COLORADO STRUCTURES INC | B= | C | 11/07/2019 | All required inspections are complete | MATTHEWM | MATTHEWM | | B= | C | 6391981 | COLORADO STRUCTURES INC | B= | P | 10/11/2019 | Temp CO: Temp CO: Pending Zoning final( per contractor missing trees that were delayed by weather) ( Expires: 11/10/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6365540 | COLORADO STRUCTURES INC | B= | P | 09/12/2019 | Temp CO: Temp CO: Pending Zoning Final ( Expires: 10/12/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6332754 | COLORADO STRUCTURES INC | B= | P | 08/14/2019 | Temp CO: Pending Mechanical/ Building and zoning finals ( Expires: 9/13/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6299836 | COLORADO STRUCTURES INC | B= | P | 07/23/2019 | PENDING COMPLETION OF OTHER required inspections, south tower and 6 garages okay / units 101 - 104 type B accessible. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), External Agency Inspection U= by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), External Agency Inspection UWS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), BOCHNAK MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet, STEELE BROS. HEATING, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6273598 | COLORADO STRUCTURES INC | B= | P | 07/19/2019 | pending other required inspections units 105, 106, 107, 108, 205, 206, 207, 208, 305, 306, 307 and 308 okay, all 1st floor units are Type B accessible -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), External Agency Inspection U= by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), External Agency Inspection UWS by WIDEFIELDWSD is not Completed yet (Contact: Wateropps@wwsdonline.com or 390-7111), BOCHNAK MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet, STEELE BROS. HEATING, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6270085 | COLORADO STRUCTURES INC | BFI | C | 07/12/2019 | R10 installed / | BOBF | BOBF | | BFI | C | 6261214 | COLORADO STRUCTURES INC | BSP | P | 05/06/2019 | EJ received for penetration protection at unit 107, work completed per EJ | BOBF | BOBF | | BSP | P | 6188730 | COLORADO STRUCTURES INC | BSP | P | 04/30/2019 | fire protection above dropped ceiling in restrooms of units 101, 103, 106, 108, 201, 203, 206, 208, 301, 303, 306 and 308 okay | BOBF | BOBF | | BSP | P | 6182726 | COLORADO STRUCTURES INC | BSP | R | 04/29/2019 | fire protection above drop ceilings in bathrooms not ready | BOBF | BOBF | | BSP | R | 6181278 | COLORADO STRUCTURES INC | BSP | P | 04/03/2019 | rc channel in mech rooms, okay units 101, 102, 103, 104,105, 106, 107, 108, 201, 202, 205, 206, 207, 208, 301, 302, 303, 304, 305, 306, 307 and 308 / tub valve protection units 101, 103, 106, 108, 201, 203, 206, 208, 301, 303, 306 and 308 0kay / drywall install at rated walls units 101, 102, 103, 104, 201, 202, 203, 204, 301, 302, 303 and 304 okay, corrected per previous inspection with chuck, truss blocking, units 101, 102, 103 , 104, 201, 202 , 203, and 204 okay | BOBF | BOBF | | BSP | P | 6153890 | COLORADO STRUCTURES INC | BSP | P | 03/26/2019 | Drywall and fastener installation OK - (UL L521) ceilings, exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) - units 105-108, 207 and 208. South tower units not ready. / Training w/Bob F. | CHUCK | CHUCK | | BSP | P | 6144467 | COLORADO