HOMEOWNER | B= | C | 08/12/2019 | All other required Final inspections are complete. (This is a computer generated result) | DALE | DALE | | B= | C | 6297603 |
HOMEOWNER | B= | P | 08/06/2019 | eng. received for surface drainage. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DALE | DALE | | B= | P | 6290031 |
HOMEOWNER | BSP | P | 07/25/2019 | training with PPRBD inspector brian / reviewed final final grade requirements per revised soils and drain letter | TONYC | TONYC | | BSP | P | 6276790 |
HOMEOWNER | B= | P | 07/25/2019 | final grade - retaining wall incomplete per soils - open excavation letter requirements / other corrections okay / Training with PPRBD inspector Tony -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | BRIANB | BRIANB | | B= | P | 6276784 |
HOMEOWNER | B= | P | 07/16/2019 | final grade - retaining wall incomplete per soils - open excavation letter requirements / missing tip downs at down spouts / note - no rear deck installed - guards installed at (3) main floor rear exterior doors -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | BRIANB | BRIANB | | B= | P | 6264705 |
HOMEOWNER | BIN | C | 07/16/2019 | other rough inspections completed | BRIANB | BRIANB | | BIN | C | 6264704 |
HOMEOWNER | BFR | C | 07/16/2019 | received observation letter for rear covered patio pier / observed rear covered post | BRIANB | BRIANB | | BFR | C | 6264700 |
HOMEOWNER | BTR | C | 07/16/2019 | | BRIANB | BRIANB | | BTR | C | 6264694 |
HOMEOWNER | B= | R | 06/28/2019 | not ready for inspection / too many items to list / walked inspection with homeowner and discussed items found at inspection / went over inspection history with homeowner - still need to complete frame inspection / discussed revised drain observation letter with homeowner / need complete re-inspection. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | BRIANB | BRIANB | | B= | R | 6248030 |
HOMEOWNER | BLA | C | 04/10/2019 | Lath OK. | CHUCK | CHUCK | | BLA | C | 6161926 |
HOMEOWNER | BIN | P | 03/20/2019 | observed R19 batt insulation at exterior walls and R38 batt insulation at ceiling | BRIANB | BRIANB | | BIN | P | 6138106 |
HOMEOWNER | BFR | P | 03/20/2019 | pending inspection for rear covered patio post and pier / all other corrections noted from previous inspection are okay / received letter for truss modifications and structural modifications / note - no rear deck installed or on approved design | BRIANB | BRIANB | | BFR | P | 6138105 |
HOMEOWNER | BFR | P | 03/05/2019 | inspection notes cont. / missing nails in M01 truss hangers over front porch / pt. loads incomplete in crawl space to beam for posts above at fridge wall / wood block installed in beam pocket / NOTE - still need to inspect rear deck frame and posts / all other corrections noted from previous frame inspections are okay / okay to insulate as long as corrections are exposed for re-inspection / received RBD stamped truss design and engineering letter for framing modifications | BRIANB | BRIANB | | BFR | P | 6124796 |
HOMEOWNER | BFR | P | 03/05/2019 | still missing 2nd k.s and trimmer at each end of east window in 2nd floor guest room / still missing ST22 strap at all A note locations / firestop incomplete top of concealed chase at 2nd floor hall bath / still missing ledger loks for M02 trusses over kitchen / missing nails in HB3.56 hanger for dbl lvl over kitchen / firestop tub drain penetration above hall to pantry / need engineering for modified M03A trusses over mbr entry / still missing post for rear covered porch / T05 truss over study missing bracing / missing LUS24 hangers for M10 truss repairs over f.p / insp. notes conti -- | BRIANB | BRIANB | | BFR | P | 6124787 |
HOMEOWNER | BFD | C | 02/26/2019 | revised drain requirement letter from Geoquest omitting drain received onsite | BRIANB | BRIANB | | BFD | C | 6117662 |
HOMEOWNER | BFR | R | 02/26/2019 | still missing triple 2x10 floor joist at 2nd floor framing above kit area slider door / missing LS70 at each end of M19 truss over rear porch / missing 6x6 post and hardware at rear porch / missing TBE6 at triple 16" lvl to post by fireplace / missing 2nd k.s and trimmer at each end of east window in 2nd flr guest room / altered H2.5 and nails incomplete at north exterior wall in mbr / need engineering for modified M03A trusses over mbr entry / missing HTS20 at each end of MO9A truss over mbr bth area / missing (3) 2x4 column under dbl lvl over main floor laundry / H2.5 for T01 trusses over launder installed at non-load bearing wall / missing 2nd k.s and trimmer at laundry rm window / insp. stopped - too many items / still need to inspect all trusses and main floor framing / walked insp. with homeowner and went over items / received letter for stair framing / other corrections noted from BFR 24JAN okay | BRIANB | BRIANB | | BFR | R | 6117636 |
