MARTINES PALMEIRO CONSTRUCTION | B= | C | 05/05/2020 | Exterior riser rooms adjacent to driveways comply with 1003.5 exception 1 for a single rise/step into rooms. Building final complete. | CHUCK | CHUCK | | B= | C | 6561255 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 04/21/2020 | All building final corrections OK except step outside 2 exterior riser rooms shall comply with 1008.1.5 (exception 1003.5 (exception 1 or 2)) or 1008.1.6 of the 2009 IBC. -- Schedule a new Building Final when above items are complete. | CHUCK | CHUCK | | B= | P | 6546884 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 04/16/2020 | Partial final inspection - Side towers only - 2011 Permit -- Type A Unit 102 - Garage door opener control set at 55". Max. height is 48" - Roll in shower threshold is 1/2" without bevel or ramp / Type B Units 101 and 107 OK / Unit 201, 202, 207 and 208 OK // Need to complete final inspection items from other partial inspections. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): DIE HARD, INC Electrical Final Inspection is not Completed yet, LDI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6542485 |
MARTINES PALMEIRO CONSTRUCTION | B= | R | 04/15/2020 | Partial final inspection - Middle tower only - 2011 Permit - 4 Type A units -- All unit to corridor door tags painted over, 1st-3rd floor / Need to firestop all mech. closet penetrations, 1st-3rd floor / Type A restrooms in Units 103 and 104 - Clearance at toilets < 60" between perpendicular side walls (58.5") - Roll in shower threshold lip is 1/2" without bevel/ramp // Rest of center tower units OK. Additional Inspections Required (computer generated): DIE HARD, INC Electrical Final Inspection is not Completed yet, LDI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | R | 6541225 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/15/2020 | 2003 A117.1 section 1003.11.7 - toilet overlap exception cited for allowance of lavatory next to toilet in Type A accessible units. Will need to verify that lavatory meets exception requirements per 1003.11.5. | CHUCK | CHUCK | | BSP | P | 6540796 |
MARTINES PALMEIRO CONSTRUCTION | B= | R | 04/14/2020 | Partial final inspection - 2011 Permit - 4 Type A units - Broken window in Unit 202 / Need to seal exterior windows in Units 107 and 108 / Missing landings at exterior IT/Riser, Fire Riser and Water Riser Rooms - stair riser into rooms exceed 7" (10-12") / Type A Unit 108 - Clearance to side of accessible toilet < 60"(43")/doesn't meet overlap requirements of 1003.11.7.2/.3 / Lavatory with cabinetry does not meet exceptions as per 1003.11.5 / Shower threshold is 1/2" but not tapered or beveled / Shower surround installed adds 1 3/8" to threshold and door width is 27" wide / Garage door opener controls > 48" max. (54") / Garage to unit door does not fully close or latch / Need to seal penettrations in garage ceiling rated assembly drywall / Inspection stopped for time - discussed findings with Elmer (MPC). /// UPON further review on 4.15.20 by CL, Lavatory in Unit 108 does meet the toilet clearance exception overlap requirements. Additional Inspections Required (computer generated): DIE HARD, INC Electrical Final Inspection is not Completed yet, LDI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | R | 6540043 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/05/2019 | Rock and rock attachment 1st and 2nd layer ceiling UNIT 301 ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6417300 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/04/2019 | Rock and rock attachment walls and ceiling ok UNITS: 107, 101, 103, 104, 105, 106, 203, 204, 205, 206, Garages 1-6 / Rock and rock attachment walls and 2nd layer ceiling ok UNITS: 202, 207, 208, 302, 303, 304 / UNIT 301: 1st ceiling layer cut around truss before 2nd layer installed, need to correct and recall inspection | TIMOTHYS | TIMOTHYS | | BSP | P | 6415686 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 12/02/2019 | Field cancelled by site superintendent Elmer Vigil, ceilings not fastened per listing | TIMOTHYS | TIMOTHYS | | BSP | R | 6412574 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 11/25/2019 | inspection site canceled per Elmer as ceilings are not installed per listed assemblies | DANE | DANE | | BSP | R | 6410112 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/20/2019 | 2nd layer rock and rock attachment ok under stairs all units | TIMOTHYS | TIMOTHYS | | BSP | P | 6405385 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/11/2019 | Unit 103 sprinkler fireblock ok at bathroom drop ceiling | TIMOTHYS | TIMOTHYS | | BSP | P | 6394589 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/07/2019 | Bathroom drop ceiling fireblocking / UNIT 103: Fireblock sprinkler drop / All other units ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6391513 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/07/2019 | 1st layer rock and rock attachments under stairs ok all units | TIMOTHYS | TIMOTHYS | | BSP | P | 6391499 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 11/04/2019 | Garage interior shear 4 walls ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6387037 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/23/2019 | Building 3 RC reinspect - Unit 108 RC ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6377600 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/21/2019 | First layer rock and rock attachment ok 301, 302, 303, 304 - Bathroom drop ceiling prerock and rock attachment ok 103, 104, 203, 204, 205, 206 | TIMOTHYS | TIMOTHYS | | BSP | P | 6374784 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/15/2019 | ES report for spray foam insulation on file - Installers certificate for blown in insulation on file | TIMOTHYS | TIMOTHYS | | BSP | P | 6368169 |
MARTINES PALMEIRO CONSTRUCTION | BIN | P | 10/10/2019 | Blown in insulation ok Building 3 pending receipt of installers certificate | TIMOTHYS | TIMOTHYS | | BIN | P | 6364677 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/09/2019 | RC inspection Building 3 - Garages 1,2,3,4 ok - 101,102,103,104,107,203,204,205,206 ok - 108 not ready for inspection | TIMOTHYS | TIMOTHYS | | BSP | P | 6363056 |
MARTINES PALMEIRO CONSTRUCTION | BIN | P | 10/08/2019 | Insulation at cantilevers over garage ok pending receipt of installers certificate of installation | TIMOTHYS | TIMOTHYS | | BIN | P | 6361423 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/08/2019 | Prerock for tubs ok 101,102,103,104,107,108,301,302,303,304 - Rock wool at top plate ok 301,302,303,304 | TIMOTHYS | TIMOTHYS | | BSP | P | 6361421 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/04/2019 | Breezeway entrance 1st floor 2nd layer rock and rock attachments ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6357799 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 10/02/2019 | Under stair framing and rock backing ok all units | TIMOTHYS | TIMOTHYS | | BFR | P | 6354987 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 10/01/2019 | 3rd floor breezeway ceiling 2nd layer rock attachment ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6353490 |
MARTINES PALMEIRO CONSTRUCTION | BIN | P | 09/30/2019 | rim joist insulation at all units and garages in all towers OK pending receipt of installers certificate of installation / still need to insulate cantilevers over exterior of garages | DANE | DANE | | BIN | P | 6352897 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 09/26/2019 | rock and attachments OK at corridor ceiling at level 2 and first layer of level 3 | DANE | DANE | | BSP | P | 6349703 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 09/23/2019 | Not ready - cancelled on site by contractor. | CHUCK | CHUCK | | BSP | R | 6344185 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 09/20/2019 | Penetrations fire stopped, units 107, 205, 206, 208, 301, 302 and 303. | CHUCK | CHUCK | | BFR | P | 6342565 |
