2018 | 1st floor stairwells - 2nd layer of sheetrock (including stagger & fasteners) on outside of stairwells OK per UL U301 - still need to install both layer on inside of stairwells | RICHB | RICHB | | BSP | P | 6020259 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/19/2018 | 1st floor stairwells - framing & 1st layer of sheetrock OK per UL U301, discussed required inspection for 2nd layer to verify stagger between layers | RICHB | RICHB | | BSP | P | 6000581 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFN | P | 10/19/2018 | Authorized 3rd party engineer inspection with all observation paperwork - ufer letter,soils and open hole letter to be picked up by inspector @ BFI or BFD inspection | RICHB | RICHB | | BFN | P | 6000435 |
SOUTH CENTRAL ELECTRIC LLC | E= | C | 09/27/2019 | a/c's, pole lights complete | GARYL | GARYL | | E= | C | 6351152 |
STILSON ELECTRIC SYSTEMS, INC. | E= | C | 09/27/2019 | FIRE ALARM INSPECTION: FIRE ALARM only | GARYL | GARYL | | E= | C | 6350181 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/26/2019 | need to identify a/c's northeast side of bldg, 30 a,p breakers-okay, 4--units, check pole lighting to the east of this building | GARYL | GARYL | | E= | P | 6349150 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/25/2019 | UNITS: 102, 104, corridors and mech closets, storage rooms | GARYL | GARYL | | E= | P | 6347426 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/10/2019 | Unit 102--adjust pnl cover, breaker to refer not working UNITS: 106, 108. 110, 112 114 -okay UNIT 104 --not ready | GARYL | GARYL | | E= | P | 6329948 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/09/2019 | units 204 , 205 , 206 , 210 , 211 , 214 , 215 OK | CRAIGS | CRAIGS | | E= | P | 6328843 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/06/2019 | UNITS: 207, 208, 209, 212, okay | GARYL | GARYL | | E= | P | 6326961 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/05/2019 | UNITS: 201, 202, 203 | GARYL | GARYL | | E= | P | 6325235 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 09/04/2019 | power failure at site | GARYL | GARYL | | E= | R | 6323698 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 09/03/2019 | UNITS: 307, 308, 315 | GARYL | GARYL | | E= | P | 6322081 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 08/30/2019 | UNITS: 414, 415 --- #6 to heater, 309, 310, 311, Ok, 314 --- #6 to htr- Ok | GARYL | GARYL | | E= | P | 6320255 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 08/29/2019 | UNITS: 408, 409, 410, 411, 412, htrs okay | GARYL | GARYL | | E= | P | 6318636 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 08/27/2019 | UNITS: 401, 402 have 6/3 cu pulled to heating | GARYL | GARYL | | E= | P | 6315445 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 08/23/2019 | UNITS: 403, 404, 405, 406, 407 | GARYL | GARYL | | E= | P | 6312100 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 08/22/2019 | 401 and 402 need gfci protection for recpt in seating area within 6'of kitchen sink / need to verify heater size and wire size / | ROB | ROB | | E= | P | 6311498 |
SOUTH CENTRAL ELECTRIC LLC | E= | P | 08/16/2019 | UNITS: 301-306----six units | GARYL | GARYL | | E= | P | 6303751 |
SOUTH CENTRAL ELECTRIC LLC | E= | R | 08/14/2019 | not ready | GARYL | GARYL | | E= | R | 6300378 |
SOUTH CENTRAL ELECTRIC LLC | ER | C | 04/24/2019 | units 114 thru 102 OK | CRAIGS | CRAIGS | | ER | C | 6176534 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 04/24/2019 | units 114 thru 102 OK | CRAIGS | CRAIGS | | EP | P | 6176533 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 04/09/2019 | units 212-- 214 -- 215--OK | CRAIGS | CRAIGS | | EP | P | 6159939 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 04/09/2019 | units 212--214--- 215 OK | CRAIGS | CRAIGS | | ER | P | 6159932 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 04/08/2019 | 2nd floor panels | BRET | BRET | | EP | P | 6158402 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 04/08/2019 | FIRE ALARM INSPECTION: 2nd floor ok | BRET | BRET | | ER | P | 6158399 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 04/08/2019 | 2nd floor units and corridor except 212,214.215 | BRET | BRET | | ER | P | 6158398 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 04/01/2019 | units 201-- through 207---OK | CRAIGS | CRAIGS | | EP | P | 6150579 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 04/01/2019 | units 201 through 207 OK | CRAIGS | CRAIGS | | ER | P | 6150576 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 03/26/2019 | panel 309,310,311,312,314,315 | BRET | BRET | | EP | P | 6144258 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 03/26/2019 | 311,312,314,316 corridor ok | BRET | BRET | | ER | P | 6144248 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 03/22/2019 | panel 307,308 | BRET | BRET | | EP | P | 6140719 |
STILSON ELECTRIC SYSTEMS, INC. | ER | P | 03/22/2019 | FIRE ALARM INSPECTION: 3rd floor units ok | BRET | BRET | | ER | P | 6140718 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 03/22/2019 | units 307,308,309,310 | BRET | BRET | | ER | P | 6140714 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 03/20/2019 | Panels ok for Units 301,302,303,304,305,306 / | ROB | ROB | | EP | P | 6138817 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 03/20/2019 | Rough ok for for Units 301,302,303,304,305,306 / Electrical Rough ok, FA not complete ---------------do not sheetrock--------------- / | ROB | ROB | | ER | P | 6138800 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 03/12/2019 | Panels ok for 401,402,403,404,405,406,407,408, these are correct unit numbers for inspection made on3.08.2019 / Panels ok for 409,410,411,412,414,415 / | ROB | ROB | | EP | P | 6132308 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 03/12/2019 | Electrical Rough ok, FA not complete ---------------do not sheetrock--------------- / Units 401,402,403,404,405,406,407,408,409,410,411,412,414,415, / Corridor and storage closet on 4th level / | ROB | ROB | | ER | P | 6132276 |
SOUTH CENTRAL ELECTRIC LLC | EP | P | 03/08/2019 | EP ok for Units 1,2,3,4,5,6,7,8 / | ROB | ROB | | EP | P | 6128908 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 03/08/2019 | ER for Units 1,2,3,4,5,6,7,8 / All units missing 1 receptacle on penensula
ER for Units 1,2,3,4,5,6,7,8 / All units need receptacle on LR side of kitchen peninsula / Units 3,4,6,7,8 missing bath counter receptacle /
| ROB | ROB | | ER | P | 6128907 |
SOUTH CENTRAL ELECTRIC LLC | ES | P | 03/06/2019 | Commercial Service: 1- 2000 amp 4 wire service / Ok to set 49 meters / 1- 600 amp 4 wire service Ok to set 1 meter/ NOTE: Need to check water pie GEC connection / Need applicable labeling for fault current and series rating / | ROB | ROB | | ES | P | 6126024 |
SOUTH CENTRAL ELECTRIC LLC | ESL | P | 11/30/2018 | ufer okay to cover | GARYL | GARYL | | ESL | P | 6039930 |
SOUTH CENTRAL ELECTRIC LLC | ESL | P | 11/29/2018 | 1st of 2 inspections for ufer to pour concrete, okay | GARYL | GARYL | | ESL | P | 6037708 |
J & B ELECTRIC OF COLORADO LLC | EUG | R | 06/21/2018 | Not installed per 250.52 (A) (3) / | ROB | ROB | | EUG | R | 5881451 |
JR HOBBS CO - ATLANTA, LLC | H= | C | 12/04/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6415364 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 12/03/2019 | TEST AND BALANCE REPORT REVIEW: LEVEL -1 CORRIDOR OUTSIDE AIR IS OUTSIDE +/-10 % ALLOWED . LEVEL -1,2,3,4 - SUPPLY GRILL # 8 IS OUTSIDE +/-10 % ALLOWED. | LIDO | LIDO | | H= | P | 6413919 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/27/2019 | TEST AND BALANCE REPORT REVIEW- LEVEL 1,2,3,4 OUTSIDE AIR IS OUTSIDE THE 10 % PLUS OR MINUS ALLOWED . LEVEL 1,2,3,4 SUPPLY GRILLS # 8 ARE NOT PER THE CFM DESIGN FROM THE PLANS . NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READINGS. | LIDO | LIDO | | H= | P | 6410795 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/13/2019 | TEST AND BALANCE REPORT REVIEW : LEVEL 1,2,3,4 -MULTIPLE SUPPLY AIR READING ARE OUTSIDE THE 10% PLUS OR MINUS ALLOWED. MISSING THE OUTSIDE AIR READINGS. NEED REVISED TEST AND BALANCE