STRUCTURES INC | BSP | P | 03/26/2019 | training with Chuck , reviewing listed walls and ceilings, inspecting screw patterns on rated walls and ceiling, met with site super Gary D | BOBF | BOBF | | BSP | P | 6144454 | COLORADO STRUCTURES INC | BSP | P | 03/20/2019 | BSP inspection / Fire stopping of penetrations completed in units 101-304 / Drywall and fastener installation OK per UL L521 requirements on ceilings of units 205-208 / Units 205, 208, and 305-308 - drywall installation and fastener spacing on exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK./ Resilient channel installation OK per UL L521 requirements in units 105-108. / Hold down anchors OK except for unit 106. / Need to inspect: shear box repair - units 101, 102, 104 and 204; drywall rated assembly wall continuity at all tub dead spaces (no drywall behind tub at unit 208) and cable bundles at wall/ceiling in units 203 and 303; top plate penetration at laundry closet in unit 203; remaining mech. closets for RC installation. | CHUCK | CHUCK | | BSP | P | 6138765 | COLORADO STRUCTURES INC | BIN | P | 03/18/2019 | BIN inspection / Exterior and breezeway wall cavity insulation (R15) OK as per ComCheck paperwork on file in units 205-208 and 305-308. | CHUCK | CHUCK | | BIN | P | 6136221 | COLORADO STRUCTURES INC | BSP | P | 03/18/2019 | BSP inspection / Drywall and fastener installation OK per UL P522 requirements on ceilings of units 301-304 and 305-308 / All exterior drywall and fasteners for breezeway ceilings OK per UL L513 requirements. / Resilient channel installation OK per UL L521 requirements in units 101-204, 205-208 and mechanical closets in 305 and 306. / Need to inspect: 1st floor hold downs; shear box repair and fire stopping in units 101-304; drywall rated assembly wall continuity at tub dead spaces; remaining mech. closets for RC installation. | CHUCK | CHUCK | | BSP | P | 6136217 | COLORADO STRUCTURES INC | BSP | P | 03/12/2019 | BSP inspection / Resilient channel installation in both 1st and 2nd floor exterior breezeway ceilings OK per UL L513 requirements. | CHUCK | CHUCK | | BSP | P | 6131569 | COLORADO STRUCTURES INC | BFR | P | 03/12/2019 | BFR inspection - Exterior and interior wall, hold down/shear straps and floor truss framing OK for units 101-104, 201-204 and 301-304, except shear boxes cut due to plumbing between units in 101-104 and 201-204. / Hold-down/shear straps OK in units 205-208 and 305-308. / Need to verify correct installation of holddown anchors. throughout 1st floor units. / Man-sized opening in OSB shear wall in unit 307 repaired / Truss to truss connectors in units 306 and 308 installed. | CHUCK | CHUCK | | BFR | P | 6131531 | COLORADO STRUCTURES INC | BFR | P | 03/08/2019 | BFR inspection - Exterior and interior wall and floor truss framing OK for units 105-108, 205-208 and 305-308. / Need to verify installation of sill plate anchors, holddown anchors and interior shear wall straps. / Need to repair man-sized opening in OSB shear wall in unit 307 / Need to install truss to truss connectors in units 306 and 308. | CHUCK | CHUCK | | BFR | P | 6128425 | COLORADO STRUCTURES INC | BSP | P | 03/08/2019 | BSP inspection / Fire stopping of penetrations OK in units 305-308, 205-208, 105-107. Need to fire stop A/C linesets top plate penetration at exterior wall and provide horizontal