COLORADO STRUCTURES INC | B= | C | 11/07/2019 | All required inspections have been completed | MATTHEWM | MATTHEWM | | B= | C | 6391762 |
COLORADO STRUCTURES INC | B= | P | 09/24/2019 | Temp CO: Temp CO: Pending Plmb final ( Expires: 10/24/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6345699 |
COLORADO STRUCTURES INC | B= | P | 08/28/2019 | . Additional Inspections Required (computer generated): BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6316493 |
COLORADO STRUCTURES INC | B= | P | 08/20/2019 | Temp CO: Pending Mech/Bld/Plmb/ Zoning finals ( Expires: 9/19/2019 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | P | 6307814 |
COLORADO STRUCTURES INC | B= | P | 08/20/2019 | need to comeplete guard on southwest corner / need to complete plumb and mech finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, STEELE BROS. HEATING, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 6307341 |
COLORADO STRUCTURES INC | BSP | P | 08/16/2019 | reviewed installation of grab bars in mens and womens toilets, womens toilet grab bars installed incorrect, swing bar to be between 39 and 41" from back wall, side bar to be installed with 42" bar starting at 12" from back wall extending to 54" / mens room toilet grab bars okay / back wall of bar of accessible shower okay | BOBF | BOBF | | BSP | P | 6303406 |
COLORADO STRUCTURES INC | B= | R | 08/14/2019 | need to install bathroom partitions and grab bars, need pipe protection under sinks / need to complete other required inspections, will need compete reinspect. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: mgates@fountainfire.org), External Agency Inspection Z= by ZONINGF is not Completed yet (Contact: 719-322-2028), BOCHNAK MECHANICAL, INC. Mechanical Final Inspection is not Completed yet, BOCHNAK MECHANICAL, INC. Plumbing Final Inspection is not Completed yet, MAGNUM ELECTRIC, INC Electrical Final Inspection is not Completed yet, STEELE BROS. HEATING, INC Mechanical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | R | 6300300 |
COLORADO STRUCTURES INC | BFN | C | 08/07/2019 | open hole on file --2600 PSF -- usable -- 10% / footing and foundation observation on file - ufer noted / foundation design on file (bearing capacity verified) / | BOBF | BOBF | | BFN | C | 6291103 |
COLORADO STRUCTURES INC | BFT | C | 08/07/2019 | eng letter for footing on file | BOBF | BOBF | | BFT | C | 6291101 |
COLORADO STRUCTURES INC | BSP | P | 06/25/2019 | drywall install at rated walls in boiler room per U 356 okay | BOBF | BOBF | | BSP | P | 6242962 |
COLORADO STRUCTURES INC | BIN | P | 06/20/2019 | pending other required inspections, insulation okay | BOBF | BOBF | | BIN | P | 6238272 |
COLORADO STRUCTURES INC | BFR | P | 06/17/2019 | pending completion of other required inspections, frame and fire protection okay / frame per U 356 at north and west walls of boiler room okay | BOBF | BOBF | | BFR | P | 6233680 |
COLORADO STRUCTURES INC | BIN | P | 06/17/2019 | insulation in mens and womens rest rooms okay | BOBF | BOBF | | BIN | P | 6233675 |
COLORADO STRUCTURES INC | BFR | P | 05/20/2019 | exterior shear and hold downs okay | BOBF | BOBF | | BFR | P | 6204886 |
COLORADO STRUCTURES INC | BSP | T | 12/19/2018 | PAID (REC#1565408) ADDITIONAL PLAN REVIEW TIME: $100 From: SHELLEY Complete re-review of plans | SHELLEY | SHELLEY | | BSP | T | 6058217 |
COLORADO STRUCTURES INC | BSP | P | 07/05/2018 | Met Superintendent (Garry) - discussed project status, rated assemblies (including details for all penetrations) and inspection sequencing | RICHB | RICHB | | BSP | P | 5893661 |
