D & D CUSTOM HOME REMODELING | B= | C | 09/19/2019 | all outside agency signed off | TERRI | TERRI | | B= | C | 6341247 |
D & D CUSTOM HOME REMODELING | B= | P | 08/15/2019 | Temp CO: Last 30 day extension per Jeremy ( Expires: 9/14/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6302801 |
D & D CUSTOM HOME REMODELING | B= | P | 07/19/2019 | Temp CO: Okay per Jeremy ( Expires: 8/18/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6270506 |
WYKOTA CONSTRUCTION INC. | B= | P | 06/04/2019 | Temp CO: Per Jeremy A. extension ( Expires: 7/4/2019 12:00:00 AM) | RITA | RITA | | B= | P | 6218696 |
WYKOTA CONSTRUCTION INC. | B= | P | 05/30/2019 | Temp CO: need finals ( Expires: 6/29/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6215138 |
WYKOTA CONSTRUCTION INC. | B= | P | 04/29/2019 | handrail has been completed. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), HIGH MOUNTAIN ELECTRIC INC. Electrical Final Inspection is not Completed yet, SIERRA MECHANICAL, INC Mechanical Final Inspection is not Completed yet, WYKOTA CONSTRUCTION INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6180863 |
WYKOTA CONSTRUCTION INC. | B= | P | 04/26/2019 | Temp CO: All finals and partials in place ( Expires: 5/26/2019 12:00:00 AM) | GITA | GITA | | B= | P | 6179287 |
WYKOTA CONSTRUCTION INC. | B= | P | 04/25/2019 | still need all completed required inspections, bottom of handrail below 34" in height -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), HIGH MOUNTAIN ELECTRIC INC. Electrical Final Inspection is not Completed yet, SIERRA MECHANICAL, INC Mechanical Final Inspection is not Completed yet, WYKOTA CONSTRUCTION INC. Plumbing Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 6178872 |
WYKOTA CONSTRUCTION INC. | BFN | C | 04/16/2019 | stamped open excavation letter and assumed foundation bearing pressure match at 1500 psf | NATHAN | NATHAN | | BFN | C | 6166683 |
WYKOTA CONSTRUCTION INC. | B= | R | 04/10/2019 | elec final has been rejected 2x for not ready / need to complete all required inspections/ need hand rail both sides of stairs / 42" grab bars need to extend at least 54" from back wall. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), HIGH MOUNTAIN ELECTRIC INC. Electrical Final Inspection is not Completed yet, SIERRA MECHANICAL, INC Mechanical Final Inspection is not Completed yet, WYKOTA CONSTRUCTION INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | R | 6162055 |
WYKOTA CONSTRUCTION INC. | BFN | P | 04/10/2019 | still need open excavation to provide or address soils bearing conditions for plan design bearing, engineers observation letter for footer and foundation observation uploaded. | NATHAN | NATHAN | | BFN | P | 6161113 |
WYKOTA CONSTRUCTION INC. | BFN | R | 04/04/2019 | Density test per RMG does not give a bearing pressure for foundation requirements, Geoquest provided no bearing pressure do to not performing the compaction, letter for foundation reinforcement observation is not complete corrections where needed work was not completed. | NATHAN | NATHAN | | BFN | R | 6154853 |
WYKOTA CONSTRUCTION INC. | BFN | P | 03/26/2019 | Engineers letter of foundation observation on file ====== pending stamped open excavation. | NATHAN | NATHAN | | BFN | P | 6144068 |
WYKOTA CONSTRUCTION INC. | BFT | P | 03/26/2019 | Engineers letter for footer observation and density testing on file ====== Stamped open excavation needed still.======= | NATHAN | NATHAN | | BFT | P | 6144061 |
WYKOTA CONSTRUCTION INC. | BFN | R | 02/20/2019 | ========no further inspection for building until foundation and soils paperwork have been received.======== | NATHAN | NATHAN | | BFN | R | 6111525 |