MARTINES PALMEIRO CONSTRUCTION | BFR | T | 09/19/2019 | PAID (REC#1631479): Fire stopping not completed in units for re-inspection. | CHUCK | CHUCK | | BFR | T | 6340772 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 09/17/2019 | R02 truss repair complete. | CHUCK | CHUCK | | BSP | P | 6337496 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 09/17/2019 | R02 truss repair paperwork on file - need to verify repair in site. | CHUCK | CHUCK | | BSP | P | 6337210 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 09/06/2019 | 301 - Need engineer repair for truss R02 -- 302 - Need to fix hole in top plates -- 303 -- Need to tie walls together at corner of great room -- 205 - Need to fix hole in top plate -- 206 - Need to firecaulk eelctrical penetrations above electrical panel -- 208 - Need to fix hole in bottom plate in bedroom -- Need to fireblock chase behind tub -- 107 -- Need to fix hole in top plate at utility room | DAKOTAB | DAKOTAB | | BFR | P | 6327417 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 09/06/2019 | truss fix for F10 floor trusses on file | DANE | DANE | | BSP | P | 6326153 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 09/05/2019 | Not ready - cancelled by contractor. | CHUCK | CHUCK | | BFR | R | 6324880 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 09/03/2019 | Multiple plate penetrations found in unit 108 - contractor cancelled inspection. | CHUCK | CHUCK | | BFR | R | 6321530 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 08/30/2019 | All 1st floor unit shear wall framing, fire stopping and anchors and all 1st /2nd floor center tower shear wall framing, fire stopping and anchors OK. | CHUCK | CHUCK | | BFR | P | 6319939 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 08/29/2019 | Cancelled by contractor on site. | CHUCK | CHUCK | | BFR | R | 6318312 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/29/2019 | Engineering letter to eliminate putty pads in fire rated walls providing that conditions of IBC 713.3.2 are met. | CHUCK | CHUCK | | BSP | P | 6317924 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 08/27/2019 | Contractor cancelled on site. | CHUCK | CHUCK | | BFR | R | 6315190 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/23/2019 | Testing report for ice maker boxes in fire resistance rated assembly walls. | CHUCK | CHUCK | | BSP | P | 6311645 |
MARTINES PALMEIRO CONSTRUCTION | BSP | T | 07/01/2019 | PAID (REC#1614479): ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Listed assembly modifications, soffits for fire sprinklers | SHELLEY | SHELLEY | | BSP | T | 6249365 |
MARTINES PALMEIRO CONSTRUCTION | BFN | C | 06/19/2019 | Open ex. and observation for concrete reinforcing steel. | CHUCK | CHUCK | | BFN | C | 6236080 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/24/2019 | Cannot accept damper paperwork. Inspection and image to go to mechanical inspector. | CHUCK | CHUCK | | BSP | R | 6209426 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 05/22/2019 | Upper floor wing wall framing OK. | CHUCK | CHUCK | | BSP | P | 6206884 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 05/01/2019 | Breezeway drywall and fastener spacing OK per WP8105 assembly, all floors. | CHUCK | CHUCK | | BSP | P | 6183949 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 04/25/2019 | RFI 103 Revision STAMPED BY ARCHITECT | JEREMYA | JEREMYA | | BFR | P | 6177477 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 04/19/2019 | WP8105 assembly walls require 4" vertical edge and 7" field fastener spacing - missed spacing throughout breezeway. Discussed with Larry and Rick from MPC on site. | CHUCK | CHUCK | | BSP | R | 6171410 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/05/2019 | stamped letter for as built conditions of exterior corridor roof received / stamped design for ledger attachment and hangers at exterior corridor roof received / still need open hole and eng obs for footing and foundation | DANE | DANE | | BSP | P | 6156903 |