HOMEOWNER | BFR | R | 02/26/2019 | narrow braced wall and front porch are still covered prior to inspection / still unable to verify ST22 strap per note A at all locations - covered prior to inspection / still missing truss design on file with permit and no truss design onsite for inspection - still need to inspect all trusses / firestop missing top of concealed chase at tub wall - 2nd floor guest closet / need engineering for modifications done to T05 trusses over 2nd floor guest bath (2x10s added to side of trusses) / missing 3rd king stud at each end of sliding glass door opening in 2nd floor guest room / missing ledger loks for M02 truss ledger over fridge area in kitchen / still missing nails in HB3.56 hanger for dbl lvl over kitchen / firestop tub drain penetration and 3" drain pipe penetration above hall to pantry / cut top flange of BCI floor joist over hall to pantry at 3" plumbing drain / inspection notes continued next insp. | BRIANB | BRIANB | | BFR | R | 6117635 |
HOMEOWNER | BFR | R | 01/24/2019 | inspection notes continued / stair landing framing not per approved design / inspection stopped at main floor great room - too many items / NOTE - at time of frame inspection average crawl space height from grade to bottom of floor joist measured 6' - see RBC 303.4.1 definition of crawl space (not more than 5' in height measured from the average interior grade to underside of floor framing) / note only - pergola frame not ready at time of frame inspection | BRIANB | BRIANB | | BFR | R | 6087370 |
HOMEOWNER | BFR | R | 01/24/2019 | missing nails in HB3.56 hanger for double LVL over kitchen area / framed opening for windows in south - south west exterior wall in kitchen have been increased and framing installed is not per approved design / firestop tub drain penetration and 3" drain pipe penetration above hall to pantry / cut top flange of BCI floor joist over hall to pantry at 3" plumbing drain / column installed at mid-pt. under stl beam in kitchen is not per approved design / framed opening for window in south exterior wall by slider door in great room has been increased and framing installed is not per approved design / missing triple 2x10 floor joist at 2nd floor framing above kit area slider door / missing LS70 at each end of M19 truss over rear porch / missing (2) rows of through bolts at 2x pack out for stl beam over rear porch / missing 6x6 post and hardware at rear porch / missing TBE6 at triple 16" lvl to post by fireplace --- | BRIANB | BRIANB | | BFR | R | 6087358 |
HOMEOWNER | BFR | R | 01/24/2019 | still need to complete drain inspection / narrow braced wall and front porch covered prior to inspection / unable to verify ST22 strap per note A at all locations - covered prior to inspection / additional window - framing for window at east exterior wall in guest room not on approved design - need to revise design to reflect as built condition / missing truss design on file with permit and no truss design onsite for inspection - still need to inspect all trusses / missing approved IECC certificate on file with permit / firestop missing top of concealed chase at tub wall - 2nd floor guest closet / need engineering for modifications done to T05 trusses over 2nd floor guest bath (2x10s added to side of trusses) / missing 3rd king stud at each end of sliding glass door opening in 2nd floor guest room / missing ledger loks for M02 truss ledger over fridge area in kitchen / notes continued next inspection -- | BRIANB | BRIANB | | BFR | R | 6087335 |
HOMEOWNER | BFN | C | 01/23/2019 | foundation design on file | BRIANB | BRIANB | | BFN | C | 6085357 |
HOMEOWNER | BFR | R | 01/22/2019 | call with the homeowner from office and went over inspection history for permit / still need to complete the foundation drain and foundation wall (BFN) inspections prior to further inspections / please see comments from BFN and BFD inspections dated 22JAN19 / no inspection performed | BRIANB | BRIANB | | BFR | R | 6084140 |
HOMEOWNER | BFD | R | 01/22/2019 | no drain required per drain requirements revision letter received - still need to complete inspection for damp proof at foundation walls / need to complete foundation inspection | BRIANB | BRIANB | | BFD | R | 6084071 |
