COLORADO STRUCTURES INC | B= | C | 08/27/2019 | All required inspections are complete | MATTHEWM | MATTHEWM | | B= | C | 6315401 |
COLORADO STRUCTURES INC | B= | P | 08/13/2019 | Temp CO: Temp CO: Pending Zoning Final ( Expires: 9/12/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6297986 |
COLORADO STRUCTURES INC | B= | P | 07/12/2019 | eng letter for protection of annular space at fire dampers in mech rooms received areas are protected per letter / pending completion of plumb final, building okay. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6262361 |
COLORADO STRUCTURES INC | B= | P | 07/12/2019 | Temp CO: Pending Plumbing/Building/ZOning ( Expires: 8/11/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6262267 |
COLORADO STRUCTURES INC | B= | P | 07/11/2019 | pending verification of protection at fire dampers in mech room building okay / units 101, 102, 103, 104, 106, 107 and 108 are Type B, unit 105 is Type A -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6260720 |
COLORADO STRUCTURES INC | BFN | P | 04/29/2019 | revised letter for steel with ufer noted on file | BOBF | BOBF | | BFN | P | 6180856 |
COLORADO STRUCTURES INC | BFR | P | 03/20/2019 | BFR / Framing complete. / Partial pending completion of mechanical, electrical and plumbing rough inspections. | CHUCK | CHUCK | | BFR | P | 6138840 |
COLORADO STRUCTURES INC | BSP | P | 02/08/2019 | Training with Chuck - fastener requirements (including alternates) and continuity for fire resistance rated walls | RICHB | RICHB | | BSP | P | 6102373 |
COLORADO STRUCTURES INC | BSP | P | 02/08/2019 | BSP inspection / All 1st floor units - drywall screw patterns on ceilings (UL L521), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK. / Training with Rich B. on fire-resistive assemblies. | CHUCK | CHUCK | | BSP | P | 6102362 |
COLORADO STRUCTURES INC | BSP | P | 02/05/2019 | BSP inspection / All 2nd floor units - drywall screw patterns on ceilings (UL L521), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK. | CHUCK | CHUCK | | BSP | P | 6098506 |
COLORADO STRUCTURES INC | BSP | P | 02/04/2019 | BSP inspection / All 3rd floor units - drywall screw patterns on ceilings (UL P522), exterior walls (UL U356), tenant separation (UL U341) and unit side of breezeway walls (UL U305) OK. / Training with Rich B. on fire resistive rated assemblies and handrail continuity. | CHUCK | CHUCK | | BSP | P | 6096926 |
COLORADO STRUCTURES INC | BSP | P | 02/04/2019 | Training with Chuck - fire resistance rated assembly fastener requirement, handrail continuity | RICHB | RICHB | | BSP | P | 6096829 |
COLORADO STRUCTURES INC | BSP | P | 01/30/2019 | BSP inspection - fastener pattern for breezeway ceiling assembly UL L513 OK throughout building. / Breezeway walls fastener pattern OK per UL U305 assembly throughout building. Need to fill gap at doorway frame side of breezeway at 1st floor units to maintain continuity of the U305 assembly. | CHUCK | CHUCK | | BSP | P | 6092514 |
COLORADO STRUCTURES INC | BSP | P | 01/17/2019 | BSP inspection / Installation of resilient channel (UL L521 assembly) on ceilings and firestopping/blocking of penetrations on interior walls of all units on 1st and 2nd floors. / Discussed accessible clearances of fixtures with Jeremy B. (CSI) in Type A Unit # 105. / Training with Rich on fire resistive rated assemblies. | CHUCK | CHUCK | | BSP | P | 6081433 |
