MARTINES PALMEIRO CONSTRUCTION | B= | C | 05/22/2020 | All other required Final inspections are complete. (This is a computer generated result) | CHUCK | CHUCK | | B= | C | 6581303 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 05/08/2020 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6565997 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 05/07/2020 | Building final OK. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6564309 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 05/06/2020 | Still need to maintain rated assembly continuity at plumbing pipe membrane penetration in 1st floor breezeway mech. closet / Complete all other final inspections // Rest of building final items complete. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet, HORIZON, LLC Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6563135 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 05/01/2020 | Side Towers: Need to install smoke seals on doors // Need to seal penetrations in water heater closet ceilings // Complete all other final inspections to include outside agencies -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet, HORIZON, LLC Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 6558890 |
MARTINES PALMEIRO CONSTRUCTION | B= | P | 04/27/2020 | Partial final inspection - Center tower units only -- All center tower unit entry doors missing smoke seals / Need to install rated fire extinguisher cabinets in breezeways, all floors / Need to secure bottom of guards at Unit 103 and 104 patios / Need to maintain rated assembly continuity at plumbing pipe membrane penetration in 1st floor mech. closet // Rest of Unit building final OK in center tower. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COLORADO SECURITY, LLC Electrical Final Inspection is not Completed yet, HORIZON, LLC Mechanical Final Inspection is not Completed yet, HORIZON, LLC Plumbing Final Inspection is not Completed yet, LDI MECHANICAL, INC. Mechanical Final Inspection is not Completed yet. | CHUCK | CHUCK | | B= | P | 6552259 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 04/10/2020 | Metal frame and firestopping for sprinkler soffits in garages 2 and 5 OK. | CHUCK | CHUCK | | BSP | P | 6537251 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/19/2019 | Side tower drywall inspection / Rock and rock attachment ok UNITS: 107, 108 / Rock and rock attachment and 2nd layer ceiling rock and rock attachment ok UNITS: 207, 208 / Will need to inspect fire sprinkler fireblocking within soffits before covering | TIMOTHYS | TIMOTHYS | | BSP | P | 6432439 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/16/2019 | Center tower screw inspection / Rock and rock attachment ok UNITS: 103, 104, 203, 204, 205, 206 GARAGES: 4, 5, 6 / Rock and rock attachment and 2nd layer on ceilings ok UNITS: 301, 302, 303, 304 | TIMOTHYS | TIMOTHYS | | BSP | P | 6428610 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/11/2019 | Rock and rock attachment, and fire sprinkler fireblocking now ok UNIT: 205 | TIMOTHYS | TIMOTHYS | | BSP | P | 6423778 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 12/10/2019 | Bathroom ceiling drop fireblocking ok UNITS: 104, 103, 206, 203, 206, 301, 302, 303, 304 / UNIT 205: large patch cut from ceiling for fire sprinkler work, repair and recall / Fire sprinkler fireblocking within soffits ok UNITS: 301, 302, 303, 304 | TIMOTHYS | TIMOTHYS | | BSP | P | 6422235 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/20/2019 | 2nd layer rock and rock attachment ok under stairs all units | TIMOTHYS | TIMOTHYS | | BSP | P | 6405369 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/14/2019 | First layer rock and rock attachment understairs ok UNITS: 101, 102, 107, 108 / Second layer rock and rock attachment 3rd floor breezeway and first floor breezeway entrance lids ok | TIMOTHYS | TIMOTHYS | | BSP | P | 6399095 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/13/2019 | 2nd layer rock and rock attachment ok bathroom drop ceilings UNITS: 301, 302, 303, 304 / Rock and rock attachment ok bathroom drop ceilings UNITS: 203, 204, 205, 206, 103, 104 / UNIT 203: Fireblock new holes in plates at pvc, sprinkler, and service lines added since BFR / UNIT 301: Rock corrected at bedroom ceiling | TIMOTHYS | TIMOTHYS | | BSP | P | 6397500 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/12/2019 | 1st layer rock and rock attachments at ceiling ok UNITS: 201, 202, 207, 208, 302, 303, 304 / UNIT 301: Plywood on ceiling in bedroom, remove and replace with correct rock | TIMOTHYS | TIMOTHYS | | BSP | P | 6396049 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/11/2019 | RC ok at units 101, 102, 103, 204, Garages 1-6 / RC and tub drain corrections ok at units 104, 107, 206, 207 / Unit 103 corrections complete from BSP 11/8/19 | TIMOTHYS | TIMOTHYS | | BSP | P | 6394584 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 11/08/2019 | center tower corridor ceilings rock / level 3 - first layer of rock and attachments OK / levels 2 and 1 rock and attachments OK | DANE | DANE | | BSP | P | 6393456 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 11/08/2019 | RC at bathroom ceilings for prerock / units 101 102 203 and 204 OK / unit 104 107 206 and 207 need tub drain penetrations corrected and RC completed / unit 103 need to remove rock installed before inspection | DANE | DANE | | BSP | R | 6393453 |
MARTINES PALMEIRO CONSTRUCTION | BIN | P | 11/04/2019 | Spray foam and blown in insulation ok all units and garages - Installers certs and ES reports on file | TIMOTHYS | TIMOTHYS | | BIN | P | 6387038 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 11/01/2019 | Frame reinspect, Interior unit shear inspection, Prerock inspection / Unit 201: Fireblock bottom plate bedroom closet - Fireblock all chases / Unit:204: Fireblock hole in top plate corner of shower / Unit 107: Fireblock all chases / Interior shear and preock ok Units: 206, 205, 204, 203 / Prerock ok Units: 108, 301, 302, 303, 304, 201 | TIMOTHYS | TIMOTHYS | | BFR | P | 6385774 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 10/23/2019 | Building 11 Frame reinspect / Outstanding items: GARAGE 4: Missing holddowns at garage door - Fireblock 1 1/2" PVC rear wall / UNIT 108: Missing anchor rear bedroom closet wall / UNIT 107: Fireblock all chases / UNIT 207: Fireblock chase by bathroom / UNIT 201: Fireblock bottom plate bedroom closet - Fireblock all chases / UNIT 301: Fireblock bottom plate penetrations bedroom closet | TIMOTHYS | TIMOTHYS | | BFR | P | 6377617 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 10/17/2019 | Building 11 partial frame inspection continued - Unit 103: Dryer box prerock ok - Frame ok / Unit 201: Dryer box prerock ok - Mineral wool at top plate ok - Fireblock bottom plate bedroom closet - Fireblock chase left of mech room - Fireblock chase at shower / Unit: 204: Fireblock hole top plate corner of shower - Dryer box prerock ok - Frame ok / Unit 203: Dryer box prerock ok - Frame ok / Unit 205: Dryer box prerock ok - Frame ok / Unit 206: Dryer box prerock ok - Frame ok / Unit 301: Dryer box prerock ok - Mineral wool at top plates ok - Fireblock bottom plate penetrations bedroom closet / Unit: 302: Dryer box prerock ok - Mineral wool at top plate ok - Frame ok / Unit 303: Dryer box prerock ok - Mineral wool at top plate ok - Fireblock 2" pvc left of panel - Fireblock 12-2 wire coat closet by entry - Fireblock kitchen island / Unit 304: Dryer box prerock ok - Mineral wool at top plate ok - Frame ok / | TIMOTHYS | TIMOTHYS | | BFR | P | 6371915 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 10/16/2019 | Field cancelled by contractor | TIMOTHYS | TIMOTHYS | | BFR | R | 6370208 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 10/15/2019 | Building 11 partial frame inspection continued / Unit 104: Fireblock gas line at mech room - Broken block in common wall at laundry, replace and fireblock / Unit 107: Fireblock all chases - Received engineers repair detail for C06, repairs ok per detail - Under stair framing ok / Unit 207: Fireblock chase by bathroom - Fireblock common wall at laundry / Rest of 1st floor still needs inspected, Rest of 2nd floor needs inspected, 3rd floor not inspected yet | TIMOTHYS | TIMOTHYS | | BFR | P | 6368595 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 10/15/2019 | ES report for spray foam insulation on file - Installers certificate for blown in insulation on file | TIMOTHYS | TIMOTHYS | | BSP | P | 6368170 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 10/11/2019 | Field cancelled by contractor | TIMOTHYS | TIMOTHYS | | BFR | R | 6365627 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 10/10/2019 | Building 11 partial frame inspection / Garage 4: Missing holddowns at garage door - Fireblock 1 1/2" pvc rear of garage / Unit 108: Fireblock holes in top pate front bedroom closet - Missing anchor rear bedroom closet wall - Under stair framing ok / Unit 101: Frame ok, Under stair framing ok / Garages: 1,2,3,5,6 Frame ok / Rest of first floor still needs inspected, 2nd floor, 3rd floor still needs inspected - Received engineers truss repair detail for F13X, truss repair ok per detail | TIMOTHYS | TIMOTHYS | | BFR | P | 6364701 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 09/23/2019 | Inspection stopped - Center shear walls, 1st floor - Missing plate anchors and need to remove debris in wall cavities, unit 101 / Missing fire stopping at DWV pipe, garage, right of breezeway / Over-notched stud in bathroom and over-notched top plate in laundry closet, unit 206. | CHUCK | CHUCK | | BFR | R | 6344214 |
MARTINES PALMEIRO CONSTRUCTION | BFR | R | 09/09/2019 | Not ready, center tower units - Fire stopping not started / Insulation installed in 1st floor unit/unit S2B shear wall cavities - unable to verify framing. | CHUCK | CHUCK | | BFR | R | 6327962 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 08/29/2019 | Engineering letter to eliminate putty pads in fire rated walls providing that conditions of IBC 713.3.2 are met. | CHUCK | CHUCK | | BSP | P | 6317929 |
MARTINES PALMEIRO CONSTRUCTION | BFN | C | 06/19/2019 | Open ex. and observation for concrete reinforcing steel. | CHUCK | CHUCK | | BFN | C | 6236082 |
MARTINES PALMEIRO CONSTRUCTION | BSP | R | 05/24/2019 | Cannot accept damper paperwork. Inspection and image to go to mechanical inspector. | CHUCK | CHUCK | | BSP | R | 6209438 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 05/23/2019 | 3rd floor breezeway framing OK. | CHUCK | CHUCK | | BFR | P | 6208413 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 05/06/2019 | Deck wing wall frame OK - Copy of RFI received for connection of double 2x4 plates on 2x8 wing walls. | CHUCK | CHUCK | | BFR | P | 6188400 |
MARTINES PALMEIRO CONSTRUCTION | BFR | P | 04/25/2019 | RFI 103 Revision STAMPED BY ARCHITECT | JEREMYA | JEREMYA | | BFR | P | 6177485 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 03/05/2019 | rock and attachments at exterior side of rated corridor walls OK | DANE | DANE | | BSP | P | 6124906 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/11/2019 | interior OSB shear OK | DANE | DANE | | BSP | P | 6104132 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/08/2019 | Training with Dane - Exterior shear inspection - Discussed sticker reading, code study, examination of rough framing plans, and shear schedules including holddowns | TIMOTHYS | TIMOTHYS | | BSP | P | 6102419 |
MARTINES PALMEIRO CONSTRUCTION | BSP | P | 02/08/2019 | exterior shear including breezeway OK / training with Tim S. | DANE | DANE | | BSP | P | 6102412 |
MARTINES PALMEIRO CONSTRUCTION | BSP | T | 02/05/2019 | PAID (REC#1574274): ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY TRUSSES | SHELLEY | SHELLEY | | BSP | T | 6097403 |
COLORADO SECURITY, LLC | E= | C | 05/13/2020 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6569957 |
DIE HARD, INC | E= | C | 04/21/2020 | | RANDY | RANDY | | E= | C | 6546618 |
DIE HARD, INC | E= | P | 04/09/2020 | unit 104 has 50 amp outlet for dryer----- 103 ok---207 ok | RANDY | RANDY | | E= | P | 6536226 |
DIE HARD, INC | E= | P | 04/08/2020 | 2nd and 3rd floor units 8 in total | RANDY | RANDY | | E= | P | 6534873 |
DIE HARD, INC | E= | P | 04/06/2020 | units 201,202,208,101,102,107,108 ok----unit 207 kitchen breakers will not test, | RANDY | RANDY | | E= | P | 6532006 |
