MARTINES PALMEIRO CONSTRUCTION | B= | C | 07/27/2020 | | CHUCK | CHUCK | | B= | C | 6650291 |
MARTINES PALMEIRO CONSTRUCTION | BFN | C | 07/27/2020 | Open ex. and foundation reinforcement observations on file. | CHUCK | CHUCK | | BFN | C | 6650286 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 07/24/2020 | Complete required foundation inspections / All other aspects of final ok -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 6649184 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/23/2020 | Sprinkler metal soffit frame and firestopping OK - Garages 2 and 5. | CHUCK | CHUCK | | BSP | P | 6549380 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/03/2020 | Building 15 drop ceiling reinspection / UNIT 106 ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6531453 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/02/2020 | Building 15 bathroom drop ceiling reinspection / UNIT 106: Still need to fireblock penetration at furnace control wires / UNITS: 205, 105 ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6530281 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/01/2020 | Building 15 ceiling drop check / UNIT 205, 105: Insufficient mud over tape, tape hanging from ceiling / UNIT 106: Insufficient mud on tape, fireblock empty hole at furnace control wires / UNITS: 304, 303, 302, 301, 206, 204, 203, 106, 104, 103 ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6528849 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 03/27/2020 | inspection stopped / above ceilings at bathroom drops not ready | DANE | DANE | | BSP | R | 6524126 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 03/25/2020 | Bathroom ceiling drops inspection - Field cancelled after top floor - Not ready | TIMOTHYS | TIMOTHYS | | BSP | R | 6520884 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 03/16/2020 | Building 15 rock and rock attachment / UNITS: 201, 207 ok / GARAGES: 1, 2, 3, 4, 5, 6, ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6511575 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 03/12/2020 | Building 15 rock and rock attachment reinspection / UNITS: 103, 104, 105, 106 now ok / Still need to inspect all GARAGES and UNITS 201, 207 | TIMOTHYS | TIMOTHYS | | BSP | P | 6508733 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 03/03/2020 | Rock and rock attachment 1st and 2nd layers ok UNITS: 303, 304, 203, 204, 205, 206, 202, 101, 107, GARAGE: 6, 5, 3 / Rock and rock attachment incomplete UNITS: 103 (tub), 104 (tub), 105 (tub), 106 (tub), 207 (loft closet), 201 (loft closet, loft lav wall) GARAGE: 4 (not ready), 2 (not ready), 1 (not ready) / 1st and second layer rock and rock attachment ok under all stairs | TIMOTHYS | TIMOTHYS | | BSP | P | 6498307 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/28/2020 | Breezeway screw inspection / Rock and rock attachment ok 1st and 2nd layers 1st, 2nd, 3rd floor breezeways Building 15 | TIMOTHYS | TIMOTHYS | | BSP | P | 6495895 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 02/20/2020 | Fireblocking at all loft pluimbing walls ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6487451 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/19/2020 | Mineral wool at top plates ok all units | TIMOTHYS | TIMOTHYS | | BSP | P | 6485697 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/19/2020 | UNIT 204: Corrections complete | TIMOTHYS | TIMOTHYS | | BSP | P | 6485607 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/18/2020 | Ceiling RC installation OK, Units 101/107 and garages. | CHUCK | CHUCK | | BSP | P | 6484507 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/14/2020 | Building 15 center tower RC / RC ok UNITS: 103, 104, 105, 106, 203, 204, 205, 206 | TIMOTHYS | TIMOTHYS | | BSP | P | 6482642 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 02/12/2020 | Building 15 side tower frame / UNIT 202: Missing window in loft - Fireblock double plumbing wall loft / UNIT 201: Fireblock double plumbing wall loft / UNIT 101: Fireblock sprinkler line elbow at door to garage - Stair fur down ok / UNIT 208: Fireblock double plumbing wall loft - Fireblock thermostat line loft - Fireblock wire at main level batroomh / UNIT 207: Fireblock plumbing wall loft / Mineral wool at top plates incomplete in all upper units | TIMOTHYS | TIMOTHYS | | BFR | P | 6480349 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 02/05/2020 | Building 15 side towers / UNIT 107: Fireblock empty hole bathroom - Under stairs fur down ok / UNIT 207: Missing 1x top plate around bathroom - Fireblock plumbing wall loft - Fireblock AC lineset loft bottom plate / GARAGE 4: under stair fur down ok / GARAGE 5: Missing anchor back wall - Fireblock 3" pvc / GATRAGE 6: Missing anchor exterior wall / Mineral wool incomplete upper units / Training with Dave W | TIMOTHYS | TIMOTHYS | | BFR | P | 6474331 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 02/03/2020 | Building 15 center tower frame / Mineral wool at top plates incomplete UNITS: 301, 302, 303, 304 / UNIT 204: Fireblock sprinkler line in bedroom - Fireblock empty hole in mech room wall / UNITS: 203, 205, 206, 103, 104, 105, 106 ok / Prerock at tubs, showers, and dryer boxes ok all units | TIMOTHYS | TIMOTHYS | | BFR | P | 6472368 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/15/2019 | ES report for spray foam insulation on file - Installers certificate for blown in insulation on file | TIMOTHYS | TIMOTHYS | | BSP | P | 6368183 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/29/2019 | Engineering letter to eliminate putty pads in fire rated walls providing that conditions of IBC 713.3.2 are met. | CHUCK | CHUCK | | BSP | P | 6317953 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/23/2019 | Frame inspection for 3rd floor breezeway roof OK. | CHUCK | CHUCK | | BSP | P | 6312118 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/16/2019 | Items from previous inspection on exterior wing walls corrected | DAKOTAB | DAKOTAB | | BSP | P | 6304533 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/08/2019 | Breezeway side drywall screw inspection OK per WP8105 assembly, 1st - 3rd floors, center tower. | CHUCK | CHUCK | | BSP | P | 6293112 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 06/13/2019 | Wing walls - Need sill anchors installed within 12" of plate section ends. | CHUCK | CHUCK | | BSP | R | 6230009 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/24/2019 | Cannot accept damper paperwork. Inspection and image to go to mechanical inspector. | CHUCK | CHUCK | | BSP | R | 6209435 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/15/2019 | Exterior and breezeway shear walls OK / Wing wall framing OK except sill anchors missing nuts/washers, installed in middle of split 2-2x4 plates and plates bored larger than anchors washers - foundations poured short of ends of wing walls. | CHUCK | CHUCK | | BSP | R | 6199578 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 04/25/2019 | RFI 103 Revision STAMPED BY ARCHITECT | JEREMYA | JEREMYA | | BFR | P | 6177484 |
DIE HARD, INC | E= | C | 07/07/2020 | | BRET | BRET | | E= | C | 6628769 |
COLORADO SECURITY, LLC | E= | C | 07/07/2020 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 6628768 |
COLORADO SECURITY, LLC | E= | C | 07/07/2020 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 6628765 |
COLORADO SECURITY, LLC | ER | C | 07/07/2020 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 6628764 |
DIE HARD, INC | E= | P | 07/02/2020 | Center tower units ok / GFCI in HWH closet relocated / | LOGANP | LOGANP | | E= | P | 6625380 |
DIE HARD, INC | E= | P | 07/01/2020 | A/C'S AND BREEZWAYS RELOCATE GFCI IN 3RD FLOOR WATER HEATER CLOSET | BRET | BRET | | E= | P | 6624253 |
DIE HARD, INC | E= | P | 06/23/2020 | *****Very top level roof needs to be checked, No Ladder access / Rest of lower roofs and units - Ok / 20,25,30 amp units | BRETC | BRETC | | E= | P | 6614412 |
COLORADO SECURITY, LLC | ER | P | 01/29/2020 | FIRE ALARM INSPECTION: all units ok pending riser room, | BRET | BRET | | ER | P | 6467967 |