REPORT OR STAMPED ENGINEER LETTER APPROVING THE READING. | LIDO | LIDO | | H= | P | 6397264 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/12/2019 | TEST AND BALANCE REPORT IS BEING REVIEWED. | LIDO | LIDO | | H= | P | 6395575 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/05/2019 | PARTIAL PENDING : NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6388294 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/05/2019 | BUILDING # 3 : LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS OK. | LIDO | LIDO | | H= | P | 6390931 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/04/2019 | PARTIAL PENDING: LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS - SUPPORT AND ALL SECONDARY PROTECTION WIRES OUT OF THE WAY OF THE FILTER RACK FILTER DOOR WITH APPROVED FASTENERS (NOT TAPE.) NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6387580 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 11/01/2019 | LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS - SUPPORT AND ALL SECONDARY PROTECTION WIRES UP OF THE FLOOR AND OUT OF THE WAY OF THE FILTER RACK FILTER DOOR. SEAL ALL EXPOSED YELLOW INSULATION IN SUPPLY DUCT. LABEL ALL FIRE DAMPER ACCESS DOORS. (( ALL CONDENSERS OK )) | LIDO | LIDO | | H= | P | 6386451 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 10/31/2019 | BUILDING #3 LEVEL - 1,2,3 CORRIDOR MECHANICAL ROOM SUPPLY AND RETURN FIRE DAMPERS COMPLETE. STILL NEED LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS WHEN READY. | LIDO | LIDO | | H= | P | 6385175 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 10/29/2019 | PARTIAL PENDING : LEVEL 1,2,3 CORRIDOR SUPPLY AND DAMPER ANGELS AND ACCESS / LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOM FINALS.NEED THE 4- CONDENSERS INSPECTED LOCATED OUTSIDE. TEST AND BALANCE REPORT FOR LEVEL 1,2,3,4 CORRIDORS. (( LEVEL 1,2,3,4 AL DWELLING UNIT HEAT FINALS OK.)) | LIDO | LIDO | | H= | P | 6382799 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 10/08/2019 | ELEVATOR COMPLETE | ERIC | ERIC | | HE= | C | 6361085 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 10/07/2019 | NEED IDENTIFICATION FOR ELEVATOR CHANGED TO #1 -- REST OK FOR PUBLIC USE. | ROBERTV | ROBERTV | | HE= | P | 6360008 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | P | 09/24/2019 | NEED TO COMPLETE INTERIOR ELEVATOR SHAFT CMU GROUTING AND SCHEDULE INSPECTION WITH BUILDING INSPECTOR. NEED IDENTIFICATION FOR ELEVATOR CHANGED TO #1. NEED ELECTRICAL DISCONNECT LUG COVER PLATE INSTALLED AT 2ND FLOOR. EMERGENCY PHONE MONITORING COMPANY NEEDS TO CHANGE ELEVATOR ADDRESS TO 1360 KELLY JOHNSON BLVD. NEED CSFD ELEVATOR APPROVAL …… NOT AVAILABLE FOR PUBLIC USE | ROBERTV | ROBERTV | | HE= | P | 6345426 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/20/2019 | BUILDING -3- (NEED TO RESEARCH CONDENSATE DISPOSAL) DWELLING UNIT HEAT FINAL. 1ST FLOOR STILL NEED ROOM # 104 AND 114. 2ND FLOOR ALL DWELLING UNITS PENDING RESEARCH . | LIDO | LIDO | | H= | P | 6342798 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/19/2019 | 1ST FLOOR . SPRINKLER ROOM : ELECTRIC UNIT HEATER OK. DWELLING UNIT HEAT FINAL: UNIT 102 CLEAN UP LOW VOLTAGE WIRES. 108, 110 OK . REST OF FLOOR NOT READY. 2ND FLOOR DWELLING UNIT HEAT FINAL : 215 MISSING BATHROOM EXHAUST FAN ON WALL. 201 OK. | LIDO | LIDO | | H= | P | 6341834 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/18/2019 | 2ND FLOOR DWELLING UNIT HEAT FINAL : DWELLING UNIT # 202 AND 203 OK/ STILL NEED 201, 205, 212 AND 215 FOR THIS FLOOR. | LIDO | LIDO | | H= | P | 6339434 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/17/2019 | BUILDING - 3 : LEVEL 3 - ALL DWELLING UNITS HEAT FINAL OK. 2ND FLOOR - DWELLING UNIT HEAT FINAL OK FOR UNIT # 204, 206, 207, 208, 209, 210, 211, 214. LEVEL 2 AND 3 - CORRIDOR MECHANICAL ROOM SUPPLY AIR DUCT CONNECTION IN CORRIDOR RATED SOFFIT ONLY OK.
