MARTINES PALMEIRO CONSTRUCTION | B= | C | 07/28/2020 | Building final corrections complete. | CHUCK | CHUCK | | B= | C | 6652419 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 07/24/2020 | UNIT 105: Complete waterproof wall coverings in shower / MECH ROOM 1st FLOOR: Missing door trim inside / UNIT 107: Fire tape patch in laundry room / GARAGE 3: Fire tape patches in walls / Rest of building final ok -- Schedule a new Building Final when above items are complete. | TIMOTHYS | TIMOTHYS | | B= | P | 6649203 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/21/2020 | Fire sprinkler soffit frame and firestopping OK - Garage 2 and 5. | CHUCK | CHUCK | | BSP | P | 6546871 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/13/2020 | Bathroom drop ceiling firestopping OK - Units 103-105. | CHUCK | CHUCK | | BSP | P | 6538427 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/14/2020 | Builing 10 bathroom ceiling drop fire tape, fireblock ok UNITS:301, 302, 303, 304, 203, 204, 206, 106 / UNIT 205: Damage to rock / UNIT 103: Fireblock sprinkler and armored cable / UNIT 104: Fireblock sprinkler and armored cable / UNIT 105: Patch and fireblock condensate line | TIMOTHYS | TIMOTHYS | | BSP | P | 6482633 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/31/2020 | Rock and rock attachment ok UNITS: 101, 103, 104, 105, 106, 107, 203, 204, 205, 206 GARAGES: 1, 2, 3, 4, 5, 6 / 2nd later rock and rock attachment ok UNITS: 201, 202, 207, 208, 301, 302, 303, 304 / 2nd layer rock and rock attachment ok Under stairs Garage 3, Garage 4 | TIMOTHYS | TIMOTHYS | | BSP | P | 6471039 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/23/2020 | RC check / UNITS: 101, 103, 105, 107 ok GARAGES: 4, 5, 6 ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6461770 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/22/2020 | Fireblock issues corrected UNITS: 303, 304 | TIMOTHYS | TIMOTHYS | | BSP | P | 6459980 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/21/2020 | RC ok UNITS: 106, 104, 204, 203, 205, 206 / Correction made UNITS: 205, 206, 302 / Still need to correct fireblock issues UNITS: 303, 304 | TIMOTHYS | TIMOTHYS | | BSP | P | 6458024 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 01/14/2020 | Field cancelled per Elmer of MPC - Not ready for reinspection | TIMOTHYS | TIMOTHYS | | BFR | R | 6452212 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 01/13/2020 | Building 10 Center Tower Frame / UNIT 205: Fireblock fire alarm wires - Fireblock 3" pvc bathroom / UNIT 206: Fireblock firesprinikler at laundry, firealarm wires bedroom, plumbing in oarty wall / UNIT 301: Mineral wool ok / UNIT 302: Fireblock switch wires at entry - Mineral wool ok / UNIT 303: Fireblock entire exterior wall at drop ceiling - Mineral wool ok / UNIT 304: Fireblock switch wires at entry - Mineral wool ok / UNITS: 103, 104, 203, 204 ok | TIMOTHYS | TIMOTHYS | | BFR | P | 6451096 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/10/2020 | OSB wall sheer at center tower at 1st and 2nd floor at east and west walls inside of units OK | DANE | DANE | | BSP | P | 6449873 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 01/09/2020 | first layer of rock and attachments at roof ceiling and floor ceiling assemblies in center tower corridors OK / note 2nd layer is to break between rafters at 3rd level | DANE | DANE | | BSP | P | 6448622 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 01/06/2020 | inspection site canceled - sheer not ready per Elmer of MCP | DANE | DANE | | BFR | R | 6444298 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 01/03/2020 | Building 10 Side towers / UNIT 