COLORADO STRUCTURES INC | BSP | P | 01/17/2019 | Training with Chuck - fire resistance rated assemblies (wall-ceiling intersections, continuity, firestopping, permitted materials, RC installation), fireblocking & draftstopping | RICHB | RICHB | | BSP | P | 6081312 |
COLORADO STRUCTURES INC | B16 | C | 01/11/2019 | B16 bldg consult. - Discussed rated wall assemblies in units, attic insulation requirements and firestopping of penetrations with contractor (Jeremy B) on site. | CHUCK | CHUCK | | B16 | C | 6075983 |
COLORADO STRUCTURES INC | BSP | R | 01/08/2019 | BSP inspection - Firestopping/blocking in interior units / Not ready for inspection. Open penetrations found in several units including at tub valve pre-drywall wall assembly and 10' horizontal fireblocking in P3/P4 walls (Sht. WT-1). | CHUCK | CHUCK | | BSP | R | 6071858 |
COLORADO STRUCTURES INC | BFR | P | 01/07/2019 | BFR inspection / HDU4 hold down corrections made per engineer's detail/stamped RFI on 1st floor. / Framing of exterior and interior walls OK per assemblies listed on Sht. WT-1 of the amended plans. Need to verify firestopping of penetrations in areas not already inspected for pre-drywall installation. | CHUCK | CHUCK | | BFR | P | 6070616 |
COLORADO STRUCTURES INC | BSP | P | 01/07/2019 | BSP / Engineer's letter for 1st floor holddown repair on file / Installation of 2 - #16d nails at 8" o.c. for the full length of the cut stud to be completed on site. | CHUCK | CHUCK | | BSP | P | 6069699 |
COLORADO STRUCTURES INC | BSP | P | 01/04/2019 | BSP inspection / 3rd floor units 301-304/305-308 and breezeway resilient channel installation OK. | CHUCK | CHUCK | | BSP | P | 6069146 |
COLORADO STRUCTURES INC | BSP | P | 01/02/2019 | BSP inspection / Resilient channel installation at 12" o.c. OK at 1st and 2nd floor breezeways. 3rd floor units and breezeways not ready at time of inspection. / Penetrations in breezeways to be firestopped. | CHUCK | CHUCK | | BSP | P | 6066688 |
COLORADO STRUCTURES INC | BSP | P | 12/27/2018 | Training with Chuck L on fire resistive rated wall assemblies and shear walls in multi-family residential construction, fire partitions, Fire barriers, corridors, egress requirements | JUSTINL | JUSTINL | | BSP | P | 6063967 |
COLORADO STRUCTURES INC | BSP | R | 12/27/2018 | BSP inspection / R.C. channel missing fasteners at end support and 4" overlaps in various locations, 3rd floor units and all breezeways / Firestopping needed at ledgerboard end joint gaps / Laundry closet pre-rock for UL U341 wall assembly missing required fasteners and spacing, units 302/304 and all of north side units. / Training with Justin L. regarding fire resistive rated wall assemblies and shear walls in multi-family residential construction. | CHUCK | CHUCK | | BSP | R | 6063899 |
COLORADO STRUCTURES INC | BSP | T | 12/19/2018 | PAID (REC#1565409) ADDITIONAL PLAN REVIEW TIME: $100 From: SHELLEY Complete re-review of plans | SHELLEY | SHELLEY | | BSP | T | 6058219 |
COLORADO STRUCTURES INC | BSP | R | 12/12/2018 | BSP inspection cancelled on site by Jeremy (CSI). | CHUCK | CHUCK | | BSP | R | 6051040 |
