HOMEOWNER | B= | C | 02/26/2019 | | NICK | NICK | | B= | C | 6117591 |
HOMEOWNER | B= | P | 12/13/2018 | Need to install siding at front of house over metal roof patio section of house / Need to seal penetration of AC at exterior of house / Need to install landing and steps for front bedroom sliding door / All other aspects of final OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | NICK | NICK | | B= | P | 6052067 |
HOMEOWNER | BLA | C | 09/27/2018 | Lath okay | TRENTP | TRENTP | | BLA | C | 5978712 |
HOMEOWNER | BIN | C | 09/19/2018 | Previous item complete | RICHB | RICHB | | BIN | C | 5969927 |
HOMEOWNER | BFR | C | 09/19/2018 | Previous item complete | RICHB | RICHB | | BFR | C | 5969923 |
HOMEOWNER | BIN | P | 09/14/2018 | Thermal OK pending completion of BFR | RICHB | RICHB | | BIN | P | 5965710 |
HOMEOWNER | BFR | P | 09/14/2018 | Still need several hangers at double LVL nailed off in basement (at stair opening) / chimney framing need double 2x12 and hangers at cantilevered end - all other chimney framing OK | RICHB | RICHB | | BFR | P | 5965705 |
HOMEOWNER | BFD | C | 09/13/2018 | BFT and BFN completed | LONNYS | LONNYS | | BFD | C | 5963632 |
HOMEOWNER | BFN | C | 09/13/2018 | all paperwork on file | LONNYS | LONNYS | | BFN | C | 5963631 |
HOMEOWNER | BFT | C | 09/13/2018 | received updated footing observation | LONNYS | LONNYS | | BFT | C | 5963625 |
HOMEOWNER | BFR | P | 09/11/2018 | Still need letter to complete BFT / engineering received for (3) truss repairs - repairs OK / need (6) anchor bolts at plate breaks in garage / need hangers at stair opening fully nailed (basement) / need hangers installed at stair landing / need schedule 40 column in basement per plans (11 ga installed) / chimney framing not per plans / discussed all above items with Contractor onsite | RICHB | RICHB | | BFR | P | 5961230 |
HOMEOWNER | BSP | P | 09/11/2018 | received revised open hole | LONNYS | LONNYS | | BSP | P | 5960594 |
HOMEOWNER | BFD | P | 09/06/2018 | Need footing complete / Please see Lonny's comments for review | NICK | NICK | | BFD | P | 5956707 |
HOMEOWNER | BFT | P | 09/06/2018 | Date of observation of footing is 4/26, permit pulled on 5/3 / Please see Lonny's inspections comments for history | NICK | NICK | | BFT | P | 5956687 |
HOMEOWNER | BFN | P | 09/06/2018 | Soils report on file / Still need footing complete per Lonny's comments from previous inspections | NICK | NICK | | BFN | P | 5956682 |
HOMEOWNER | BTR | C | 08/15/2018 | | LONNYS | LONNYS | | BTR | C | 5934492 |
HOMEOWNER | BFD | P | 08/15/2018 | need to complete BFT and BFN | LONNYS | LONNYS | | BFD | P | 5934491 |
HOMEOWNER | BFN | P | 08/15/2018 | need to complete BFT / received foundation design / received foundation observation - ufer noted | LONNYS | LONNYS | | BFN | P | 5934490 |
HOMEOWNER | BFT | R | 08/15/2018 | received stamped open hole / received footing observation dated prior to permit | LONNYS | LONNYS | | BFT | R | 5934486 |
HOMEOWNER | BFD | P | 05/15/2018 | need to complete BFN and BFT / drain is usable to street / damp proofing OK | LONNYS | LONNYS | | BFD | P | 5844793 |
HOMEOWNER | BFN | P | 05/15/2018 | need to complete BFT / need foundation design and foundation observation | LONNYS | LONNYS | | BFN | P | 5844792 |
