COLORADO COMMERCIAL CONSTRUCTION, INC. | B= | C | 02/21/2019 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 6112752 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | B= | P | 02/11/2019 | pending completion of mech, plumb and elec finals, building okay. Additional Inspections Required (computer generated): EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6103280 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFR | P | 12/11/2018 | need to splice in wall changes such as deletion of vestibule and conference room and wall change at storage room and deletion of service counter if it is going to be removed / all other interior light gauge framing at fir out walls, restrooms walls and hard lids, and storage room OK / discussed accessible elements and need for indicator at front door for final | DANE | DANE | | BFR | P | 6048911 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFR | P | 12/10/2018 | Welding and Bolting Observation on file // Partial pending other rough inspections | JEREMYA | JEREMYA | | BFR | P | 6047179 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFN | P | 12/10/2018 | Open hole on file to complete BFT // Need observations for foundation wall inspections | JEREMYA | JEREMYA | | BFN | P | 6047174 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BIN | P | 11/12/2018 | pending other required inspections, insulation at exterior walls and ceiling okay | BOBF | BOBF | | BIN | P | 6022664 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFR | P | 09/13/2018 | exterior framing okay, need letter for structural steel welds and bar joist welds, need to insulate box posts at windows | BOBF | BOBF | | BFR | P | 5964044 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BLA | C | 09/13/2018 | | BOBF | BOBF | | BLA | C | 5964040 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFR | P | 08/09/2018 | storage side only okay | BOBF | BOBF | | BFR | P | 5929130 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFT | P | 06/18/2018 | footing okay pending receipt of stamped open hole | BOBF | BOBF | | BFT | P | 5877212 |
EL PASO ELECTRIC, LLC. | E= | C | 02/15/2019 | sign permit pulled | TOMC | TOMC | | E= | C | 6108464 |
EL PASO ELECTRIC, LLC. | E= | P | 02/07/2019 | pending sign permits pulled for each building that has a sign | BRET | BRET | | E= | P | 6101267 |
EL PASO ELECTRIC, LLC. | ER | C | 01/22/2019 | | BRET | BRET | | ER | C | 6084665 |
EL PASO ELECTRIC, LLC. | ER | P | 12/10/2018 | walls | BRET | BRET | | ER | P | 6047566 |
EL PASO ELECTRIC, LLC. | ES | P | 12/04/2018 | Commercial Service: 400 amp service ok to energize bond neutral in metal pull box prior to overcurrent protection | BRET | BRET | | ES | P | 6042648 |
EL PASO ELECTRIC, LLC. | EUG | P | 09/27/2018 | 8 - LIGHT POLE CAISSONS OK/ | GREGM | GREGM | | EUG | P | 5978321 |
EL PASO ELECTRIC, LLC. | EUG | P | 09/25/2018 | 1" conduit for pole lights ok to cover | BRET | BRET | | EUG | P | 5975937 |
EL PASO ELECTRIC, LLC. | EUG | P | 09/13/2018 | building and gate ug ok, lacking parking lot lighting | BRET | BRET | | EUG | P | 5964581 |
EL PASO ELECTRIC, LLC. | EUG | P | 08/28/2018 | 2 3" from building t0 transformer, 1 " runs s.w area marked on plans | BRET | BRET | | EUG | P | 5948294 |
EL PASO ELECTRIC, LLC. | EUG | P | 08/23/2018 | see plans for locations | BRET | BRET | | EUG | P | 5944160 |
EL PASO ELECTRIC, LLC. | EUG | P | 08/20/2018 | marked on plans | BRET | BRET | | EUG | P | 5939163 |
EL PASO ELECTRIC, LLC. | EUG | P | 08/16/2018 | see plans for locations | BRET | BRET | | EUG | P | 5936530 |
EL PASO ELECTRIC, LLC. | EUG | P | 08/14/2018 | eug marked on electrical contractors set of plans | BRET | BRET | | EUG | P | 5933886 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 02/14/2019 | GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6107078 |
R & R HEATING & AIR CONDITIONING, INC. | H= | C | 02/07/2019 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6100169 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 02/06/2019 | MECHANICAL FINAL OK PENDING: PROVIDE TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 6099523 |
R & R HEATING & AIR CONDITIONING, INC. | H= | P | 01/17/2019 | MECHANICAL FINAL OK PENDING ROOF INSPECTION FOR CONDENSER, NO ACCESS TODAY. PROVIDE TEST AND BALANCE REPORT FOR FINAL. | DUSTINS | DUSTINS | | H= | P | 6081123 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 12/13/2018 | OK TO SET METER AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6051695 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 12/13/2018 | PER CONTRACTOR FIREPLACE IS GETTING DELETED, WILL NEED REVISED MECHANICAL AND GAS PLANS DELETING FIREPLACE BY FINAL. PROTECT GAS PIPING ENTERING BUILDING PER 2009 IFGC 404.7 BY FINAL. 10 LB TEST OK. | DUSTINS | DUSTINS | | HI | C | 6051678 |
