RANSOM CONSTRUCTION, INC. | B= | C | 07/31/2019 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 6283866 |
RANSOM CONSTRUCTION, INC. | B= | P | 06/14/2019 | decks and cabanas have been removed from the scope of work and removed from site / final OK pending other finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | P | 6231520 |
RANSOM CONSTRUCTION, INC. | B= | P | 04/26/2019 | Building OK pending other Finals / need third party observations for all deck foundations - decks not built per plans (incorrect joist size and orientation, headers missing, etc) - need full reinspection of decks when ready -- Schedule a new Building Final when above items are complete. | RICHB | RICHB | | B= | P | 6180074 |
RANSOM CONSTRUCTION, INC. | BFR | P | 01/11/2019 | Framing for fireplace and exterior porch lids OK pending other Roughs | RICHB | RICHB | | BFR | P | 6076071 |
RANSOM CONSTRUCTION, INC. | BFR | P | 10/09/2018 | Interior framing OK per Splice pending other Roughs / discussed pending Splices to address exterior items / discussed BIN requirements - exterior walls are existing (no inspection required) but attic will need inspected due to various areas of re-framing and drywall removal / training with Justin - Splices and commercial plan reading | RICHB | RICHB | | BFR | P | 5990314 |
RANSOM CONSTRUCTION, INC. | BSP | R | 08/15/2018 | front entry and rear entry are not built per plan / plan shows original timber trusses being cut out and changed and original is still in place / posts are not installed per plan / need attachment details for posts / beams at front and rear of building are not continuous and detail for connection of existing beams to new beams is not correct for 2x12 existing beams and existing beams have been spliced with no mention of it in plans | DANE | DANE | | BSP | R | 5935106 |
RANSOM CONSTRUCTION, INC. | BSP | T | 07/31/2018 | PAID (REC#1523915) ADDITIONAL PLAN REVIEW TIME: $50 From: BPHILLIPS Relocated men's restroom. Revised framing at entry areas. Provided details on existing conditions. | BPHILLIPS | BPHILLIPS | | BSP | T | 5918703 |
RANSOM CONSTRUCTION, INC. | BSP | R | 07/06/2018 | no inspection done. inspection called on wrong permit | DANE | DANE | | BSP | R | 5894874 |
RANSOM CONSTRUCTION, INC. | BSP | T | 06/15/2018 | PAID (REC#1513850) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Relocate spa EPO, lighting, panel schedule and coffee bar circuit changes | SHELBY | SHELBY | | BSP | T | 5875804 |
FRONT RANGE ELECTRIC OF CO, LLC | E= | C | 03/12/2019 | | CRAIGS | CRAIGS | | E= | C | 6131922 |
FRONT RANGE ELECTRIC OF CO, LLC | E= | P | 03/08/2019 | Need ty handles for multi wire circuits in all panels / Need to make sure panels are properly labeled, could not find fireplace circuit / GFCI receptacle on north wall of dog wash not functioning / | ROB | ROB | | E= | P | 6128765 |
FRONT RANGE ELECTRIC OF CO, LLC | E= | P | 03/07/2019 | Need to check panels / Need to check OC protection for 3-AC's Max is 40 amp / Need to verify all dog wash room recpts. are GFCI protected per change # 2 / | ROB | ROB | | E= | P | 6127326 |
FRONT RANGE ELECTRIC OF CO, LLC | ER | C | 09/17/2018 | Discussed AFCI/GFCI/TR requirements with owner. / Discussed accessibility requirements with contractor / | TOMC | TOMC | | ER | C | 5966664 |
FRONT RANGE ELECTRIC OF CO, LLC | ESL | P | 08/30/2018 | ESL ok for 8 floor boxes with power and data / | ROB | ROB | | ESL | P | 5951235 |
ALL SEASONS HEATING AND AIR CONDITIONING | H= | C | 04/30/2019 | | LIDO | LIDO | | H= | C | 6182766 |
THE VINE PLUMBING COMPANY L.L.C. | H= | C | 03/27/2019 | WATER HEATER VENT OK . | LIDO | LIDO | | H= | C | 6146003 |