fire block in double wall in bathroom in unit 108. | CHUCK | CHUCK | | BSP | P | 6128401 | COLORADO STRUCTURES INC | BSP | P | 03/05/2019 | BSP inspection / Resilient channel installation OK per UL P522 requirements on ceilings of units 305-308. | CHUCK | CHUCK | | BSP | P | 6124839 | COLORADO STRUCTURES INC | BSP | P | 03/01/2019 | BSP inspection / Resilient channel installation OK per UL P522 requirements on ceilings of units 301-304 and both 3rd floor exterior breezeway ceilings OK per UL L513 requirements. | CHUCK | CHUCK | | BSP | P | 6121941 | COLORADO STRUCTURES INC | BFR | P | 02/26/2019 | BFR inspection - roof trusses, bracing and truss to end wall hardware OK as per truss plans on site. Need all truss to truss hardware installed. / Shear wall hold downs not inspected. | CHUCK | CHUCK | | BFR | P | 6118328 | COLORADO STRUCTURES INC | BFT | C | 02/04/2019 | BFT / Engineer's observation for turned down slab footing/foundation reinforcement and UFER on file. | CHUCK | CHUCK | | BFT | C | 6096130 | COLORADO STRUCTURES INC | BFN | P | 02/01/2019 | BFN / Turned down footing/foundation reinforcement and open hole observation on file (2600 PSF max bearing capacity matches soil report and foundation design). / No mention of UFER installation / Need to complete BFI inspection. | CHUCK | CHUCK | | BFN | P | 6094398 | COLORADO STRUCTURES INC | BFT | P | 02/01/2019 | BFT / Engineer's observation for turned down slab footing/foundation reinforcement on file. / No mention of UFER documented. / Open hole observation on file - 2600 PSF Max. bearing capacity (matches soil report and foundation design)/10% grade slope (found on soil report)/no perimeter drain required (no useable space). | CHUCK | CHUCK | | BFT | P | 6094378 | COLORADO STRUCTURES INC | BSP | P | 01/31/2019 | BSP inspection / Breezeway drywall installation with fastener spacing OK per UL U305 assembly wall requirements, all floors, east and west sides. / Discussed pre-drywall locations per different wall assemblies with Jeremy B (CSI). | CHUCK | CHUCK | | BSP | P | 6093769 | COLORADO STRUCTURES INC | BSP | P | 01/07/2019 | BSP / Engineer's letter for 1st floor holddown repair on file / Installation of 2 - #16d nails at 8" o.c. for the full length of the cut stud to be completed on site. | CHUCK | CHUCK | | BSP | P | 6069694 | COLORADO STRUCTURES INC | BFT | R | 01/03/2019 | BFT / Stamped RFI documentation to be submitted and approved through Plan Review as a structural change to the plans. | CHUCK | CHUCK | | BFT | R | 6067058 | COLORADO STRUCTURES INC | BSP | P | 12/27/2018 | BSP inspection / R-15 rim joist insulation at breezeway walls and exterior tenant wall rim joist locations (all floors) OK per R-value noted on the IECC cert. on file. / Training with Justin L. regarding fire resistive rated wall assemblies and shear walls in multi-family residential construction. | CHUCK | CHUCK | | BSP | P | 6063920 | COLORADO STRUCTURES INC | BSP | T | 12/19/2018 | PAID (REC#1565410) ADDITIONAL PLAN REVIEW TIME: $100 From: SHELLEY Complete re-review of plans | SHELLEY | SHELLEY | | BSP | T | 6058221 | COLORADO STRUCTURES INC | BSP | P | 12/19/2018 | BSP inspection / verified shear wall nailing pattern for interior and breezeway walls are in compliance with the S05 requirements of the shear wall schedule per Sht. S-02 of the