COLORADO STRUCTURES INC | BSP | P | 12/10/2018 | BSP inspection / Pre-drywall insulation inspection at breezeway rim joists, fireplaces at exterior walls (R-15) and kitchen/bathroom/dead space areas for tenant separation walls (R-11) in west units 101-104; 201-204 and 301-304 and east units 105-108, 205-208 and 305-308. Insulation R-value for breezeway rim joists and exterior walls reflects the ComCheck certificate on file. | CHUCK | CHUCK | | BSP | P | 6048050 |
COLORADO STRUCTURES INC | BFR | P | 12/06/2018 | BFR inspection / Framing for pre-drywall installation at breezeway and exterior wall rim joists OK, all floors. | CHUCK | CHUCK | | BFR | P | 6045042 |
COLORADO STRUCTURES INC | BSP | P | 12/04/2018 | BSP inspection / Drywall screw pattern for east and west stair towers meet the 8" o.c. requirement as per the UL U305 wall assembly. | CHUCK | CHUCK | | BSP | P | 6042551 |
COLORADO STRUCTURES INC | BFR | R | 10/17/2018 | BFR inspection cancelled by Jeremy with CSI prior to arrival. | CHUCK | CHUCK | | BFR | R | 5998049 |
COLORADO STRUCTURES INC | BFR | R | 10/09/2018 | BFR - Inspection cancelled prior to arrival by CSI rep. Jeremy. | CHUCK | CHUCK | | BFR | R | 5989597 |
COLORADO STRUCTURES INC | BSP | R | 10/01/2018 | Building special inspection - Stairway framing and breezeway drywall. Cancelled in field by contractor. Stamped architect's letter to change UL U032 to UL U305 assembly wall received. Discussed shear wall nailing at the plates and interior drywall nailing for shear walls as per Sht. S-02 schedule. | CHUCK | CHUCK | | BSP | R | 5981741 |
COLORADO STRUCTURES INC | BFR | R | 09/28/2018 | Building framing inspection - trusses / contractor to clarify truss connections with manufacturer and re-schedule inspection / training with Rich on review of truss plans and required hardware. | CHUCK | CHUCK | | BFR | R | 5980004 |
COLORADO STRUCTURES INC | BSP | P | 09/28/2018 | Training with Chuck - plan reading, truss calculations and truss connection hardware | RICHB | RICHB | | BSP | P | 5979983 |
COLORADO STRUCTURES INC | BSP | R | 09/26/2018 | Building special inspection / several exposed drywall seams and nail heads that do not comply with the submitted UL U032 and UL general note requirement #11 for coverage of drywall joints and fastener heads. / training with Chuck. | RICHB | RICHB | | BSP | R | 5977191 |
COLORADO STRUCTURES INC | BSP | P | 09/06/2018 | Pre-drywall insulation installation at 2' step rim of rated walls (prior to HVAC trunk line installation). Interior unit and breezeway shear wall nailing OK, 2nd and 3rd floors. | CHUCK | CHUCK | | BSP | P | 5956869 |
COLORADO STRUCTURES INC | BSP | P | 08/31/2018 | Interior shear - 1st floor OK , still need all upper levels inspected // Hold downs - 1st floor OK, still need all upper levels // Exterior shear - OK on all levels | RICHB | RICHB | | BSP | P | 5952154 |
COLORADO STRUCTURES INC | BFI | C | 08/29/2018 | Observation on file | RICHB | RICHB | | BFI | C | 5949005 |
COLORADO STRUCTURES INC | BFN | P | 08/29/2018 | Pad observation received - need observation for all foundation elements | RICHB | RICHB | | BFN | P | 5949003 |
COLORADO STRUCTURES INC | BFT | C | 08/29/2018 | Open Hole on file | RICHB | RICHB | | BFT | C | 5949002 |