THE VINE PLUMBING COMPANY L.L.C. | HV | P | 03/11/2019 | VENT CONDENSATE DRAIN DISPOSAL IS NOT INSTALLED PER INSTALLATION INSTRUCTIONS - REFER TO PAGE # 7 AND #8 , ADD SUPPORT TO VERTICAL VENT AND INTAKE PER PAGE # 24 . CONCENTRIC VENT TERMINATION INSTALLED THROUGH ROOF JACK IS NOT SEALED AT ROOF JACK / THIS NEEDS TO BE ACCOMPLISHED WITH AN APPROVED METHOD. | LIDO | LIDO | | HV | P | 6130281 |
ALL SEASONS HEATING AND AIR CONDITIONING | H= | P | 03/08/2019 | PARTIAL PENDING : STILL NEED CONTRACTOR THAT INSTALLED WATER HEATER VENT TO ATTACH TO PERMIT AND CALL FOR INSPECTION . MISSING EXHAUST IN WOMEN'S BATHROOM CLOSET # 104 / INSTALL PER PLANS OR HAVE PLANS REVISED / APPROVED NOT TO BE INSTALLED. | LIDO | LIDO | | H= | P | 6128537 |
ALL SEASONS HEATING AND AIR CONDITIONING | H= | P | 03/08/2019 | PICTURES RECEIVED FOR TWO CONDENSER CLEARANCES OK ( SEE IMAGES )
| LIDO | LIDO | | H= | P | 6127537 |
ALL SEASONS HEATING AND AIR CONDITIONING | H= | P | 02/08/2019 | TWO EXISTING EXHAUST FANS ARE INSTALLED IN THE DOG WASH ROOM # 117 THAT ARE NOT SHOWN ON THE PLANS- NEED REVISED/APPROVED PLANS SHOWING THESE FANS ARE EXISTING /INSTALL EXHAUST IN CLOSET FROM EF-1 IN WOMEN'S BATHROOM CLOSET # 117 OR HAVE PLANS REVISED AND APPROVED REMOVING THIS FROM THE INSTALL .NEED REVISED AND APPROVED MECHANICAL SCHEDULE FOR BRYANT FURNACES INSTALLED PLAN CALLS FOR TRANE. AHU-1,2,3,4,5,6 THIS WAS FIRST NOTED ON INSPECTION DATE SEP -5 2018. CONTRACTOR INSTALLING GAS WATER HEATER AND VENT WILL NEED TO ATTACH TO PERMIT FOR GAS AND VENT. ELECTRIC FIREPLACE IS BEING INSTALLED A REVISED AND APPROVED PLAN WILL BE REQUIRED TO SHOWING THIS AS A ELECTRIC FIREPLACE AND WILL NEED TO SHOW ELECTRICAL ON PLANS ALSO .AC CONDENSER # 6 IS LACKING SERVICE CLEARANCE REFER TO 2009 IMC 306.1 | LIDO | LIDO | | H= | P | 6101729 |
ALL SEASONS HEATING AND AIR CONDITIONING | HD | P | 01/18/2019 | INSPECTION NOTES CONTINUED : TWO USED EXHAUST FANS ARE INSTALLED IN THE DOG WASH ROOM # 117 THAT ARE NOT SHOWN ON THE PLANS / THESE WERE NOT INSTALLED AT ROUGH . NEED REVISED AND APPROVED PLAN TO SHOW INSTALLED AND WILL NEED A DUCT INSPECTION FROM FAN TO TERMINATION / WILL ALSO NEED A REVISED TEST AND BALANCE REPORT INCLUDING THESE TWO FANS .MAY NEED ELECTRICAL . | LIDO | LIDO | | HD | P | 6082918 |
ALL SEASONS HEATING AND AIR CONDITIONING | HD | P | 01/18/2019 | INSTALL EXHAUST IN CLOSET FROM EF-1 IN WOMENS BATHROOM CLOSET # 117 OR HAVE PLANS REVISED AND APPROVED .NEED REVISED AND APPROVED MECHANICAL SCHEDULE FOR BRYANT FURNACES INSTALLED PLAN CALLS FOR TRANE. AHU-1,2,3,4,5,6 THIS WAS FIRST NOTED ON INSPECTION DATE SEP -5 2018. CONTRACTOR INSTALLING GAS TO FIRE PLACE WILL NEED TO ATTACH TO PERMIT AND CALL FOR INSPECTIONS .GAS PLAN M-202 NOTE # 2 SHOWS 1/2" GAS PIPE TO A FIREPLACE / MECHANICAL PLAN M-201 DOES NOT SHOW A FIREPLACE IF A FIREPLACE IS TO BE INSTALLED A REVISED AND APPROVED PLAN WILL BE REQUIRED TO SHOW FIREPLACE AND VENT LOCATION , FIREPLACE CONTRACTOR WILL NEED TO ATTACH TO PERMIT. CONTRACTOR INSTALLING GAS WATER HEATER AND VENT WILL NEED TO ATTACH TO PERMIT.ALL THERMOSTATS ARE MOUNTED TO HIGH / THE REQUIRED HIGH IS 48" AFF. NEED INSTALLATION INSTRUCTIONS FOR CONDENSERS .NEED TO LABEL ALL THREE EAST SIDE CONDENSERS FOR THE AHU THEY SERVE . | LIDO | LIDO | | HD | P | 6082897 |
ALL SEASONS HEATING AND AIR CONDITIONING | H= | P | 01/18/2019 | RECEIVED TEST AND BALANCE REPORT ( SEE IMAGES ) | LIDO | LIDO | | H= | P | 6082121 |
ALL SEASONS HEATING AND AIR CONDITIONING | HSP | P | 01/10/2019 | CONTRACTOR INSTALLING GAS NEEDS TO ATTACH TO PERMIT AND CALL FOR INSPECTIONS .GAS PLAN M-202 NOTE # 2 SHOWS 1/2" GAS PIPE TO A FIREPLACE / MECHANICAL PLAN M-201 DOES NOT SHOW A FIREPLACE IF A FIREPLACE IS TO BE INSTALLED A REVISED AND APPROVED PLAN WILL BE REQUIRED TO SHOW FIREPLACE AND VENT LOCATION , FIREPLACE CONTRACTOR WILL NEED TO ATTACH TO PERMIT. CONTRACTOR INSTALLING GAS WATER HEATER AND VENT WILL NEED TO ATTACH TO PERMIT.