DIE HARD, INC | E= | P | 04/03/2020 | breezeway ok | BRET | BRET | | E= | P | 6530828 |
DIE HARD, INC | E= | P | 04/02/2020 | no power to service receptacles, ac units ok center tower units 25 amp max, east and west units 30 amp max | BRET | BRET | | E= | P | 6529762 |
DIE HARD, INC | ES | C | 01/07/2020 | Commercial service:800 amp service need meter set for 125amp units101,102,103,104,107,108.201,102,203,304,205,206,207,208,301,302,303, 304 and 200 amp house panel | BRET | BRET | | ES | C | 6445175 |
DIE HARD, INC | ES | R | 01/02/2020 | need access to ufer connection, make water bond cannot release service without an electrode made | BRET | BRET | | ES | R | 6441255 |
DIE HARD, INC | ER | P | 11/20/2019 | drop ceiling | BRET | BRET | | ER | P | 6405679 |
DIE HARD, INC | EP | P | 08/21/2019 | unit panels ok | BRET | BRET | | EP | P | 6308355 |
DIE HARD, INC | ER | P | 08/21/2019 | all units ok except bath drop lids | BRET | BRET | | ER | P | 6308354 |
DIE HARD, INC | ER | P | 08/20/2019 | east tower units except 208, and first floor unit island | BRET | BRET | | ER | P | 6307001 |
DIE HARD, INC | ER | P | 08/15/2019 | breeze way ok | BRET | BRET | | ER | P | 6301877 |
COLORADO SECURITY, LLC | ER | P | 08/09/2019 | FIRE ALARM INSPECTION: ok except 302 missing cable to living room device | BRET | BRET | | ER | P | 6294678 |
DIE HARD, INC | EUG | P | 07/18/2019 | fire alarm and lighting conduits thru parking and drive | BRET | BRET | | EUG | P | 6268395 |
DIE HARD, INC | EUG | P | 07/10/2019 | conduits for fire alarm and lighting thru drive and parking | BRET | BRET | | EUG | P | 6258604 |
DIE HARD, INC | ER | P | 05/23/2019 | Rough ok for 3rd level breezeway lid / | ROB | ROB | | ER | P | 6209169 |
HORIZON LLC OF SOUTH CAROLINA | H= | C | 05/07/2020 | BUILDING 11. GAS/ELECTRIC METER VERIFICATION LETTER RECEIVED / GAS AND WATER HEATER VENT FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6563744 |
LDI MECHANICAL, INC. | H= | C | 04/29/2020 | BUILDING 11. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6555613 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 04/24/2020 | BUILDING 11. GAS AND WATER HEATER VENT FINAL OK PENDING METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6551424 |
LDI MECHANICAL, INC. | H= | P | 04/24/2020 | BUILDING 11. MECHANICAL FINAL OK IN END UNITS ONLY. STILL NEED TO SEE CENTER TOWER, ROOF AND OUTSIDE. | DUSTINS | DUSTINS | | H= | P | 6551414 |
LDI MECHANICAL, INC. | H= | P | 04/23/2020 | CANCELLED BY EMANUAL WITH LDI, THERMOSTATS NOT INSTALLED TO VERIFY INTERLOCKS. | DUSTINS | DUSTINS | | H= | P | 6549843 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 04/23/2020 | BUILDING 11. GAS AND WATER HEATER VENT FINAL OK EXCEPT 302: GAS LEAK ON FLEX CONNECTOR AT REGULATOR. 303: IMPROPER GLUE JOINT ON WATER HEATER EXHAUST VENT AT FIRST 45 DEGREE ELBOW. 101: CLAMP CONDENSATE DRAIN LINE. 201: CLAMP CONDENSATE DRAIN LINE. GAS LEAK ON FLEX CONNECTOR AT REGULATOR. 207: CLAMP CONDENSATE DRAIN LINE. 107: CLAMP CONDENSATE DRAIN LINE. 208: MISSING LOOP ON CONDENSATE DRAIN LINE. 202: CLAMP CONDENSATE DRAIN LINE. TIGHTEN EXHAUST VENT HOSE CLAMPS. 102: CLAMP CONDENSATE DRAIN LINE. NEED METER VERIFICATION FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6549839 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 04/17/2020 | BUILDING 11. GAS AND WATER HEATER VENT FINAL OK IN CENTER TOWER EXCEPT 205: MISSING CONDENSATE DRAIN LINE. 206: MISSING LOOP IN CONDENSATE DRAIN LINE. 302: GAS LEAK ON FLEX CONNECTOR AT REGULATOR. 303: IMPROPER GLUE JOINT AT FIRST 45 DEGREE ELBOW ON EXHAUST VENT PIPE. ROOF OK. STILL NEED TO SEE END UNITS AND OUTSIDE. NEED METER VERIFICATION LETTER FROM CSU. | DUSTINS | DUSTINS | | H= | P | 6544427 |
LDI MECHANICAL, INC. | HD | C | 03/27/2020 | BUILDING 11. ALL APARTMENTS GAPS AROUND SUPPLY OUTLETS TO SHEET ROCK OK. | DUSTINS | DUSTINS | | HD | C | 6523900 |
LDI MECHANICAL, INC. | HD | P | 03/25/2020 | BUILDING 11. ALL APARTMENTS GAPS AROUND SUPPLY OUTLETS TO SHEET ROCK OK EXCEPT 103: FRESH GLUE ON FLOOR FOR FLOORING, NO ENTRY. 204: FRESH GLUE ON FLOOR FOR FLOORING IN HALLWAY, NO ENTRY TO BEDROOM. 207: MISSING SUPPLY AIR IN LIVING ROOM. 301: MISSING SUPPLY AIR AT ENTRY. | DUSTINS | DUSTINS | | HD | P | 6521383 |