LANDMARK PLUMBING AND HEATING, INC. | HI | R | 12/12/2018 | NO TEST. PIPING PER PLAN TO FURNACE ONLY. IS FIREPLACE BEING INSTALLED? IF SO NEED TO COMPLETE GAS TO FIREPLACE AND FIREPLACE CONTRACTOR NEEDS TO BE ATTACHED TO PERMIT. IF NO FIREPLACE WILL BE INSTALLED NEED PLANS REVISED TO DELETE FIREPLACE AND GAS TO IT. | DUSTINS | DUSTINS | | HI | R | 6050448 |
R & R HEATING & AIR CONDITIONING, INC. | HV | C | 12/06/2018 | FURNACE VENT IN STORAGE OK. | DUSTINS | DUSTINS | | HV | C | 6044675 |
R & R HEATING & AIR CONDITIONING, INC. | HD | P | 12/06/2018 | NEED ENGINEER TO ADDRESS OUTSIDE AIR DUCT, PLAN CALLS FOR 14" AND 8" INSTALLED. NEED REVISED EQUIPMENT SCHEDULE OR ENGINEER TO APPROVE CHANGES TO EQUIPMENT. SUPPLY/RETURN AIR DUCT OK, OK TO WRAP. NO FLEX AND DIFFUSERS YET. BATH EXHAUST DUCT OK. NO ROOF TODAY. | DUSTINS | DUSTINS | | HD | P | 6044674 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 02/21/2019 | this was looked at on 2/15/19. NOTE: pvb ok | JOHNS | JOHNS | | P= | C | 6112751 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/15/2019 | need contractor who installed irrigation pvb to call for inspection, once inspection has been called inspector can sign off plbg permit, rest ok | JOHNS | JOHNS | | P= | P | 6108693 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/06/2019 | need to remove vent cap @ roof, verify roof jack installed, need counter top to be 34" above floor @ break sink (per plans), can complete w/ uploaded images to include tape measure showing height of break sink, rest ok to include revisions | JOHNS | JOHNS | | P= | P | 6099707 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/12/2018 | plans show water heater on platform above service sink, will need plans changed to show new layout and floor drain, nail protection ok plumbing in walls at bathroom and drinking fountain ok note: S1 VTR | JOSEPHD | JOSEPHD | | PTO | P | 6050456 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/06/2018 | new plan splice shows water heater above a service sink please call me at 429-6383, need nail protection thru out, vent test ok, water pipe test ok | JOSEPHD | JOSEPHD | | PTO | P | 6044814 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 06/26/2018 | | TAYLOR | TAYLOR | | PB | C | 5885499 |
EL PASO ELECTRIC, LLC. | XES | T | 01/17/2019 | PAID (REC#1570931): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add baseboard heater | SHELBY | SHELBY | | XES | T | 6081135 |
EL PASO ELECTRIC, LLC. | XES | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Remove walls from scope | SHELBY | SHELBY | | XES | P | 6053165 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | P | 12/14/2018 | PLAN SPLICE: (No Fee) by: SHANEN for Mechanical: Delta 3 12/14/18 | SHANEN | SHANEN | | XMS | P | 6053140 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 12/14/2018 | PLAN SPLICE FEE: by: SHANEN for Plumbing: Plumbing splice 12/14/18 | SHANEN | SHANEN | | XPS | P | 6053115 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | XBS | T | 12/14/2018 | PAID (REC#1575180) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Minor floor plan revision. | BPHILLIPS | BPHILLIPS | | XBS | T | 6053066 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 12/10/2018 | PAID (REC#1562745): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: Mechanical splice 12/10/18 | TCRIPPEN | TCRIPPEN | | XMS | T | 6047551 |
EL PASO ELECTRIC, LLC. | XES | T | 12/03/2018 | PAID (REC#1560826): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Relocated furnace and water heater. | BERTHA | BERTHA | | XES | T | 6041588 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | P | 12/03/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Mechanical: mechanical splice 12/3/18 | TCRIPPEN | TCRIPPEN | | XMS | P | 6041578 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 12/03/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: Plumbing splice 12/3/2018 | TCRIPPEN | TCRIPPEN | | XPS | P | 6041488 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | XBS | T | 06/26/2018 | PAID (REC#1525495) PLAN SPLICE FEE: $50 by: DANM for Construction: Various revisions throughout and new structural drawings for storage part | DANM | DANM | | XBS | T | 5885229 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | XBS | T | 06/04/2018 | PAID (REC#1525495) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised foundation plan | LBENNETT | LBENNETT | | XBS | T | 5863615 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | XBS | T | 05/17/2018 | PAID (REC#1525495) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise structural faoundation | MICHAELA | MICHAELA | | XBS | T | 5847869 |