COLORADO STRUCTURES INC | B= | C | 08/27/2019 | All required inspections are complete | MATTHEWM | MATTHEWM | | B= | C | 6315408 |
COLORADO STRUCTURES INC | B= | P | 08/20/2019 | Temp CO: TEMP CO: Pending Zoning Final ( Expires: 9/19/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6307820 |
COLORADO STRUCTURES INC | B= | P | 07/23/2019 | Temp CO: TCO: Pending Zoning Final ( Expires: 8/22/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6274146 |
COLORADO STRUCTURES INC | B= | P | 07/17/2019 | pending other required inspections, building okay / unit 104 is a type A, units 101, 102, 103 are Type B. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), External Agency Inspection U= by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), External Agency Inspection UWS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6266874 |
COLORADO STRUCTURES INC | B= | P | 07/16/2019 | need to complete other required inspections / inspected south tower units 105, 106, 107 and 108 are type B units / units 105, 106, 107, 108, 205, 206, 207, 208, 305, 306, 307 and 308 okay -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), External Agency Inspection U= by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), External Agency Inspection UWS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6265246 |
COLORADO STRUCTURES INC | BSP | P | 07/11/2019 | letter for footing with ufer noted on file | BOBF | BOBF | | BSP | P | 6259689 |
COLORADO STRUCTURES INC | BSP | P | 05/22/2019 | reviewed type B units for option b with Super, including sink height with parallel approach / traing with Lonnie S. reviewed accessible elments for Type A units, Type B units with options A and Option B bathrooms/ review including all elements of type A including appliances, floor covering reach range for windows kitchens, work stations / removable panels, roll in showers, lavatory , grab bars toilet clearances | BOBF | BOBF | | BSP | P | 6207397 |
COLORADO STRUCTURES INC | BSP | P | 05/22/2019 | training with inspector Bob F / reviewed all accessible elements for type A accessible dwelling unit - including thresh holds / reach ranges / bathing facilities / operable parts / windows / clear floor space / turning space / working counter tops / removable elements / laundry facilities / walking surfaces / roll in shower / grab bars | LONNYS | LONNYS | | BSP | P | 6207389 |
COLORADO STRUCTURES INC | BFR | P | 03/20/2019 | BFR / Framing complete. / Partial pending completion of mechanical, electrical and plumbing rough inspections. | CHUCK | CHUCK | | BFR | P | 6138848 |
COLORADO STRUCTURES INC | BSP | P | 02/25/2019 | BSP inspection / Resilient channel installation OK in mechanical closets for Units - 101-104, 201-204 and 301-304. | CHUCK | CHUCK | | BSP | P | 6116899 |
COLORADO STRUCTURES INC | BSP | P | 02/22/2019 | BSP inspection / Resilient channel installation OK per UL P522/L521 requirements on mechanical closet ceilings of units 205 and 305 / Units 205, 206, and 105-108 - drywall installation and fastener spacing on ceilings (UL L521), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK. / NOTE: Fire stopping of dead spaces for tub in Unit 308 and laundry closet in Unit 305 completed. | CHUCK | CHUCK | | BSP | P | 6114988 |
COLORADO STRUCTURES INC | BSP | P | 02/19/2019 | BSP inspection / Resilient channel missing in mechanical closets in Units 205 and 305. RC OK in 306-308, 206-208 and 105-108. | CHUCK | CHUCK | | BSP | P | 6111204 |
COLORADO STRUCTURES INC | BSP | P | 02/19/2019 | BSP inspection / Resilient channel installation OK per UL L521 requirements on ceilings of units 105, 106 and 108 / Units 207, 208, and 305-308 (except dead space at tub in 308 and laundry in 305) - drywall installation and fastener spacing on ceilings (UL P522/L521), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK. / NOTE: Fire stopping of dead spaces listed on inspection dated 2.15.19 have been corrected. OK to cover. | CHUCK | CHUCK | | BSP | P | 6111183 |
