COLARELLI CONSTRUCTION, INC. | B= | C | 03/11/2019 | All other Finals are now complete | RICHB | RICHB | | B= | C | 6129722 |
COLARELLI CONSTRUCTION, INC. | B= | P | 03/08/2019 | Temp CO: need fire and building ( Expires: 4/7/2019 12:00:00 AM) | JANE | JANE | | B= | P | 6128620 |
COLARELLI CONSTRUCTION, INC. | B= | P | 02/15/2019 | Addition & remodel OK pending other Finals. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6108890 |
COLARELLI CONSTRUCTION, INC. | BFN | C | 12/05/2018 | Foundation observations received | RICHB | RICHB | | BFN | C | 6043052 |
COLARELLI CONSTRUCTION, INC. | BFT | C | 12/05/2018 | Open Hole observation received - 2000 psf //// Structural Steel observation received | RICHB | RICHB | | BFT | C | 6043050 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 12/04/2018 | Framing along Gridline 4 OK pending other Roughs - all framing now complete pending other Roughs / Training with Justin - plan reading, IECC compliance (including thermal envelope materials and assemblies), commercial Final Inspection requirements | RICHB | RICHB | | BFR | P | 6042743 |
COLARELLI CONSTRUCTION, INC. | BSP | P | 12/04/2018 | Training with Rich - parameters for thermal envelope of commercial buildings - Commercial framing on interior remodels | JUSTINL | JUSTINL | | BSP | P | 6042741 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 11/13/2018 | Still need to inspect frame along entire grid line 4 -- Rest of interior light gauge framing OK -- Hat channel at vaulted portion of roof OK -- Frame at (4) new bathrooms in interior remodel section OK -- Reviewed accessible elements with contractor | DAKOTAB | DAKOTAB | | BFR | P | 6023775 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 09/28/2018 | Remainder of exterior framing OK pending other Roughs | RICHB | RICHB | | BFR | P | 5980631 |
COLARELLI CONSTRUCTION, INC. | BFR | P | 09/24/2018 | Need all third party observation for work thus far (Open Hole, foundation, bolt/weld) / framing for exterior walls (including parapet) - OK from Grid A to B and E to F pending other Roughs, pre-insulated jambs & headers observed, plans highlighted in green in field office | RICHB | RICHB | | BFR | P | 5973864 |
COLARELLI CONSTRUCTION, INC. | BFI | P | 07/30/2018 | COMcheck does not call for any foundation insulation but R10 ridged insulation has been installed around the inside of the entire foundation | DANE | DANE | | BFI | P | 5917505 |
COLARELLI CONSTRUCTION, INC. | BFN | P | 06/28/2018 | OK to use engineer for footing and foundation inspections / stamped paperwork to follow | DANE | DANE | | BFN | P | 5888079 |
RYBA ELECTRIC, INC. | E= | C | 02/15/2019 | | CRAIGS | CRAIGS | | E= | C | 6108839 |
RYBA ELECTRIC, INC. | EP | P | 02/04/2019 | all gear okay, only need correct labeling etc | GARYL | GARYL | | EP | P | 6096747 |
RYBA ELECTRIC, INC. | E= | P | 01/15/2019 | 1) rest of ceilings, 2) RTU's-- #1--60 amps., #2--125 amps, steam generator--60 amps | GARYL | GARYL | | E= | P | 6078886 |
DILLER ELECTRIC LLC | E= | C | 01/15/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 6078852 |
DILLER ELECTRIC LLC | E= | C | 01/15/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | E= | C | 6078843 |
DILLER ELECTRIC LLC | ER | C | 01/15/2019 | FIRE ALARM INSPECTION: | GARYL | GARYL | | ER | C | 6078842 |
RYBA ELECTRIC, INC. | ER | P | 01/14/2019 | all ceilings, NOTE! FA has not been called in, they will have it for 1/15, | GARYL | GARYL | | ER | P | 6077257 |
RYBA ELECTRIC, INC. | EP | P | 01/09/2019 | 1) transformer and 208 4-wires panel | GARYL | GARYL | | EP | P | 6073550 |
RYBA ELECTRIC, INC. | EP | P | 01/04/2019 | panels p211 ,dp211, and hp 4ll | BRET | BRET | | EP | P | 6068517 |
RYBA ELECTRIC, INC. | ER | P | 12/20/2018 | bath room expansion complete | GARYL | GARYL | | ER | P | 6060442 |
RYBA ELECTRIC, INC. | ER | P | 11/13/2018 | all of vaulted ceiling, check with Jake | GARYL | GARYL | | ER | P | 6023719 |
DILLER ELECTRIC LLC | ER | P | 11/13/2018 | FIRE ALARM INSPECTION: vaulted ceiling, east wall | GARYL | GARYL | | ER | P | 6023710 |
RYBA ELECTRIC, INC. | ER | P | 11/02/2018 | all walls OK | CRAIGS | CRAIGS | | ER | P | 6014634 |
DILLER ELECTRIC LLC | ER | P | 11/02/2018 | FIRE ALARM INSPECTION: wall stubs from the 8"wall north OK | CRAIGS | CRAIGS | | ER | P | 6014630 |