COLORADO STRUCTURES INC | BFN | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFN | P | 5825776 |
COLORADO STRUCTURES INC | BFT | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER Authorized 3rd party engineer inspection with all observation paperwork-ufer letter, soils, and open hole letter to be picked up by inspector @ BFI or BFD inspection / | MATTHEWM | MATTHEWM | | BFT | P | 5825772 |
MAGNUM ELECTRIC, INC | E= | C | 10/18/2019 | | TIMA | TIMA | | E= | C | 6373900 |
MAGNUM ELECTRIC, INC | E= | P | 10/14/2019 | need mc cable strapped at panel / label new circuit in panel-----ok to upload pics of corrections to permit--- | TIMA | TIMA | | E= | P | 6367430 |
MAGNUM ELECTRIC, INC | E= | P | 08/19/2019 | changed to partial by Matt S 10/11/19 for additional inspection; plans spliced for electrical to new unit heater | TIMA | TIMA | | E= | P | 6306022 |
MAGNUM ELECTRIC, INC | E= | R | 08/15/2019 | need gfci breaker for pool lights / need to bond the pool heaters to the #8 / only 1 wire per lug on pool pump / 4plex outlet in bbq area needs to be supported / breaker locks on hand dryers / brass address tag on meter / | BRIAN | BRIAN | | E= | R | 6302564 |
MAGNUM ELECTRIC, INC | ER | P | 08/09/2019 | wet niche bonding and sealing of bonding lug--ok | BRIAN | BRIAN | | ER | P | 6295168 |
MAGNUM ELECTRIC, INC | EP | P | 07/24/2019 | need 42k breakers or need to show series rating info | TIMA | TIMA | | EP | P | 6275403 |
MAGNUM ELECTRIC, INC | ES | C | 07/24/2019 | Commercial Service: 200 amp 3/w ok to energize | TIMA | TIMA | | ES | C | 6275391 |
MAGNUM ELECTRIC, INC | EUG | P | 07/09/2019 | perimeter pool and hot tub bond wire ok | TIMA | TIMA | | EUG | P | 6257375 |
MAGNUM ELECTRIC, INC | EUG | P | 07/01/2019 | feeds to deck boxes ok | TIMA | TIMA | | EUG | P | 6250208 |
MAGNUM ELECTRIC, INC | ER | P | 06/06/2019 | walls and ceilings ok | TIMA | TIMA | | ER | P | 6222836 |
MAGNUM ELECTRIC, INC | EUG | P | 06/05/2019 | niche lights bonding at pool and hot tub / pool and hot tub bonding at 4 points / and stub outs for ladder cups ok | TIMA | TIMA | | EUG | P | 6221263 |
MAGNUM ELECTRIC, INC | EUG | P | 05/22/2019 | pedestrian walk stair light on west side ok | TIMA | TIMA | | EUG | P | 6207528 |
MAGNUM ELECTRIC, INC | EUG | P | 05/21/2019 | gas grill feed to edge of building ok | TIMA | TIMA | | EUG | P | 6206258 |
MAGNUM ELECTRIC, INC | EUG | P | 12/20/2018 | service lateral ok | TIMA | TIMA | | EUG | P | 6059555 |
BOCHNAK MECHANICAL, INC. | H= | C | 09/19/2019 | REGULATOR MOVED FROM UNDER FIRE PIT TO STORAGE CLOSET TO COVER FIRE PIT AND BBQ'S. | MARKB | MARKB | | H= | C | 6340782 |
BOCHNAK MECHANICAL, INC. | H= | P | 09/17/2019 | FOR FINAL - Install 2 PSI regulators for BBQ grills - appliance regulators on grills are only designed for max inlet of 1/2 PSI. Regulator installed outside for fire pit cannot use a vent limiter. ALL OTHER REGULATORS AND MEDIUM PRESSURE LABELS ARE INSTALLED | MARKB | MARKB | | H= | P | 6337667 |
BOCHNAK MECHANICAL, INC. | HC | C | 09/16/2019 | OK TO RELEASE 2PSI METER. | MARKB | MARKB | | HC | C | 6336679 |
BOCHNAK MECHANICAL, INC. | HI | C | 09/16/2019 | Need to inspect 2 psi regulators. Note: Changing system to 2psi per plan splice. 6" Outside air to water heater closet | MARKB | MARKB | | HI | C | 6335789 |
STEELE BROS. HEATING, INC | H= | C | 08/28/2019 | EXHAUST GRILLS COMPLETE | MARKB | MARKB | | H= | C | 6316462 |
STEELE BROS. HEATING, INC | HSP | C | 08/28/2019 | TEST AND BALANCE RECEIVED | MARKB | MARKB | | HSP | C | 6316460 |