COLORADO STRUCTURES INC | BSP | P | 08/29/2018 | Open Hole received - 2600 psf, drain usable below grade // footing observation for "portions of interior pads" received - need observation for all foundation elements // BFI observation received | RICHB | RICHB | | BSP | P | 5949001 |
COLORADO STRUCTURES INC | BSP | P | 07/05/2018 | Met Superintendent (Garry) - discussed project status, rated assemblies (including details for all penetrations) and inspection sequencing | RICHB | RICHB | | BSP | P | 5893668 |
COLORADO STRUCTURES INC | BFN | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFN | P | 5825768 |
COLORADO STRUCTURES INC | BFT | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFT | P | 5825767 |
MAGNUM ELECTRIC, INC | E= | C | 07/08/2019 | | TIMA | TIMA | | E= | C | 6255806 |
MAGNUM ELECTRIC, INC | ER | C | 07/08/2019 | | TIMA | TIMA | | ER | C | 6255805 |
COLORADO SECURITY, LLC | E= | C | 07/08/2019 | FIRE ALARM INSPECTION: | TIMA | TIMA | | E= | C | 6255800 |
MAGNUM ELECTRIC, INC | E= | P | 06/04/2019 | exterior and corridors ok | TIMA | TIMA | | E= | P | 6219546 |
MAGNUM ELECTRIC, INC | E= | P | 05/23/2019 | units 101,102,103,104 ok | TIMA | TIMA | | E= | P | 6209105 |
MAGNUM ELECTRIC, INC | E= | P | 05/22/2019 | units 301,302,303,304,201,202,203 ok---- | TIMA | TIMA | | E= | P | 6207527 |
MAGNUM ELECTRIC, INC | E= | P | 05/21/2019 | units 107 and 108 have v-tac units installed in wrong units wire size not correct / 105 needs ada hood installed to verify controls and trim counter top out / ------units 206,208,106 ok--- | TIMA | TIMA | | E= | P | 6206270 |
MAGNUM ELECTRIC, INC | E= | R | 05/20/2019 | units locked-----need address posted--- | TIMA | TIMA | | E= | R | 6204617 |
MAGNUM ELECTRIC, INC | E= | P | 05/16/2019 | NEED ADDRESS POSTED ---north tower units 205-207-305-306-307-308----ok | BRIAN | BRIAN | | E= | P | 6201961 |
MAGNUM ELECTRIC, INC | EUG | P | 03/12/2019 | light pole feeds east side ok | TIMA | TIMA | | EUG | P | 6131741 |
MAGNUM ELECTRIC, INC | EP | P | 02/06/2019 | NEED UFER INSPECTION LETTER---NEED TO CHECK HOUSE PANEL BREAKERS FOR SERIES RATING---NEED PLANS REVISED TO SHOW CHANGE FROM 3/0 CU TO 4/0 AL FEEDER ON HOUSE PANEL-- | TIMA | TIMA | | EP | P | 6100116 |
MAGNUM ELECTRIC, INC | ES | C | 02/06/2019 | Commercial Service: 1200 AMP 3/W ok to energize and set all units meters and house meter | TIMA | TIMA | | ES | C | 6100115 |
MAGNUM ELECTRIC, INC | EUG | P | 12/27/2018 | feeder to garage G31 ok | TIMA | TIMA | | EUG | P | 6064285 |
MAGNUM ELECTRIC, INC | EUG | P | 12/20/2018 | light pole bases ok | TIMA | TIMA | | EUG | P | 6059557 |
MAGNUM ELECTRIC, INC | EUG | P | 12/13/2018 | service lateral and garage panel G32 feeder fed from house panel ok | TIMA | TIMA | | EUG | P | 6052113 |
COLORADO SECURITY, LLC | ER | P | 12/05/2018 | FIRE ALARM INSPECTION: units 105,106,107,108 ok | TIMA | TIMA | | ER | P | 6043852 |
MAGNUM ELECTRIC, INC | ER | P | 12/05/2018 | units 105,106,107,108 and east 1st floor breezeways ok ,riser room ok------sub panels ok----fireplaces all ok-- | TIMA | TIMA | | ER | P | 6043836 |
COLORADO SECURITY, LLC | ER | P | 12/03/2018 | FIRE ALARM INSPECTION: units 305,306,307,308,205,206,207,208 ok | TIMA | TIMA | | ER | P | 6041450 |