RYBA ELECTRIC, INC. | EUG | P | 08/15/2018 | EUG ok for pole lights and pole bases for east and west lots / | ROB | ROB | | EUG | P | 5935466 |
RYBA ELECTRIC, INC. | EUG | P | 08/07/2018 | EUG ok for floor boxes, misc. branch circuits, and stub for site work / | ROB | ROB | | EUG | P | 5926609 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 03/04/2019 | SPLICE COMPLETE | LIDO | LIDO | | H= | C | 6123072 |
COLORADO SHEET METAL CO., INC. | H= | C | 02/25/2019 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) | LIDO | LIDO | | H= | C | 6115759 |
COLORADO SHEET METAL CO., INC. | HSP | P | 02/20/2019 | TEST AND BALANCE REPORT REVIEW : NEED A REVISED TEST AND BALANCE REPORT FOR THE MISSING RTU-2 RETURN AIR READINGS / OR A STAMPED ENGINEER LETTER APPROVING NO RETURN AIR BALANCE REQUIRED FOR RTU-2 . | LIDO | LIDO | | HSP | P | 6111755 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/20/2019 | PARTIAL PENDING : IMAGE NOT EXCEPTED . GAS SPLICE WILL NEED TO GO THROUGH PLANS AND REVIEW SO IT CAN BE SCANNED INTO PLANS FOR THIS PERMIT. | LIDO | LIDO | | H= | P | 6111402 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/20/2019 | TEST AND BALANCE REPORT REVIEW :MISSING RETURN AIR READINGS FOR RTU-2 . | LIDO | LIDO | | H= | P | 6111400 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 02/07/2019 | METER RELEASE FOR MEDIUM PRESSURE SYSTEM / ADDED GAS LOAD ON EXISTING METER 995 K | LIDO | LIDO | | HC | C | 6100663 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/07/2019 | PARTIAL PENDING: PLAN PAGE M202 ( BDA167) SHOWS NEW GAS PIPING TYING INTO EXISTING HIGH PRESSURE GAS / THIS WILL NEED TO BE CLARIFIED IF THIS IS HIGH PRESSURE GAS OR MEDIUM PRESSURE GAS / IF THIS IS MEDIUM PRESSURE GAS PLANS WILL NEED TO BE REVISED TO SHOW THE CORRECT PRESSURE OF GAS . | LIDO | LIDO | | H= | P | 6100650 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/06/2019 | PLAN PAGE M202 ( BDA167) SHOWS NEW GAS PIPING TYING INTO EXISTING HIGH PRESSURE GAS / THIS WILL NEED TO BE CLARIFIED IF THIS IS HIGH PRESSURE GAS OR MEDIUM PRESSURE GAS / IF THIS IS MEDIUM PRESSURE GAS PLANS WILL NEED TO BE REVISED TO SHOW THE CORRECT PRESSURE OF GAS .(( MISSING MEDIUM PRESSURE LABELS.))OK TO ATTACH PICTURES TO NEXT INSPECTION REQUEST. | LIDO | LIDO | | H= | P | 6099887 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/06/2019 | PARTIAL PENDING: NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6099886 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/05/2019 | PARTIAL PENDING: NEED ROOF INSPECTION, NEED FINAL EXHAUST VENTING CONNECTIONS FOR TWO OVENS. NEED TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 6098465 |
LANDMARK PLUMBING AND HEATING, INC. | HSP | P | 01/30/2019 | PLAN PAGE M202 ( BDA167) SHOWS NEW GAS PIPING TYING INTO EXISTING HIGH PRESSURE GAS / THIS WILL NEED TO BE CLARIFIED IF THIS IS HIGH PRESSURE GAS OR MEDIUM PRESSURE GAS / IF THIS IS MEDIUM PRESSURE GAS PLANS WILL NEED TO BE REVISED TO SHOW THE CORRECT PRESSURE OF GAS . | LIDO | LIDO | | HSP | P | 6093014 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 01/28/2019 | NEED TO RESEARCH HIGH PRESSURE GAS NOTED ON PLAN PAGE M202 ( BDA167) NEED CAPS ON THE TWO GAS OUTLETS TO RTU-1/RTU-2, OK TO ATTACH PICTURES TO NEXT INSPECTION REQUEST/ WILL RELEASE METER AFTER . 10 LB TEST OK / GAS INSTALLED PER PLAN / STILL NEED REGULATORS ,FINAL CONNECTIONS TO ROOF TOPS AND TIE IN TO EXISTING GAS . | LIDO | LIDO | | HI | P | 6090155 |
COLORADO SHEET METAL CO., INC. | HD | P | 01/25/2019 | SUPPLY, RETURN, EXHAUST AND TRANSFER GRILLS AND REGISTERS FINAL CONNECTION IN DROP CEILING AREAS OK . | LIDO | LIDO | | HD | P | 6088381 |
COLORADO SHEET METAL CO., INC. | HSP | P | 01/25/2019 | SECTION OF DUCT WITH HUMIDIFIER (H-1) OK TO WRAP . | LIDO | LIDO | | HSP | P | 6087793 |
COLORADO SHEET METAL CO., INC. | HD | P | 12/28/2018 | NEED TO RESEARCH HUMIDIFIER ( H-1) DO NOT INSULATE. NEED REVISED AND APPROVED PLANS FOR ALL DUCT CHANGES. (SOUTH ROOMS ,TEST LAB SPACE /AREA SOUTH OF EXPOSED DUCT , OPEN OFFICE SPACE :ABOVE CEILING SUPPLY AND RETURN DUCT ROUGH OK / OK TO WRAP .) | LIDO | LIDO | | HD | P | 6065421 |