WYKOTA CONSTRUCTION INC. | BSP | R | 12/26/2018 | BSP inspection / Entrance and Exit ends of carwash - Plan change from installed ACM panels (per Sht. A4) to stucco - Spoke with stucco contractor and GC on site. Will need to update plan or provide documentation from the design professional to show change of material in these locations. / Lath OK. | CHUCK | CHUCK | | BSP | R | 6062646 |
WYKOTA CONSTRUCTION INC. | BLA | C | 11/07/2018 | | NATHAN | NATHAN | | BLA | C | 6019387 |
WYKOTA CONSTRUCTION INC. | BSP | P | 10/30/2018 | OSB and attachment have been corrected | NATHAN | NATHAN | | BSP | P | 6011123 |
WYKOTA CONSTRUCTION INC. | BIN | P | 10/18/2018 | walls okay | NATHAN | NATHAN | | BIN | P | 5999572 |
WYKOTA CONSTRUCTION INC. | BFR | P | 10/18/2018 | need CDX at exterior per wall detail and attachment of 6"/12" edges and field, framing okay otherwise with completed required inspections. | NATHAN | NATHAN | | BFR | P | 5999537 |
WYKOTA CONSTRUCTION INC. | BSP | R | 10/17/2018 | per sheet A-1 wall types OSB not on plans design profesional letter needed for change before inspection can be completed. | NATHAN | NATHAN | | BSP | R | 5996810 |
WYKOTA CONSTRUCTION INC. | BFR | R | 10/04/2018 | all walls types call for CDX or exterior drywall not OSB per stamped plans design professional to give letter for substitution of products, code calls for minimum 6" attachment at edges and 12" in the field. | NATHAN | NATHAN | | BFR | R | 5986394 |
WYKOTA CONSTRUCTION INC. | BSP | P | 08/30/2018 | red iron only bolting okay with all completed foundation paperwork. | NATHAN | NATHAN | | BSP | P | 5951548 |
WYKOTA CONSTRUCTION INC. | BFI | C | 07/16/2018 | 2" rigid 30" deep | NATHAN | NATHAN | | BFI | C | 5904001 |
WYKOTA CONSTRUCTION INC. | BFT | P | 07/16/2018 | prior approval of foundation and footer inspection not given please call for inspection authorization. | NATHAN | NATHAN | | BFT | P | 5903986 |
HIGH MOUNTAIN ELECTRIC INC. | E= | C | 05/14/2019 | | BRIAN | BRIAN | | E= | C | 6199162 |
HIGH MOUNTAIN ELECTRIC INC. | E= | P | 04/26/2019 | need to ground all pole lights / 1 bad gfci on north side near garage door / label panel completely and label mcc control cabinet with multi power sources and breakers / panels /---may need disconnects on the motors?? will let you know monday | BRIAN | BRIAN | | E= | P | 6180193 |
HIGH MOUNTAIN ELECTRIC INC. | E= | P | 04/12/2019 | clips installed on lights / egress lighting up and working / EP corrections made / still need to inspect the rest / | BRIAN | BRIAN | | E= | P | 6164346 |
HIGH MOUNTAIN ELECTRIC INC. | EP | P | 04/12/2019 | corrections made / still need aic rating label and color per phase label | BRIAN | BRIAN | | EP | P | 6164331 |
HIGH MOUNTAIN ELECTRIC INC. | E= | R | 04/11/2019 | not ready / | MIGUEL | MIGUEL | | E= | R | 6166499 |
HIGH MOUNTAIN ELECTRIC INC. | EP | P | 04/11/2019 | BP2 and BP3 ok / BP1 still need correct bond supply side jumpers installed / | MIGUEL | MIGUEL | | EP | P | 6166498 |
HIGH MOUNTAIN ELECTRIC INC. | ER | P | 04/08/2019 | ceilings still not ready , need additional clips or screws on fixtures in office, flight deck and restroom / fixture missing grid wires in upper office /box above panel BP2 in ceiling needs ko and cover / exhaust fan in restroom needs wired / split unit on roof min 35A, max 50A #10s, disconnect 30A rated, need to replace disco and check breaker size / 277/ 480 equipment using low voltage colors need re-phased / 277/480v disconnects need bond bushings installed on raceways / vacuum posts need lug to land EGCs / | MIGUEL | MIGUEL | | ER | P | 6159507 |