MAGNUM ELECTRIC, INC | ER | P | 12/03/2018 | units 305,306,307,308,205,206,207,208 ok----2nd and 3rd floor east breezeways -sub panels ok | TIMA | TIMA | | ER | P | 6041441 |
COLORADO SECURITY, LLC | ER | P | 11/28/2018 | FIRE ALARM INSPECTION: units 101,102,103,104,201,202,203,204,301,302,303,304 ok | TIMA | TIMA | | ER | P | 6036419 |
MAGNUM ELECTRIC, INC | ER | P | 11/28/2018 | units 101,102,103,104 ok----1st floor west breezeway ok---all sub panels these units ok | TIMA | TIMA | | ER | P | 6036415 |
MAGNUM ELECTRIC, INC | ER | P | 11/26/2018 | units 201,202 203,204,301,302,303,304 ok including subpanels----2nd and 3rd floor west breezeways ok----FIRE ALARM OK THESE UNITS BUT NEED CONTRACTOR TO ATTACH TO PERMIT--- | TIMA | TIMA | | ER | P | 6033652 |
BOCHNAK MECHANICAL, INC. | H= | C | 07/11/2019 | FINAL FOR GAS CONTRACTOR | BILLS | BILLS | | H= | C | 6260071 |
BOCHNAK MECHANICAL, INC. | H= | P | 06/04/2019 | FOR FINAL - Complete gas to VTEC unit in apartment 107. 1ST, 2ND, 3RD FLOOR MECHANICAL CLOSETS AND VENT TERMINATIONS COMPLETE. | MARKB | MARKB | | H= | P | 6219503 |
STEELE BROS. HEATING, INC | H= | C | 05/14/2019 | 1ST, 2ND & 3RD FLOOR FINAL OK. | MARKB | MARKB | | H= | C | 6198748 |
BOCHNAK MECHANICAL, INC. | HV | P | 04/25/2019 | SPLICE ON FILE FOR COMBUSTION AIR AND WATER HEATER VENTS. 2 PSI APPROVAL FROM BLACK HILLS ON FILE. WATER HEATER VENTS ABOVE DUCT FOR NORTH END OF BUILDING OK FOR 1ST, 2ND & 3RD FLOORS | MARKB | MARKB | | HV | P | 6178257 |
STEELE BROS. HEATING, INC | HD | P | 01/29/2019 | Training with Paul O. & T.J. ABOVE CEILING DUCT ABOVE PRE-ROCK - DAMPERS IN MECHANICAL CLOSETS FOR 1ST, 2ND AND 3RD FLOORS COMPLETE. | MARKB | MARKB | | HD | P | 6090966 |
BOCHNAK MECHANICAL, INC. | HC | C | 01/18/2019 | OK TO SET 2 LB METER. | NANCY | NANCY | | HC | C | 6082388 |
BOCHNAK MECHANICAL, INC. | HI | C | 01/18/2019 | MEDIUM PRESSURE GAS APPROVAL LETTER RECEIVED. AT FINAL CHECK FOR LABELS AND REGULATORS. | NANCY | NANCY | | HI | C | 6082386 |
STEELE BROS. HEATING, INC | HSP | P | 01/10/2019 | SEE IMAGES FOR DAMPER LETTER REPLACING LETTER SCANNED INTO PERMIT AND DAMPER INSTRUCTIONS. | MARKB | MARKB | | HSP | P | 6074036 |
STEELE BROS. HEATING, INC | HD | P | 01/09/2019 | ABOVE CEILING DUCT ABOVE PRE-ROCK: 3RD FLOOR UNITS - Need to finish insulation on bath exhaust in unconditioned attic. MECHANICAL CLOSET DAMPERS - Need all dampers installed at rated drywall level to meet assembly rating. 3rd floor dampers not yet installed. Training with Nancy, T.J. and Paul O. | MARKB | MARKB | | HD | P | 6073144 |
STEELE BROS. HEATING, INC | HD | P | 01/07/2019 | ABOVE PRE-ROCK DUCT INSPECTION - NORTH/EAST END 1ST, 2ND, 3RD FLOORS SUPPLY/RETURN, DAMPERS, DRYERS AND EXHAUST FANS INSTALLED PER PLAN OK TO CONCEAL EXCEPT 3RD FLOOR DUCT NEEDS TO ELEVATED ABOVE INSULATION DEPTH. No mechanical closets this inspection. | MARKB | MARKB | | HD | P | 6070071 |
STEELE BROS. HEATING, INC | HD | P | 01/04/2019 | ----Contractor needs to add exhaust fans to permit scope---- ABOVE PRE-ROCK DUCT INSPECTION - SOUTH/WEST END 1ST, 2ND, 3RD FLOORS SUPPLY/RETURN, DAMPERS, DRYERS AND EXHAUST FANS INSTALLED PER PLAN OK TO CONCEAL. | MARKB | MARKB | | HD | P | 6068463 |
BOCHNAK MECHANICAL, INC. | HI | P | 12/28/2018 | STILL NEED - 2 PSI approval letter from Black Hills.
