HIGH COTTON HOMES, INC | B= | C | 08/02/2019 | Building corrections complete - Building final OK. | CHUCK | CHUCK | | B= | C | 6286765 | HIGH COTTON HOMES, INC | B= | P | 07/05/2019 | Temp CO: pending health and building finals ( Expires: 8/4/2019 12:00:00 AM) | NELIDA | NELIDA | | B= | P | 6254606 | HIGH COTTON HOMES, INC | B= | P | 07/05/2019 | Still need to complete exterior finishes, exposed lath and plywood in places - Still need to seal exterior penetrations at electrical service entrance - Need to complete all downspouts and tip outs - Need fall protection at window well NE corner by patio - Other items corrected - UPDATE: Changed trip fee to partial | TIMOTHYS | TIMOTHYS | | B= | P | 6254350 | HIGH COTTON HOMES, INC | B= | P | 07/05/2019 | ES report for foam insulation and thermal barrier application certificate on file / still need to field verify all other items are complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | DANE | DANE | | B= | P | 6253729 | HIGH COTTON HOMES, INC | B= | P | 07/05/2019 | 3rd party insulation certificate on file / ES report for spray foam on file -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | TIMOTHYS | TIMOTHYS | | B= | P | 6253724 | HIGH COTTON HOMES, INC | B= | P | 07/03/2019 | Exterior finishes not complete - finish stucco, seal exterior penetrations / Guards not installed for 2nd floor balcony / Spray foam installed on underside of roof deck and rim joist - rim joist exposed in mech/storage room - Need spray foam installers cert and ES/UES report to determine if 15 min. thermal/ignition barriers required - will need verification of barrier installation if required. / Rest of building final OK - No A/C, No deck, finished basement. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | CHUCK | CHUCK | | B= | P | 6253164 | HIGH COTTON HOMES, INC | BSP | P | 04/29/2019 | Front,side and rear porch post and lid OK | DAKOTAB | DAKOTAB | | BSP | P | 6181459 | HIGH COTTON HOMES, INC | BSP | P | 04/17/2019 | 2 remaining front porch piers OK. | CHUCK | CHUCK | | BSP | P | 6168599 | HIGH COTTON HOMES, INC | BIN | C | 10/08/2018 | | BOBF | BOBF | | BIN | C | 5988598 | HIGH COTTON HOMES, INC | BFR | C | 10/08/2018 | | BOBF | BOBF | | BFR | C | 5988591 | HIGH COTTON HOMES, INC | BFR | P | 10/02/2018 | 2 TBE 6's at mid point of Fireplace wall / THAJ 26 at hip truss above stairs / provide metal shims under steel beams / glue shims under steel beam / okay to insulate | BOBF | BOBF | | BFR | P | 5983259 | HIGH COTTON HOMES, INC | BFR | P | 10/02/2018 | revised trusses on file | BOBF | BOBF | | BFR | P | 5982315 | HIGH COTTON HOMES, INC | BFR | R | 09/27/2018 | inspection stopped, too many items | BOBF | BOBF | | BFR | R | 5979389 | HIGH COTTON HOMES, INC | BSP | R | 08/29/2018 | plans do not show P1 and P2 trusses at entry porch, need to revise and splice plans with correct trusses, missing LS 30 's at beam side of structural facia at front porch, 2 H 2.5 at west end of HG05 / miss LUS 26 at J15 connecting to HG05 on front porch / north side porch trusses okay, posts not installed rear porch trusses okay, posts not installed , southeast structural facia okay, sout side porch trusses okay, posts not installed | BOBF | BOBF | | BSP | R | 5950102 | HIGH COTTON HOMES, INC | BFT | C | 05/22/2018 | | BOBF | BOBF | | BFT | C | 5851596 | HIGH COTTON HOMES, INC | BFN | C | 05/22/2018 | design on file 5000# | BOBF | BOBF | | BFN | C | 5851595 | HIGH COTTON HOMES, INC | BFT | P | 05/21/2018 | letter for footing on file, still need foundation design | BOBF | BOBF | | BFT | P | 5850203 | HIGH COTTON HOMES, INC | BFN | P | 05/21/2018 | Letters for footing , steel and eufer on file, letter for footing, steel and eufer on file, still need stamped foundation design | BOBF | BOBF | | BFN | P | 5850199 | HIGH COTTON HOMES, INC | BFD | C | 05/21/2018 | open hole