approved plans. | CHUCK | CHUCK | | BSP | P | 6057837 | COLORADO STRUCTURES INC | BSP | P | 11/19/2018 | BSP inspection - Type S04 exterior shear wall sheathing, locations and fasteners/spacing around perimeter of bldg #13 OK per Shts. S-02 and S-31 of the approved plans. | CHUCK | CHUCK | | BSP | P | 6029864 | COLORADO STRUCTURES INC | BFN | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFN | P | 5825739 | COLORADO STRUCTURES INC | BFT | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFT | P | 5825737 | MAGNUM ELECTRIC, INC | E= | C | 07/26/2019 | riser room complete/ | BRIAN | BRIAN | | E= | C | 6278707 | COLORADO SECURITY, LLC | E= | C | 07/25/2019 | FIRE ALARM INSPECTION: Riser Room ok ------------- Fire Alarm Complete | CRAIG | CRAIG | | E= | C | 6276751 | MAGNUM ELECTRIC, INC | E= | P | 07/18/2019 | exterior and garages ok----riser room needs completed-- | TIMA | TIMA | | E= | P | 6268884 | MAGNUM ELECTRIC, INC | E= | P | 07/17/2019 | units 101,102,103,104,105,106,107,108,203,204 ok-----A/C BREAKERS 20 AMP | TIMA | TIMA | | E= | P | 6267160 | MAGNUM ELECTRIC, INC | E= | P | 07/09/2019 | units 203 and 204 needs closet unit heaters installed-----units 201,202,301,302,303,304 ok----A/C BREAKERS 20 AMP | TIMA | TIMA | | E= | P | 6257373 | MAGNUM ELECTRIC, INC | E= | P | 07/08/2019 | units 205,206,207,208,305,306,307,308 ok------20 AMP BREAKERS FOR ALL A/C UNITS-- | TIMA | TIMA | | E= | P | 6255819 | MAGNUM ELECTRIC, INC | EP | P | 05/29/2019 | NEED PLANS REVISED TO SHOW CHANGE ON SERVICE LATERAL TO 4- 500 MCM AL AND 4/0 AL ON HOUSE PANEL | TIMA | TIMA | | EP | P | 6213380 | MAGNUM ELECTRIC, INC | ES | C | 05/29/2019 | Commercial Service: 1200 amp 3/w ok to energize and set all meters | TIMA | TIMA | | ES | C | 6213376 | MAGNUM ELECTRIC, INC | ER | P | 04/30/2019 | unit 301 electric furnace ok | TIMA | TIMA | | ER | P | 6183156 | MAGNUM ELECTRIC, INC | ER | P | 04/29/2019 | unit 301 bath fan missing feed------electric furnaces rest of units ok--- | TIMA | TIMA | | ER | P | 6181704 | MAGNUM ELECTRIC, INC | EUG | P | 03/28/2019 | site lighting feeds to far north and east parking areas | TIMA | TIMA | | EUG | P | 6147952 | MAGNUM ELECTRIC, INC | EUG | P | 03/21/2019 | site light feed to north side of maintenance garage ok | TIMA | TIMA | | EUG | P | 6139897 | MAGNUM ELECTRIC, INC | EUG | P | 03/12/2019 | light poles feeds ok | TIMA | TIMA | | EUG | P | 6131711 | COLORADO SECURITY, LLC | ER | P | 03/07/2019 | FIRE ALARM INSPECTION: units 101,102,103,104 ok | TIMA | TIMA | | ER | P | 6126999 | MAGNUM ELECTRIC, INC | EUG | P | 03/07/2019 | service lateral and feeder for garage ok | TIMA | TIMA | | EUG | P | 6126993 | MAGNUM ELECTRIC, INC | ER | P | 03/07/2019 | units 101,102,103,104 ok----sub panels ok these units----fireplaces good all units-- | TIMA | TIMA | | ER | P | 6126988 | COLORADO SECURITY, LLC | ER | P | 03/04/2019 | FIRE ALARM INSPECTION: units 301,302,303,304,201,202,203,204 ok | TIMA | TIMA | | ER | P | 6123578 | MAGNUM ELECTRIC, INC | ER | P | 03/04/2019 | units 301,302,303,304,201,202,203,204 ok----- sub panels ok these units -----NEED TO SEE ELECTRIC FURNACES HOOK-UP -- | TIMA | TIMA | | ER | P | 6123569 | COLORADO SECURITY, LLC | ER | P | 02/26/2019 | FIRE ALARM INSPECTION: units 105,106,107,108,205,206,207,208,305,306,307,308 ok | TIMA | TIMA | | ER | P | 