COLORADO STRUCTURES INC | BIN | P | 02/15/2019 | BIN inspection / Exterior and breezeway wall cavity insulation (R15) OK as per ComCheck paperwork on file, 2nd floor, units 205-208 and 1st floor units 105-107 (108 not completed at time of inspection). | CHUCK | CHUCK | | BIN | P | 6109499 |
COLORADO STRUCTURES INC | BSP | P | 02/15/2019 | BSP inspection / Resilient channel installation OK per UL L521 requirements on ceilings of units 107 and 205-208 / All exterior breezeway ceilings - drywall installation and fastener spacing OK per UL L513 requirements, all floors throughout building / Units 201-204 (except dead space at tub and laundry valve box in Unit 202) - drywall installation and fastener spacing on ceilings (UL L521), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK / Need to fire stop dead spaces behind: tubs in Units 101, 102 (accessible shower), 104, 107, 202 and 205-208 and laundry walls of Units 107, 202, 205 and 207. | CHUCK | CHUCK | | BSP | P | 6109497 |
COLORADO STRUCTURES INC | BIN | P | 02/13/2019 | BIN inspection / Exterior and breezeway wall cavity insulation (R15) OK as per ComCheck paperwork on file, 3rd floor, units 305-308. / Need to verify fire stopping of dead spaces (laundry closets and tubs), all units. | CHUCK | CHUCK | | BIN | P | 6106405 |
COLORADO STRUCTURES INC | BSP | P | 02/12/2019 | BSP inspection / Resilient channel installation OK per UL L521 requirements on ceilings of units 101-104 and 201-204 / All exterior breezeway walls - drywall installation and fastener spacing OK per UL U305 requirements, all floors throughout building / Units 301-304 - drywall installation and fastener spacing on ceilings (UL P522), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK. / Units 201-204 - drywall installation and fastener spacing on interior side of UL U305 breezeway walls only OK. / Need to fire stop dead spaces behind tubs and laundry walls, all units. | CHUCK | CHUCK | | BSP | P | 6105320 |
COLORADO STRUCTURES INC | BSP | P | 02/11/2019 | BIN inspection / Exterior and breezeway wall cavity insulation (R15) OK as per ComCheck paperwork on file, 1st floor, units 101-104. | CHUCK | CHUCK | | BSP | P | 6103989 |
COLORADO STRUCTURES INC | BIN | P | 02/08/2019 | BIN inspection / Units 201-204 and 301-304 - Exterior and breezeway wall cavity insulation (R15) OK as per ComCheck paperwork on file. / Training with Rich B. on fire-resistance rated wall assemblies and fire stopping of penetrations. | CHUCK | CHUCK | | BIN | P | 6102381 |
COLORADO STRUCTURES INC | BSP | P | 02/08/2019 | BSP inspection / Fire stopping - fire blocking OK in units 105-108, 205-208 and 305-308. Training with Rich B. on fire stopping of penetrations. | CHUCK | CHUCK | | BSP | P | 6102377 |
COLORADO STRUCTURES INC | BSP | P | 02/08/2019 | Training with Chuck - firestopping requirements (including manufacturer listings), membrane penetrations in fire resistance rated walls | RICHB | RICHB | | BSP | P | 6102817 |
COLORADO STRUCTURES INC | BSP | P | 02/05/2019 | BSP inspection / Resilient channel installation OK for all units (301-308) on the 3rd floor (meets UL P522)and breezeway ceilings (meets UL L513) on floors 1-3. | CHUCK | CHUCK | | BSP | P | 6098504 |
COLORADO STRUCTURES INC | BFR | P | 02/05/2019 | BFR inspection - Exterior and interior wall framing, sill plate anchors, holddown anchors and interior shear wall straps OK, all units on floors 1-3. / Fire stopping/fire blocking OK in units 101-104, 201-204 and 301-304. | CHUCK | CHUCK | | BFR | P | 6098497 |