201: Missing mineral wool at top plates - Fireblock fire sprinkler line bottom plate back bedroom / UNIT 101: Complete stair drywall fur down / UNIT 202: Missing mineral wool at top plates / UNIT 107: Missing mineral wool at top plates - Stair fur downs ok / UNIT 207: Missing mineral wool at top plates / UNIT 208: Missing mineral wool at top plates / GARAGE 1: ok / GARAGE 2: ok / GARAGE 3: Stair fur down ok / GARAGE 4: Stair fur down ok / GARAGE 5: ok / GARAGE 6: Missing anchors at rear wall | TIMOTHYS | TIMOTHYS | | BFR | P | 6442491 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 01/02/2020 | Field cancelled by superintendent Elemr Vigil | TIMOTHYS | TIMOTHYS | | BFR | R | 6441355 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 11/22/2019 | 2nd and 3rd floor balcony framing ok all units | TIMOTHYS | TIMOTHYS | | BFR | P | 6408467 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 11/20/2019 | Field cancelled by contractor - not ready | TIMOTHYS | TIMOTHYS | | BFR | R | 6405349 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 11/18/2019 | Steel deck beam bolts not seated all end unit decks | TIMOTHYS | TIMOTHYS | | BFR | R | 6402079 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/15/2019 | ES report for spray foam insulation on file - Installers certificate for blown in insulation on file | TIMOTHYS | TIMOTHYS | | BSP | P | 6368178 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/29/2019 | Engineering letter to eliminate putty pads in fire rated walls providing that conditions of IBC 713.3.2 are met. | CHUCK | CHUCK | | BSP | P | 6317944 |
MARTINES PALMEIRO CONSTRUCTION | BFN | C | 06/19/2019 | Open ex. and observation for concrete reinforcing steel. | CHUCK | CHUCK | | BFN | C | 6236085 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 06/12/2019 | 3rd floor breezeway ceiling frame OK. | CHUCK | CHUCK | | BSP | P | 6228529 |
MARTINES PALMEIRO CONSTRUCTION | BSP | T | 05/30/2019 | PAID (REC#1602442): ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY Under stair details; sprinkler line soffit details; washer/dryer/shower box details. | SHELLEY | SHELLEY | | BSP | T | 6214513 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 05/30/2019 | Breezeway drywall and screw spacing OK per WP8105 assembly wall, all floors, center tower. DWV pipes moved, assembly wall continuity restored, 1st floor. | CHUCK | CHUCK | | BSP | P | 6214498 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 05/24/2019 | Missing hanger shear nails - penetrations through ledger not draftstopped/fire blocked. | CHUCK | CHUCK | | BFR | R | 6209677 |
MARTINES PALMEIRO CONSTRUCTION | BSP | T | 05/24/2019 | PAID (REC#1601910): Screw spacing does not conform to WP8105 assembly requirements - DWV penetrations through assembly still not addressed at Unit 104/106 breezeway walls. | CHUCK | CHUCK | | BSP | T | 6209669 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/24/2019 | Cannot accept damper paperwork. Inspection and image to go to mechanical inspector. | CHUCK | CHUCK | | BSP | R | 6209432 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/14/2019 | Screw fasteners splitting joints, missing spacing and continuity interrupted by DWV pipe through assembly wall at Units 104 and 106 - Inspection stopped. | CHUCK | CHUCK | | BSP | R | 6197995 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 05/13/2019 | Exterior wing wall framing OK - Stamped paperwork received for 2-2x4 plate connections on 2x8 wall. | CHUCK | CHUCK | | BFR | P | 6196468 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/06/2019 | Interior shear walls at garages - sill anchors missing plates or too close to edge of plate. / Missing nails at top of shear wall in Unit 207 - Remaining shear wall fasteners OK. | CHUCK | CHUCK | | BSP | R | 6188391 |
