FRED FLETEMEYER COMPANY GENERAL CONTRACTORS, INC. | B= | C | 08/10/2018 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 5931103 | FRED FLETEMEYER COMPANY GENERAL CONTRACTORS, INC. | B= | P | 08/08/2018 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, HOGAN MECHANICAL, INC Plumbing Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 5927279 | FRED FLETEMEYER COMPANY GENERAL CONTRACTORS, INC. | BFR | P | 06/13/2018 | new interior framing OK pending other roughs / discussed accessible elements | DANE | DANE | | BFR | P | 5873697 | SAWYER ELECTRIC, INC | E= | C | 08/06/2018 | | BRET | BRET | | E= | C | 5924766 | SAWYER ELECTRIC, INC | E= | P | 08/03/2018 | gfci wont hold in kitchen no power to outlet below it. | BRET | BRET | | E= | P | 5923486 | SAWYER ELECTRIC, INC | ER | C | 07/24/2018 | | BRET | BRET | | ER | C | 5912296 | SAWYER ELECTRIC, INC | ER | P | 06/12/2018 | walls and bath lid ok | BRET | BRET | | ER | P | 5871590 | SAWYER ELECTRIC, INC | ES | C | 05/30/2018 | Commercial Service: 200 amp service for unit 110 . made to main only inspace | BRET | BRET | | ES | C | 5859075 | SAWYER ELECTRIC, INC | ESL | C | 05/15/2018 | | BRET | BRET | | ESL | C | 5844853 | EAGLE HEATING AND AIR CONDITIONING, INC. | H= | C | 08/08/2018 | TEST AND BALANCE REPORT RECEIVED, SEE IMAGES. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5927060 | HOGAN MECHANICAL, INC. | H= | C | 08/07/2018 | MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5926485 | HOGAN MECHANICAL, INC. | HV | C | 08/07/2018 | WATER HEATER VENT OK. | DUSTINS | DUSTINS | | HV | C | 5926484 | EAGLE HEATING AND AIR CONDITIONING, INC. | H= | P | 08/07/2018 | MECHANICAL FINAL OK, PENDING TEST AND BALANCE REPORT. | DUSTINS | DUSTINS | | H= | P | 5926483 | O.M.A.G.M., INC. | H= | C | 07/24/2018 | GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 5912539 | O.M.A.G.M., INC. | HC | C | 07/24/2018 | OK TO SET 2 LB METER | DUSTINS | DUSTINS | | HC | C | 5912538 | O.M.A.G.M., INC. | HI | C | 07/24/2018 | 10 LB TEST OK. PIPING PER PLAN. | DUSTINS | DUSTINS | | HI | C | 5912537 | EAGLE HEATING AND AIR CONDITIONING, INC. | HD | P | 06/20/2018 | NEED GAS CONTRACTOR ATTACHED TO PERMIT. WHAT IS CLEARANCE ON HOOD? THERE IS PVC, PEX PIPE AND BACKER BOARD IN THE HOOD WALL. SUPPLY AIR DUCTS OK. OK TO INSULATE. EXHAUST DUCTS ABOVE BATHROOM HARD LIDS OK. NO FLEX AND DIFFUSERS. NO ROOF INSPECTION TODAY. | DUSTINS | DUSTINS | | HD | P | 5879881 | HOGAN MECHANICAL, INC. | P= | C | 08/09/2018 | Corrections made, images uploaded from contractor. | DANR | DANR | | P= | C | 5928400 | HOGAN MECHANICAL, INC. | P= | P | 08/07/2018 | Need trap guard floor sink by oven, need back flow for coffee makers, pictures ok for all items rest ok. | DANR | DANR | | P= | P | 5926254 | HOGAN MECHANICAL, INC. | PTO | C | 08/07/2018 | Ok. | DANR | DANR | | PTO | C | 5926253 | HOGAN MECHANICAL, INC. | PTO | P | 06/12/2018 | Need make up water for MAU ran, woman's toilet at 19-1/2" off frame at final need 18" max off finish wall, rest ok, ok to insulate domestic water. Note: By final need engineer letter approving pex instead of L copper pipe. At final check water heater, vtr connection, pvc plenum wrap and domestic water insulation, | DANR | DANR | | PTO | P | 5871903 | HOGAN MECHANICAL, INC. | PB | C | 05/17/2018 | | TAYLOR | TAYLOR | | PB | C | 5848043 | HOGAN MECHANICAL, INC. | PB | P | 05/15/2018 | re- grade 4 inch G.W. and 4x3 wye for bathrooms, floors sinks need connect directly to 4 inch ( as plan shows ). | TAYLOR | TAYLOR | | PB | P | 5845115 | HOGAN MECHANICAL, INC. | PB | R | 05/14/2018 | expose all piping. | TAYLOR | TAYLOR | | PB | R | 5843951 | O.M.A.G.M., INC. | XMS | T | 07/31/2018 | PAID (REC#1526435) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised type 1 hood to type 2 hood revised to remove interlocks | JUSTINC | JUSTINC | | XMS | T | 5919718 | HOGAN MECHANICAL, INC. | XPS | T | 06/19/2018 | PAID (REC#1508716) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice 6-19-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5878249 | HOGAN MECHANICAL, INC. | XPS | P | 06/18/2018 | PLAN SPLICE: (No Fee) by: TCRIPPEN for Plumbing: plumbing splice 6-18-18 | TCRIPPEN | TCRIPPEN | | XPS | P | 5876944 | FRED FLETEMEYER COMPANY GENERAL CONTRACTORS, INC. | XBS | P | 06/12/2018 | PLAN SPLICE: (No Fee) by: MICHAELA for Construction: Revise toilet room walls | MICHAELA | MICHAELA | | XBS | P | 5871250 |
|
|