HOMEOWNER | B= | C | 07/07/2020 | | TRENTP | TRENTP | | B= | C | 6628691 |
HOMEOWNER | BFR | C | 07/07/2020 | | TRENTP | TRENTP | | BFR | C | 6628665 |
HOMEOWNER | BFR | P | 12/18/2019 | complete PTO -- rest ok | SCOTTS | SCOTTS | | BFR | P | 6430567 |
HOMEOWNER | BIN | P | 11/21/2019 | complete BFR/exterior thermal is per plan/attic and crawlspace at final | SCOTTS | SCOTTS | | BIN | P | 6407201 |
HOMEOWNER | BFR | P | 11/21/2019 | attach fireplace permit to this permit -- verified clearances on wood burning stove with gas log insert -- complete PTO -- other corrections complete | SCOTTS | SCOTTS | | BFR | P | 6407170 |
HOMEOWNER | BFR | P | 10/31/2019 | Missing fire blocking at top plate penetrations, entry closet/hall and Master Bathroom. Also, fire blocking needed at furred wall between existing house and addition - wall to attic and no greater than 10' horizontally / Need to install fire place to verify clearances / Need to correct header detail at non-load bearing walls in Master Bathroom from latest splice / Rest of frame corrections OK. | CHUCK | CHUCK | | BFR | P | 6384787 |
HOMEOWNER | BFR | R | 09/27/2019 | Need to splice plan changes as identified in last frame / Wall ties and T05 truss repair OK (truss repair paperwork received / Fire blocking not started yet. | CHUCK | CHUCK | | BFR | R | 6350727 |
HOMEOWNER | BFR | R | 09/03/2019 | 1. Missing garage doors to complete dry in / 2. Tie walls together at entry powder to garage common wall / 3. Provide detail for ledger connection at rear of garage to T03 trusses / 4. Tie walls together at rear of garage adjacent to T03 ledger / 5. Provide truss repair for T05 above great room / 6. Door and windows at master bed north side not on plans / 7. Enlarge openings for doors at bedroom and study do not match max opening size on plans - Plans call for max span of 3'5" - Provide updated detail for sized openings / Need to inspect fireplace after installed for clearances to combustibles / Need to inspect faux gable truss after installed / Crawl space / No deck | JUSTINL | JUSTINL | | BFR | R | 6322037 |
HOMEOWNER | BFR | R | 02/25/2019 | not ready for frame inspection / homeowner just wanted to put house wrap on outside ok to wrap | DALE | DALE | | BFR | R | 6116879 |
HOMEOWNER | BFI | R | 10/26/2018 | foundation insulation not required per RBD res check | LONNYS | LONNYS | | BFI | R | 6007129 |
HOMEOWNER | BFD | C | 06/29/2018 | damp proofing corrected | SCOTTS | SCOTTS | | BFD | C | 5890473 |
HOMEOWNER | BFD | P | 06/26/2018 | Perimeter drain - habitable / damp proofing incomplete | PARKER | PARKER | | BFD | P | 5885254 |
HOMEOWNER | BFN | C | 05/17/2018 | ufer in | DALE | DALE | | BFN | C | 5848561 |
HOMEOWNER | BFT | C | 05/11/2018 | open hole 2000#, soil report and revised foundation design 2000# on file, owner needs to splice revised S-2 page for floor framing to permit at PPRBD | BOBF | BOBF | | BFT | C | 5843039 |
HOMEOWNER | E= | C | 06/09/2020 | E= OK ----- NO A/C ------ | GREGM | GREGM | | E= | C | 6598287 |
HOMEOWNER | ES | C | 10/17/2019 | Residential Underground: 200-amp 3 Wire New Residence ok to set meter. / | GREGM | GREGM | | ES | C | 6372073 |
HOMEOWNER | EUG | C | 10/17/2019 | EUG OK ------4/0 - 4/0 - 4/0 ---# 4 ----- | GREGM | GREGM | | EUG | C | 6372041 |