MARTINES PALMEIRO CONSTRUCTION | BFN | R | 03/26/2019 | still need all engineer observations for footing and foundation and open hole | DANE | DANE | | BFN | R | 6144951 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 03/26/2019 | breeze way roof framing is not built per plan at east or west end - need double hanger for double 2x12 beams out on ends and need engineering for extensions on both ends past the cantilever beams / need complete reinspection | DANE | DANE | | BSP | R | 6144939 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 03/22/2019 | wing wall outside of unit 202 post is not bearing on foundation / framing at remainder of exterior wing walls at decks and shed roofs over entry stairs at north and south towers at level 1 OK / engineer letters for 2 2x4 plates ILO 2x8 plates and no post caps at post to beam connections received / need engineer observations for footing, foundation, foundation insulation and open hole to complete BFT BFN and BFI inspections | DANE | DANE | | BSP | P | 6141833 |
MARTINES PALMEIRO CONSTRUCTION | BSP | T | 02/05/2019 | PAID (REC#1574273): ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY TRUSSES | SHELLEY | SHELLEY | | BSP | T | 6097410 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/17/2019 | interior and exterior OSB shear OK | DANE | DANE | | BSP | P | 6081801 |
DIE HARD, INC | E= | C | 04/17/2020 | | BRET | BRET | | E= | C | 6543902 |
DIE HARD, INC | E= | P | 04/14/2020 | all ok except need access to pole lights, and closets have exterior light on for next inspection | BRET | BRET | | E= | P | 6540034 |
COLORADO SECURITY, LLC | E= | C | 04/13/2020 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 6538646 |
DIE HARD, INC | E= | P | 03/31/2020 | unit 202 garage needs gfci on garage door outlet | RANDY | RANDY | | E= | P | 6526544 |
DIE HARD, INC | E= | P | 03/30/2020 | 2 BAD GFCI IN CLOSET BETWEEN 203,205 rest of breeze ways ok | BRET | BRET | | E= | P | 6525259 |
DIE HARD, INC | E= | P | 03/26/2020 | a/cunits ok | BRET | BRET | | E= | P | 6522419 |
DIE HARD, INC | E= | R | 03/24/2020 | remove nm cable from a/c whips | BRET | BRET | | E= | R | 6519687 |
DIE HARD, INC | E= | R | 03/23/2020 | 204 ok correction not made on first floor tower units | BRET | BRET | | E= | R | 6518137 |
DIE HARD, INC | E= | P | 03/20/2020 | 206 ok, bad breaker micro 204, install microwave receptacles in both first floor center tower units | BRET | BRET | | E= | P | 6516872 |
DIE HARD, INC | E= | P | 03/19/2020 | 203,205,and 3rd floor units ok | BRET | BRET | | E= | P | 6515704 |
DIE HARD, INC | ES | C | 11/12/2019 | Commercial Service: 800 amp 120/208--- need meters set for units 101,102,103,104,107,108, 201,202,203,204,205,206,207,208,301,302,303,304 and house | RANDY | RANDY | | ES | C | 6396111 |
DIE HARD, INC | ER | P | 11/07/2019 | drop ceilings ok | BRET | BRET | | ER | P | 6391446 |
COLORADO SECURITY, LLC | ER | P | 07/10/2019 | FIRE ALARM INSPECTION: all units and corridor ok | BRET | BRET | | ER | P | 6258594 |
DIE HARD, INC | EP | P | 07/10/2019 | unit panels ok ir ufer made behind service | BRET | BRET | | EP | P | 6258583 |
DIE HARD, INC | ER | P | 07/10/2019 | all units and corridors except bath drop ceilings, | BRET | BRET | | ER | P | 6258571 |
DIE HARD, INC | EUG | C | 07/08/2019 | lighting and f.a conduit ok | BRET | BRET | | EUG | C | 6255476 |
DIE HARD, INC | ER | P | 07/08/2019 | breeze way rough ok | BRET | BRET | | ER | P | 6255465 |
COLORADO SECURITY, LLC | ER | P | 07/08/2019 | FIRE ALARM INSPECTION: breeze way f.a ok | BRET | BRET | | ER | P | 6255460 |
DIE HARD, INC | ER | R | 05/02/2019 | not ready | BRET | BRET | | ER | R | 6184883 |
DIE HARD, INC | EE | C | 12/17/2018 | | TERRI | TERRI | | EE | C | 6055069 |
DIE HARD, INC | ESL | P | 07/16/2018 | slab ok ufer? | BRET | BRET | | ESL | P | 5903128 |
LDI MECHANICAL, INC. | H= | C | 04/16/2020 | BUILDING 3. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6542787 |
LDI MECHANICAL, INC. | H= | P | 04/15/2020 | BUILDING 3. MECHANICAL FINAL OK PENDING 101: NEED TO VERIFY EQUIPMENT SHUT DOWN INTERLOCKS WITH SMOKE DETECTOR. | DUSTINS | DUSTINS | | H= | P | 6541525 |
LDI MECHANICAL, INC. | H= | P | 04/14/2020 | BUILDING 3. CENTER TOWER MECHANICAL FINAL OK. STILL NEED TO SEE ROOF, END UNITS AND OUTSIDE. | DUSTINS | DUSTINS | | H= | P | 6540437 |