| LIDO | LIDO | | H= | P | 6337819 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 09/16/2019 | BUILDING -3 - LEVEL 2 AND 3 -CORRIDOR MECHANICAL ROOM SUPPLY AIR TIE-IN TO DUCT PENETRATING INTO THE CORRIDOR CEILING SPACE IN THE RATED SOFFIT IS NOT READY. LEVEL -1 CORRIDOR MECHANICAL ROOM SUPPLY FIRE DAMPER IS UNDER SIZED AND SUPPLY DUCT IS UNDER SIZED IN CORRIDOR RATED SOFFIT PER SPLICE DATED 8/13/19 / NEED STAMPED ENGINEER DETAIL FOR FIRE DAMPER AND DUCT SIZE CHANGES/ WILL RE - INSPECT AFTER DETAIL IS RECEIVED. | LIDO | LIDO | | HD | P | 6336119 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/16/2019 | 2ND FLOOR DWELLING UNIT HEAT FINAL NOT READY. | LIDO | LIDO | | H= | P | 6336107 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/13/2019 | 3RD FLOOR DWELLING UNIT HEAT FINAL OK / EXCEPT FOR UNIT # 312. LEVEL 1,2,3,4 CORRIDOR HEAT FINAL OK. | LIDO | LIDO | | H= | P | 6335450 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 09/13/2019 | BUILDING- 3 - LEVEL -1 CORRIDOR MECHANICAL ROOM SUPPLY FIRE DAMPER IS UNDER SIZED AND SUPPLY DUCT IS UNDER SIZED IN CORRIDOR RATED SOFFIT PER SPLICE DATED 8/13/19 / NEED STAMPED ENGINEER DETAIL FOR FIRE DAMPER AND DUCT SIZE CHANGES/ WILL RE - INSPECT AFTER DETAIL IS RECEIVED. LEVEL -2 AND 3 CORRIDOR MECHANICAL ROOM -SUPPLY METAL DUCT TIE - IN TO DUCT BOARD IS RESTRICTING AIR FLOW. (( LEVEL -1 CORRIDOR MECHANICAL ROOM - OUTSIDE AIR CEILING RADIATION DAMPER OK. LEVEL -4 CORRIDOR MECHANICAL ROOM - SUPPLY AND RETURN AIR FIRE DAMPER OK / SUPPLY DUCT IN RATED SOFFIT OK / STILL NEED MECHANICAL ROOM. | LIDO | LIDO | | HD | P | 6335449 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 09/12/2019 | BUILDING - 3 : 3RD FLOOR LEVEL- 1,2,3,4 CORRIDOR MECHANICAL ROOMS ARE NOT READY FOR FIRE DAMPER INSPECTION . | LIDO | LIDO | | HD | P | 6333225 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/12/2019 | 3RD FLOOR : REST OF DWELLING UNITS ARE NOT READY FOR HEAT FINAL INSPECTION . ((HEAT FINAL FOR UNIT 310 OK.)) | LIDO | LIDO | | H= | P | 6333209 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 09/10/2019 | BUILDING -3 - LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS : SUPPLY FIRE DAMPER ONLY OK. | LIDO | LIDO | | HD | P | 6329942 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/10/2019 | BUILDING -3 - 3RD FLOOR DWELLING UNIT HEAT FINAL : (UNIT 306 IS NOT SHUTTING DOWN WITH SMOKE DETECTOR ACTIVATION.) 301, 302, 303, 304, 305, 307, 308 OK | LIDO | LIDO | | H= | P | 6329941 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 09/09/2019 | DAMPERS NOT READY FOR INSPECTION. | LIDO | LIDO | | HD | P | 6329072 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/09/2019 | 3RD FLOOR DWELLING UNIT HEAT FINAL : 311, 314, 315 CORRECTIONS NOT MADE. 310 , 312 - AIR HANDLER UNIT IS NOT SHUTTING DOWN WITH SMOKE DETECTOR ACTIVATION. ((309 OK.)) | LIDO | LIDO | | H= | P | 6329053 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/06/2019 | 4TH FLOOR DWELLING UNIT HEAT FINAL: ALL DWELLING UNITS OK. 3RD FLOOR DWELLING UNIT HEAT FINAL : UNIT 315 - CONDENSATE DRAIN IS BACK GRADING . SEAL CONDENSATE PIPE PENETRATION INTO AIR HANDLER CABINET. UNIT 311,314 - AIR HANDLER UNITS ARE NOT SHUTTING DOWN WITH SMOKE DETECTOR ACTIVATION. | LIDO | LIDO | | H= | P | 6327489 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/05/2019 | 4TH FLOOR DWELLING UNIT HEAT FINAL : UNIT 415 - NEED TO COMPLETE CONDENSATE DRAIN PIPE / CONDENSATE DRAIN PIPE IS BACK GRADING. UNIT 410 - UNDER CUT BEDROOM DOOR BY LAUNDRY ROOM , AIR HANDLER UNIT IS NOT SHUTTING DOWN WITH SMOKE DETECTOR ACTIVATION. UNIT 406 - LABEL FIRE DAMPER ACCESS DOOR IN MECHANICAL ROOM. UNIT 405 - MISSING MAKE UP AIR FOR LAUNDRY ROOM, CONDENSATE DRAIN IS BACK GRADING . ((HEAT FINAL FOR THE REST OF THE DWELLING UNIT ON 4TH FLOOR OK. )) | LIDO | LIDO | | H= | P | 6325031 |