HOMEOWNER | ER | C | 08/27/2019 | ER OK ----#2 AL SUB PANEL ---#6 CU COOK TOP ---#8 CU WALL OVEN ----CRAWL SPACE----- | GREGM | GREGM | | ER | C | 6315735 |
POPES PLUMBING HEATING & AC INC. | H= | C | 06/26/2020 | NOTE / LOUVER DOOR TO MECHANICAL ROOM / | GREGV | GREGV | | H= | C | 6619420 |
GENE'S HEATING AND AIR LLC | H= | C | 05/19/2020 | NOTE / LOUVER DOOR TO MECHANICAL ROOM / NO A/C / NO OUTSIDE AIR TO THE FURNACE RETURN / | GREGV | GREGV | | H= | C | 6577116 |
GENE'S HEATING AND AIR LLC | HRR | C | 06/07/2019 | Notes-- No AC. No outside air to return. No fireplace installed. | JEFFL | JEFFL | | HRR | C | 6223851 |
POPES PLUMBING HEATING & AC INC. | HC | C | 05/13/2019 | RELEASE METER | JEFFL | JEFFL | | HC | C | 6197103 |
POPES PLUMBING HEATING & AC INC. | HI | C | 05/13/2019 | 10 lb test ok on inside lines. Will inspect water heater at final when gas is supplied. | JEFFL | JEFFL | | HI | C | 6197094 |
POPES PLUMBING HEATING & AC INC. | H= | L | 05/09/2019 | Unable to locate test gauge. Please call me in the morning @ 719-492-6371 between 7:30 and 8:30 to discuss. Permit needed for vent install. Access needed to attic for vent inspection. Need gas to water heater to final water heater install. | JEFFL | JEFFL | | H= | L | 6193851 |
POPES PLUMBING HEATING & AC INC. | HI | L | 05/09/2019 | Unable to locate test gauge. Please call me in the morning @ 719-492-6371 between 7:30 and 8:30 to discuss. Permit needed for vent install. Access needed to attic for vent inspection. Need gas to water heater to final water heater install. | JEFFL | JEFFL | | HI | L | 6193848 |
POPES PLUMBING HEATING & AC INC. | P= | C | 06/25/2020 | Note: tempering at water heater | MALYNDA | MALYNDA | | P= | C | 6617924 |
POPES PLUMBING HEATING & AC INC. | PTO | C | 06/25/2020 | Able to verify leaks have been corrected, unable to verify nail protection at ice box, but no leaks found in crawlspace | MALYNDA | MALYNDA | | PTO | C | 6617913 |
POPES PLUMBING HEATING & AC INC. | PTO | P | 09/12/2019 | Leak on washer box cleanout, leak on mech room floor drain, missing straps on left side master lav in crawler, need nail protection at ice box, rest ok. Note: aav at mech room floor drain (in crawler), need tempering for master tub by final | MALYNDA | MALYNDA | | PTO | P | 6333649 |
POPES PLUMBING HEATING & AC INC. | PTO | R | 09/03/2019 | S-trap at washer box, Water closet must be lowest fixture on wet vent system at laundry room stack. Need to test laundry DWV, Toilet clearance is 15" off stud wall at powder and master bath. Need 15" clearance from finished wall. Re-grade master lav vents, Crawl space dwv throughout, Strap crawl space dwv and water lines to code throughout. Need mixing valve at master tub. Re-inspect all. | SAMH | SAMH | | PTO | R | 6321716 |
POPES PLUMBING HEATING & AC INC. | PTO | P | 08/28/2019 | Note: looked at new washer box, added to existing structure (vtr) Need to test through all dwv and water lines in new addition for next PTO. | MALYNDA | MALYNDA | | PTO | P | 6317157 |
HOMEOWNER | XBS | T | 10/10/2019 | PAID (REC#1636455) PLAN SPLICE FEE: $50 by: DANM for Construction: Revisions to Sheets S-2 & S-3 floor and roof framing | DANM | DANM | | XBS | T | 6364462 |
HOMEOWNER | XBS | T | 05/15/2018 | PAID (REC#1500435) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: revised framing and foundation | SHELLEY | SHELLEY | | XBS | T | 5845595 |