COLORADO STRUCTURES INC | BFR | P | 02/04/2019 | BFR inspection / 2nd and 3rd floor floor truss framing / Floor trusses OK. / Inspected roof trusses - H2.5's installed in all breezeways - still need truss to truss connectors at HR03 to R83 trusses. H2.5 installed on truss R66 in Unit 306. Truss to truss connector installed at truss J04 to R70 truss. Contractor able to re-install gusset plate on truss R71 in Unit 303 without further repair / Training with Rich B. on truss framing/bracing requirements. | CHUCK | CHUCK | | BFR | P | 6096961 |
COLORADO STRUCTURES INC | BSP | P | 02/04/2019 | Training with Chuck - floor truss bracing requirements, truss repairs/modifications, firestopping/fireblocking | RICHB | RICHB | | BSP | P | 6096839 |
COLORADO STRUCTURES INC | BFR | P | 02/01/2019 | BFR inspection - Roof trusses, entire building / Truss R74 repair in Unit 301 inspected - stamped repair documentation received on site. / Need repair on R71 truss in Unit 303. Gusset plate dislodged from bottom chord and purlins. / Need truss to truss connector for J04 to R70 truss / Missing H2.5 on R66 truss at exterior wall in Unit 306. / Missing H2.5's at R80-83 truss ends and truss to truss connectors at HR03 to R83 trusses in all breezeways. | CHUCK | CHUCK | | BFR | P | 6095229 |
COLORADO STRUCTURES INC | BSP | P | 01/07/2019 | BSP / Engineer's letter for 1st floor holddown repair on file / Installation of 2 - #16d nails at 8" o.c. for the full length of the cut stud to be completed on site. | CHUCK | CHUCK | | BSP | P | 6069691 |
COLORADO STRUCTURES INC | BFT | R | 01/03/2019 | BFT / Stamped RFI documentation to be submitted and approved through Plan Review as a structural change to the plans. | CHUCK | CHUCK | | BFT | R | 6067056 |
COLORADO STRUCTURES INC | BSP | R | 12/27/2018 | BSP inspection - framing/firestopping in stair towers / Missing firestopping in UL U305 stairway walls. / Training with Justin L. regarding fire resistive rated wall assemblies and shear walls in multi-family residential construction. | CHUCK | CHUCK | | BSP | R | 6063912 |
COLORADO STRUCTURES INC | BSP | P | 12/19/2018 | BSP inspection / Inspection of R15 insulation installation in stepped wall and breezeway rim joist cavities meets the value submitted on the ComCheck documentation on file with RBD. | CHUCK | CHUCK | | BSP | P | 6057838 |
COLORADO STRUCTURES INC | BFI | P | 12/11/2018 | BFI / Engineer's observation of foundation insulation on file. / Need UFER observation / Need Usable drain observation (where required). | CHUCK | CHUCK | | BFI | P | 6048497 |
COLORADO STRUCTURES INC | BFT | P | 12/11/2018 | BFT / Engineer's open hole and footing form and reinforcement observation letter on file. / Engineer's reported 2600 PSF reflects bearing capacity noted on Sht. S-00 of the approved plans / Usable drain required. / No slope noted / No UFER observation noted. | CHUCK | CHUCK | | BFT | P | 6048492 |
COLORADO STRUCTURES INC | BSP | P | 12/10/2018 | BSP inspection / exterior wall framing and pre-drywall insulation behind fireplaces, entire building. Rim joist areas not ready at time of inspection. | CHUCK | CHUCK | | BSP | P | 6048016 |
COLORADO STRUCTURES INC | BSP | P | 09/21/2018 | Building special inspection / verified shear wall nailing pattern for exterior, interior and breezeway walls was in compliance with the shear wall attachment schedule per Sht. S-02 of the approved plans. | CHUCK | CHUCK | | BSP | P | 5972932 |
COLORADO STRUCTURES INC | BFI | R | 08/29/2018 | Inspection request comments indicate attachments but none were attached - need Open Hole, stamped RFI 028 and stamped BFI observation | RICHB | RICHB | | BFI | R | 5949051 |