MARTINES PALMEIRO CONSTRUCTION | BSP | T | 05/02/2019 | PAID (REC#1595685): ADDITIONAL PLAN REVIEW TIME: $50 From: BPHILLIPS Provided details on washer and shower box assemblies. | BPHILLIPS | BPHILLIPS | | BSP | T | 6185606 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 04/25/2019 | RFI 103 Revision STAMPED BY ARCHITECT | JEREMYA | JEREMYA | | BFR | P | 6177482 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 03/25/2019 | exterior shear including exterior corridor OK / need engineer observations for footing and foundation and open hole | DANE | DANE | | BSP | P | 6143756 |
DIE HARD, INC | E= | C | 06/18/2020 | | RANDY | RANDY | | E= | C | 6608771 |
COLORADO SECURITY, LLC | E= | C | 06/17/2020 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6607416 |
DIE HARD, INC | E= | P | 06/16/2020 | ok pending f.a circuit wiring | BRET | BRET | | E= | P | 6606676 |
DIE HARD, INC | E= | P | 06/11/2020 | breezways | RANDY | RANDY | | E= | P | 6600909 |
DIE HARD, INC | E= | P | 06/10/2020 | Ran out of time / call back in / Mitch wanted to focus on1110 | BRETC | BRETC | | E= | P | 6600470 |
DIE HARD, INC | E= | P | 06/05/2020 | a/c ok | BRET | BRET | | E= | P | 6595457 |
DIE HARD, INC | E= | P | 06/04/2020 | garages ok | BRET | BRET | | E= | P | 6593932 |
DIE HARD, INC | E= | P | 06/03/2020 | center tower units ok | RANDY | RANDY | | E= | P | 6591820 |
DIE HARD, INC | ER | C | 02/12/2020 | no drop ceilings on outer units | BRET | BRET | | ER | C | 6480140 |
DIE HARD, INC | ER | P | 02/11/2020 | Middle tower drop ceilings ok. | BRETC | BRETC | | ER | P | 6478965 |
COLORADO SECURITY, LLC | ER | P | 01/09/2020 | FIRE ALARM INSPECTION: fire alarm ok except riser room | BRET | BRET | | ER | P | 6447768 |
DIE HARD, INC | EP | P | 01/09/2020 | unit panels ok | BRET | BRET | | EP | P | 6447767 |
DIE HARD, INC | ER | P | 01/09/2020 | all units and garages ok except drop ceilings | BRET | BRET | | ER | P | 6447766 |
DIE HARD, INC | EP | P | 01/08/2020 | center tower panels ok | BRET | BRET | | EP | P | 6446601 |
DIE HARD, INC | ER | R | 01/08/2020 | center tower unit ok need fire alarm attached to permit | BRET | BRET | | ER | R | 6446600 |
DIE HARD, INC | ES | C | 11/08/2019 | Commercial Service: 800 amp 4/w 120/208-----ok to set unit meters----101,103,104,105,201,202,203,204,205,206,207,208,301,302,303,304 and house---check water next inspection | RANDY | RANDY | | ES | C | 6392895 |
DIE HARD, INC | EUG | P | 07/25/2019 | lighting and fire alarm conduits | BRET | BRET | | EUG | P | 6276315 |
DIE HARD, INC | ER | P | 06/07/2019 | breezeway | BRET | BRET | | ER | P | 6223943 |
HORIZON LLC OF SOUTH CAROLINA | H= | C | 07/14/2020 | BUILDING 10. GAS/ELECTRIC METER VERIFICATION LETTER RECEIVED / GAS AND WATER HEATER VENT FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6636388 |
LDI MECHANICAL, INC. | H= | C | 06/19/2020 | BUILDING 10. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6611042 |
LDI MECHANICAL, INC. | H= | P | 06/18/2020 | BUILDING 10. MECHANICAL FINAL OK IN CENTER TOWER AND ROOF. STILL NEED TO SEE END UNITS AND OUTSIDE. | DUSTINS | DUSTINS | | H= | P | 6609434 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 06/08/2020 | BUILDING 10. GAS AND WATER HEATER VENT FINAL OK PENDING METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6596513 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 06/02/2020 | BUILDING 10. GAS AND WATER HEATER VENT FINAL OK EXCEPT 106: MISSING CONCENTRIC VENTING AND CAP ON ROOF. NEED METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6590726 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 05/14/2020 | BUILDING 10. GAS AND WATER HEATER VENT FINAL OK EXCEPT 101 AND 107: MISSING BAY VENT TERMINATION. 106: MISSING CONCENTRIC VENT/CAP ON ROOF. 208: IMPROPER GLUE JOINT AT FIRST 90 DEGREE ELBOW ON EXHAUST VENT. 105, 205, 204, 302 AND 303: CONNECT GAS TO WATER HEATER. NEED METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6571917 |