LDI MECHANICAL, INC. | HD | P | 12/05/2019 | BUILDING 11. STILL NEED TO SEE GAPS AROUND ALL SUPPLY OUTLETS WHEN SHEET ROCK IS INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6417358 |
LDI MECHANICAL, INC. | HD | P | 12/02/2019 | BUILDING 11 CENTER TOWER. INSPECTION ABOVE BATHROOM DROP CEILINGS. ALL UNITS: INSTALL RETURN WATER LINE INTO FAN COIL CABINET. 203: LACKS PROPER SLOPE ON CONDENSATE DRAIN LINE. 301, 302, 303 AND 304: REMOVE SHEET ROCK INSTALLED ON BATHROOM DROP CEILING. | NANCY | NANCY | | HD | P | 6413197 |
LDI MECHANICAL, INC. | HSP | P | 09/20/2019 | RECEIVED LETTER FROM ENGINEER ADDRESSING THE GAPS AROUND SUPPLY OUTLETS, SEE IMAGES. | DUSTINS | DUSTINS | | HSP | P | 6342050 |
LDI MECHANICAL, INC. | HV | C | 07/30/2019 | BUILDING 11. ALL FURNACE VENTS ABOVE CEILING OK, CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HV | C | 6282219 |
LDI MECHANICAL, INC. | HD | P | 07/30/2019 | BUILDING 11. MECHANICAL ROUGH ABOVE CEILING OK IN ALL APARTMENTS. STILL NEED TO SEE BATH EXHAUST COMPLETED IN CENTER TOWER AFTER PRE ROCK IS INSTALLED AND GAPS AROUND ALL SUPPLY OUTLETS AFTER SHEET ROCK IS INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6282211 |
LDI MECHANICAL, INC. | HD | P | 07/24/2019 | BUILDING 11. CENTER TOWER MECHANICAL ROUGH ABOVE CEILING OK. STILL NEED TO SEE BATH EXHAUST AFTER PRE-ROCK INSTALLED AND GAP AROUND SUPPLY OUTLETS AFTER SHEET ROCK IS INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6275847 |
HORIZON LLC OF SOUTH CAROLINA | HV | C | 06/24/2019 | BUILDING 11. STILL NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT. WATER HEATER VENTS ABOVE CEILING OK, CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HV | C | 6241892 |
HORIZON LLC OF SOUTH CAROLINA | HV | P | 06/21/2019 | BUILDING 11. STILL NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT. CENTER TOWER WATER HEATER VENTS ABOVE CEILING OK EXCEPT ONE ON THIRD FLOOR EAST CLOSET IS BROKEN AT CONCENTRIC KIT. | DUSTINS | DUSTINS | | HV | P | 6239886 |
HORIZON LLC OF SOUTH CAROLINA | HWP | C | 06/21/2019 | BUILDING 11. STILL NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT. HOT WATER SUPPLY/RETURN PIPING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HWP | C | 6239881 |
HORIZON LLC OF SOUTH CAROLINA | HC | C | 03/20/2019 | OK TO SET EIGHTEEN 2 LB METERS AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6138440 |
HORIZON LLC OF SOUTH CAROLINA | HI | C | 03/20/2019 | NEED MECHANICAL CONTRACTOR TO ATTACH TO PERMIT. BUILDING 11. EIGHTEEN 10 LB TEST OK. PIPING PER PLAN SPLICE. CHECK MEDIUM PRESSURE STICKERS, REGULATORS AND CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HI | C | 6138428 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 04/29/2020 | Corrections made. | DANR | DANR | | P= | C | 6555016 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 04/24/2020 | Need inspection unit 101 / leak left lav unit 102 / run water heater pan drain unit 107 / rest ok. | DANR | DANR | | P= | P | 6550740 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 04/23/2020 | Inspection the following units only - All water heaters rooms need pipe support - PTO needs completed: 103 - 203 -204 and 205 hook up condensate to tail piece at lav - 206 hook up condensate at lav and leak right lav - 301-302-303-304. | DANR | DANR | | P= | P | 6549232 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/28/2019 | need to secure all 1st floor flanges, still need ALL tub / shwrs set w/ test on traps | JOHNS | JOHNS | | PTO | P | 6247705 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/26/2019 | ok for corrections **STILL NEED all 1st floor flanges set, ALL tub and shwrs installed w/ test on traps | JOHNS | JOHNS | | PTO | P | 6244759 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/24/2019 | ok for dwv and accessible measurements MINUS need to secure all first floor flanges, @ 102 AND 107 can not off set w.b. stack, horizontal dry vent @ all middle unit shwrs, @ 101 need accessible clearance @ both w.c. @ 107 need