on file 5000# | BOBF | BOBF | | BFD | C | 5850194 | HIGH COTTON HOMES, INC | BFD | P | 05/17/2018 | letter uploaded is field copy, need engineer stamped copy of open hole | BOBF | BOBF | | BFD | P | 5847363 | HIGH COTTON HOMES, INC | BFD | R | 05/16/2018 | need open hole to verify drain requirements, drain installed is exterior and usable, need to complete foundation and footing inspections | BOBF | BOBF | | BFD | R | 5846553 | J2D ELECTRIC, INC. | E= | C | 07/02/2019 | a/c prewire | TOMC | TOMC | | E= | C | 6251644 | J2D ELECTRIC, INC. | ES | C | 11/02/2018 | Residential Underground: 200 amp service new res | BRET | BRET | | ES | C | 6014674 | J2D ELECTRIC, INC. | EUG | C | 11/02/2018 | 4/0-4/0-2/0 | BRET | BRET | | EUG | C | 6014668 | J2D ELECTRIC, INC. | EUG | P | 10/15/2018 | 2 - uf cables to septic tank | TOMC | TOMC | | EUG | P | 5994469 | J2D ELECTRIC, INC. | ES | R | 09/21/2018 | service wires not installed yet | TOMC | TOMC | | ES | R | 5972708 | J2D ELECTRIC, INC. | ER | C | 09/21/2018 | 3 - #8 , 1 - #6 , 1 - #10 , no mcc , no central vac , irreversible ufer , finished basement | TOMC | TOMC | | ER | C | 5972700 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 06/28/2019 | Correction Made See Images. | TREVORH | TREVORH | | H= | C | 6247259 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/27/2019 | PERFORMANCE TEST UPLOADED | TREVORH | TREVORH | | H= | P | 6245870 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 06/26/2019 | Refer to HRR dated 9-24-2018 requiring performance test at final---------water heater vent termination must be 12'' above anticipated snow load or in the installation instructions 12'' above porches, verandas,patios etc. NOTES:PARTIALLY FINISHED BASEMENT, DIRECT VENT FURNACE, OUTSIDE AIR TO RETURN, A/C ROUGH COIL AND LINE SET ONLY. MECHANICAL ROOM MEETS THE 50 TO 1 COMBUSTION AIR RATIO. | TREVORH | TREVORH | | H= | P | 6244944 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 09/25/2018 | RELEASE METER | BENH | BENH | | HC | C | 5975189 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 09/25/2018 | SPOKE WITH BRANDON FROM MITCHELL THIS MORNING AND FIREPLACE IS WOOD BURNING AND TO BE INSPECTED BY BUILDING, AND BASEMENT IS UNFINISHED AND BY FINAL VENT NEEDS TO BE 10 FOOT FROM OUTSIDE AIR | BENH | BENH | | HRR | C | 5975183 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 09/24/2018 | NEED INSULATION SHIELD ON FIREPLACE VENT, OUTSIDE AIR IS WITHIN 10 FEET OF WATER HEATER EXHAUST REFER TO WATER HEATER MANUFACTURERS INSTRUCTIONS ON PAGE 17 , BY FINAL NEED PERFORMANCE TEST NOTES: FINISHED BASEMENT, DIRECT VENT FURNACE, OUTSIDE AIR TO RETURN, A/C ROUGH COIL AND LINE SET | BENH | BENH | | HRR | P | 5973961 | PRECISION PLUMBING | HI | C | 09/07/2018 | 10 LB TEST OK, 1-1/4'' MAIN. 1 RANGE, 1 PATIO STUB, 1 FURNACE, 1 WATER HEATER. | TREVORH | TREVORH | | HI | C | 5958179 | PRECISION PLUMBING | P= | C | 06/17/2019 | potable water cert received, see images | JOHNS | JOHNS | | P= | C | 6233086 | PRECISION PLUMBING | P= | P | 04/17/2019 | **STILL NEED potable water cert rest ok. NOTE: pvb ok, finished bsmnt | JOHNS | JOHNS | | P= | P | 6168200 | HOMEOWNER | PWO | C | 09/12/2018 | need certificate of potable water by final. | TAYLOR | TAYLOR | | PWO | C | 5962807 | PRECISION PLUMBING | PTO | C | 08/23/2018 | finished basement, aav's at laundry and bar sinks, check water service connections at final and need 6 inch sleeve for sewer in mech room, note: need PWO inspection. | TAYLOR | TAYLOR | | PTO | C | 5943484 | PRECISION PLUMBING | PB | C | 05/23/2018 | base on ejector, no water service at this time. | TAYLOR | TAYLOR | | PB | C | 5854074 | HIGH COTTON HOMES, INC | XBS | T | 09/27/2018 | PAID (REC#1542020): PLAN SPLICE FEE: $50 by: DANM for Construction: Convert entry porch cover rafters to trusses | DANM | DANM | | XBS | T | 5978566 |
|
|