JR HOBBS CO - ATLANTA, LLC | H= | P | 09/04/2019 | (LEVEL 1,2,3,4 SUPPLY AND RETURN DAMPER FRAME AND SHEET ROCK WRAP OK / OK TO INSTALL DAMPER . CORRIDOR MECHANICAL ROOM OUTSIDE AIR CEILING RADIATION DAMPER OK .) 4TH FLOOR DWELLING UNIT HEAT FINAL : UNIT 401, 402, 403 - AIR HANDLER UNITS AIR NOT SHUTTING DOWN WITH SMOKE DETECTOR ACTIVATION. NEED MECHANICAL FASTENERS FOR DUCT BOARD CONNECTION TO AIR HANDLER UNIT. PVC IS NOT RATED FOR PLENUM RETURN / WRAP WITH APPROVED MATERIAL. SEAL CONDENSATE PRIMARY AND SECONDARY DRAIN PIPE PENETRATION INTO AIR HANDLER CABINET . | LIDO | LIDO | | H= | P | 6323305 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 08/28/2019 | BUILDING - 3 - CORRIDOR MECHANICAL ROOMS : LEVEL 1- MISSING OUTSIDE AIR CEILING RADIATION DAMPER. LEVEL 2,3,4 - SHEET ROCK INSTALLED AROUND OUTSIDE AIR CEILING RADIATION DAMPER BEFORE DAMPER WAS INSPECTED / REMOVE SHEET ROCK FOR INSPECTION.LEVEL - 4- SUPPLY DAMPER FRAMED OPENING DOES NOT HAVE THE REQUIRED ANNULAR SPACING FOR EXPANSION PER THE INSTALL INSTRUCTIONS . RETURN DAMPER FRAME OK. LEVEL -1,2,3 SUPPLY AND RETURN AIR DAMPER FRAME AND INSIDE FRAME SHEET ROCK WRAP OK. ( HEAT FINAL CONSULT FOR DWELLING UNIT.) | LIDO | LIDO | | HD | P | 6317191 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 08/27/2019 | BUILDING -3- LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOM FIRE DAMPER FRAMES ARE NOT FRAMED PER THE INSTALLATION INSTRUCTIONS. | LIDO | LIDO | | HD | P | 6316278 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 08/23/2019 | BUILDING -3 - LEVEL 1,2,3,4 CORRIDOR MECHANICAL ROOMS : ON SITE CONSULT FOR FIRE DAMPER FRAMING AND INSTALL. | LIDO | LIDO | | HSP | P | 6312487 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 07/26/2019 | BUILDING -3- CORRIDOR MECHANICAL ROOM FIRE DAMPER FRAMING INSPECTION : 1ST FLOOR NOT READY. 2ND AND 3RD FLOOR -THERE IS A LARGE HOLE IN THE TOP HEADER OF THE SUPPLY FRAMING . 4TH FLOOR - VERTICAL STUD ON THE RIGHT SIGHT OF FRAMING IS SPLIT / THIS WILL NEED TO BE REPLACED. | LIDO | LIDO | | HD | P | 6278831 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 07/25/2019 | NOT READY , FIELD CANCELED BY CONTRACTOR | LIDO | LIDO | | HD | P | 6276841 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 07/19/2019 | BUILDING - 3- CORRIDOR MECHANICAL ROOMS : LEVEL 2,3,4 OUTSIDE AIR CEILING RADIATION DAMPERS AND DUCT ABOVE RATED CEILING OK . | LIDO | LIDO | | HD | P | 6270459 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 07/16/2019 | BUILDING -3- LEVEL 1,2,3,4 CORRIDOR MAIN SUPPLY TRUNK LINE DUCT RISER UP FROM CORRIDOR JUST OUTSIDE THE MECHANICAL ROOM UP INTO THE RATED FLOOR CEILING ASSEMBLY IS NOT INSTALLED PER PLAN / CEILING RADIATION DAMPER IS MISSING / INSTALL PER PLANS OR REVISED AND APPROVED PLANS ARE REQUIRED. PROCEED AT OWN RISK . | LIDO | LIDO | | HD | P | 6265328 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 07/11/2019 | BUILDING -1- LEVEL -1 : OUTSIDE AIR FOR AHU-2-1 ROUTING DOES NOT MATCH DUCT DESIGN ON THE PLANS / OUTSIDE AIR INTAKE INSTALLED ON THE NORTH SIDE OF THE BUILDING , PLANS SHOW INTAKE TO BE ON THE WEST SIDE OF BUILDING / BEFORE INSTALL CAN BE APPROVED, REVISED AND APPROVED PLANS ARE NEEDED. | LIDO | LIDO | | HD | P | 6260189 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 07/02/2019 | BUILDING -3 - 1ST FLOOR DWELLING UNIT MECHANICAL ROOMS : CEILING RADIATION ANGLES FOR 1ST FLOOR OK. SUPPLY AIR CEILING RADIATION DAMPER BY CORRIDOR MECHANICAL ROOM OK. | LIDO | LIDO | | HD | P | 6252178 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/27/2019 | TWO 8" SUPPLY AIR FLEX DUCTS INSTALLED TO THE BIKE STORAGE ROOM / PLANS SHOWS 1- 8X8 WITH A FIRE DAMPER IN WALL FOR THIS AREA /NEED REVISED AND APPROVED PLANS TO MATCH INSTALL / IF FIRE DAMPER IS NOT GOING TO BE INSTALLED IN WALL THE REVISED PLANS WILL NEED TO REFLECT THIS . CORRIDOR ABOVE CEILING DUCT ROUGH AND CEILING RADIATION DAMPERS INSTALL FROM THE SOUTH SIDE OF MECHANICAL ROOM TO THE END OF THE CORRIDOR OK. | LIDO | LIDO | | HD | P | 6247220 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/25/2019 | BUILDING -3- 1ST FLOOR DWELLING UNIT MECHANICAL ROOM ANGLE INSPECTION OK / EXCEPT FOR UNIT 106. | LIDO | LIDO | | HD | P | 6243743 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/19/2019 | BUILDING -3- 1ST FLOOR MECHANICAL ROOM ANGLE INSPECTION : ALL DWELLING UNIT MECHANICAL ROOMS NOT OK / THERE ARE LARGE GAPS AT THE CORNER WERE THE ANGLES MEET. | LIDO | LIDO | | HD | P | 6237276 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 