HORIZON LLC OF SOUTH CAROLINA | H= | C | 04/06/2020 | BUILDING 3. GAS AND WATER HEATER VENT FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6531561 |
HORIZON LLC OF SOUTH CAROLINA | HSP | P | 04/06/2020 | GAS/ELECTRIC METER VERIFICATION LETTER RECEIVED / | DUSTINS | DUSTINS | | HSP | P | 6531559 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 03/27/2020 | BUILDING 3 GAS AND WATER HEATER VENT FINAL OK PENDING METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6523901 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 03/25/2020 | BUILDING 3. GAS AND WATER HEATER VENT FINAL OK EXCEPT ALL APARTMENTS: COMPLETE WATER HEATER VENT TERMINATION. NEED METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6521401 |
LDI MECHANICAL, INC. | HD | C | 03/25/2020 | BUILDING 3. ALL APARTMENTS GAPS AROUND SUPPLY OUTLETS TO SHEET ROCK OK. | DUSTINS | DUSTINS | | HD | C | 6521392 |
LDI MECHANICAL, INC. | HD | P | 02/28/2020 | BUILDING 3. ALL APARTMENTS GAPS AROUND DAMPERS TO SHEET ROCK OK EXCEPT 201: MISSING SUPPLY AIR IN LIVING ROOM. 202: MISSING SUPPLY AIR IN BEDROOM. | DUSTINS | DUSTINS | | HD | P | 6496418 |
LDI MECHANICAL, INC. | HD | P | 02/27/2020 | BUILDING 3. CENTER TOWER GAPS AROUND DAMPERS TO SHEET ROCK OK, STILL NEED TO SEE END UNITS. | DUSTINS | DUSTINS | | HD | P | 6494989 |
LDI MECHANICAL, INC. | HD | P | 11/05/2019 | BUILDING 3. CENTER TOWER: BATH FANS AFTER PRE-ROCK OK. DUCT PLENUMS AND CONDENSATE LINES FOR FAN COIL UNITS OK. STILL NEED TO SEE ALL GAPS AROUND SUPPLY OUTLETS. | DUSTINS | DUSTINS | | HD | P | 6388827 |
LDI MECHANICAL, INC. | HSP | P | 09/20/2019 | RECEIVED LETTER FROM ENGINEER ADDRESSING THE GAPS AROUND SUPPLY OUTLETS, SEE IMAGES. | DUSTINS | DUSTINS | | HSP | P | 6342032 |
LDI MECHANICAL, INC. | HD | P | 06/17/2019 | BUILDING 3: ALL UNITS ABOVE CEILING OK, WILL NEED TO ADDRESS LADDER ACCESS TO LOWER ROOF FOR CONDENSERS BY FINAL REFER TO 306.5 IN 2009 IMC | BENH | BENH | | HD | P | 6234270 |
HORIZON LLC OF SOUTH CAROLINA | HWP | C | 05/31/2019 | BUILDING 3. ALL APARTMENTS HOT WATER/SUPPLY PIPING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HWP | C | 6216079 |
HORIZON LLC OF SOUTH CAROLINA | HV | C | 05/31/2019 | BUILDING 3. WATER HEATER VENTS ABOVE CEILING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HV | C | 6215999 |
HORIZON LLC OF SOUTH CAROLINA | HC | C | 03/07/2019 | OK TO SET EIGHTEEN 2 LB METERS AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6126685 |
HORIZON LLC OF SOUTH CAROLINA | HI | C | 03/07/2019 | NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT. BUILDING 3. EIGHTEEN 10 LB TEST OK. PIPING PER PLAN SPLICE. CHECK MEDIUM PRESSURE STICKERS, REGULATORS AND CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HI | C | 6126675 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 03/31/2020 | | TAYLOR | TAYLOR | | P= | C | 6526557 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 03/27/2020 | all ok minus units 102, 103, 108, and water entry room. | TAYLOR | TAYLOR | | P= | P | 6524415 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 03/26/2020 | end towers ok minus units 102, 108, 207. | TAYLOR | TAYLOR | | P= | P | 6522190 |
HORIZON LLC OF SOUTH CAROLINA | PTO | C | 03/25/2020 | | TAYLOR | TAYLOR | | PTO | C | 6520797 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 03/25/2020 | 1st and 2nd floor of middle tower ok minus unit 103. | TAYLOR | TAYLOR | | P= | P | 6520792 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/07/2019 | ok for corrections, MINUS freeze pro (x2) @ garage looped underground waters | JOHNS | JOHNS | | PTO | P | 6223793 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/05/2019 | ok for previous correction ok for main water, unit water, and accessible measurements MINUS @ 103 expose wrap @ incoming water and need freeze pro @ incoming water under slab @ garages (x2), @ 101 and 107 need accessible clearances @ water closets @ hall bath | JOHNS | JOHNS | | PTO | P | 6220902 |