HIGH MOUNTAIN ELECTRIC INC. | EP | R | 04/08/2019 | BP2 feeders #4 should be #3 per plan / BP3# not ready / BP1 supply side bonding jumper too small / need all labeling applied / | MIGUEL | MIGUEL | | EP | R | 6159506 |
HIGH MOUNTAIN ELECTRIC INC. | E= | R | 04/08/2019 | not ready / | MIGUEL | MIGUEL | | E= | R | 6159505 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | C | 03/25/2019 | pole lights and rest of exterior pvc / | MIGUEL | MIGUEL | | EUG | C | 6143939 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | P | 03/20/2019 | W. side for vacuum system ok / exterior trench needs cleared to meet depth and raceway needs installed / | MIGUEL | MIGUEL | | EUG | P | 6139094 |
HIGH MOUNTAIN ELECTRIC INC. | E= | R | 03/20/2019 | not ready / | MIGUEL | MIGUEL | | E= | R | 6139093 |
HIGH MOUNTAIN ELECTRIC INC. | ER | R | 03/20/2019 | flight deck ceiling- incomplete emt, low voltage on grid, install all four hurricane clips on light fixtures/ bathroom- install 4 hurricane clips on fixture/ office - install hurricane clips on fixtures, EMT incomplete, can not run mc between corrugated roof and beam / | MIGUEL | MIGUEL | | ER | R | 6139092 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | P | 03/12/2019 | underground and stubs at cassions only / | MIGUEL | MIGUEL | | EUG | P | 6132015 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | R | 03/11/2019 | raceways for exterior lighting not ready / | MIGUEL | MIGUEL | | EUG | R | 6129908 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | P | 01/18/2019 | 1-2", 1-1" in S.E corner ok / 4-1" and 2- 1 1/2" in N.E corner ok / will need to see S.W. corner / | MIGUEL | MIGUEL | | EUG | P | 6082896 |
HIGH MOUNTAIN ELECTRIC INC. | ES | C | 12/07/2018 | Commercial Service: new 800A 4w 277/480 V ok to set CTs and meter ----RBD note: up to main only ---ground rods ok / | MIGUEL | MIGUEL | | ES | C | 6046130 |
HIGH MOUNTAIN ELECTRIC INC. | ER | P | 09/28/2018 | INSIDE WALL ---OK ----OFFICE AREAS AND BATHROOM--STORAGE---- | BRIAN | BRIAN | | ER | P | 5980134 |
HIGH MOUNTAIN ELECTRIC INC. | ESL | P | 07/27/2018 | SLAB OK // | GREGM | GREGM | | ESL | P | 5916562 |
HIGH MOUNTAIN ELECTRIC INC. | EST | R | 05/11/2018 | Temporary Service: 50 AMP 3-W ----NEED TEMP POWER PERMIT---- | BRIAN | BRIAN | | EST | R | 5842761 |
HIGH MOUNTAIN ELECTRIC INC. | EST | R | 05/09/2018 | Temporary Service: NEED GFCI OUTLET OR GRCI PROTECTED OUTLET----NO SECONDARY INSTALLED NEED TO VERIFY WITH CSU-----60 AMP 3-W | BRIAN | BRIAN | | EST | R | 5840291 |
SIERRA MECH, INC | H= | C | 08/23/2019 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. | NANCY | NANCY | | H= | C | 6312275 |
SIERRA MECH, INC | H= | P | 08/02/2019 | MECHANICAL FINAL OK, PENDING TAB REPORT | BENH | BENH | | H= | P | 6286293 |
SIERRA MECH, INC | HRP | P | 04/25/2019 | STILL NEED DRAINS COMPLETED AT TIE AT SINK NOTES: CONDENSATE DRAINS AT 2 MINI SPLITS IN CEILING OK | JERRYF | JERRYF | | HRP | P | 6177686 |
SIERRA MECH, INC | HD | P | 04/25/2019 | OUTSIDE AIR DUCT COMPLETE AT 2 MINI SPLITS | JERRYF | JERRYF | | HD | P | 6177670 |
SIERRA MECH, INC | HD | P | 04/16/2019 | NEED TO INSULATE ALL OSA DUCT WORK ON MINI SPLITS - PROPERLY SUPPORT OSA DUCT ON 1ST FLOOR | JERRYF | JERRYF | | HD | P | 6166918 |
SIERRA MECH, INC | HRP | P | 04/16/2019 | NEED TO PROPERLY SUPPORT ALL CONDENSATE DRAINS AND ROUTE TO APPROVED LOCATION | JERRYF | JERRYF | | HRP | P | 6166917 |
