MARTINES PALMEIRO CONSTRUCTION | B= | C | 12/31/2019 | Item corrected | TIMOTHYS | TIMOTHYS | | B= | C | 6440941 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 12/27/2019 | Reflective surface of mirror higher than 40" - Other items corrected -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 6437986 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 12/11/2019 | Missing compliant signage at restroom - Grab bars in rest room in wrong location - Refer to the 2003 ANSI for requirements -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), HORIZON, LLC Plumbing Final Inspection is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6423704 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/11/2019 | Insulation secured parcel room | TIMOTHYS | TIMOTHYS | | BSP | P | 6423697 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 07/11/2019 | need to secure insulation in ceiling of dead space at northwest corner of parcel room / no RC to inspect as there are no rated ceiling assemblies in this building / hard lid drops were inspected prior to insulation installation | DANE | DANE | | BSP | P | 6260691 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 07/08/2019 | Fireblocking and wall/ceiling cavity insulation OK. | CHUCK | CHUCK | | BSP | P | 6255292 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 07/05/2019 | still need to complete the fire blocking at the tops of all of the interior walls where they meet the hard lids and at all wires that have been drilled through the top plates at the pots of walls after the fire caulking was done / all other thermal insulation OK | DANE | DANE | | BSP | R | 6254028 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 06/28/2019 | fireblocking incomplete / remaining framing items ok / training with tony | CHUCK | CHUCK | | BFR | P | 6247828 |
MARTINES PALMEIRO CONSTRUCTION | BFN | C | 06/19/2019 | Open ex. and observation for concrete reinforcing steel. | CHUCK | CHUCK | | BFN | C | 6236095 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 05/29/2019 | No stud spacing details found in plan. / Missing sill anchors within 12" of plate ends / Fire blocking incomplete / Missing SDS screws at 2-2x10 roof ledgers. | CHUCK | CHUCK | | BFR | R | 6212950 |
MARTINES PALMEIRO CONSTRUCTION | BE | L | 02/05/2019 | Renewed at 2/5/2019 2:42:00 PM | MATTHEWM | MATTHEWM | | BE | L | 6098434 |
DIE HARD, INC | E= | C | 11/20/2019 | | BRET | BRET | | E= | C | 6405647 |
DIE HARD, INC | E= | P | 11/19/2019 | install label to indicate where panel is fed from, install gec from ufer to panel gfci and in -use covers for receptacles in dog wash (no equipment or wash tub on site) | BRET | BRET | | E= | P | 6403741 |
DIE HARD, INC | E= | P | 11/18/2019 | gfci dish/disposal outlet | RANDY | RANDY | | E= | P | 6402439 |
DIE HARD, INC | ER | P | 05/22/2019 | walls and lid except panel walls | BRET | BRET | | ER | P | 6207236 |
LDI MECHANICAL, INC. | H= | C | 11/21/2019 | MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6407025 |
LDI MECHANICAL, INC. | HD | C | 05/28/2019 | 4- LINE SETS ABOVE CEILING AND IN WALL OK AND EXHAUST FAN AND DUCT ABOVE CEILING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL | DUSTINS | DUSTINS | | HD | C | 6212062 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 12/26/2019 | | TAYLOR | TAYLOR | | P= | C | 6436868 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 12/03/2019 | crossed water lines at lav, install floor drain and relief port piping for RP at water entry room, rest ok. | TAYLOR | TAYLOR | | P= | P | 6414123 |
HORIZON LLC OF SOUTH CAROLINA | P= | L | 11/20/2019 | field cancelled. | TAYLOR | TAYLOR | | P= | L | 6405347 |
HORIZON LLC OF SOUTH CAROLINA | PTO | C | 03/26/2019 | check final water connections @ water entry and water entry @ final | JOHNS | JOHNS | | PTO | C | 6144186 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 03/26/2019 | ok for looped underground main water line | JOHNS | JOHNS | | PB | C | 6144184 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 03/12/2019 | **NEED to add water htr, back flow, and water meter to scope ok for test / design , MINUS need to see water transition fitting @ tie in, looped under ground waters, rest ok. NOTE: check under sink water htr @ final, unit shut off @ water entry | JOHNS | JOHNS | | PTO | P | 6131148 |
HORIZON LLC OF SOUTH CAROLINA | PE | L | 02/04/2019 | Renewed online for 1/2 Fee at 2/4/2019 8:27:44 AM (RECEIPT #: 1573816) | WEBSITE | WEBSITE | | PE | L | 6096233 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/20/2018 | need to install underground H2O lines. | TAYLOR | TAYLOR | | PB | P | 5909072 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/16/2018 | complete restroom and underground H2O lines. | TAYLOR | TAYLOR | | PB | P | 5903202 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 06/24/2019 | PAID (REC#1609326): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revision 10 only - stud sizing on details. | SHELLEY | SHELLEY | | XBS | T | 6241877 |
DIE HARD, INC | XES | T | 04/25/2019 | PAID (REC#1593383): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Approved for Revision 31 ONLY. Revised power. | BERTHA | BERTHA | | XES | T | 6177711 |
MARTINES PALMEIRO CONSTRUCTION | XBS | P | 04/24/2019 | PLAN SPLICE: (No Fee) by: DANM for Construction: Minor revisions to floor plan and reflected ceiling plan | DANM | DANM | | XBS | P | 6176847 |