UB CORP INC | B= | C | 12/19/2018 | All other required Final inspections are complete. (This is a computer generated result) | PARKER | PARKER | | B= | C | 6058237 |
UB CORP INC | B= | P | 12/12/2018 | Crawlspace / No decks. Additional Inspections Required (computer generated): External Agency Inspection N= by EPCZONING is not Completed yet (Contact: Paul Wiggs at 520-6819). | PARKER | PARKER | | B= | P | 6050936 |
UB CORP INC | BIN | C | 08/23/2018 | | SCOTTS | SCOTTS | | BIN | C | 5943139 |
UB CORP INC | BFR | C | 08/23/2018 | corrections complete | SCOTTS | SCOTTS | | BFR | C | 5943138 |
UB CORP INC | BIN | P | 08/10/2018 | complete BFR -- insulation ok | SCOTTS | SCOTTS | | BIN | P | 5930491 |
UB CORP INC | BFD | C | 08/07/2018 | drain observation on file | SCOTTS | SCOTTS | | BFD | C | 5925839 |
UB CORP INC | BFN | C | 08/07/2018 | footing and foundation observations on file -- eufer noted | SCOTTS | SCOTTS | | BFN | C | 5925837 |
UB CORP INC | BFT | C | 08/07/2018 | soils/open ex on file/2000 psf/drain 5% | SCOTTS | SCOTTS | | BFT | C | 5925835 |
UB CORP INC | BFR | P | 08/07/2018 | provide letter for frame change at fireplace and moving windows to perpendicular walls of fireplace -- ok to insulate | SCOTTS | SCOTTS | | BFR | P | 5925824 |
UB CORP INC | BSP | P | 07/10/2018 | Porch lid inspection- 2 porch lids okay | SHAUN | SHAUN | | BSP | P | 5898006 |
BOULTON ELECTRICAL SERVICES | E= | C | 11/29/2018 | | CRAIG | CRAIG | | E= | C | 6038705 |
BOULTON ELECTRICAL SERVICES | E= | R | 11/28/2018 | afci dining room light ----------- 20 - amp A/C ok / | CRAIG | CRAIG | | E= | R | 6035840 |
BOULTON ELECTRICAL SERVICES | ES | C | 08/06/2018 | Residential Underground: 150 amp 3w new res need meter set | JOSEPH | JOSEPH | | ES | C | 5924736 |
BOULTON ELECTRICAL SERVICES | ER | C | 08/06/2018 | | JOSEPH | JOSEPH | | ER | C | 5924735 |
BOULTON ELECTRICAL SERVICES | ER | R | 08/02/2018 | Add one receptacle in N.E. bedroom (I marked location). --- Terminate service conductors at MTVE utility pedestal. ----- At panel strip all NM & terminate all grounds & neutrals. --- Install all fixture boxes (unless fixtures are surface mounted or cut ins'). --- Notes: -- Crawler -- 10/3 -- 6/3 al ----- Double check UFER on reinspect. | JOSEPH | JOSEPH | | ER | R | 5922772 |
BOULTON ELECTRICAL SERVICES | EUG | C | 07/03/2018 | 2/0 urd | TOMC | TOMC | | EUG | C | 5892781 |
GROUNDHOG CONSTRUCTION | H= | C | 12/12/2018 | | BILLS | BILLS | | H= | C | 6049980 |
GROUNDHOG CONSTRUCTION | H= | P | 12/11/2018 | A/C COMPLETED SINCE LAST INSPECTION: LINESET INSULATION TO CONTINUE TO COIL CABINET, COIL DRAIN TO BE TRAPPED. OK TO ATTACH PICTURES AT NEXT INSPECTION REQUEST. NOTE: CONDITIONED CRAWLSPACE, DIRECT VENT FURNACE, FULL A/C, NO OUTSIDE AIR, 6" COMBUSTION AIR FROM VENTED ATTIC | BILLS | BILLS | | H= | P | 6048771 |
GROUNDHOG CONSTRUCTION | H= | P | 12/05/2018 | CONNECT FURNACE CONDENSATE RELIEF TUBE IN FURNACE CABINET, FURNACE CONDENSATE CAN NOT DRAIN INTO WATER HEATER DRAIN PAN, INSTALL COIL DRAIN PLUG, MISSING CRAWLSPACE RETURN AIR, SUPPLY AIRS IN CRAWLSPACE TO BE LOCKED IN THE OPEN POSITION, REMOVE SCREEN FROM DRYER EXHAUST TERMINATION CAP. NOTE: DIRECT VENT FURNACE, A/C ROUGH COIL, LINESET, AND CONDENSER (LINESET NOT CONNECTED TO COIL), NO OUTSIDE AIR, 6" COMBUSTION AIR FROM VENTED ATTIC TO MECHANICAL CLOSET | BILLS | BILLS | | H= | P | 6043998 |
GROUNDHOG CONSTRUCTION | HC | C | 08/06/2018 | RELEASE METER | BILLS | BILLS | | HC | C | 5925110 |
GROUNDHOG CONSTRUCTION | HRR | C | 08/06/2018 | NOTE: CONDITIONED CRAWLSPACE, DIRECT VENT FURNACE, FULL A/C, NO OUTSIDE AIR, 6" COMBUSTION AIR FROM VENTED ATTIC TO MECHANICAL CLOSET | BILLS | BILLS | | HRR | C | 5925109 |
GROUNDHOG CONSTRUCTION | HRR | P | 08/02/2018 | DRYER VENT TO BE 26 GAUGE MATERIAL AND BE SUPPORTED EVERY 4', , MISSING INSULATION SHIELD AT WATER HEATER VENT, INSULATE FURNACE VENTS IN ACCORDANCE TO INSTALLATION MANUAL, PAGE 49, TABLE 16. | BILLS | BILLS | | HRR | P | 5921813 |
PEAK VIEW PLUMBING, INC. | HI | C | 07/12/2018 | 10LB TEST OK. 1" MAIN, 6' OF 1" TO MANIFOLD. FROM MANIFOLD ALL PIPE IS COUNTERSTRIKE. 15' OF EHD25 TO FURNACE AND 15' OF EHD25 TO WATER HEATER, 45' OF EHD19 TO COOK TOP, 35' OF EHD19 TO FIREPLACE | BILLS | BILLS | | HI | C | 5900287 |
GROUNDHOG CONSTRUCTION | HRR | P | 06/20/2018 | NEED TO SEE FIREPLACE FRAMING AND DRYER VENT NEEDS TO BE INSTALLED. NOTE: CONDITIONED CRAWLSPACE, DIRECT VENT FURNACE, FULL A/C, 6" COMBUSTION AIR FROM VENTED ATTIC TO MECHANICAL CLOSET, NO OUTSIDE AIR | BILLS | BILLS | | HRR | P | 5880236 |
PEAK VIEW PLUMBING, INC. | P= | C | 11/19/2018 | 3/4'' pvb installed | TED | TED | | P= | C | 6030151 |
PEAK VIEW PLUMBING, INC. | PTO | C | 07/12/2018 | correction made | TED | TED | | PTO | C | 5901007 |
PEAK VIEW PLUMBING, INC. | PTO | P | 07/03/2018 | need expansion tank, need tub hangers or ledger board installed, need T.G.I. repair under hall bath tub (has been cut out), note: crawlspace, drain and water under footer, sprinkler stub with shut off and drain down in crawlspace | TED | TED | | PTO | P | 5893096 |