06/18/2019 | BUILDING -3 - 1ST FLOOR MECHANICAL ROOM ANGLE INSPECTION - NOT READY. | LIDO | LIDO | | HD | P | 6235590 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/24/2019 | BUILDING -3 - 1ST FLOOR : ALL DWELLING UNIT MECHANICAL ROOMS PRE ANGLE INSPECTION FOR CEILING RADIATION DAMPERS OK. | LIDO | LIDO | | HD | P | 6210167 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/14/2019 | BUILDING -3 - 2ND FLOOR DWELLING UNIT MECHANICAL ROOMS CEILING RADIATION DAMPER ANGLES OK. | LIDO | LIDO | | HD | P | 6198544 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/13/2019 | BUILDING # 3- 2ND FLOOR : PRE ANGLE INSPECTIONS FOR ALL DWELLING UNIT MECHANICAL ROOMS OK. | LIDO | LIDO | | HD | P | 6197427 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 05/06/2019 | BUILDING # 3. 3RD FLOOR DWELLING UNIT MECHANICAL ROOM CEILING RADIATION DAMPER ANGLE INSPECTION : 313, 305 OK TO ANGLE / REMAINING DWELLING UNITS MECHANICAL ROOMS ANGLES OK . | LIDO | LIDO | | HD | P | 6188460 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/26/2019 | BUILDING -3 -4TH FLOOR : ALL DWELLING UNIT MECHANICAL ROOMS CEILING RADIATION DAMPER ANGLE OK. 3RD FLOOR : 305 , 314 NOT READY, REST OF DWELLING UNIT MECHANICAL ROOMS CEILING RADIATION DAMPER PRE ANGLE ANNULAR SPACING OK / OK TO INSTALL ANGLE. | LIDO | LIDO | | HD | P | 6179667 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/24/2019 | BUILDING -3 -4TH FLOOR : ALL DWELLING UNIT MECHANICAL ROOMS CEILING RADIATION DAMPER PRE ANGLE ANNULAR SPACING OK / OK TO INSTALL ANGLE. | LIDO | LIDO | | HD | P | 6177168 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/22/2019 | BUILDING # 3 - 1ST FLOOR - ALL DWELLING UNITS ABOVE CEILING DUCT ROUGH OK . | LIDO | LIDO | | HD | P | 6174372 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/15/2019 | BUILDING -3- MULTIPLE SUPPLY RUN REGISTER LOCATIONS HAVE BEEN RELOCATED FROM WHAT IS SHOWN ON PLANS. EITHER INSTALL PER PLAN OR NEED REVISED/APPROVED PRINT.2ND FLOOR ALL DWELLING UNITS ABOVE CEILING DUCT ROUGH OK . | LIDO | LIDO | | HD | P | 6166459 |
JR HOBBS CO - ATLANTA, LLC | HRP | P | 04/15/2019 | 250 lb TEST AND INSTALL FOR ALL FOUR LINE SETS TO CORRIDOR AHU'S OK . | LIDO | LIDO | | HRP | P | 6166458 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/12/2019 | BUILDING -3- 2ND FLOOR ABOVE CEILING DWELLING UNIT DUCT ROUGH : 205, 213, NOT READY. 214 DRYER BOX INSTALLED IN RATED WALL DRYER BOX WILL NEED TO BE PROTECTED PER INSTALLATION INSTRUCTION FOR INSTALL IN A RATED WALL/ ABOVE CEILING DUCT ROUGH OK. | LIDO | LIDO | | HD | P | 6164430 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/10/2019 | FIELD CANCELLED BY CONTRACTOR / NOT READY. | LIDO | LIDO | | HD | P | 6161692 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 04/09/2019 | 2ND FLOOR CORRIDOR : SUPPLY MAIN TRUNK LINE ,SUPPLY BRANCH LINES AND SUPPLY AIR CEILING RADIATION DAMPERS ONLY OK. | LIDO | LIDO | | HD | P | 6160896 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/29/2019 | BUILDING # 3 - 2ND LEVEL DWELLING UNIT ABOVE CEILING DUCT ROUGH : UNIT 201,208,209,210 OK / BY FINAL NEED REVISED AND APPROVED PLANS FOR SUPPLY 8" TO THE KITCHEN AND 6" TO BATH-1 ARE NOW COMMING OFF A 9" FLEX INSTEAD OF THE 16'X10' THE PLAN SHOWS/ REFER TO PLAN PAGE 2.01 DETAIL (B1A) | LIDO | LIDO | | HD | P | 6148484 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/28/2019 | BUILDING # 3 -2ND FLOOR DWELLING UNITS : UNIT 207,208,209,210,211,212 ABOVE CEILING DUCT ROUGH IS NOT OK , DUCT INSTALL DOES NOT MATCH DUCT DESIGN DETAIL B1A - NEED TO RE-INSPECT ALL. | LIDO | LIDO | | HD | P | 6148287 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/26/2019 | 2ND LEVEL- DWELLING UNITS ABOVE CEILING DUCT ROUGH IN UNITS # 205 IS NOT INSTALLED PER PLAN NEED TO RE-INSPECT ALL , UNIT 201,202,203,204,206. OK | LIDO | LIDO | | HD | P | 6144521 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/25/2019 | BUILDING # 3 LEVEL 3 - ABOVE CEILING DUCT ROUGH FOR ALL DWELLING UNITS OK/ CORRIDOR SUPPLY PARTIAL MAIN TRUNK AND BRANCH LINES ONLY- ABOVE CEILING DUCT ROUGH AND DAMPERS OK .