6117726 | MAGNUM ELECTRIC, INC | ER | P | 02/26/2019 | units 105,106,107,108,205,206,207,208,305,306,307,308 ok----sub panels ok these units----STILL NEED TO SEE FIREPLACES WIRED AND ELECTRIC FURNACE CONNECTIONS--- | TIMA | TIMA | | ER | P | 6117721 | MAGNUM ELECTRIC, INC | ER | P | 02/21/2019 | all corridors and stair towers ok | TIMA | TIMA | | ER | P | 6113658 | STEELE BROS. HEATING, INC | H= | C | 08/15/2019 | Correction made | MARKB | MARKB | | H= | C | 6301699 | BOCHNAK MECHANICAL, INC. | H= | C | 08/13/2019 | CORRECTION MADE | MARKB | MARKB | | H= | C | 6298697 | STEELE BROS. HEATING, INC | H= | P | 08/13/2019 | Need to address damper access in mechanical closet for unit 302. OTHER ITEMS ADDRESSED. | MARKB | MARKB | | H= | P | 6298693 | STEELE BROS. HEATING, INC | H= | P | 06/27/2019 | NEED TO CONFIRM DAMPER OPERATIONS AT 3RD FLOOR FAN COIL UNITS. REST OK | BILLS | BILLS | | H= | P | 6246209 | BOCHNAK MECHANICAL, INC. | H= | P | 06/26/2019 | All units ok except for unit #302 the water heater vent is incomplete. | MARKB | MARKB | | H= | P | 6244850 | STEELE BROS. HEATING, INC | H= | P | 06/25/2019 | SOUTH END ONLY - 1ST, 2ND, 3RD FLOOR APARTMENTS COMPLETE EXCEPT FOR: 3rd floor dampers above fan coil units, unit 302 lacks proper access for dampers in mech closet, unit 304 bath exhaust fan/damper falling out of ceiling & unit 201 no access to bathroom. | MARKB | MARKB | | H= | P | 6243082 | STEELE BROS. HEATING, INC | H= | P | 06/21/2019 | NORTH END ONLY - 1ST, 2ND & 3RD FLOOR APARTMENTS COMPLETE FOR DIFFUSERS, MECH CLOSETS & FAN COILS EXCEPT FOR: Dampers above fan coils in 308 & 306. No condensers this inspection. | MARKB | MARKB | | H= | P | 6239788 | STEELE BROS. HEATING, INC | HRP | P | 04/05/2019 | 375 PSI PRESSURE TEST FOR UNITS 301 & 303 OK | MARKB | MARKB | | HRP | P | 6156358 | STEELE BROS. HEATING, INC | HRP | P | 03/11/2019 | ADD CONDENSING UNITS TO PERMIT SCOPE. 350 PSI PRESSURE TEST, INSULATION AND NAIL PROTECTION COMPLETE FOR ALL LINESETS EXCEPT FOR UNITS 303 & 301 NOT HOLDING PRESSURE. | MARKB | MARKB | | HRP | P | 6130225 | STEELE BROS. HEATING, INC | HD | P | 03/11/2019 | ABOVE CEILING DUCT - 3RD FLOOR DUCT BOARD BOXES TAPED PER INSTALL INSTRUCTIONS. Still need to install 3rd floor dampers above FCU'S | MARKB | MARKB | | HD | P | 6130220 | BOCHNAK MECHANICAL, INC. | HSP | P | 03/05/2019 | ON SITE CONSULT WITH GARY & ROGER (CSI) ABOUT WATER HEATERS - EQUIPMENT SCHEDULE SHOWS INDIRECT WATER HEATERS BUT MECHANICAL PLANS SHOW WATER HEATERS AS DIRECT VENT. ENGINEER TO PROVIDE A PLAN SPLICE FOR WATER HEATER VENTING AND ADDRESS COMBUSTION AIR ON PANS. | MARKB | MARKB | | HSP | P | 6124385 | STEELE BROS. HEATING, INC | HD | P | 03/05/2019 | ABOVE CEILING DUCT ABOVE RATED ASSEMBLY - SUPPLY/RETURN MAINS/BRANCHES/EXHAUST/ DAMPERS INSTALLED PER PLAN FOR 1ST, 2ND & 3RD FLOOR EXCEPT STILL NEED DAMPERS INSTALLED ON 3RD FLOOR FOR FCU'S AND COMPLETE TAPE ON DUCT BOARD BOXES. | MARKB | MARKB | | HD | P | 6124378 | BOCHNAK MECHANICAL, INC. | HC | C | 01/31/2019 | RELEASE METER. OK TO SET 2# METERS. | PAULO | PAULO | | HC | C | 6093500 | BOCHNAK MECHANICAL, INC. | HI | C | 01/31/2019 | NEEDED BY FINAL-- MEDIUM PRESSURE STICKERS APPLIED TO ALL VISIBLE AREAS, REGULATORS INSTALLED AND VENTED, GAS FLEX LINES INSTALLED. 