COLORADO SHEET METAL CO., INC. | HD | P | 10/25/2018 | FPB-5 WAS MOVED FROM OPEN OFFICE TO OFFICE # 9 THIS REQUIRES A REVISED AND APPROVED PLAN. RTU-1/ RTU-2 ABOVE CEILING DUCT ROUGH SUPPLY , RETURN AIR MAIN TRUNK LINE OK / OK TO WRAP, STILL HAVE SOME TRUNK LINES TO INSTALL , MECHANICAL PLANS HIGHLIGHTED ON SITE. | LIDO | LIDO | | HD | P | 6006379 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 02/20/2019 | Correction made, image from contractor uploaded. | DANR | DANR | | P= | C | 6111399 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/12/2019 | Need engineer letter for removal of hose bibs, rest ok. | DANR | DANR | | P= | P | 6104175 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/11/2019 | **STILL need engineers letter allowing cell core pvc piping and removing hose bibs**, rest ok for corrections made | JOHNS | JOHNS | | P= | P | 6103065 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/07/2019 | Need isolation valves pump ejector discharge lines - pipe support and seal pit lid holes at ejector, trap guards all floor drains, need engineer letter for cell core pvc pipe and removing hose bibs, rest ok. | DANR | DANR | | P= | P | 6100739 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 12/28/2018 | Dwv and domestic ok. Note: by final need engineer approval for pvc - plans splice on piping change on bathroom underground and removal of hose bibs, check water heaters and ejector pit connections at final. | DANR | DANR | | PTO | C | 6064774 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 12/28/2018 | Ok. Note: Plenum wrap need engineer approval for pvc by final. | DANR | DANR | | PRD | C | 6064767 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 11/14/2018 | Need engineer approval for pvc, drawings show cast, need inspection on all roof drain tie ins existing building, rest ok for new addition roof drains. | DANR | DANR | | PRD | P | 6025038 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 11/08/2018 | This inspection for bathrooms, need engineer approval for pvc dwv piping, need plenum wrap on non rated pipe in plenum, need engineer approval for removal of hose bibs, cover at own risk. Note: check domestic water connection in ceiling at final. | DANR | DANR | | PTO | P | 6020622 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 10/31/2018 | Need engineer approval for pvc piping , this inspection in wall only for room L2 dwv and domestic cover at own risk, Note: add ejector pit to scope of work, need rest of top out , need roof drain inspections ( 6" pipe needs 1/2" rod), need engineer letter and splice on plumbing base changes. | DANR | DANR | | PTO | P | 6011886 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 10/23/2018 | Switched to PB inspection, Need engineer splice and approval for material and circuit vent in bathroom, cover at own risk. | DANR | DANR | | PB | P | 6003152 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 08/07/2018 | Need engineer approval for pvc piping, cover at own risk. roof drain underground stub outs ok. | DANR | DANR | | PRD | P | 5926251 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 08/07/2018 | Need engineer approval for pvc piping, cover at own risk. | DANR | DANR | | PB | P | 5926250 |
COLORADO SHEET METAL CO., INC. | XMS | P | 02/27/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED NOTE FROM HI PRESSURE TO MEDIUM PRESSURE | JUSTINC | JUSTINC | | XMS | P | 6118715 |
COLARELLI CONSTRUCTION, INC. | XBS | T | 01/10/2019 | PAID (REC#1576620) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise layout | MICHAELA | MICHAELA | | XBS | T | 6075050 |
COLORADO SHEET METAL CO., INC. | XMS | P | 01/10/2019 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Layout revisions added exhaust new phone booth rooms | JUSTINC | JUSTINC | | XMS | P | 6075015 |
RYBA ELECTRIC, INC. | XES | T | 12/26/2018 | PAID (REC#1566900) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise 400 amp feeder | SHELBY | SHELBY | | XES | T | 6062517 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 08/06/2018 | PAID (REC#1524512) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 8-6-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5924610 |
COLARELLI CONSTRUCTION, INC. | XES | P | 08/03/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised for addition of sump pump - added receptacle and revised Panel P211. | BERTHA | BERTHA | | XES | P | 5922993 |