| LIDO | LIDO | | HD | P | 6143424 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/19/2019 | BUILDING # 3 - 4TH FLOOR CORRIDOR : ABOVE CEILING SUPPLY AIR DUCT ROUGH AND SUPPLY AIR CEILING RADIATION DAMPERS ONLY OK. | LIDO | LIDO | | HD | P | 6136722 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/11/2019 | BUILDING -3 - 3RD FLOOR DWELLING UNITS ABOVE CEILING DUCT ROUGH : UNIT# 302, 303, 304, 305, 306 OK / UNIT 301 NOT READY. | LIDO | LIDO | | HD | P | 6130400 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/11/2019 | MULTIPLE SUPPLY RUN REGISTER LOCATIONS HAVE BEEN RELOCATED FROM WHAT IS SHOWN ON PLANS. EITHER INSTALL PER PLAN OR NEED REVISED/APPROVED PRINT. | LIDO | LIDO | | HSP | P | 6129698 |
JR HOBBS CO - ATLANTA, LLC | HSP | P | 03/11/2019 | CORRIDOR MECHANICAL ROOMS FOR ALL FLOORS -THE COMBINED SUPPLY, RETURN AND OUTSIDE AIR CEILING RADIATION DAMPER OPENINGS ARE GREATER THAN WHAT IS ALLOWED FOR THE AGGREGATE OPENINGS PER THE UL LISTING UL L546 AND UL P522 - Aggregate damper openings shall not exceed 128 sq in. per 100 sq ft of ceiling area. for POTTORFF — Models CFD-521-IP, CFD-521-NP | LIDO | LIDO | | HSP | P | 6129680 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/08/2019 | BUILDING - 3 - 3RD FLOOR DWELLING UNITS ABOVE CEILING DUCT ROUGH : MULTIPLE SUPPLY RUN REGISTER LOCATIONS HAVE BEEN RELOCATED FROM WHAT IS SHOWN ON PLANS. EITHER INSTALL PER PLAN OR NEED REVISED/APPROVED PRINT. UNITS - 307,308,309,310,311,312,313,314 OK. | LIDO | LIDO | | HD | P | 6128406 |
JR HOBBS CO - ATLANTA, LLC | HRP | P | 03/07/2019 | ((THIS INSPECTION WAS CALLED IN UNDER THE WRONG PERMIT # BY CONTRACTOR / NOTES HAVE BEEN TRANSFERED TO PERMIT # L42935 BY (LM) ON 3/11/19 INFORMED CONTRACTOR )) 250lb LINE SET PRESSURE TEST FOR 1ST, 2ND, 3RD, 4TH FLOOR CORRIDOR AHU UNITS OK. | LIDO | LIDO | | HRP | P | 6126702 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/05/2019 | BUILDING # 3- 4TH FLOOR - ALL DWELLING UNITS ABOVE CEILING DUCT ROUGH OK. | LIDO | LIDO | | HD | P | 6124469 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 03/01/2019 | ALTERED NOTES 3/5/19 (LM) INFORMED CONTRACTOR. FIELD CANCELLED BY CONTRACTOR . | LIDO | LIDO | | HD | P | 6121394 |
JR HOBBS CO - ATLANTA, LLC | HD | P | 02/28/2019 | BUILDING # 3 . 4TH FLOOR : DWELLING UNIT ABOVE CEILING DUCT ROUGH UNITS 401,402, 403, 404, 405, 406, 407, 408 OK . | LIDO | LIDO | | HD | P | 6120502 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | C | 09/18/2019 | | SAMH | SAMH | | P= | C | 6339516 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | C | 09/18/2019 | Splice approved. | SAMH | SAMH | | PB | C | 6339514 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | C | 09/18/2019 | | SAMH | SAMH | | PTO | C | 6339504 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 09/09/2019 | All rooms complete excluding room 208 & 210 lavs. | SAMH | SAMH | | P= | P | 6329074 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 09/06/2019 | 3rd floor complete. 2nd floor rooms 201-207 complete. | SAMH | SAMH | | P= | P | 6326958 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 09/05/2019 | 4th floor complete, 3rd floor rooms 309-314 ok excluding leak at kitchen sink in 310. | SAMH | SAMH | | P= | P | 6325620 |
KIMBEL MECHANICAL SYSTEMS, INC. | P= | P | 09/03/2019 | 4th floor complete excluding Shock arrestors at dishwashers throughout. | SAMH | SAMH | | P= | P | 6322648 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/18/2019 | Need inspection elevator discharge piping rest of PTO ok. Note: check water heaters - water entry - hose bib access doors at final. | DANR | DANR | | PTO | P | 6170205 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/16/2019 | Domestic water the following units ok: 102-104-106-108-110-112-114. | DANR | DANR | | PTO | P | 6167098 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/12/2019 | Units 212, and 214 OK. | SAMH | SAMH | | PTO | P | 6164434 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/11/2019 | Low test on water in units 214, and 212. Units 209, 211, 215 OK. | SAMH | SAMH | | PTO | P | 6162882 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/10/2019 | Domestic water and toilet flanges units 201-202-203-204-206-207-208-210 ok. Tub drain unit 311 ok. | DANR | DANR | | PTO | P | 6161295 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 04/09/2019 | Unit 205 domestic water and toilet flange ok. | DANR | DANR | | PTO | P | 6159753 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/19/2019 | Low domestic water test unit 306, rest ok dwv and domestic this units. Domestic water and toilet flanges units 307-308-309-310-311-312-314-315 ok. | DANR | DANR | | PTO | P | 6136701 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/18/2019 | Domestic water units 306-307-308 low test, rest ok these units for domestic water and toilet flanges. Domestic water and toilet flanges units: 301-302-303-304-305-412 ok. | DANR | DANR | | PTO | P | 6135328 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/15/2019 | 4th floor unit 412 missing toilet flange, rest ok for 4th floor dwv. | DANR | DANR | | PTO | P | 6133314 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | L | 03/13/2019 | Field cancel. | SAMH | SAMH | | PTO | L | 6132947 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/12/2019 | DWV unit: 311 tub s-trapped - install toilet flange and tubs, rest ok this unit. DWV units: 211-215-315-411-415 need toilet flanges and tubs set, rest ok these units. | DANR | DANR | | PTO | P | 6131550 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/11/2019 | DWV units ok except as noted: Units 110 - 112 - 114 need tubs set - toilet flanges set , 114 needs nail protection. Units 210 - 212 - 214 - 310 - 312 - 314 - 410 - 412 - 414 , need toilet flanges set, rest ok. Domestic water test units 411 - 412 - 414 ok. | DANR | DANR | | PTO | P | 6130687 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/08/2019 | All units need toilet flanges. DWV units: 207-209-307-309-407-409 ok. Domestic water units: 411-412-415 low test, rest ok these units. Domestic water units 419-414 ok.