10# test ok to both gas lines. gas lines installed per plans for 2# system. OK TO SET 2# METERS. | PAULO | PAULO | | HI | C | 6093489 | STEELE BROS. HEATING, INC | HSP | P | 01/10/2019 | SEE IMAGES FOR DAMPER LETTER REPLACING LETTER SCANNED INTO PERMIT AND DAMPER INSTRUCTIONS. | MARKB | MARKB | | HSP | P | 6074138 | BOCHNAK MECHANICAL, INC. | P= | C | 08/02/2019 | Corrections made. | DANR | DANR | | P= | C | 6287258 | BOCHNAK MECHANICAL, INC. | P= | P | 08/01/2019 | All T&P's need air gap, Units 101 - 106 -201 - 203 - 208 - 301 - 306 need pex pipe support water heater lines. Unit 208 leak at kitchen sink, Unit 301 leak at vanity. Rest ok for the plumbing final. | DANR | DANR | | P= | P | 6285885 | BOCHNAK MECHANICAL, INC. | PTO | C | 08/01/2019 | Breeze way freeze protection ok. | DANR | DANR | | PTO | C | 6285881 | BOCHNAK MECHANICAL, INC. | PTO | P | 02/26/2019 | Need heat trace water lines at breeze way, rest ok for domestic water units: 101-102-103-104-201-202-203-204-301-302-303-304. Note: at final check water heaters and water entry. | DANR | DANR | | PTO | P | 6118125 | BOCHNAK MECHANICAL, INC. | PTO | P | 02/13/2019 | This inspection DWV only units 101-102-103-104-201-202-203-204-301-302-303-304. | DANR | DANR | | PTO | P | 6106514 | BOCHNAK MECHANICAL, INC. | PTO | P | 02/12/2019 | DWV and domestic water ok the following units except flanges, discussed accessible elements: 105-106-107-108-205-206-207-208-305-306-307-308. | DANR | DANR | | PTO | P | 6105403 | BOCHNAK MECHANICAL, INC. | PTO | P | 01/15/2019 | Notes revised 1-16-2019 wrong address not ready.
| DANR | DANR | | PTO | P | 6079080 | BOCHNAK MECHANICAL, INC. | PB | C | 09/05/2018 | ok for test and design, water stubbed into water entrty NOTE: bldg 13 type 3 plan page P1.4 | JOHNS | JOHNS | | PB | C | 5955464 | BOCHNAK MECHANICAL, INC. | PB | P | 06/20/2018 | ok for test and design at deep base risers @ bldg 13 type 3 plan page P1.4 | JOHNS | JOHNS | | PB | P | 5879521 | BOCHNAK MECHANICAL, INC. | XMS | T | 04/16/2019 | PAID (REC#1590885): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Water heater venting revisions | JUSTINC | JUSTINC | | XMS | T | 6166712 | COLORADO STRUCTURES INC | XBS | T | 03/06/2019 | PAID (REC#1580880): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise structural pages | MICHAELA | MICHAELA | | XBS | T | 6126062 | BOCHNAK MECHANICAL, INC. | XMS | P | 12/21/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | P | 6060814 | COLORADO STRUCTURES INC | XES | T | 12/18/2018 | PAID (REC#1565410) PLAN SPLICE FEE: $50 by: MATTHEW for Electrical: misc changes | MATTHEW | MATTHEW | | XES | T | 6056291 | BOCHNAK MECHANICAL, INC. | XPS | T | 11/16/2018 | PAID (REC#1559251) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-16-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6028664 | BOCHNAK MECHANICAL, INC. | XMS | T | 11/09/2018 | PAID (REC#1559251) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Plan revised with all new sheets for consolidation. Not just clouded revisions | JUSTINC | JUSTINC | | XMS | T | 6021559 | COLORADO STRUCTURES INC | XBS | T | 08/01/2018 | PAID (REC#1523554): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 5920209 | COLORADO STRUCTURES INC | XBS | T | 07/03/2018 | PAID (REC#1523553): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Floor and roof trusses | MICHAELA | MICHAELA | | XBS | T | 5892085 |
|
|