DIE HARD, INC | ES | C | 01/29/2020 | Commercial Service: 800 amp service need meter set for 101,103,104,105,106,107,203,204,205,206,301,302,303,304 all 125 amp 201,202,207,208 all 150 amp, 200 amp house | BRET | BRET | | ES | C | 6467963 |
DIE HARD, INC | ES | C | 01/24/2020 | Commercial Service: 800 amp service need meter set for units 101,103,104,105,106,107 ,301,302,303.303 -125 amp. 201,202,207-208 - 150 amp. 200 amp house panel | BRET | BRET | | ES | C | 6463219 |
DIE HARD, INC | ER | C | 01/23/2020 | units and garages ok | BRET | BRET | | ER | C | 6461714 |
COLORADO SECURITY, LLC | ER | P | 01/23/2020 | FIRE ALARM INSPECTION: first floor only | BRET | BRET | | ER | P | 6461713 |
DIE HARD, INC | EP | C | 01/23/2020 | unit panels ok | BRET | BRET | | EP | C | 6461712 |
DIE HARD, INC | ER | P | 01/22/2020 | Still need to attach Fire Alarm Permit / Rough ok for center tower apartments / | ROB | ROB | | ER | P | 6460716 |
DIE HARD, INC | ER | R | 01/17/2020 | not ready to much to list , need fire alarm attached to permit , need fire alarm cable installed | BRET | BRET | | ER | R | 6456270 |
DIE HARD, INC | EUG | P | 07/25/2019 | lighting and f.a conduits ok | BRET | BRET | | EUG | P | 6276311 |
DIE HARD, INC | EUG | P | 07/18/2019 | lighting and fire alarm conduits thru parking and drive ok | BRET | BRET | | EUG | P | 6268251 |
DIE HARD, INC | ER | P | 07/12/2019 | breeze ways ceilings except ground level f.a cable not installed | BRET | BRET | | ER | P | 6261871 |
HORIZON LLC OF SOUTH CAROLINA | H= | C | 07/20/2020 | BUILDING 15. GAS/ELECTRIC METER VERIFICATION LETTER RECEIVED / GAS AND WATER HEATER VENT FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6642308 |
LDI MECHANICAL, INC. | H= | C | 07/17/2020 | BUILDING 15. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6641347 |
LDI MECHANICAL, INC. | H= | P | 07/14/2020 | BUILDING 15. MECHANICAL FINAL OK IN CENTER TOWER EXCEPT 202 AND 204: NEED TO VERIFY INTERLOCK SHUT DOWN OF AIR HANDLER. 107: IMPROPER GLUE JOINTS ON FURNACE VENTING IN MECHANICAL CLOSET. | DUSTINS | DUSTINS | | H= | P | 6636786 |
LDI MECHANICAL, INC. | H= | P | 07/13/2020 | BUILDING 15. MECHANICAL FINAL OK IN CENTER TOWER EXCEPT 204: NEED TO VERIFY INTERLOCK SHUT DOWN OF AIR HANDLER. ROOF OK. STILL NEED END UNITS AND OUTSIDE. | DUSTINS | DUSTINS | | H= | P | 6634942 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 06/12/2020 | BUILDING 15. GAS AND WATER HEATER VENT FINAL OK PENDING METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6603296 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 06/02/2020 | BUILDING 15. CENTER TOWER GAS AND WATER HEATER VENT FINAL OK EXCEPT 103 AND 105: TIGHTEN EXHAUST HOSE CLAMPS. 104 AND 106: TIGHTEN EXHAUST HOSE CLAMPS. COMPLETE CONDENSATE DRAIN LINE. 203 AND 205: TIGHTEN EXHAUST HOSE CLAMPS. 301: TIGHTEN EXHAUST HOSE CLAMPS. 303: TIGHTEN EXHAUST HOSE CLAMPS. GAS LEAK AT FLEX CONNECTOR. 304: GAS LEAK AT FLEX CONNECTOR. STILL NEED ROOF, OUTSIDE AND END UNITS. NEED METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6590722 |
LDI MECHANICAL, INC. | HD | C | 05/05/2020 | BUILDING 15. ALL APARTMENTS GAPS FROM SUPPLY OUTLETS TO SHEET ROCK OK. | DUSTINS | DUSTINS | | HD | C | 6561304 |
LDI MECHANICAL, INC. | HD | P | 05/04/2020 | BUILDING 15. CENTER TOWER GAPS FROM SUPPLY OUTLETS TO SHEET ROCK OK. STILL NEED TO SEE END UNITS. | DUSTINS | DUSTINS | | HD | P | 6560126 |
LDI MECHANICAL, INC. | HD | P | 04/08/2020 | BUILDING 15. MECHANICAL ROUGH ABOVE DROP CEILINGS OK. STILL NEED TO SEE GAPS AROUND SUPPLY OUTLETS AFTER SHEET ROCK INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6534957 |
LDI MECHANICAL, INC. | HD | P | 03/19/2020 | BUILDING 15. 301: CONDENSATE DRAIN LINE LACKS REQUIRED SLOPE AND NEEDS NAIL PROTECTION. 302: CONDENSATE DRAIN LINE LACKS REQUIRED SLOPE AND NEEDS NAIL PROTECTION. 304: CONDENSATE DRAIN LINE NEEDS NAIL PROTECTION. 203: CONDENSATE DRAIN LINE NEEDS NAIL PROTECTION. 204: REPAIR TORN ARMAFLEX ON LINE SET. 205: REPAIR TORN ARMAFLEX ON LINE SET. CONDENSATE DRAIN LINE LACKS REQUIRED SLOPE. 206: REPAIR TORN ARMAFLEX ON LINE SET. CONDENSATE DRAIN LINE NEEDS NAIL PROTECTION. 103: REPAIR TORN ARMAFLEX ON LINE SET. 104: CONDENSATE DRAIN LINE NEEDS NAIL PROTECTION. 106: CONDENSATE DRAIN LINE LACKS REQUIRED SLOPE. | DUSTINS | DUSTINS | | HD | P | 6515816 |