HOMEOWNER | BFN | P | 01/22/2019 | received open excavation letter at office / 3000 psf and 1000 psf (south wall) / no drain required - see drain requirements revision letter / still need complete stamped foundation design | BRIANB | BRIANB | | BFN | P | 6084067 |
HOMEOWNER | BFR | R | 01/18/2019 | met with the homeowner (Robert) onsite / need to complete foundation - foundation drain inspections prior to further inspections / discussed inspection history for permit and paper work needed to complete foundation inspections - missing stamped open excavation letter and foundation design to complete BFN - foundation inspection / also reviewed and discussed completing the perimeter drain inspection per the soils letter requirements / still need to complete frame inspection for front and rear porch and for narrow braced wall covered prior to inspection / no inspection performed | BRIANB | BRIANB | | BFR | R | 6082560 |
HOMEOWNER | B16 | P | 01/16/2019 | meeting at office with mechanical inspector Mark / discussed penetration (modification) created through cabinet of wood burning fireplace in living room / NOTE: will need to provide manufacturers installation instructions for the wood burning fireplace at frame inspection for inspector / updated 5MAR19 - verified manufactured knock-out in side of wood burning fireplace per f.p. manual onsite | BRIANB | BRIANB | | B16 | P | 6079394 |
HOMEOWNER | BTR | P | 01/14/2019 | Standing seam metal roof with multiple TPO sections / No battens needed / Please add T patches at seam intersections of TPO roof (will check at final)/ Standing seam roof okay / Provide invoice of materials used to achieve Class A fire rating for TPO roof at building final (B=) | TRENTP | TRENTP | | BTR | P | 6077937 |
HOMEOWNER | BLA | R | 01/10/2019 | prior to completing the lath inspection need to complete inspections for the narrow braced wall, front and rear porch lid - framing including trusses over both of the mentioned areas / narrow braced wall and porch lid - framing have been covered prior to inspection / other lath corrections are okay / note only - still need stamped open excavation letter, soils letter and foundation design to complete foundation inspection / also need to complete foundation drain inspection per soils letter requirements / unable to view electronically and or missing approved IECC certificate / if you have any questions please call me at 719-327-2914 at office between 7:30 - 8:30 | BRIANB | BRIANB | | BLA | R | 6074688 |
HOMEOWNER | BLA | R | 12/18/2018 | still need to complete inspections for narrow braced wall and front - rear porch lid framing - trusses / narrow braced wall covered prior to inspection / front and rear porch lid - framing covered prior to inspection / still have penetrations through paper - wall at electrical meter location / note - still need open excavation letter, foundation design and drain observation letter to complete foundation inspections / missing approved IECC certificate (ResCheck) with design | BRIANB | BRIANB | | BLA | R | 6057038 |
HOMEOWNER | BFN | P | 12/17/2018 | missing engineering stamp on open excavation observation letter received at office / letter for foundation wall modification received / need copy of stamped foundation design / foundation wall observation letter on file / eufer documented | BRIANB | BRIANB | | BFN | P | 6054534 |
HOMEOWNER | BFT | C | 12/17/2018 | observation letter for foundation footing received at office | BRIANB | BRIANB | | BFT | C | 6054531 |
HOMEOWNER | BLA | R | 12/05/2018 | narrow braced wall covered prior to inspection / front and rear porch lid - framing covered prior to inspection / penetrations through paper - wall at electrical meter location / lath incomplete at front entry wall - door and around window at east elevation / lath incomplete at window along south elevation / note - need open excavation letter, foundation observation letters, foundation design, drain observation letter to complete foundation inspections / missing approved IECC certificate (ResCheck) with design | BRIANB | BRIANB | | BLA | R | 6043211 |
HOMEOWNER | BFN | P | 12/03/2018 | AUTHORIZED INSPECTION BY ENGINEER | JLANE | JLANE | JLANE | BFN | P | 6041108 |
HOMEOWNER | BFT | P | 05/10/2018 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 5840834 |
HOMEOWNER | E= | C | 06/27/2019 | Electrical complete / | ROB | ROB | | E= | C | 6246486 |
HOMEOWNER | E= | R | 06/20/2019 | Floor heat needs GFCI not AFCI / Outside fixture needs ground attached and the ENT is not approved for outdoor use / Any type of connection from the box to fixture has to have connectors attaching it to the box and fixture / | ROB | ROB | | E= | R | 6238145 |
