GMC CONSTRUCTION COMPANY, INC | B= | C | 06/11/2019 | All other required Final inspections are complete. (This is a computer generated result) | LONNYS | LONNYS | | B= | C | 6226828 |
GMC CONSTRUCTION COMPANY, INC | B= | P | 06/10/2019 | . Additional Inspections Required (computer generated): FELIX PLUMBING LLC Plumbing Final Inspection is not Completed yet. | LONNYS | LONNYS | | B= | P | 6226376 |
GMC CONSTRUCTION COMPANY, INC | BFN | C | 05/24/2019 | letter for stem walls on file | BOBF | BOBF | | BFN | C | 6209591 |
GMC CONSTRUCTION COMPANY, INC | BSP | P | 05/23/2019 | 2 new deck piers OK / deck framing OK | LONNYS | LONNYS | | BSP | P | 6209263 |
GMC CONSTRUCTION COMPANY, INC | BFT | C | 05/23/2019 | Open Hole and foundation observations received | RICHB | RICHB | | BFT | C | 6207923 |
GMC CONSTRUCTION COMPANY, INC | BIN | C | 10/22/2018 | Thermal OK | RICHB | RICHB | | BIN | C | 6002305 |
GMC CONSTRUCTION COMPANY, INC | BIN | P | 10/19/2018 | Evaluation Report for spray foam received - Bayseal CC | RICHB | RICHB | | BIN | P | 5999759 |
GMC CONSTRUCTION COMPANY, INC | BFR | C | 10/12/2018 | Framing for addition OK / discussed spray foam insulation - need product data on specific material being installed | RICHB | RICHB | | BFR | C | 5993928 |
HOMEOWNER | E= | C | 05/08/2019 | 25 amp ac--ok | BRIAN | BRIAN | | E= | C | 6192333 |
HOMEOWNER | ER | C | 11/15/2018 | kitchen | CRAIGS | CRAIGS | | ER | C | 6027287 |
HOMEOWNER | ER | P | 10/11/2018 | 14/3 n/m cable run for control | CRAIGS | CRAIGS | | ER | P | 5992520 |
HOMEOWNER | ER | R | 10/09/2018 | box up stairs needs made up --- power to the mini splits and the control cable installed , control cable has to be type tc, er, jp | CRAIGS | CRAIGS | | ER | R | 5990270 |
HOMEOWNER | ES | C | 07/09/2018 | Residential Underground: 200 amp service, overhead to eug., meter is okay, wire not installed to pole, schedule with CSU for transistion | GARYL | GARYL | | ES | C | 5897149 |
HOMEOWNER | EUG | P | 07/05/2018 | EUG okay to cover, had q's about service etc... | GARYL | GARYL | | EUG | P | 5894404 |
A & Z MECHANICAL, INC. | H= | C | 05/30/2019 | SEE IMAGES | JERRYF | JERRYF | | H= | C | 6214010 |
A & Z MECHANICAL, INC. | H= | P | 05/23/2019 | SECURE CONDENSER TO PAD OK TO ATTACH PICTURES OF CORRECTION TO NEXT INSPECTION REQUEST NOTES: NATURALLY VENTILATED CRAWLSPACE | JERRYF | JERRYF | | H= | P | 6208953 |
A & Z MECHANICAL, INC. | HRR | C | 10/12/2018 | | JERRYF | JERRYF | | HRR | C | 5992918 |
A & Z MECHANICAL, INC. | HRR | P | 10/09/2018 | PARTIAL PENDING ELECTRICAL INSPECTION TO VERIFY CORRECT WIRING TO INDOOR UNITS - REST OK | JERRYF | JERRYF | | HRR | P | 5989951 |
A & Z MECHANICAL, INC. | HRR | P | 10/08/2018 | NEED NAIL PROTECTION INSTALLED AT LINE SETS - NOTES ADDED AT 1:09 - NEED ELECTRICAL INSPECTOR TO VERIFY WIRING TO INDOOR UNITS BEFORE COVER TO VERIFY PROPER WIRING | JERRYF | JERRYF | | HRR | P | 5988720 |
FELIX PLUMBING LLC | P= | C | 06/11/2019 | Ok. | DANR | DANR | | P= | C | 6226827 |
FELIX PLUMBING LLC | PE | C | 05/08/2019 | | TERRI | TERRI | | PE | C | 6192006 |
FELIX PLUMBING LLC | PTO+ | C | 11/06/2018 | Ok for kitchen sink, aav. | DANR | DANR | | PTO+ | C | 6016800 |
FELIX PLUMBING LLC | PTO | C | 10/05/2018 | Ok, vtr. Note: freeze protection crawler by final. Need mechanical permit attached. | DANR | DANR | | PTO | C | 5986865 |
GMC CONSTRUCTION COMPANY, INC | XBS | T | 05/21/2018 | PAID (REC#1546774): PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Revised framing in master bed & for basement stairs | LBENNETT | LBENNETT | | XBS | T | 5851309 |