LDI MECHANICAL, INC. | HD | C | 04/10/2020 | BUILDING 10. ALL APARTMENTS GAPS TO SUPPLY OUTLETS FROM SHEET ROCK OK. | DUSTINS | DUSTINS | | HD | C | 6537706 |
LDI MECHANICAL, INC. | HD | P | 04/02/2020 | BUILDING 10. ALL APARTMENTS GAPS TO SUPPLY OUTLETS FROM SHEET ROCK OK EXCEPT 202: NEED TO ADDRESS BEDROOM SUPPLY. | DUSTINS | DUSTINS | | HD | P | 6530064 |
LDI MECHANICAL, INC. | HD | P | 02/18/2020 | BUILDING 10. MECHANICAL ROUGH ABOVE DROP CEILINGS OK. STILL NEED TO SEE GAPS AROUND SUPPLY OUTLETS TO SHEET ROCK. | DUSTINS | DUSTINS | | HD | P | 6484511 |
LDI MECHANICAL, INC. | HSP | P | 09/20/2019 | RECEIVED LETTER FROM ENGINEER ADDRESSING THE GAPS AROUND SUPPLY OUTLETS, SEE IMAGES. | DUSTINS | DUSTINS | | HSP | P | 6342046 |
HORIZON LLC OF SOUTH CAROLINA | HV | C | 08/05/2019 | BUILDING 10. WATER HEATER VENTS ABOVE CEILING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HV | C | 6289016 |
HORIZON LLC OF SOUTH CAROLINA | HWP | C | 08/05/2019 | BUILDING 10. HOT WATER SUPPLY/RETURN PIPING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HWP | C | 6289013 |
LDI MECHANICAL, INC. | HV | C | 08/05/2019 | BUILDING 10. FURNACE VENTS ABOVE CEILING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HV | C | 6289012 |
LDI MECHANICAL, INC. | HD | P | 08/05/2019 | BUILDING 10. MECHANICAL ROUGH ABOVE CEILING OK IN ALL APARTMENTS. STILL NEED TO SEE ALL GAPS AROUND SUPPLY OUTLETS, BATH FANS AFTER PRE ROCK IN CENTER TOWER AND 107. | DUSTINS | DUSTINS | | HD | P | 6288999 |
LDI MECHANICAL, INC. | HD | P | 08/02/2019 | BUILDING 10. CENTER TOWER MECHANICAL ROUGH ABOVE CEILING OK. STILL NEED TO SEE BATH FANS AFTER PRE ROCK INSTALLED AND GAPS AROUND SUPPLY OUTLETS AFTER SHEET ROCK IS INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6286442 |
HORIZON LLC OF SOUTH CAROLINA | HC | C | 03/29/2019 | OK TO SET EIGHTEEN 2 LB METERS AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6149018 |
HORIZON LLC OF SOUTH CAROLINA | HI | C | 03/29/2019 | BUILDING 10. EIGHTEEN 10 LB TEST OK. PIPING PER PLAN SPLICE. CHECK MEDIUM PRESSURE STICKERS, REGULATORS AND CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HI | C | 6149007 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 07/16/2020 | | TAYLOR | TAYLOR | | P= | C | 6640338 |
HORIZON LLC OF SOUTH CAROLINA | PTO | C | 07/16/2020 | | TAYLOR | TAYLOR | | PTO | C | 6640334 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 07/14/2020 | all DWV ok minus 1st floor flanges. | TAYLOR | TAYLOR | | PTO | P | 6636452 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 07/10/2020 | DWV at middle tower ok. | TAYLOR | TAYLOR | | PTO | P | 6633504 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/16/2020 | Need test on all DWV piping / expose all traps and in wall piping. | DANR | DANR | | PTO | P | 6605692 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 08/05/2019 | water pipe ok | JOSEPHD | JOSEPHD | | PTO | P | 6288297 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 10/30/2018 | water service ok. | TAYLOR | TAYLOR | | PB | C | 6009837 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 08/06/2018 | DWV branches ok | DANR | DANR | | PB | P | 5924800 |