HOMEOWNER | E= | R | 06/14/2019 | Need Listed fixture at driveway / Need GFCI protection for recpts. on backside of kitchen sink and floor heat in master bath / DW recpt to be relocated to under sink / | ROB | ROB | | E= | R | 6232231 |
HOMEOWNER | E= | R | 06/05/2019 | Covers need to be properly installed for all o/s recpts. / No AC or Hot Tub installed / J boxes installed for future use at patio / No o/s light at driveway installed / No stair light installed / Complete mounting crawler lights / Need all closet shelving installed / Label panel / No GFCI for kitchen recpts or DW / 2-recpts in master bed not working, n&e walls / Need to verify GFCI for master bath floor heat /o/s light switching not working in upper bedrooms / Cannot pot RG-6 and line volt wires in same box /Need recpt adjacent to slider in master bed / | ROB | ROB | | E= | R | 6221336 |
HOMEOWNER | ES | C | 01/22/2019 | Residential Underground: 200 amp 3/w new res --- OK to energize | CRAIGS | CRAIGS | | ES | C | 6084017 |
HOMEOWNER | ES | R | 01/18/2019 | need a pvc bell end or male adaptor and plastic bushing installed on the end of the riser --- need the cover for the meter and enclosed circuit breaker installed to keep moisture out | CRAIGS | CRAIGS | | ES | R | 6083003 |
HOMEOWNER | ES | R | 01/14/2019 | Residential Underground: Need to install riser / Need to install blank hub on top of meter base / | ROB | ROB | | ES | R | 6077440 |
HOMEOWNER | ER | C | 12/18/2018 | | CRAIGS | CRAIGS | | ER | C | 6056135 |
HOMEOWNER | ER | R | 12/14/2018 | need to add a receptacle on south wall of kitchen towards the peninsula next the stack of 2x6's | CRAIGS | CRAIGS | | ER | R | 6053371 |
HOMEOWNER | ER | R | 12/10/2018 | ground dryer box --- dining room needs to be a 20 amp circuit --add out let to 30" wall in dining room --have provisions for counter top outlets on sink counter top -- correct spacing in kitchen --finish make up in kitchen ---- ground oven box ---support n/m cable in stair well --- make up and ground ceiling fan box in stair well --- add out door receptacle on upper deck | CRAIGS | CRAIGS | | ER | R | 6047810 |
HOMEOWNER | ES | R | 12/06/2018 | Residential Underground: meter has to be between 5 and 6 foot above grade --- riser needs installed --- top blank needs installed --- load side of over current made up --- load side of meter made up --- | CRAIGS | CRAIGS | | ES | R | 6044538 |
HOMEOWNER | ER | P | 10/10/2018 | outside soffits --- OK --- consult on the rest of the electrical work | CRAIGS | CRAIGS | | ER | P | 5991237 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 06/17/2019 | Rough has been completed, pictures attached. | MARK | MARK | | H= | C | 6233206 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/13/2019 | Still need to seal 2- connections for 6" heat run described on 5/17, 6/6, 6/12. Please seal these joints before rescheduling a heat final. Note: Outside air relocated, elbow on suction line at the coil has been insulated. | MARK | MARK | | H= | P | 6230597 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/12/2019 | Outside air needs to be within 12' of the blower fan per code. 2- 6" heat runs still need to be sealed. Insulation to the coil missing at elbow. Water heater vent is ok. | MARK | MARK | | H= | P | 6229079 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/06/2019 | Still missing outside air to the furnace return. Still need to seal the 2 joints on the supply air round pipe. It is the supply on the south west wall to the left of the sliding door nearest the fireplace in center of home. complete suction line insulation all the way to the coil. Still need water heater vent installation instructions for termination specs. T&P on Bosch water heater is being covered in the plumbing inspection. Note: A/C has been installed. | MARK | MARK | | H= | P | 6222957 |
HOMEOWNER | H= | T | 05/17/2019 | PAID (REC#1604277): This house is not ready for a final inspection. Multiple returns in crawl space are open to the crawl. Either damaged or missing panning. There is a large (12"?) return flex that has been pulled away from the sheet metal. there are flex ducts that require additional support as previously noted. there is a supply that needs to be sealed at two connections. Still missing outside air to the furnace return as previously noted. both water heaters are missing their T&P drain pipes. condensate pump needs to be powered up. Need tankless gas water heater installation instructions to verify the intake and exhaust termination location from wall. Gas regulator with vent limiter is in the crawl and sizing fits without individual regulators