HOMEOWNER | BFT | P | 05/15/2018 | need stamped soils report / need stamped open hole / need stamped foundation design / need stamped footing observation / per field copy of open hole 2400 PSF - usable - 5% | LONNYS | LONNYS | | BFT | P | 5844791 |
HOMEOWNER | BFT | P | 05/15/2018 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 5844606 |
HOMEOWNER | BFN | P | 05/15/2018 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFN | P | 5844605 |
CL SHARPER ELECTRIC | E= | C | 12/07/2018 | 30-amp A/C ok, no appliancs or steamer installed, 50 amp prewire for future steamer, | JOHNN | JOHNN | | E= | C | 6046078 |
HOMEOWNER | ES | C | 09/05/2018 | Residential Underground: 200-amp 3 Wire service, ok to set meter / New / | ROB | ROB | | ES | C | 5955137 |
HOMEOWNER | ER | C | 09/05/2018 | Corrections complete / | ROB | ROB | | ER | C | 5955130 |
CL SHARPER ELECTRIC | ES | R | 08/30/2018 | need corrosion tape on GRC and need to see bushing on bottom. | JOHNN | JOHNN | | ES | R | 5951308 |
CL SHARPER ELECTRIC | ER | R | 08/30/2018 | nail plates:front of garage, kitchen top plate, grd round plastic box front of garage, nm connector in fireplace, add outlet with in 3' of bath sink on 1st floor, confirm dishwasher has dedicated circuit,-----------------------if basement has sub panel, check on final, no mcc,#6al,#8cu,rev ufer | JOHNN | JOHNN | | ER | R | 5951304 |
THE FURNACE GUY HEATING & COOLING | H= | C | 11/26/2018 | a/c x 1" , hi/lo transfer for w/h direct vent furn, finished basement | DAVIDH | DAVIDH | | H= | C | 6033874 |
THE FURNACE GUY HEATING & COOLING | HC | C | 09/10/2018 | RELEASE METER | DAVIDH | DAVIDH | | HC | C | 5959842 |
THE FURNACE GUY HEATING & COOLING | HRR | C | 09/10/2018 | | DAVIDH | DAVIDH | | HRR | C | 5959837 |
THE FURNACE GUY HEATING & COOLING | HRR | R | 09/06/2018 | Insulation shield to maintain 1" air gap from fireplace vent. | RANDYB | RANDYB | | HRR | R | 5957521 |
RIDGEVIEW PLUMBING | HI | C | 08/24/2018 | 10 lb test ok note 1 1/2" main 2 furn,2 f/p , 1 w/h,bbq , c/t and future tap good for 100,000 | DAVIDH | DAVIDH | | HI | C | 5945285 |
THE FURNACE GUY HEATING & COOLING | HRR | P | 08/22/2018 | basement fireplace needs framed on main level also insulation shield on main level fireplace needs tabs cut in to maintain 1"clearance. note a/c x 1, 6"osa to both furn direct vent | DAVIDH | DAVIDH | | HRR | P | 5942253 |
RIDGEVIEW PLUMBING | P= | C | 12/11/2018 | finished basement. | TAYLOR | TAYLOR | | P= | C | 6049353 |
RIDGEVIEW PLUMBING | P= | P | 12/10/2018 | Leak at laundry sink, rest ok. Note: pvb installed | MALYNDA | MALYNDA | | P= | P | 6047575 |
RIDGEVIEW PLUMBING | PTO | C | 08/27/2018 | Corrections made | SHANEN | SHANEN | | PTO | C | 5946795 |
RIDGEVIEW PLUMBING | PTO | P | 08/24/2018 | need 1 inch clearance from b- vent to 3 inch PVC, complete and test washer vent, need to re- grade the following ( vents in attic, kitchen, hall bath lav and shower, 3 inch drain in mech room ), rest ok, finished basement, aav at bar sink. | TAYLOR | TAYLOR | | PTO | P | 5945679 |
RIDGEVIEW PLUMBING | PB | C | 06/01/2018 | | JOEL | JOEL | | PB | C | 5862303 |
RIDGEVIEW PLUMBING | PB | P | 05/31/2018 | low test | JOEL | JOEL | | PB | P | 5860673 |
HOMEOWNER | XBS | T | 06/21/2018 | PAID (REC#1509540) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Shorten structure | MICHAELA | MICHAELA | | XBS | T | 5882055 |