accessible clearance @ mstr w.c., and @ 108 need accessible clearance @ hall w.c.m rest ok | JOHNS | JOHNS | | PTO | P | 6241249 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 06/21/2019 | BLDG 11 TYPE D ok for main water and unit waters. NOTE: vtr, ALL GROUND FLOOR UNITS TYPE B = ALL BATHS COMPLY, unit shut offs @ mech, check water entry and water htrs @ final **STILL NEED dwv and accessible measurements | JOHNS | JOHNS | | PTO | P | 6239213 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 10/03/2018 | Water stub ok. | DANR | DANR | | PB | C | 5984216 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/30/2018 | all ok minus water service. | TAYLOR | TAYLOR | | PB | P | 5917412 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 07/26/2018 | trunk line and risers ok. | TAYLOR | TAYLOR | | PB | P | 5914596 |
COLORADO SECURITY, LLC | XES | P | 02/19/2020 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Splice to address inspector's comments - Provide series rated list. | BERTHA | BERTHA | | XES | P | 6486349 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 09/12/2019 | PAID (REC#1629374): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Lower roof access hatch | SHELLEY | SHELLEY | | XBS | T | 6332410 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 08/21/2019 | PAID (REC#1624383): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised G-501, G502, G503, (new)G504C, G502B, A432D - under stair rating/details, revised listed chase wall and dryer box details. | SHELLEY | SHELLEY | | XBS | T | 6309427 |
DIE HARD, INC | XES | T | 07/29/2019 | PAID (REC#1617788): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Added EUH's to garages. | BERTHA | BERTHA | | XES | T | 6279724 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/29/2019 | PAID (REC#1617789): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Added heat to garages, revised rescheck, sprinkler line details. | SHELLEY | SHELLEY | | XBS | T | 6279352 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 07/18/2019 | PAID (REC#1616098): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to relocate electric unit heaters at garages | JUSTINC | JUSTINC | | XMS | T | 6267934 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 07/01/2019 | PAID (REC#1614476): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Listed assembly modifications, soffits for fire sprinklers | SHELLEY | SHELLEY | | XBS | T | 6249386 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 06/25/2019 | PAID (REC#1609331): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace operation in fire event | JUSTINC | JUSTINC | | XMS | T | 6242786 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 05/30/2019 | PAID (REC#1602441): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Under stair details; sprinkler line soffit details; washer/dryer/shower box details. | SHELLEY | SHELLEY | | XBS | T | 6214509 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 05/21/2019 | PAID (REC#1600553): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised furnace detail | JUSTINC | JUSTINC | | XMS | T | 6205829 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/26/2019 | PAID (REC#1594358): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Knee wall detail | SHELLEY | SHELLEY | | XBS | T | 6179879 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/15/2019 | PAID (REC#1590602): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised under stair space and plumbing wall assembly per GA general notes. | SHELLEY | SHELLEY | | XBS | T | 6165220 |
MARTINES PALMEIRO CONSTRUCTION | XBS | T | 04/01/2019 | PAID (REC#1587123): PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised floor/ceiling assembly | SHELLEY | SHELLEY | | XBS | T | 6150258 |
HORIZON LLC OF SOUTH CAROLINA | XMS | T | 01/11/2019 | PAID (REC#1574476): PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Gas revisions | JUSTINC | JUSTINC | | XMS | T | 6075986 |
MARTINES PALMEIRO CONSTRUCTION | XBS | P | 01/10/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Gas meter location on buildings. | SHELLEY | SHELLEY | | XBS | P | 6074180 |