as noted at HI. This house needs to be pre inspected by responsible party, (Homeowner or contractor) prior to rescheduling. Note: Ventilated crawl space with two supply, 1 return. No a/c. Plans call for outside air to return but missing at ti | MARK | MARK | | H= | T | 6203482 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 05/17/2019 | received performance test and equipment change letter. | MARK | MARK | | H= | P | 6202467 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 05/08/2019 | Not ready. Reinspect all. Still need performance test results. Still need equipment change letter for furnace. Missing water heater vent termination, GFI for condensate pump. Stopped inspection. Trip fee on next inspection if not ready. See all previous notes for mechanical and make all corrections including pictures of underground gas depth before re scheduling. | MARK | MARK | | H= | P | 6192474 |
HOMEOWNER | HC | C | 01/17/2019 | RELEASE METER | MARK | MARK | | HC | C | 6081476 |
HOMEOWNER | HRR | C | 01/17/2019 | Clearance has been met for water heater vent. | MARK | MARK | | HRR | C | 6081475 |
HOMEOWNER | HRR | P | 01/16/2019 | Fireplace in master bedroom vent clearance has been met. Frame inspector to check fire stop at frame. Wood burning fireplace on main level will not be converted to gas, stub is for future. Gas penetration through fire brick to be inspected by building inspection at frame. vent clearances etc. Water heater vent (Exhaust) lacks clearance to wood, need to install thimble to wall penetration per Heat Fab EZ Seal installation instructions (Not on site) See EZ seal quick kit.Still need at final outside air to the return, furnace is not correct per plan, will need revised heat calculations and duct design by final. | MARK | MARK | | HRR | P | 6080413 |
HOMEOWNER | HRR | P | 01/14/2019 | Refer to page 59 of the fireplace installation instructions on vent termination framing for combustibles. Furnace does not match plans. Water heater vents need to be properly connected to the water heater by final, and tabs need to be folded over on stainless steel vent connections. No tape at connections. See mfg installation instructions pg 19.20. Need outside air to return by final and I only see one supply and one return in crawl space, contractor to install second supply by final. Performance test required at final along with change letter for furnace. Note: No a/c, conditioned crawl space, furnace and water heater are direct vented. | TREVORH | TREVORH | | HRR | P | 6077455 |
HOMEOWNER | HRR | P | 01/10/2019 | Installation instructions need to be available at time of inspection. Unable to inspect vent or furnace and unable to inspect gas fireplace frame clearances. Need both manuals at next inspection. Furnace does not match plans. Water heater vents need to be properly connected to the water heater by final, and tabs need to be folded over on stainless steel vent connections. No tape at connections. See mfg installation instructions pg 19.20. Need outside air to return by final and I only see one supply and one return in crawl space, contractor to install second supply by final. (Per plans) Performance test required at final along with change letter for furnace. Note: No a/c, conditioned crawl space, furnace and water heater are direct vented. | MARK | MARK | | HRR | P | 6074873 |
HOMEOWNER | HRR | R | 01/07/2019 | Duplicate, scheduled HRR for Mitchell and Homeowner as 2 seperate inspections. | MARK | MARK | | HRR | R | 6070862 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 01/07/2019 | Not ready, too many items. Need plans showing duct sizing unless this is a performance test plan. Water heater vent does not meet mfg requirements. Need proper support for furnace vents see mfg requirements. Missing osa, a/c? seal electrical through returns, missing part of return header by entry, need to pan off return at pocket door, Gas log lighters are not approved for wood burning fireplaces, remove gas. Need mfg installation instructions for gas fireplace. More... Stopped inspection. trip fee next time of not correct. | MARK | MARK | | HRR | R | 6070859 |
DAVIS GAS SHOP INC | HI | C | 01/03/2019 | 10 lb test ok. Will require individual regulators for each gas appliance at final and proper support for all gas piping in crawl space as well as labels on all medium pressure gas piping. Note: 3/4" gas main. Furnace, tank less water heater, cook top, fireplace, future fireplace (Wood burning fireplace in living room possible conversion in future) Garage stub only for future no gas piping in garage at time of inspection.