SIERRA MECH, INC | H= | P | 04/09/2019 | NEED THE FOLLOWING - ((((REVISE PLAN DELETING SEALED COMBUSTION VENTING AT UNIT HEATERS - REVISE EQUIPMENT SCHEDULE TO MATCH INSTALLED BOILER AND CARRIER MINI SPLIT - DELETE TF 1 FROM PLAN )))) - SECURE BOILER VENT AT BACK OF BOILER - COMPLETE ALL CONDENSATE DRAINS AND BOILER T&P DRAIN - INSTALL ADDITIONAL LADDER RUNG AT FLIGHT DECK ROOF ACCESS AND INSTALL GRAB HANDLES AT 2 ROOF ACCESS HOLES - SECURE MINI SPLIT CONDENSER TO PAD - COMPLETE EXHAUST FAN AT FLIGHT DECK - FRESH AIR AT MINI SPLITS - NEED EF 4 COMPLETED - INSTALL TRANSFER GRILLES AT STORAGE PER PLAN - INSTALL SUPPLY GRILLE PER PLAN AT UH 2 - STOPPED INSPECTION MAY BE MORE NOTES: GAS LABELS / REGULATORS / VENTS AND FINAL CONNECTIONS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 6160137 |
SIERRA MECH, INC | HC | C | 01/02/2019 | OK TO SET 2# METER | JERRYF | JERRYF | | HC | C | 6066398 |
SIERRA MECH, INC | HI | C | 01/02/2019 | NEED PLAN REVISED SHOWING SYSTEM AS INSTALLED AND NEW METER LOCATION BEFORE FINAL - CONTRACTOR PROCEEDING AT OWN RISK - NEW HAS TO SHOW DRYER STUBS AND SNOW MELT STUB AS FUTURE - AT FUTURE INSPECTION VERIFY REGULATORS AND FINAL CONNECTIONS | JERRYF | JERRYF | | HI | C | 6066392 |
CASCADE PLUMBING & HEATING | P= | C | 08/26/2019 | corrections made, water heater installed in north bathroom, note: 2" RP installed | JOSEPHD | JOSEPHD | | P= | C | 6313695 |
WYKOTA CONSTRUCTION INC. | P= | P | 04/09/2019 | need to install emergency eye wash, check north bathroom flush handle on wrong side, need to run backflow drain, check t&p for water heater and boiler, need letter for water heater at north end and backflow location change, need to conduct more research on drinking fountain requirement rest ok
update 4/10/19 drinking fountain will require a bottle filler as well | JOSEPHD | JOSEPHD | | P= | P | 6160890 |
CASCADE PLUMBING & HEATING | PRD | P | 10/26/2018 | ok for test / design MINUS supports | JOHNS | JOHNS | | PRD | P | 6007199 |
CASCADE PLUMBING & HEATING | PTO | P | 10/26/2018 | gc to attach mech permit, scope of work to reflect all plbg related items, ok for dwv / h20 in walls only @ this time, MINUS VENT TERMINATIONS AND WATER CLOSETS SET, test and design ok. NOTE: vtr (2), aav in wall above d.f. w/ louver panel by final | JOHNS | JOHNS | | PTO | P | 6007194 |
CASCADE PLUMBING & HEATING | PB | C | 07/30/2018 | ok for test and design | JOHNS | JOHNS | | PB | C | 5917910 |
CASCADE PLUMBING & HEATING | PB | P | 07/27/2018 | ok for 4" water sleeve and (3) 6" gravity drains @ conveyor pit | JOHNS | JOHNS | | PB | P | 5915975 |
SIERRA MECH, INC | XMS | T | 07/17/2019 | PAID (REC#1616590): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice see plans for notes, | TCRIPPEN | TCRIPPEN | | XMS | T | 6267271 |
WYKOTA CONSTRUCTION INC. | XPS | P | 07/17/2019 | PLAN SPLICE: (No Fee) by: SHANEN for Plumbing: Plumbing splice 7/17/19: Delta 2 revisions P-1 adjust fixture schedule, P-2 sheet note 8, P-3 1/2" CW to mat washer, correct orientation, 1 1/2" BFP | SHANEN | SHANEN | | XPS | P | 6267107 |
WYKOTA CONSTRUCTION INC. | XBS | T | 03/22/2019 | PAID (REC#1584507) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised cladding to black stucco w/ exposed aluminum grid. | BPHILLIPS | BPHILLIPS | | XBS | T | 6141811 |
WYKOTA CONSTRUCTION INC. | XBS | P | 02/06/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Does not appear to have any building code enforced information on the drawing | DANM | DANM | | XBS | P | 6099016 |
SIERRA MECH, INC | XMS | T | 01/30/2019 | PAID (REC#1574126): PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: mechanical splice relocate metewr and redesign gas line sizes | TCRIPPEN | TCRIPPEN | | XMS | T | 6091990 |
WYKOTA CONSTRUCTION INC. | XBS | T | 10/29/2018 | PAID (REC#1551874) PLAN SPLICE FEE: $50 by: DANM for Construction: Clarification on extent of CDX | DANM | DANM | | XBS | T | 6009198 |