HORIZON LLC OF SOUTH CAROLINA | PTO | L | 06/04/2019 | cancelled @ call ahead, contractor will reschedule for tomorrow | JOHNS | JOHNS | | PTO | L | 6220131 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 05/31/2019 | contractor stated CSU has been inspecting these lines along with their outside structure water line inspections | JOHNS | JOHNS | | PB | C | 6216803 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 05/31/2019 | ok for BLDG 3 TYPE A dwv test / design ok, MINUS @ 104 can not off set washer box waste / vent stack, need to set all first floor flanges. NOTE: 4 FIRST FLOOR UNITS TYPE A = MSTR BATH COMPLIES, @ 101 AND 107 = TYPE B (ALL BATHS COMPLY) aav @ all kitchens, unit shut offs @ mech room, check water htrs and water entry @ final | JOHNS | JOHNS | | PTO | P | 6216787 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/16/2018 | all ok, minus water service. | TAYLOR | TAYLOR | | PB | P | 5903147 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/05/2018 | trunk line and risers ok. | TAYLOR | TAYLOR | | PB | P | 5894384 |
COLORADO SECURITY, LLC | XES | T | 02/19/2020 | PAID (REC#1663179) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Splice to address inspector's comments - Provide series rated list. | BERTHA | BERTHA | | XES | T | 6486342 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 09/12/2019 | PAID (REC#1629375): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Lower roof access hatch | SHELLEY | SHELLEY | | XBS | T | 6332408 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2019 | PAID (REC#1624381): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised G-501, G502, G503, (new)G504C, G502B and A-432A - under stair rating/details, revised listed chase wall and dryer box details. | SHELLEY | SHELLEY | | XBS | T | 6309401 |
COLORADO SECURITY, LLC | XES | T | 07/29/2019 | PAID (REC#1617792): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added EUH's to garages. | BERTHA | BERTHA | | XES | T | 6279549 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/29/2019 | PAID (REC#1617791): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Added heat to garages, revised rescheck, sprinkler line details. | SHELLEY | SHELLEY | | XBS | T | 6279346 |
LDI MECHANICAL, INC. | XMS | T | 07/18/2019 | PAID (REC#1616101): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to relocate electric unit heaters at garages | JUSTINC | JUSTINC | | XMS | T | 6267875 |
LDI MECHANICAL, INC. | XMS | T | 06/25/2019 | PAID (REC#1609338): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace operation in fire event | JUSTINC | JUSTINC | | XMS | T | 6242765 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 05/30/2019 | PAID (REC#1602443): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Under stair details; sprinkler line soffit details; washer/dryer/shower box details. | SHELLEY | SHELLEY | | XBS | T | 6214521 |
LDI MECHANICAL, INC. | XMS | T | 05/21/2019 | PAID (REC#1600556): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace detail | JUSTINC | JUSTINC | | XMS | T | 6205802 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/26/2019 | PAID (REC#1594359): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Knee wall detail | SHELLEY | SHELLEY | | XBS | T | 6179874 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/15/2019 | PAID (REC#1590599): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised under stair space and plumbing wall assembly per GA general notes. | SHELLEY | SHELLEY | | XBS | T | 6165243 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/01/2019 | PAID (REC#1587047): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor/ceiling assembly | SHELLEY | SHELLEY | | XBS | T | 6150280 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 01/11/2019 | PAID (REC#1574475): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Gas revisions | JUSTINC | JUSTINC | | XMS | T | 6075975 |
MARTINES PALMEIRO CONSTRUCTION | XBS | P | 01/10/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Gas meter location on buildings. | SHELLEY | SHELLEY | | XBS | P | 6074181 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2018 | PAID (REC#1530475): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: foundation modification. | SHELLEY | SHELLEY | | XBS | T | 5940238 |