| LIDO | LIDO | | HSP | P | 6073982 |
ALL SEASONS HEATING AND AIR CONDITIONING | HD | P | 09/24/2018 | NEED TO COMPLETE EF-1 AND EF-2 INSTALL AND DUCT INSTALL IN ATTIC . NEED TO COMPLETE LINE SET INSULATION TO COILS IN ATTIC. SERVICE ACCESS TO ALL SIX FURNACES OK AND FURNACE INSTALL OK . NEED TEST AND BALANCE REPORT BY FINAL . | LIDO | LIDO | | HD | P | 5974062 |
ALL SEASONS HEATING AND AIR CONDITIONING | HV | P | 09/24/2018 | AHU-3 / AHU-2 SEAL AND SCREW INTAKE AT FURNACE PER INSTALLATION INSTRUCTIONS PAGE # 55. AHU-1-4-5-6 NEED RUBBER COUPLER INSTALLED ON VENT PIPE AT FURNACE AND SEAL AND SCREW INTAKE AT FURNACE PER INSTALLATION INSTRUCTIONS PAGE # 54 AND 55. | LIDO | LIDO | | HV | P | 5974058 |
ALL SEASONS HEATING AND AIR CONDITIONING | HD | P | 09/05/2018 | INSTALL EXHAUST IN CLOSET FROM EF-1 OR HAVE PLANS REVISED AND APPROVED .NEED REVISED AND APPROVED MECHANICAL SCHEDULE FOR BRYANT FURNACES INSTALLED PLAN CALLS FOR TRANE. AHU-1,2,3,4,5,6 CONDENSATE DISPOSAL OK AND SECONDARY PROTECTION IN PLACE / STILL NEED FURNACE AND FURNACE VENT INSPECTION . ALL SIX AHU'S IN ATTIC ARE LACKING THE REQUIRED 30 " X 30 " SERVICE PLATFORM REFER TO IMC CODE SECTION 306.1 . DUCT ROUGH BELOW HARD LIDS OK . | LIDO | LIDO | | HD | P | 5955412 |
THE VINE PLUMBING COMPANY L.L.C. | P= | C | 02/25/2019 | Ok. | DANR | DANR | | P= | C | 6115970 |
THE VINE PLUMBING COMPANY L.L.C. | P= | P | 01/23/2019 | water heater lacking removal access, mens lav counter top to high off floor, need to see partitions in bathroom mounted, need to check sink in front area, rest ok | JOSEPHD | JOSEPHD | | P= | P | 6086099 |
THE VINE PLUMBING COMPANY L.L.C. | PTO | C | 08/21/2018 | Ok. Note: check water heater and back flow at final. | DANR | DANR | | PTO | C | 5940388 |
THE VINE PLUMBING COMPANY L.L.C. | PB | C | 06/05/2018 | Test ok. | DANR | DANR | | PB | C | 5864467 |
RANSOM CONSTRUCTION, INC. | XBS | P | 05/17/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Remove decks and cabanas from scope of work | DANM | DANM | | XBS | P | 6202540 |
ALL SEASONS HEATING AND AIR CONDITIONING | XMS | P | 04/01/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised fan schedule | JUSTINC | JUSTINC | | XMS | P | 6150380 |
ALL SEASONS HEATING AND AIR CONDITIONING | XMS | T | 03/06/2019 | PAID (REC#1580681) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised equipment schedule Demo of exhaust | JUSTINC | JUSTINC | | XMS | T | 6125276 |
ALL SEASONS HEATING AND AIR CONDITIONING | XMS | T | 02/05/2019 | PAID (REC#1574381) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 2 and 3 | DALEH | DALEH | | XMS | T | 6098640 |
RANSOM CONSTRUCTION, INC. | XBS | T | 12/31/2018 | PAID (REC#1568813) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided structural notes for clarification, minor floor plan changes, revised sheets to reflect site conditions, | BPHILLIPS | BPHILLIPS | | XBS | T | 6065964 |
FRONT RANGE ELECTRIC OF CO, LLC | XES | T | 12/12/2018 | PAID (REC#1580897): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise lighting | SHELBY | SHELBY | | XES | T | 6051339 |
THE VINE PLUMBING COMPANY L.L.C. | XPS | T | 08/02/2018 | PAID (REC#1523914) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 8-2-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5922111 |
RANSOM CONSTRUCTION, INC. | XMS | P | 07/31/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 5919691 |