LDI MECHANICAL, INC. | HRP | C | 01/29/2020 | BUILDING 15. PRESSURE TEST ON LINE SET OK FOR APARTMENT 101. | DUSTINS | DUSTINS | | HRP | C | 6468025 |
LDI MECHANICAL, INC. | HD | P | 01/29/2020 | BUILDING 15. ALL APARTMENTS MECHANICAL ROUGH ABOVE CEILING OK. STILL NEED TO SEE ABOVE DROP CEILING IN PENTHOUSES AND CENTER TOWER BATHROOMS AFTER PRE ROCK AND GAPS AROUND SUPPLY OUTLETS AFTER SHEET ROCK INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6468021 |
LDI MECHANICAL, INC. | HD | P | 01/28/2020 | BUILDING 15. MECHANICAL ROUGH ABOVE CEILING OK EXCEPT 201: NEED TO REPAIR ARMAFLEX FOR CONCEALED FITTING ABOVE BEDROOM, WILL ALSO REQUIRE HRP INSPECTION ON LINE SET FOR 101. STILL NEED TO SEE PENTHOUSE AND CENTER TOWER AFTER PRE-ROCK AND ALL SUPPLY OUTLETS AFTER SHEET ROCK INSTALLED. NOTE : PER DAMPER MANUFACTURER THERE CAN BE NO MORE THAN 1/8" GAP AROUND SUPPLY OUTLETS TO SHEET ROCK. SEE ENGINEER DETAIL FOR REPAIR IF GAP IS LARGER. | DUSTINS | DUSTINS | | HD | P | 6466209 |
LDI MECHANICAL, INC. | HD | P | 01/27/2020 | BUILDING 15. CENTER TOWER MECHANICAL ROUGH OK EXCEPT 106: REPAIR TORN ARMAFLEX. RE-SUPPORT DRYER EXHAUST DUCT. 203: REPAIR TORN ARMAFLEX. STILL NEED TO SEE BATH EXHAUST AND FAN COIL UNITS AFTER PRE-ROCK ABOVE DROP CEILING. | DUSTINS | DUSTINS | | HD | P | 6464911 |
LDI MECHANICAL, INC. | HSP | P | 09/20/2019 | RECEIVED LETTER FROM ENGINEER ADDRESSING THE GAPS AROUND SUPPLY OUTLETS, SEE IMAGES. | DUSTINS | DUSTINS | | HSP | P | 6342067 |
HORIZON LLC OF SOUTH CAROLINA | HC | C | 04/23/2019 | OK TO SET EIGHTEEN 2 LB METERS AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6175352 |
HORIZON LLC OF SOUTH CAROLINA | HI | C | 04/23/2019 | EIGHTEEN 10 LB TEST OK. PIPING PER PLAN SPLICE. CHECK REGULATORS, MEDIUM PRESSURE STICKERS AND CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HI | C | 6175351 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 07/16/2020 | | TAYLOR | TAYLOR | | P= | C | 6640321 |
HORIZON LLC OF SOUTH CAROLINA | PTO | C | 07/16/2020 | | TAYLOR | TAYLOR | | PTO | C | 6640316 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 07/15/2020 | north and south towers ok. | TAYLOR | TAYLOR | | P= | P | 6637898 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 07/14/2020 | water entry room ok. | TAYLOR | TAYLOR | | P= | P | 6636474 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 07/09/2020 | middle tower ok minus unit 104. | TAYLOR | TAYLOR | | P= | P | 6632632 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 07/02/2020 | closet flange is to far from side wall at unit 104, rest ok for 1st floor flanges. | TAYLOR | TAYLOR | | PTO | P | 6626340 |
HORIZON LLC OF SOUTH CAROLINA | PTO | L | 07/01/2020 | field cancelled. | TAYLOR | TAYLOR | | PTO | L | 6624090 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 02/11/2020 | all ok minus 1st floor flanges. | TAYLOR | TAYLOR | | PTO | P | 6479113 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 02/06/2020 | inspection was for north tower ( can not tie vent into kitchen drain for unit 205, re- grade vent for unit 301 ). | TAYLOR | TAYLOR | | PTO | P | 6475427 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 02/03/2020 | south tower ok minus 1st floor flanges. | TAYLOR | TAYLOR | | PTO | P | 6472162 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 01/30/2020 | H2O mains ok. | TAYLOR | TAYLOR | | PTO | P | 6469930 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 01/29/2020 | inspection was for south tower ( replace fernco at unit 106, need proper gauge DWV and install and test shower drain at unit 202, re- grade vent at unit 302, re- grade drain for lavs at unit 306, need proper connections at floor drains for water heaters. ) | TAYLOR | TAYLOR | | PTO | P | 6467708 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 01/23/2020 | washer stacks ok minus test. | TAYLOR | TAYLOR | | PTO | P | 6461872 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 11/20/2018 | Water stub ok. | DANR | DANR | | PB | C | 6030912 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 08/10/2018 | Ok for dwv, need water riser. | DANR | DANR | | PB | P | 5930586 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/25/2018 | trunk line and risers ok. | TAYLOR | TAYLOR | | PB | P | 5913103 |