COLORADO STRUCTURES INC | BFN | P | 08/29/2018 | Footing observation for turned-down slab received / still need Open Hole and stamped copy of RFI 028 | RICHB | RICHB | | BFN | P | 5949050 |
COLORADO STRUCTURES INC | BFT | P | 08/29/2018 | Interior pad observation received - still need observation for all other foundation elements / RFI 028 (updated detail 3 on S-11) received - need stamped copy | RICHB | RICHB | | BFT | P | 5949047 |
COLORADO STRUCTURES INC | BSP | P | 07/05/2018 | Met Superintendent (Garry) - discussed project status, rated assemblies (including details for all penetrations) and inspection sequencing | RICHB | RICHB | | BSP | P | 5893663 |
COLORADO STRUCTURES INC | BFN | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFN | P | 5825710 |
COLORADO STRUCTURES INC | BFT | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFT | P | 5825709 |
MAGNUM ELECTRIC, INC | E= | C | 07/23/2019 | | TIMA | TIMA | | E= | C | 6273935 |
COLORADO SECURITY, LLC | E= | C | 07/08/2019 | FIRE ALARM INSPECTION: | TIMA | TIMA | | E= | C | 6255807 |
MAGNUM ELECTRIC, INC | E= | P | 06/25/2019 | all units ok ---just need riser room with fire panel installed / and add concrete pad at service to meet handle height / | BRIAN | BRIAN | | E= | P | 6243295 |
MAGNUM ELECTRIC, INC | E= | P | 06/18/2019 | need arc shield 205 / 308 vent pipe not move from in front of switch / 105 closet light to close to shelf / 106 breaker #6 bad, light to close to shelf / 107 missing heater cover / 108 light to close to shelf / label all units p- tec disco / label circuit and panel on unit heater in fire riser room /---- | BRIAN | BRIAN | | E= | P | 6235258 |
MAGNUM ELECTRIC, INC | E= | P | 06/17/2019 | units 201, 308, 208, 207, 206 OK////Unit 205 has vent pipe in front of wall switch and needs arc ring for range receptacle. | SHELBY | SHELBY | | E= | P | 6233935 |
MAGNUM ELECTRIC, INC | E= | R | 06/13/2019 | address not posted / to many buildings to guess / post address with unit # and recall | BRIAN | BRIAN | | E= | R | 6230195 |
MAGNUM ELECTRIC, INC | E= | P | 06/12/2019 | unit 104 has closet heater missing / unit 308 need vent pipe moved from in front of v-tac disconnect-----units 101,103,305,306,307 ok | TIMA | TIMA | | E= | P | 6228754 |
MAGNUM ELECTRIC, INC | E= | P | 06/11/2019 | units 301,303,304,202,204,203 ok | TIMA | TIMA | | E= | P | 6227537 |
MAGNUM ELECTRIC, INC | EUG | P | 03/21/2019 | garage site lighting ok | TIMA | TIMA | | EUG | P | 6139899 |
MAGNUM ELECTRIC, INC | EUG | P | 03/19/2019 | south side site lighting complete | TIMA | TIMA | | EUG | P | 6137115 |
MAGNUM ELECTRIC, INC | EUG | P | 03/12/2019 | south light poles and feeds ok | TIMA | TIMA | | EUG | P | 6131724 |
MAGNUM ELECTRIC, INC | EP | P | 02/06/2019 | NEED UFER INSPECTION LETTER----NEED TO CHECK BRANCH BREAKERS FOR SERIES RATING ON HOUSE PANEL----NEED PLANS REVISED TO SHOW CHANGE FROM 3/0 CU TO 4/0 AL FEEDERS---- AT FINAL GRADE VERIFY THAT TOP HANDLE DISCONNECTS ARE NOT OVER 6'-7 " OR WILL NEED PLATFORM INSTALLED-- | TIMA | TIMA | | EP | P | 6100111 |
MAGNUM ELECTRIC, INC | ES | C | 02/06/2019 | Commercial Service: 1200 amp 3/w ok to energize and set meters for all units and house panel | TIMA | TIMA | | ES | C | 6100107 |
MAGNUM ELECTRIC, INC | ER | C | 01/29/2019 | units 105,106,107,108,207 ok----sub panels ok all units----riser room ok---NEED ENGINEER LETTER FOR UFER INSPECTION--- | TIMA | TIMA | | ER | C | 6091167 |
COLORADO SECURITY, LLC | ER | P | 01/28/2019 | FIRE ALARM INSPECTION: units 105,106,107,108,205,206,207,208 ok | TIMA | TIMA | | ER | P | 6090149 |
MAGNUM ELECTRIC, INC | ER | R | 01/28/2019 | unit 107 nail plate in hall / make up light boxes / complete wiring in utility closet / unit 108 staple wires at panel / unit 105 tighten feeder equipment ground in sub panel / staple wire at panel / nail plate back side of island / unit 106 staple wire at fireplace / unit 207 staple wire at panel / ----units 205,206,208 ok--- | TIMA | TIMA | | ER | R | 6090146 |