10 PSI PRESSURE TEST X2 AND PIPING PER PLAN SPLICE OK FOR WHOLE BUILDING. | MARKB | MARKB | | HI | P | 6064853 |
BOCHNAK MECHANICAL, INC. | P= | C | 07/12/2019 | Corrections made. | DANR | DANR | | P= | C | 6262541 |
BOCHNAK MECHANICAL, INC. | P= | P | 07/12/2019 | Room 105 accessible hand held shower needs non positive shut off - divertor needs to be in accessible control zone - permanent shower head cannot spray out of shower, rest ok this building. | DANR | DANR | | P= | P | 6261435 |
BOCHNAK MECHANICAL, INC. | P= | P | 07/11/2019 | Toilet side clearance units 106 and 107, unit 308 no hot water, trap guard water entry, accessible hand held shower needs non positive shut off - divertor needs to be in accessible control zone - permanent shower head cannot spray out of shower, rest ok this building. | DANR | DANR | | P= | P | 6260089 |
BOCHNAK MECHANICAL, INC. | PTO | P | 12/17/2018 | NEED CLARIFICATION FROM ENGINEER ABOUT TYPE B UNITS, IF WANTING TO BE TYPE B "OPTION B" (ONE ACC. BATH) THE MSTR TUB DRAIN AND CONTROLS ARE ON THE WRONG WALL, IF CLASSIFYING AS TYPE B "OPTION A" THEN ALL IS OK, BUT BOTH BATHS WILL NEED TO BE ACCESSIBLE CONVERTIBLE (THIS IS CURRENTLY THE SETUP THE PLBRS HAVE) | JOHNS | JOHNS | | PTO | P | 6055198 |
BOCHNAK MECHANICAL, INC. | PTO | P | 12/14/2018 | bldg 15 type 1, ok for 1st floor tubs / water closets, corrections @ 201 / 301 / 306 / 308, and heat trace (x2), MINUS ALL TYPE A AND B ACCESSIBLE MEASUREMENTS, AND PROTECT PEX FROM JIP CRETE @ 306 AND 308 | JOHNS | JOHNS | | PTO | P | 6053610 |
BOCHNAK MECHANICAL, INC. | PTO | P | 12/14/2018 | bldg 15 type 1, ok for 1st floor tubs / water closets, corrections @ 201 / 301 / 306 / and 308, ok for heat trace (x2), MINUS ALL TYPE B AND TYPE A MEASUREMENTS AND NEED TO PROTECT PEX THROUGH JIP CRETE @ 306 AND 308 | JOHNS | JOHNS | | PTO | P | 6053375 |
BOCHNAK MECHANICAL, INC. | PTO | P | 12/05/2018 | ok for domestic waters @ 105 / 107 / 205 / 207 / 305 / 307 / 201 / and 301 MINUS @ 201 AND 301 UNDER SIZED WATER TO WATER HTRS, ok for dwv and domestic waters to include tubs @ 106 / 108 / 206 / 208 / 306 / and 308 MINUS @ 306 AND 308 CANT RUN WATERS ON OUTSIDE 2X4 WALL, ok for dwv corrections @ 205 and 305 **STILL NEED ABOVE CORRECTIONS, ALL GROUND FLOOR TUBS, ALL ACCESSIBLE MEASUREMENTS, AND HEAT TRACE (X2) INSPECTED | JOHNS | JOHNS | | PTO | P | 6043646 |