BOCHNAK MECHANICAL, INC. | H= | P | 08/20/2019 | Note: 5" outside air for water heater. Reopened inspections for plan splice and 2lb. upgrade. | MARKB | MARKB | | H= | P | 6306938 |
BOCHNAK MECHANICAL, INC. | H= | P | 08/19/2019 | NOT READY - Contractor is in the process of cutting in outside combustion air as was done on other units. | MARKB | MARKB | | H= | P | 6305085 |
STEELE BROS. HEATING, INC | H= | P | 08/16/2019 | FINAL PENDING - Install Exhaust grills in bathrooms and provide test and balance report. EXHAUST DUCT/GRILLS COMPLETE IN BOILER ROOM AND CHEMICAL STORAGE. | MARKB | MARKB | | H= | P | 6303647 |
BOCHNAK MECHANICAL, INC. | H= | R | 08/15/2019 | CHANGED STATUS (called contractor) - Plans show a direct vent water heater and an indirect vent water heater was installed and now water heater has zero combustion air. WATER HEATER VENT AND FINAL CONNECTIONS OK. | MARKB | MARKB | | H= | R | 6301713 |
STEELE BROS. HEATING, INC | HV | C | 08/14/2019 | Correction made | MARKB | MARKB | | HV | C | 6299558 |
STEELE BROS. HEATING, INC | HV | P | 08/13/2019 | POOL BOILER VENTS - 10" Double wall vent lacks 1" clearance to combustibles at roof sheeting. Rest OK for both vents. | MARKB | MARKB | | HV | P | 6298688 |
BOCHNAK MECHANICAL, INC. | H= | P | 08/06/2019 | GAS CONNECTIONS TO BUILT IN BBQ GRILLS COMPLETE WITH TIMERS. ALL CONSTRUCTION AROUND BBQ'S IS NON-COMBUSTIBLE AND NO OVER HEAD CONSTRUCTION. Still need connections to boilers and fire pit line capped or connected. | MARKB | MARKB | | H= | P | 6290063 |
STEELE BROS. HEATING, INC | HSP | P | 08/06/2019 | On site consult with Jeremy (CSI) & Ernie (Steele Bros) for pool & spa boilers. Went over required clearances and recommended service clearances. Discussed removal of equipment and venting. | MARKB | MARKB | | HSP | P | 6290057 |
BOCHNAK MECHANICAL, INC. | HD | P | 06/10/2019 | EXHAUST DUCTS ABOVE CEILING PER PLAN. Still need exhaust fans in boiler room and storage closet installed. AT FINAL - Will need proper service access for in line fan in attic. | MARKB | MARKB | | HD | P | 6225793 |
STEELE BROS. HEATING, INC | HV | P | 06/10/2019 | NOTE ADDED 6/11/19: Boiler vents will need to extend above peak and vertical walls within 10'. BOILER/COMBUSTION AIR VENTS - Further research required on vent height out of roof. Will need to check size against IFGC once boilers are installed if offsets in venting. CURRENTLY 10" & 6" BVENTS THROUGH ATTIC OK WITH INSULATION SHIELDS INSTALLED. | MARKB | MARKB | | HV | P | 6225789 |
BOCHNAK MECHANICAL, INC. | HC | C | 05/29/2019 | RELEASE METER | MARKB | MARKB | | HC | C | 6213096 |
BOCHNAK MECHANICAL, INC. | HI | P | 05/29/2019 | 60 PSI PRESSURE TEST OK - PIPING PER PLAN SPLICE. Still need connections to equipment. | MARKB | MARKB | | HI | P | 6213084 |
STEELE BROS. HEATING, INC | HSP | P | 05/29/2019 | Further research required on weather ceiling is rated in pool equipment room and weather louver can be in doors. Will enter notes in the morning | MARKB | MARKB | | HSP | P | 6213083 |
BOCHNAK MECHANICAL, INC. | HO | P | 03/21/2019 | 10lb TEST OK / UNDERGROUND GAS TO FIRE PIT AND THE TWO GRILLS INSTALLED PER PLAN ,OK TO COVER . | LIDO | LIDO | | HO | P | 6139625 |
BOCHNAK MECHANICAL, INC. | P= | C | 11/06/2019 | splice done | JOSEPHD | JOSEPHD | | P= | C | 6389470 |
BOCHNAK MECHANICAL, INC. | P= | P | 10/09/2019 | still need plan splice for freeze protection and relocation at backflows, mens toilet ok, bathrooms ok | JOSEPHD | JOSEPHD | | P= | P | 6362936 |
BOCHNAK MECHANICAL, INC. | P= | P | 08/16/2019 | Notes revised by Dan R 9/20/2019 need engineer splice for moving backlows from pool room to storage room and showing engineer approved freeze protection, men's toilet needs to flush to open side of stall, picture ok, rest ok. | DANR | DANR | | P= | P | 6304372 |
