C. R. SHEA HOMES, INC. | B= | C | 03/29/2019 | | BOBF | BOBF | | B= | C | 6149647 |
C. R. SHEA HOMES, INC. | B= | P | 03/21/2019 | need continuous hand rail at stairs / need to complete landing at deck stairs -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | BOBF | BOBF | | B= | P | 6140101 |
C. R. SHEA HOMES, INC. | BLA | C | 10/02/2018 | | BOBF | BOBF | | BLA | C | 5983728 |
C. R. SHEA HOMES, INC. | BIN | C | 09/24/2018 | | BOBF | BOBF | | BIN | C | 5974832 |
C. R. SHEA HOMES, INC. | BFR | C | 09/24/2018 | | BOBF | BOBF | | BFR | C | 5974799 |
C. R. SHEA HOMES, INC. | BSP | P | 09/21/2018 | letter for triple plates on file | BOBF | BOBF | | BSP | P | 5972067 |
C. R. SHEA HOMES, INC. | BFT | C | 09/19/2018 | foundation design on file 4000# | BOBF | BOBF | | BFT | C | 5969227 |
C. R. SHEA HOMES, INC. | BFR | P | 09/17/2018 | provide letter for 3 top plates in garage / FHA strap at dryervent pentration at top plate of garage common wall / Clean B vent / draftstop through out / Missing bearing block each end G02 / 4 LSTA 30 straps at steel posts each end G01 / 2 H 2.5 at M02G / 3 LSTA 30 straps at east post supporting G01A / 2 H 2.5 at J01 and J01 A each side of entry / strap bearing walls where steel posts interupt top plates / okay to insulate | BOBF | BOBF | | BFR | P | 5967656 |
C. R. SHEA HOMES, INC. | BFR | T | 09/11/2018 | PAID (REC#1537415) still need foundation design to complete footing, missing garage doors, missing roof jacks / inspection stopped, too many items to list, contractor needs to review plans with all notes, trusses do not match with approved truss details | BOBF | BOBF | | BFR | T | 5961972 |
C. R. SHEA HOMES, INC. | BTR | C | 09/10/2018 | | DAKOTAB | DAKOTAB | | BTR | C | 5960269 |
C. R. SHEA HOMES, INC. | BSP | P | 07/12/2018 | front and rear porches with posts okay rear deck frame with posts okay | BOBF | BOBF | | BSP | P | 5901316 |
C. R. SHEA HOMES, INC. | BFN | C | 05/16/2018 | letter for steel and eufer on file | BOBF | BOBF | | BFN | C | 5846151 |
C. R. SHEA HOMES, INC. | BFT | P | 05/16/2018 | letter for footing on file, still need stamped foundation design | BOBF | BOBF | | BFT | P | 5846146 |
C. R. SHEA HOMES, INC. | BFD | C | 05/16/2018 | open hole on file 4000# | BOBF | BOBF | | BFD | C | 5846144 |
C. R. SHEA HOMES, INC. | BFD | P | 05/11/2018 | pending receipt of open hole drain okay, drain installed is exterior and usable | BOBF | BOBF | | BFD | P | 5842208 |
C. R. SHEA HOMES, INC. | BFI | C | 05/11/2018 | R10 installed / | BOBF | BOBF | | BFI | C | 5842207 |
C. R. SHEA HOMES, INC. | BFT | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 5825909 |
C. R. SHEA HOMES, INC. | BFN | P | 04/24/2018 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5825908 |
D & J QUALITY ELECTRIC INC | E= | C | 03/01/2019 | E= OK ----30 AMP A/C ------ | GREGM | GREGM | | E= | C | 6121377 |
D & J QUALITY ELECTRIC INC | ES | C | 11/01/2018 | Residential Underground: 200-amp 3 Wire service, ok to set meter / EXPOSE UFFER AT FINAL--- | GREGM | GREGM | | ES | C | 6012611 |
D & J QUALITY ELECTRIC INC | EUG | C | 10/26/2018 | EUG OK ---350 MCM AL--- | GREGM | GREGM | | EUG | C | 6007646 |
D & J QUALITY ELECTRIC INC | ES | R | 09/07/2018 | Residential Underground: not ready --------- install service lateral | CRAIG | CRAIG | | ES | R | 5958051 |
D & J QUALITY ELECTRIC INC | ER | C | 09/07/2018 | no mcc 2 - 10/3 8/3 al 8/3 cu 2 - 4/w #2 al to both sub panel / Non Irreversible UFER connection / Finished Basement / Cent Vac installed / | CRAIG | CRAIG | | ER | C | 5958043 |
MINNICK ENTERPRISES INC. | H= | C | 02/04/2019 | Notes-- AC complete. Finished basement. Outside air to return. Direct vent furnace. High/low transfer air to mechanical room. | JEFFL | JEFFL | | H= | C | 6096738 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI+ | C | 09/26/2018 | 10 LB TEST OK, ADDED 1/2" BLACK PIPE TO DRYER | BENH | BENH | | HI+ | C | 5978012 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HC | C | 09/06/2018 | RELEASE METER | TREVORH | TREVORH | | HC | C | 5956941 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI | C | 09/06/2018 | 10 LB TEST OK, 1-1/4'' MAIN. 1 FURNACE, 1 WATER HEATER, 1 FIRE PLACE, 1 COOK TOP, 1 BBQ. | TREVORH | TREVORH | | HI | C | 5956923 |
BROWN'S HEATING & COOLING, INC | HRR | C | 08/16/2018 | | TREVORH | TREVORH | | HRR | C | 5936131 |
BROWN'S HEATING & COOLING, INC | HRR | P | 08/15/2018 | MISSING 6" SUPPLY FOR ENTRY WAY. THE BOOT IS THERE BUT NO PIPE. NOTES: FINISHED BASEMENT, OUTSIDE AIR TO RETURN, DIRECT VENT FURNACE, HIGH/LOW GRILLES TO MECHANICAL ROOM. A/C ROUGH COIL AND LINE SET. | KYLEW | KYLEW | | HRR | P | 5935012 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PWO | C | 03/01/2019 | | TAYLOR | TAYLOR | | PWO | C | 6121265 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | C | 03/01/2019 | finished basement, RP installed at mech room. | TAYLOR | TAYLOR | | P= | C | 6121264 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | P | 03/01/2019 | certificate of potable water ok, see images. | TAYLOR | TAYLOR | | P= | P | 6120894 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PWO | P | 10/26/2018 | will need to see connection to well in pit will need potable water certification by final note: existing yard hydrant with backflow in pit | JOSEPHD | JOSEPHD | | PWO | P | 6007195 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PTO | C | 09/05/2018 | will still need pwo note: finished basement, irrigation stub, mixing valve RH master lav, | JOSEPHD | JOSEPHD | | PTO | C | 5955823 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PB | C | 05/18/2018 | | JOSEPHD | JOSEPHD | | PB | C | 5849761 |