| MARK | MARK | | HI | C | 6067537 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 12/10/2018 | NOT READY. DRYER VENT NOT SEALED. UNSEALED RETURNS IN KITCHEN AREA. LIVING ROOM FIREPLACE INSTALLATION IS INCOMPLETE. MASTER BEDROOM FIREPLACE IS STILL IN THE PACKAGING. MORE?? FEES WAIVED THIS TIME. CONTRACTOR TO WALK JOB BEFORE CALLING NEXT INSPECTION. | KYLEW | KYLEW | | HRR | R | 6048370 |
DAVIS GAS SHOP INC | HO | P | 11/08/2018 | 10 lb test ok, but pipe lacks proper depth. Need minimum 18" of clean cover. Spoke with homeowner he will provide pictures at two locations that were not correct. Or re schedule another inspection. or leave open until rest of house underground is ready for test. Note: This is only for the 3/4" poly from the future meter location at the house to the garage. 45' in length will carry 169K BTU. | MARK | MARK | | HO | P | 6020300 |
HOMEOWNER | P= | C | 06/14/2019 | Corrections made. | DANR | DANR | | P= | C | 6231711 |
HOMEOWNER | P= | R | 06/13/2019 | Still need air gap at left water heater, and manual for right water heater to verify installation instructions. Verify T&P drain installation. Rest OK. | SAMH | SAMH | | P= | R | 6230498 |
HOMEOWNER | P= | P | 06/05/2019 | Need air gap t&p left unit, install t&P per manual right unit (need manual on site next inspection), need back water valve k.c. drain, rest ok. Note: Hall shower - master shower - upper bath tub all rough in only. will need to pull permit when complete finished. | DANR | DANR | | P= | P | 6221199 |
HOMEOWNER | P= | P | 05/17/2019 | Need tile installed and all shower trim installed (needs to drain to shower drain), caulk all lavatories to counters, need kitchen sink installed, master tub hot and cold flipped - secure faucet to floor, need backflow protection hand held sprayers in master bath, seal floor drain water entry floor drain - need aav water entry floor drain and K.C. drain in crawler, run both T&P's to approved location, secure water entry, leak at water entry - need piping approved for pressure before prv at water entry, K.C drain in crawler needs back water valve, rest ok. | DANR | DANR | | P= | P | 6202788 |
HOMEOWNER | PB | C | 01/14/2019 | | DANR | DANR | | PB | C | 6077356 |
HOMEOWNER | PTO | C | 01/07/2019 | Corrections made. | DANR | DANR | | PTO | C | 6070140 |
HOMEOWNER | PTO | P | 01/02/2019 | No test on dwv and domestic water, secure toilet flanges, upper tub need spout secured, rest ok. aav master shower (in wall) - hall shower (in wall) - kitchen - water entry floor drain - K.C. drain in crawler, no irrigation. Note: At final check water entry - water heaters - need tempering valve for master tub. | DANR | DANR | | PTO | P | 6066808 |
HOMEOWNER | PTO | R | 12/21/2018 | Recommend home owner get licensed contractor, to many items to list, reinspect all. | DANR | DANR | | PTO | R | 6061325 |
HOMEOWNER | PTO | R | 11/21/2018 | To many items to list, recommended home owner get license contractor, no base inspection completed. | DANR | DANR | | PTO | R | 6032210 |
HOMEOWNER | XBS | T | 02/25/2019 | PAID (REC#1578544) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Several minor framing revisions | LBENNETT | LBENNETT | | XBS | T | 6116654 |
HOMEOWNER | XBS | T | 02/22/2019 | PAID (REC#1578085) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Revised fireplace footing, added buttress wall, revised windows. | BPHILLIPS | BPHILLIPS | | XBS | T | 6114111 |