BOCHNAK MECHANICAL, INC. | PTO | P | 12/04/2018 | ok for All of main water and domestic waters @ units 102 / 103 / 104 / 202 / 203 / 204 / and 303 MINUS HEAT TRACE (x2) **STILL NEED ABOVE CORRECTIONS, ALL PREVIOUS CORRECTIONS, AND REMAINDER OF DOMESTIC WATERS INSPECTED | JOHNS | JOHNS | | PTO | P | 6042453 |
BOCHNAK MECHANICAL, INC. | PTO | P | 11/30/2018 | ok for test / design @ bldg 15 type 1 drawing P-10 @ dwv / tubs @ units 102 / 104 / 202 / 204 / 302 / 304 / 105 / 107 / 205 / 207 / 305 / 307 MINUS @ 205 AND 305 NEED 18" MINIMUM PIPING TO W/C, ALL GROUND FLOOR TUBS, ALL ACCESSIBLE MEASUREMENTS **STILL NEED ABOVE CORRECTIONS, 11/28/18 CORRECTIONS, REMAINDER OF DWV, MAIN WATER, AND DOMESTIC WATERS INSPECTED | JOHNS | JOHNS | | PTO | P | 6039884 |
BOCHNAK MECHANICAL, INC. | PTO | P | 11/28/2018 | ok for test / design @ bldg # 15 type 1 drawing P-10 @ dwv and tubs only @ rm#'s 101/ 103/ 201/ 203 / 301 /3 303 MINUS GROUND FLOOR ACCESSIBLE MEASUREMENTS, GARDEN TUB @ UNIT 101. NOTE: ALL GROUND FLOOR UNITS TYPE B (CONVERTIBLE) TYPE A HC UNIT @ 105, vtr, aav @ all kitchens @ west side, check water htrs and water entry @ final, main shut offs @ laundry room w/ access panel by final **STILL NEED ABOVE CORRECTIONS, REMAINDER OF DWV, MAIN WATER, AND DOMESTIC WATERS INSPECTED | JOHNS | JOHNS | | PTO | P | 6036816 |
BOCHNAK MECHANICAL, INC. | PB | C | 06/11/2018 | ok for test and design @ bldg #15 type 1 drawing P-10 | JOHNS | JOHNS | | PB | C | 5869989 |
BOCHNAK MECHANICAL, INC. | PB | P | 05/02/2018 | Test ok for deep mains only Type 1 building, building #15, drawing P-10. | DANR | DANR | | PB | P | 5833355 |
BOCHNAK MECHANICAL, INC. | XMS | T | 04/16/2019 | PAID (REC#1590886): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Water heater venting revisions | JUSTINC | JUSTINC | | XMS | T | 6166718 |
BOCHNAK MECHANICAL, INC. | XMS | P | 12/21/2018 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | P | 6060790 |
BOCHNAK MECHANICAL, INC. | XPS | T | 11/16/2018 | PAID (REC#1559220) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-16-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6028516 |
BOCHNAK MECHANICAL, INC. | XMS | T | 11/09/2018 | PAID (REC#1559220) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Plan revised with all new sheets for consolidation. Not just clouded revisions | JUSTINC | JUSTINC | | XMS | T | 6021111 |
COLORADO STRUCTURES INC | XBS | T | 08/01/2018 | PAID (REC#1523545): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 5920205 |