BOCHNAK MECHANICAL, INC. | PTO | C | 06/10/2019 | Ok. Note: At final shower controls need to be in accessible shower control zone, finish floor not marked at time inspection. | DANR | DANR | | PTO | C | 6226249 |
BOCHNAK MECHANICAL, INC. | PTO | P | 06/07/2019 | Shower controls an hand held sprayer's roll in shower need to be in accessible control zone ICC/ANSI 608.5.2, rest ok for pool equipment room and clubhouse. Note: at final check water heater and backflow, check exposed domestic water and vtr piping on walls, vtr test cap on roof of club house. | DANR | DANR | | PTO | P | 6224582 |
BOCHNAK MECHANICAL, INC. | PTO | P | 06/06/2019 | Ok for clubhouse restrooms, discussed accessible elements. Note: check water heater and backflow at final. | DANR | DANR | | PTO | P | 6222864 |
BOCHNAK MECHANICAL, INC. | PB | C | 01/08/2019 | Ok. | DANR | DANR | | PB | C | 6072303 |
BOCHNAK MECHANICAL, INC. | PB | P | 12/12/2018 | ok for test and design @ clubhouse only MINUS WATER STUBBED INTO STRUCTURE **STILL NEED POOL EQUIPMENT BLDG INSPECTED **inspector note: new plan page @ gc trailer for pool equipment room | JOHNS | JOHNS | | PB | P | 6050739 |
BOCHNAK MECHANICAL, INC. | PB | P | 11/08/2018 | SCOPE OF WORK TO REFLECT ALL PLBG RELATED ITEMS, rest ok for deep base risers @ club house and pool bldg. NOTE: 6" trunk @ mech lines, 4" trunk @ baths, PLAN PAGE P-16 (31)
| JOHNS | JOHNS | | PB | P | 6020220 |
BOCHNAK MECHANICAL, INC. | XPS | T | 11/01/2019 | PAID (REC#1641495) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: 11/1/19: Delta 26 revisions P-16 1" water service and relocated BFP | SHANEN | SHANEN | | XPS | T | 6385648 |
MAGNUM ELECTRIC, INC | XES | P | 10/11/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 6365652 |
BOCHNAK MECHANICAL, INC. | XMS | T | 09/13/2019 | PAID (REC#1629819) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: new splice uped gas pressure | TCRIPPEN | TCRIPPEN | | XMS | T | 6335233 |
MAGNUM ELECTRIC, INC | XES | T | 07/23/2019 | PAID (REC#1616626): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised lighting. | BERTHA | BERTHA | | XES | T | 6274125 |
BOCHNAK MECHANICAL, INC. | XMS | T | 04/16/2019 | PAID (REC#1590888): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised water heater combustion air | JUSTINC | JUSTINC | | XMS | T | 6166677 |
COLORADO STRUCTURES INC | XBS | T | 03/06/2019 | PAID (REC#1580883): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise structural pages | MICHAELA | MICHAELA | | XBS | T | 6126043 |
MAGNUM ELECTRIC, INC | XES | P | 03/06/2019 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised Pool House plan. | BERTHA | BERTHA | | XES | P | 6126012 |
BOCHNAK MECHANICAL, INC. | XMS | P | 03/06/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | P | 6125955 |
BOCHNAK MECHANICAL, INC. | XMS | P | 12/20/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised clubhouse pool mech area | JUSTINC | JUSTINC | | XMS | P | 6059101 |
COLORADO STRUCTURES INC | XES | T | 12/19/2018 | PAID (REC#1565408) PLAN SPLICE FEE: $50 by: MATTHEW for Electrical: show EPO for splice | MATTHEW | MATTHEW | | XES | T | 6058129 |
BOCHNAK MECHANICAL, INC. | XPS | T | 11/16/2018 | PAID (REC#1559268): PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 11-16-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 6028384 |
COLORADO STRUCTURES INC | XBS | T | 08/01/2018 | PAID (REC#1523549): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | XBS | T | 5920227 |