HORIZON LLC OF SOUTH CAROLINA | PB | L | 08/03/2018 | field cancelled. | TAYLOR | TAYLOR | | PB | L | 5923017 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/25/2018 | trunk line and risers ok. | TAYLOR | TAYLOR | | PB | P | 5913109 |
HORIZON LLC OF SOUTH CAROLINA | PB | L | 07/24/2018 | field cancelled. | TAYLOR | TAYLOR | | PB | L | 5911777 |
LDI MECHANICAL, INC. | XMS | P | 04/09/2020 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Engineer letter for unit 2.2 Bath exhaust | JUSTINC | JUSTINC | | XMS | P | 6536768 |
COLORADO SECURITY, LLC | XES | P | 02/19/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Splice to address inspector's comments - Provide series rated list. | BERTHA | BERTHA | | XES | P | 6486348 |
LDI MECHANICAL, INC. | XMS | T | 11/21/2019 | PAID (REC#1653146): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Gas added to BBQ | JUSTINC | JUSTINC | | XMS | T | 6406652 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 09/12/2019 | PAID (REC#1629377): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Lower roof access hatch | SHELLEY | SHELLEY | | XBS | T | 6332405 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2019 | PAID (REC#1624384): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised G-501, G502, G503, (new)G504C, G502B, A432C - under stair rating/details, revised listed chase wall and dryer box details. | SHELLEY | SHELLEY | | XBS | T | 6309419 |
DIE HARD, INC | XES | T | 07/29/2019 | PAID (REC#1617794): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added EUH's to garages. | BERTHA | BERTHA | | XES | T | 6279712 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/29/2019 | PAID (REC#1617795): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Added heat to garages, revised rescheck, sprinkler line details. | SHELLEY | SHELLEY | | XBS | T | 6279350 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/01/2019 | PAID (REC#1614475): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Listed assembly modifications, soffits for fire sprinklers | SHELLEY | SHELLEY | | XBS | T | 6249372 |
LDI MECHANICAL, INC. | XMS | T | 06/25/2019 | PAID (REC#1609334): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace operation in fire event | JUSTINC | JUSTINC | | XMS | T | 6242780 |
LDI MECHANICAL, INC. | XMS | T | 05/21/2019 | PAID (REC#1600554): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace detail | JUSTINC | JUSTINC | | XMS | T | 6205823 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/26/2019 | PAID (REC#1594357): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Knee wall detail | SHELLEY | SHELLEY | | XBS | T | 6179876 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/15/2019 | PAID (REC#1590597): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised under stair space and plumbing wall assembly per GA general notes. | SHELLEY | SHELLEY | | XBS | T | 6165239 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/01/2019 | PAID (REC#1587049): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor/ceiling assembly | SHELLEY | SHELLEY | | XBS | T | 6150286 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 01/11/2019 | PAID (REC#1575781): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Gas revisions | JUSTINC | JUSTINC | | XMS | T | 6075868 |
MARTINES PALMEIRO CONSTRUCTION | XBS | P | 01/10/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Gas meter location on buildings. | SHELLEY | SHELLEY | | XBS | P | 6074184 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2018 | PAID (REC#1530472): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Foundation modification | SHELLEY | SHELLEY | | XBS | T | 5940243 |