COLORADO SECURITY, LLC | ER | P | 01/23/2019 | FIRE ALARM INSPECTION: units 305,306,307,308 ok | TIMA | TIMA | | ER | P | 6086071 |
MAGNUM ELECTRIC, INC | ER | P | 01/23/2019 | units 305,306,307,308 ok------sub panels ok these units | TIMA | TIMA | | ER | P | 6086057 |
COLORADO SECURITY, LLC | ER | R | 01/22/2019 | FIRE ALARM INSPECTION: job site locked / | MIGUEL | MIGUEL | | ER | R | 6084737 |
MAGNUM ELECTRIC, INC | ER | R | 01/22/2019 | job site locked / | MIGUEL | MIGUEL | | ER | R | 6084728 |
MAGNUM ELECTRIC, INC | ER | P | 01/17/2019 | unit 304 ok---fireplaces ok units-101,102,103,104,201,202,203,204,301,302,303,304 ok---FEEDER WALL OK---UFER CONNECTION OK IRREVERSIBLE--- | TIMA | TIMA | | ER | P | 6081484 |
MAGNUM ELECTRIC, INC | ER | P | 01/15/2019 | units 101,102,103,104 ok-----sub panels ok-- | TIMA | TIMA | | ER | P | 6079005 |
COLORADO SECURITY, LLC | ER | P | 01/15/2019 | FIRE ALARM INSPECTION: units 101,102,103,104,201,202,203,301,302,303,304 ok | TIMA | TIMA | | ER | P | 6079000 |
MAGNUM ELECTRIC, INC | ER | R | 01/10/2019 | NEED FIRE ALARM PERMIT / units 201-203-202-301-303-302- 304----add outlet in hall unit 304/ need fire place installed and inspected in all units / Discussed accessibility requirements with contractor / panels ok in these units / Electrical Rough ok, FA not complete ---------------do not sheetrock--------------- / | BRIAN | BRIAN | | ER | R | 6074844 |
MAGNUM ELECTRIC, INC | EUG | P | 12/27/2018 | service lateral and feeder to garage G30 ok | TIMA | TIMA | | EUG | P | 6064219 |
MAGNUM ELECTRIC, INC | EUG | P | 12/20/2018 | light pole feeds stubbed to south edge of building ok---light pole bases ok | TIMA | TIMA | | EUG | P | 6059553 |
MAGNUM ELECTRIC, INC | ER | P | 12/11/2018 | all breezeways and towers ok | TIMA | TIMA | | ER | P | 6048859 |
BOCHNAK MECHANICAL, INC. | H= | C | 06/26/2019 | unit #101 complete | MARKB | MARKB | | H= | C | 6244866 |
BOCHNAK MECHANICAL, INC. | H= | P | 06/25/2019 | FINAL WALK FOR 1ST, 2ND & 3RD FLOOR MECHANICAL CLOSETS AND WATER HEATER VENTS OK EXCEPT FOR: Unit 101 is locked | MARKB | MARKB | | H= | P | 6243091 |
STEELE BROS. HEATING, INC | H= | C | 06/11/2019 | MECHANICAL CLOSETS AND DIFFUSERS COMPLETE FOR 1ST, 2ND & 3RD FLOORS | MARKB | MARKB | | H= | C | 6227151 |
BOCHNAK MECHANICAL, INC. | HV | C | 05/24/2019 | WATER HEATER VENTS FOR 1ST, 2ND & 3RD FLOORS COMPLETE, at final check outside terminations. | MARKB | MARKB | | HV | C | 6209925 |
STEELE BROS. HEATING, INC | HD | P | 02/07/2019 | ABOVE PRE-ROCK DUCT INSPECTION - SUPPLY/RETURN/EXHAUST MAINS/BRANCHES/DAMPERS INSTALLED PER PLAN FOR 1ST & 2ND FLOORS. 3RD FLOOR DUCT BOARD BOXES NEED TO BE TAPED ON BOTTOM ENDS PER DAMPER INSTRUCTIONS - REST OK. No mechanical closets this inspection | MARKB | MARKB | | HD | P | 6101148 |
BOCHNAK MECHANICAL, INC. | HI | C | 01/18/2019 | MEDIUM PRESSURE GAS APPROVAL LETTER RECEIVED. AT FINAL CHECK FOR LABELS AND REGULATORS. | NANCY | NANCY | | HI | C | 6082372 |
BOCHNAK MECHANICAL, INC. | HC | C | 01/18/2019 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 6082364 |
STEELE BROS. HEATING, INC | HSP | P | 01/10/2019 | SEE IMAGES FOR DAMPER LETTER REPLACING LETTER SCANNED INTO PERMIT AND DAMPER INSTRUCTIONS. | MARKB | MARKB | | HSP | P | 6074128 |
BOCHNAK MECHANICAL, INC. | HI | P | 01/08/2019 | Need 2 PSI approval letter from Black Hills to release meter. 10 PSI PRESSURE TEST X2 AND PIPING PER PLAN FOR 1ST, 2ND & 3RD FLOORS OK. AT FINAL - Need elevated pressure labels in place and regulators. | MARKB | MARKB | | HI | P | 6071357 |
