THE GARRETT CONSTRUCTION COMPANY LLC | B= | C | 08/16/2019 | Building final OK pending all other finals complete? Changed to a completion by Bert W | NICK | NICK | | B= | C | 6304546 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 08/14/2019 | still need to install all electrical devises and fix all penetrations in the 5th and 6th garages from the south end - no change from last inspection | DANE | DANE | | B= | R | 6301307 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 08/13/2019 | still need to complete the 5th and 6th garages from the south end / fire taping at joints all need to be completed and all penetrations need to be fire caulked and all electrical needs to be completed | DANE | DANE | | B= | R | 6299425 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 08/01/2019 | need to install garage doors in 5th and 6th garages / need to reinstall all lights and outlets in 5th and 6th garages / need to fire tape all portions of the horizontal portion of the fire wall assembly and need to protect all penetrations through the horizontal portion of the fire wall in the 5th and 6th garages / all other portions of the building are OK | DANE | DANE | | B= | R | 6285164 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/31/2019 | 2nd layer of drywall at horizontal portion of firewall OK | DAKOTAB | DAKOTAB | | BSP | P | 6284200 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFT | P | 07/31/2019 | Engineer letter for footing/foundation observation, open hole, and masonary observation on file | DAKOTAB | DAKOTAB | | BFT | P | 6284198 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 07/29/2019 | first layer of rock and attachments OK at horizontal portion of fire wall in 5th and 6th garages / all wood penetrations have been removed and corners are lapped with bottom extending to outer edge of vertical piece | DANE | DANE | | BSP | P | 6280164 |
THE GARRETT CONSTRUCTION COMPANY LLC | B= | R | 06/20/2019 | not ready for inspection / need address posted / need to complete BFT and BFN / rock not installed correctly at corners and ends of trusses at 5th and 6th garages / need listing for wood penetrations into rock at 5th and 6th garages / need to fix all penetrations in rock at 5th and 6th garages / need to complete all other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), SOUTH CENTRAL ELECTRIC LLC Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | R | 6237776 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/31/2019 | need to remove one sheet of rock at ceiling in both 5th and 6th garage bays to verify fire wall above to bottom roof deck per splice on 5/15/19// UPDATE: wall was inspected on 10/4/18 - so do not need to remove rock / first layer of rock at ceiling and vertical side of truss OK at both 5th and 6th garage bays at fire wall | DANE | DANE | | BSP | P | 6216460 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 04/01/2019 | glass fiber insulation at rear wall (west wall) of building installed OK per listed assembly UL U349 pending other roughs / discussed need for rock to extend to under side of roof decking and need for stamped detail for how to protect the penetrations of the trusses through the fire barriers | DANE | DANE | | BSP | P | 6151419 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/31/2018 | Exterior shear OK per plans | RICHB | RICHB | | BSP | P | 6011988 |
THE GARRETT CONSTRUCTION COMPANY LLC | BFR | P | 10/31/2018 | Framing OK pending Electrical | RICHB | RICHB | | BFR | P | 6011987 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/04/2018 | Training with Rich - unit separation walls - Construction type | JUSTINL | JUSTINL | | BSP | P | 5986525 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 10/04/2018 | Wall type W2 - 2nd layer of sheetrock on both sides OK per UL U301 / verified manufacturer & fasteners / training with Justin | RICHB | RICHB | | BSP | P | 5986512 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/24/2018 | Wall type W2 - 1st layer of sheetrock on both sides OK per UL U301 / verified manufacturer, fasteners and electrical box listing / discussed necessary firestopping listing for conduit penetrations near top of wall | RICHB | RICHB | | BSP | P | 5973955 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 09/20/2018 | Wall type W2 - Framing for 2-hour rated wall OK per UL U301, discussed continuity and required inspections for each layer of sheetrock | RICHB | RICHB | | BSP | P | 5971620 |
THE GARRETT CONSTRUCTION COMPANY LLC | BSP | P | 05/29/2018 | inspection request changed to BSP / met with site rep Lee and Tom - discussed 3rd party inspection for post tension slabs footing and foundation / also discussed inspection scheduling | LONNYS | LONNYS | | BSP | P | 5857275 |
SOUTH CENTRAL ELECTRIC LLC | E= | C | 06/20/2019 | | GARYL | GARYL | | E= | C | 6238572 |
SOUTH CENTRAL ELECTRIC LLC | ESL | P | 11/29/2018 | 2nd inspection for ufer after concrete poured | GARYL | GARYL | | ESL | P | 6037684 |
SOUTH CENTRAL ELECTRIC LLC | ESL | P | 11/28/2018 | Ufer for garage #1 ready for concrete | GARYL | GARYL | | ESL | P | 6036336 |
SOUTH CENTRAL ELECTRIC LLC | ER | P | 10/04/2018 | Need grd clips in all round light boxes in garages, Kevin said they are ordered and will change out as soon as they get in--this week???? | GARYL | GARYL | | ER | P | 5986463 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 05/15/2019 | PAID (REC#1598814) PLAN SPLICE FEE: $50 by: DANM for Construction: Clarification on firewall horizontal continuity and vertical continuity requirements | DANM | DANM | | XBS | T | 6199730 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | P | 10/01/2018 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Elevation clarifications. | SHELLEY | SHELLEY | | XBS | P | 5981944 |
THE GARRETT CONSTRUCTION COMPANY LLC | XBS | T | 09/05/2018 | PAID (REC#1538948) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Roof trusses - see structural notes for uplift hardware | MICHAELA | MICHAELA | | XBS | T | 5955267 |