| DANR | DANR | | PTO | P | 6128173 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/07/2019 | This inspection domestic water the following except water heaters an sub meters: 401-402-403-404-405-406-407-408-409. | DANR | DANR | | PTO | P | 6126479 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 03/01/2019 | This inspection DWV only the following units except toilet flanges and tub install unit106: 106-108-206-208-306-308-406-408. DWV nail protection complete the following units: 203-205-305-403. | DANR | DANR | | PTO | P | 6121548 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 02/28/2019 | DWV only the following units - all units need toilet flanges installed: 104 and 204 need traps and tubs installed. 203 - 205 - 305 - 403 nail protection. 303 - 304 - 404 - 405 ok. 201 correction made on grade to tub.
| DANR | DANR | | PTO | P | 6120020 |
KIMBEL MECHANICAL SYSTEMS, INC. | PTO | P | 02/27/2019 | This inspection DWV only the following units: All units need toilet flanges installed - 1st and 2nd floors need tubs and shower installed - 2nd floor needs tub and shower traps. Unit 102-201-202 (fix grade on hall tub drain)-301-302-401-402.
| DANR | DANR | | PTO | P | 6118673 |
KIMBEL MECHANICAL SYSTEMS, INC. | PB | P | 05/24/2018 | Need engineer drawings and splice for changes to branches and stacks, cover at own risk. | DANR | DANR | | PB | P | 5855077 |
KIMBEL MECHANICAL SYSTEMS, INC. | XPS | T | 11/07/2019 | PAID (REC#1643341): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: Adjusted CFM | TCRIPPEN | TCRIPPEN | | XPS | T | 6392287 |
THYSSENKRUPP ELEVATOR CORPORATION | XMS | T | 09/25/2019 | PAID (REC#1632904): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: ok splice page changed duct size | TCRIPPEN | TCRIPPEN | | XMS | T | 6348130 |
STILSON ELECTRIC SYSTEMS, INC. | XES | P | 08/13/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Add unit heaters | SHELBY | SHELBY | | XES | P | 6299209 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 07/18/2019 | PAID (REC#1615380): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Clarify assembly at top of shaft | MICHAELA | MICHAELA | | XBS | T | 6267946 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 05/15/2019 | PAID (REC#1598811) PLAN SPLICE FEE: $50 by: DANM for Construction: Alternate Materials and Methods - 2 hr rated wall at garages with 2-hr rated flr/clg above; new listed assembly at elevator opening | DANM | DANM | | XBS | T | 6200497 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | P | 04/25/2019 | PLAN SPLICE: (No Fee) by: BPHILLIPS for Construction: Provided bulkhead detail to relocate fire dampers. | BPHILLIPS | BPHILLIPS | | XBS | P | 6178732 |
JR HOBBS CO - ATLANTA, LLC | XMS | P | 04/25/2019 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: As built revisions | TCRIPPEN | TCRIPPEN | | XMS | P | 6178588 |
STILSON ELECTRIC SYSTEMS, INC. | XES | T | 04/25/2019 | PAID (REC#1593545) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add fire alarm interlock for air handler | SHELBY | SHELBY | | XES | T | 6178486 |
STILSON ELECTRIC SYSTEMS, INC. | XES | P | 04/10/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: See M3.31 - M3.34 | BERTHA | BERTHA | | XES | P | 6161567 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | P | 04/08/2019 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Drop corridor ceiling for duct | MICHAELA | MICHAELA | | XBS | P | 6158280 |
SOUTH CENTRAL ELECTRIC LLC | XES | T | 03/04/2019 | PAID (REC#1580175) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised conductor 2000. | BERTHA | BERTHA | | XES | T | 6123733 |
KIMBEL MECHANICAL SYSTEMS, INC. | XPS | T | 01/24/2019 | PAID (REC#1571791): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 1-24-19 added risers | TCRIPPEN | TCRIPPEN | | XPS | T | 6087490 |
SOUTH CENTRAL ELECTRIC LLC | XES | T | 01/24/2019 | PAID (REC#1580098) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added duct temperature limit switch. | BERTHA | BERTHA | | XES | T | 6086744 |
JR HOBBS CO - ATLANTA, LLC | XMS | T | 01/18/2019 | PAID (REC#1579091) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: DELTA R9 | DALEH | DALEH | | XMS | T | 6083334 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 10/12/2018 | PAID (REC#1548851) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Remove elevator smoke doors | MICHAELA | MICHAELA | | XBS | T | 5993542 |
JR HOBBS CO - ATLANTA, LLC | XMS | T | 10/05/2018 | PAID (REC#1548852) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: DELTA E,B | DALEH | DALEH | | XMS | T | 5987699 |
SOUTH CENTRAL ELECTRIC LLC | XES | T | 09/11/2018 | PAID (REC#1548853) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised dwelling units, overall plans and panel schedules. | BERTHA | BERTHA | | XES | T | 5960747 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 09/07/2018 | PAID (REC#1548851) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Architectural and structural clarifications | MICHAELA | MICHAELA | | XBS | T | 5957751 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 09/05/2018 | PAID (REC#1548851) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Floor and roof trusses - see structural notes for uplift hardware | MICHAELA | MICHAELA | | XBS | T | 5955254 |