JC DESIGN & BUILD LLC | B= | C | 08/09/2018 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 5929031 |
JC DESIGN & BUILD LLC | B= | P | 07/10/2018 | Previous item complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | RICHB | RICHB | | B= | P | 5897455 |
JC DESIGN & BUILD LLC | B= | P | 06/29/2018 | need lever handle single action knobs at all doors except the existing restrooms / need to complete all other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), WHITE LIGHT ELECTRIC ENTERPRISES INC. Electrical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5889568 |
JC DESIGN & BUILD LLC | BSP | P | 06/19/2018 | 2nd layer of drywall at all hole repairs OK | RICHB | RICHB | | BSP | P | 5878835 |
JC DESIGN & BUILD LLC | BSP | P | 06/13/2018 | Engineer letter for repairs to 2-hour separation wall received - first layer of drywall (including fire caulk) on all round holes mentioned in BFR comments from May 31 is OK / need to inspect 2nd layer when ready | RICHB | RICHB | | BSP | P | 5873036 |
JC DESIGN & BUILD LLC | BFR | P | 05/31/2018 | Framing OK pending other Roughs / inspector needs to consult with Sr Bldg Inspector - existing South wall is 2-layers and full height, may be separation wall, is opened up for remodel work / plans reviewed onsite | RICHB | RICHB | | BFR | P | 5860449 |
WHITE LIGHT ELECTRIC ENTERPRISES INC. | E= | C | 07/05/2018 | | GARYL | GARYL | | E= | C | 5893502 |
WHITE LIGHT ELECTRIC ENTERPRISES INC. | ER | C | 07/03/2018 | ceilings ok / | MIGUEL | MIGUEL | | ER | C | 5892504 |
WHITE LIGHT ELECTRIC ENTERPRISES INC. | E= | R | 07/03/2018 | install labels on panels A and B indicating location of disconnects outside / | MIGUEL | MIGUEL | | E= | R | 5892496 |
WHITE LIGHT ELECTRIC ENTERPRISES INC. | EP | R | 07/03/2018 | panels A and B need handle ties installed on multi branch circuits, 100A sub panel for X ray machine ok, no load at this time / | MIGUEL | MIGUEL | | EP | R | 5892493 |
WHITE LIGHT ELECTRIC ENTERPRISES INC. | ER | P | 05/30/2018 | walls only | GARYL | GARYL | | ER | P | 5858573 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | C | 06/06/2018 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5865583 |
MILLER HEATING & AIR CONDITIONING, INC. | H= | P | 06/05/2018 | FINAL PENDING - Test And Balance Report | MARKB | MARKB | | H= | P | 5864577 |
MILLER HEATING & AIR CONDITIONING, INC. | HD | C | 05/31/2018 | ABOVE CEILING SA / RA MAINS / RUNS OUTS AND GRILLES ARE COMPLETE - NEED TAB REPORT TO STATE OSA READINGS - ATTACH TAB REPORT TO FINAL INSPECTION REQUEST | JERRYF | JERRYF | | HD | C | 5860933 |
BEACON PLUMBING, LLC | P= | C | 06/27/2018 | Ok for drinking fountain and utility sink. | DANR | DANR | | P= | C | 5887029 |
BEACON PLUMBING, LLC | PTO | C | 06/07/2018 | Corrections made, engineer letter uploaded from contractor. | DANR | DANR | | PTO | C | 5867057 |
BEACON PLUMBING, LLC | PTO | P | 06/01/2018 | Need engineer approval for pex instead of L copper on domestic water, drawings show Fiat 24x24 mop sink piped for standing sink is there a change?, | DANR | DANR | | PTO | P | 5862492 |