HORIZON LLC OF SOUTH CAROLINA | PB | L | 07/24/2018 | field cancelled. | TAYLOR | TAYLOR | | PB | L | 5911775 |
LDI MECHANICAL, INC. | XMS | P | 04/09/2020 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Engineer letter for unit 2.2 bath exhaust | JUSTINC | JUSTINC | | XMS | P | 6536754 |
COLORADO SECURITY, LLC | XES | P | 02/19/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Splice to address inspector's comments - Provide series rated list. | BERTHA | BERTHA | | XES | P | 6486345 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 09/12/2019 | PAID (REC#1629345): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Lower roof access hatch | SHELLEY | SHELLEY | | XBS | T | 6332415 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2019 | PAID (REC#1624382): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised G-501, G502, G503, (new)G504C, G502B, A432B and A-433B - under stair rating/details, revised listed chase wall and dryer box details. | SHELLEY | SHELLEY | | XBS | T | 6309411 |
DIE HARD, INC | XES | P | 07/31/2019 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: As builts | SHELBY | SHELBY | | XES | P | 6283617 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/29/2019 | PAID (REC#1617785): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Added heat to garages, revised rescheck, sprinkler line details. | SHELLEY | SHELLEY | | XBS | T | 6279349 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 07/18/2019 | PAID (REC#1616100): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to relocate electric unit heaters at garages | JUSTINC | JUSTINC | | XMS | T | 6267888 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/01/2019 | PAID (REC#1614477): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Listed assembly modifications, soffits for fire sprinklers | SHELLEY | SHELLEY | | XBS | T | 6249366 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 06/25/2019 | PAID (REC#1609333): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace operation in fire event | JUSTINC | JUSTINC | | XMS | T | 6242777 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 05/31/2019 | PAID (REC#1603287): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Under stair details; sprinkler line soffit details; washer/dryer/shower box details; stair wall details. | SHELLEY | SHELLEY | | XBS | T | 6215731 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/15/2019 | PAID (REC#1590596): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised under stair space and plumbing wall assembly per GA general notes. | SHELLEY | SHELLEY | | XBS | T | 6165228 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/01/2019 | PAID (REC#1587124): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor/ceiling assembly | SHELLEY | SHELLEY | | XBS | T | 6150283 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 02/07/2019 | PAID (REC#1575778): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: TRUSSES | SHELLEY | SHELLEY | | XBS | T | 6100345 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 01/11/2019 | PAID (REC#1575780): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Gas revisions | JUSTINC | JUSTINC | | XMS | T | 6076002 |
MARTINES PALMEIRO CONSTRUCTION | XBS | P | 01/10/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Gas meter location on buildings. | SHELLEY | SHELLEY | | XBS | P | 6074178 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2018 | PAID (REC#1530474): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Foundation modification | SHELLEY | SHELLEY | | XBS | T | 5940239 |