BOCHNAK MECHANICAL, INC. | P= | C | 07/18/2019 | Correction made, image from contractor uploaded. | DANR | DANR | | P= | C | 6267661 |
BOCHNAK MECHANICAL, INC. | P= | P | 07/17/2019 | Accessible toilet in unit 102 needs to flush to open side (picture ok), rest ok for this building. | DANR | DANR | | P= | P | 6266463 |
BOCHNAK MECHANICAL, INC. | PTO | P | 02/11/2019 | Tub valves units 306 and 308 ok, heat trace breeze way ok. | DANR | DANR | | PTO | P | 6104083 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/28/2019 | This inspection domestic water and toilet flanges in units listed below - mains to water entry: Unit 206 need pex suport. Unit 306 need master tub valve - unit 308 missing both tub valves. Units: 105-106-107-108-205-207-208-305-307 ok. Note: Need main heat trace inspection, check water entry and water heaters at final.
| DANR | DANR | | PTO | P | 6090298 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/25/2019 | This inspection domestic water in room - domestic mains -mains to rooms toilet flanges -nail protection: Need inspection for all heat trace before covered, Unit 102 need accessible shower installed rest ok this unit. Unit 301 needs nail protection rest ok this unit. 101-103-104-201-202-203-204-302-303-304 ok Note: check water entry - water heaters at final. | DANR | DANR | | PTO | P | 6088891 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/18/2019 | DWV inspection the following rooms : Need engineer letter for aav's on kitchen sinks all units. All units need nail protection. 106-108 need toilet flanges set and tub test. 206-208-306-308 ok. | DANR | DANR | | PTO | P | 6083007 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/17/2019 | DWV inspection the following rooms : Need engineer letter for aav's on kitchen sinks all units. All units need nail protection. 105 - 107 need toilet flanges set and tub test. 205-207-305-307 ok. | DANR | DANR | | PTO | P | 6081820 |
BOCHNAK MECHANICAL, INC. | PTO | P | 01/16/2019 | DWV inspection the following rooms : Need engineer letter for aav's on kitchen sinks all units. All units need nail protection. 101 -102 -103 -104 need toilet flanges set and tub test. 201-202-203-204-301-302-303-304 ok. | DANR | DANR | | PTO | P | 6080488 |
BOCHNAK MECHANICAL, INC. | PB | C | 06/26/2018 | corrections made and water stubbed into water entry room | JOHNS | JOHNS | | PB | C | 5885311 |
BOCHNAK MECHANICAL, INC. | PB | P | 06/25/2018 | ok for pb -minus water entry floor drain and water stubbed in-, test and design per plan. note: plan page P-12 | JOHNS | JOHNS | | PB | P | 5883990 |
BOCHNAK MECHANICAL, INC. | PB | P | 05/07/2018 | test ok for deep risers only @ bldg 14, type 2 | JOHNS | JOHNS | | PB | P | 5837473 |
BOCHNAK MECHANICAL, INC. | XMS | T | 04/16/2019 | PAID (REC#1590887): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Water heater venting revisions | JUSTINC | JUSTINC | | XMS | T | 6166691 |
COLORADO STRUCTURES INC | XBS | T | 03/06/2019 | PAID (REC#1580879): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise structural pages | MICHAELA | MICHAELA | | XBS | T | 6126059 |
BOCHNAK MECHANICAL, INC. | XMS | P | 12/21/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | P | 6060818 |
COLORADO STRUCTURES INC | XBS | T | 12/20/2018 | PAID (REC#1565411) PLAN SPLICE FEE: $50 by: DANM for Construction: Plan reset - full new review | DANM | DANM | | XBS | T | 6059115 |
BOCHNAK MECHANICAL, INC. | XPS | T | 11/16/2018 | PAID (REC#1559243): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: pl;umbing splice 1-16-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6028376 |
COLORADO STRUCTURES INC | XBS | T | 08/01/2018 | PAID (REC#1523556): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 5920221 |