THE HOUSE DOCTOR | B= | C | 08/20/2018 | | NICK | NICK | | B= | C | 5939446 |
THE HOUSE DOCTOR | BFR | C | 08/20/2018 | | NICK | NICK | | BFR | C | 5939445 |
THE HOUSE DOCTOR | BFN | C | 08/20/2018 | | NICK | NICK | | BFN | C | 5939444 |
THE HOUSE DOCTOR | B= | P | 08/15/2018 | Need to install hand rail on both sides of new exterior stairs and return / Need to install nails in post to beam connection for new piers at exterior deck / All other elements of final OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): PREMIER MECHANICAL Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5934898 |
THE HOUSE DOCTOR | BFT | C | 08/02/2018 | Open hole on file / #2000psf / No drain required | NICK | NICK | | BFT | C | 5921440 |
THE HOUSE DOCTOR | BFN | P | 07/27/2018 | Still need open hole report / Foundation reinforcement OK per design | NICK | NICK | | BFN | P | 5916460 |
THE HOUSE DOCTOR | BSP | P | 07/23/2018 | Need to splice plans to show new piers for side deck / At time of inspection 3 12" piers in place | NICK | NICK | | BSP | P | 5910939 |
THE HOUSE DOCTOR | BFR | P | 07/19/2018 | Approved plans call for 2x4 wood framed walls, steel stud walls installed throughout / Need to install wood studs or provide letter for use of steel studs / Need to attach mechanical permit / Need electrical and mechanical complete / Reviewed accessible elements | NICK | NICK | | BFR | P | 5907871 |
THE HOUSE DOCTOR | BFT | P | 07/17/2018 | Footings OK per Spliced Eng foundation design / Need open hole report / Poor at own risk | NICK | NICK | | BFT | P | 5905239 |
THE WIRE NINJA LLC | E= | C | 08/14/2018 | delay timer was removed from plan, | JOHNN | JOHNN | | E= | C | 5934089 |
THE WIRE NINJA LLC | E= | R | 08/03/2018 | NEED A TEN MINUTE DELAY IN THE LOADS ON THE GROW LIGHTS PER PLAN----NEED SINGLE VOLTAGE ( 240 ) ON ANY BREAKER THAT LANDS ON THE HIGH LEG----NEED TO LABEL THE PANEL WITH THE HIGH LEG----- | BRIAN | BRIAN | | E= | R | 5924080 |
THE WIRE NINJA LLC | ES | P | 07/16/2018 | Commercial Service: existing commercial, need 1/0 cu bond clod water, check on final,-----label AIC on panels,splice 3 RTU'S on plans, | JOHNN | JOHNN | | ES | P | 5903249 |
THE WIRE NINJA LLC | ER | C | 07/10/2018 | | JOHNN | JOHNN | | ER | C | 5897887 |
THE WIRE NINJA LLC | ER | P | 06/21/2018 | see plan,lid and walls, | JOHNN | JOHNN | | ER | P | 5881857 |
PREMIER MECHANICAL | H= | C | 08/16/2018 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5935832 |
PREMIER MECHANICAL | H= | P | 08/14/2018 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 5933573 |
PREMIER MECHANICAL | H= | P | 08/09/2018 | BRACE B VENT FOR WATER HEATER BEHIND SHOWER - NEED OSA DUCTS AND EXHAUST INSTALLED CORRECTLY AT EXTERIOR WALLS INTAKES TO HAVE BACK DRAFT DAMPERS AND EXHAUST TO HAVE DAMPER CAPS AND HOW PROTECTING ALL EXTERIOR PENETRACIONS BELOW GRADE AND NEED 3 PENETRACIONS IN WINDOW WELLS TO BE 12" ABOVE GRADE - NEED ALL DRAINS COMPLETED | JERRYF | JERRYF | | H= | P | 5929219 |
PREMIER MECHANICAL | H= | P | 08/06/2018 | NEED SINGLE WALL FLUE AT COMMON VENT ON EXISTING WATER HEATER REPLACED WITH B VENT AND EXHAUST FAN DISCONNECTED FROM SAME ADD NEW VENT TO PERMIT - NEED PLAN REVISED DELETING ALL GAS / AND CHANGE GAS FURNACES TO ALL ELECTRIC EQUIPMENT AND DELETE ALL OSA IF NOT NEEDED | JERRYF | JERRYF | | H= | P | 5924671 |
PREMIER MECHANICAL | HD | C | 07/30/2018 | ALL S AND RA DUCT OK - AT FINAL VERIFY ALL SMOKE SHUTDOWN / DRAINS AND ADD ALL FANS TO PERMIT - LABEL ALL EQUIPMENT - REVISE PLANS DELETING CONDENSATE PUMPS IF NOT BEING USED | JERRYF | JERRYF | | HD | C | 5917962 |
PREMIER MECHANICAL | HRP | C | 07/30/2018 | 9 LINE SETS OK | JERRYF | JERRYF | | HRP | C | 5917959 |
PREMIER MECHANICAL | XMS | T | 08/08/2018 | PAID (REC#1525403) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: revised ventilation removed gas | JUSTINC | JUSTINC | | XMS | T | 5928301 |
THE WIRE NINJA LLC | XES | T | 08/06/2018 | PAID (REC#1525406) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised Electrical Load Summary - removed 10 minute delay. | BERTHA | BERTHA | | XES | T | 5924690 |
THE WIRE NINJA LLC | XES | T | 08/02/2018 | PAID (REC#1523749) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Revised Panel A for removal of AHU-3. | BERTHA | BERTHA | | XES | T | 5922637 |
PREMIER MECHANICAL | XMS | P | 08/02/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: REVISED CONDENSATE SYSTEM | JUSTINC | JUSTINC | | XMS | P | 5922553 |
THE WIRE NINJA LLC | XES | P | 07/25/2018 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: Revise panel schedules | SHELBY | SHELBY | | XES | P | 5913416 |
PREMIER MECHANICAL | XMS | P | 07/25/2018 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: relocated all ahu's | DALEH | DALEH | | XMS | P | 5913375 |
THE HOUSE DOCTOR | XBS | T | 07/25/2018 | PAID (REC#1520603) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added deck piers to plans per inspector request. | BPHILLIPS | BPHILLIPS | | XBS | T | 5913312 |
THE HOUSE DOCTOR | XBS | T | 07/16/2018 | PAID (REC#1517168) PLAN SPLICE FEE: $50 by: LBENNETT for Construction: Added structural sheet | LBENNETT | LBENNETT | | XBS | T | 5903737 |