FADING WEST CONSTRUCTION, LLC | B= | P | 01/03/2022 | Temp CO: Pending Zoning final ( Expires: 2/2/2022 12:00:00 AM) | RITA | RITA | | B= | P | 7227064 |
FADING WEST CONSTRUCTION, LLC | B= | T | 12/01/2021 | PAID (REC#1833625) Temp CO: Extension Pending required final ( Expires: 12/31/2021 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 7194186 |
FADING WEST CONSTRUCTION, LLC | B= | T | 10/19/2021 | PAID (REC#1833625) Temp CO: Extension Pending zoning final ( Expires: 11/18/2021 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 7146355 |
FADING WEST CONSTRUCTION, LLC | B= | P | 07/30/2021 | Temp CO: Pending zoning final ( Expires: 8/29/2021 12:00:00 AM) | RITA | RITA | | B= | P | 7056250 |
FADING WEST CONSTRUCTION, LLC | B= | P | 07/02/2021 | Temp CO: Pedning zoning final ( Expires: 8/1/2021 12:00:00 AM) | RITA | RITA | | B= | P | 7024611 |
FADING WEST CONSTRUCTION, LLC | B= | P | 06/04/2021 | Temp CO: Pending zoning final ( Expires: 7/4/2021 12:00:00 AM) | RITA | RITA | | B= | P | 6990904 |
FADING WEST CONSTRUCTION, LLC | B= | P | 05/07/2021 | Temp CO: Pending zoning and building finals ( Expires: 6/6/2021 12:00:00 AM) | RITA | RITA | | B= | P | 6960633 |
FADING WEST CONSTRUCTION, LLC | B= | P | 04/07/2021 | Temp CO: TCO pending Zoning final ( Expires: 5/7/2021 12:00:00 AM) | RITA | RITA | | B= | P | 6924590 |
FADING WEST CONSTRUCTION, LLC | B= | P | 03/08/2021 | Temp CO: extended TCO. ( Expires: 4/7/2021 12:00:00 AM) 1755509 paid | JANE | JANE | | B= | P | 6892340 |
FADING WEST CONSTRUCTION, LLC | B= | T | 11/30/2020 | PAID (REC#1736833) Temp CO: Extension pending zoning final/ Trip fee added for TCO fee collection ( Expires: 12/30/2020 12:00:00 AM) | MATTHEWM | MATTHEWM | | B= | T | 6790068 |
FADING WEST CONSTRUCTION, LLC | B= | T | 10/29/2020 | PAID (REC#1736833) Temp CO: Temp CO: Per Matt M TCO Extension/ Trip fee added for TCO fee collection ( Expires: 11/28/2020 12:00:00 AM) | RITA | RITA | | B= | T | 6757898 |
TIMBERLINE LANDSCAPING, INC. | B= | T | 09/30/2020 | PAID (REC#1717536): Trip fee for TCO. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300). | RITA | RITA | | B= | T | 6724801 |
TIMBERLINE LANDSCAPING, INC. | B= | P | 09/30/2020 | Temp CO: Per Matt M TCO extension ( Expires: 10/30/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6724789 |
TIMBERLINE LANDSCAPING, INC. | BE | T | 08/13/2020 | PAID (REC#1706929): For TCO | JANE | JANE | | BE | T | 6671103 |
TIMBERLINE LANDSCAPING, INC. | B= | P | 08/13/2020 | Temp CO: extension ( Expires: 9/12/2020 12:00:00 AM) | JANE | JANE | | B= | P | 6671101 |
TIMBERLINE LANDSCAPING, INC. | B= | T | 06/04/2020 | PAID (REC#1697528): Temp CO: Temp CO:Pending zoning final / Ok for Extension 7/14/2020( Expires: 8/14/2020 12:00:00 AM)/ Trip Fee assessed for TCO fee collection | RITA | RITA | | B= | T | 6594323 |
TIMBERLINE LANDSCAPING, INC. | B= | T | 05/06/2020 | PAID (REC#1678595): Trip fee for TCO. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300). | RITA | RITA | | B= | T | 6563413 |
TIMBERLINE LANDSCAPING, INC. | B= | P | 05/06/2020 | Temp CO: Pending Zoning final ( Expires: 6/5/2020 12:00:00 AM) | RITA | RITA | | B= | P | 6563411 |
TIMBERLINE LANDSCAPING, INC. | BSP | P | 02/06/2020 | permit extension only | JOHN | JOHN | | BSP | P | 6475213 |
TIMBERLINE LANDSCAPING, INC. | BE | L | 02/06/2020 | Renewed for No Fee at 2/6/2020 9:17:41 AM | JOHN | JOHN | | BE | L | 6475212 |
TIMBERLINE LANDSCAPING, INC. | B= | P | 06/26/2019 | corrections complete -- complete other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, TIMBERLINE LANDSCAPING, INC. Plumbing Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6244660 |
TIMBERLINE LANDSCAPING, INC. | BSP | P | 06/26/2019 | deck steel frame and pier observation letter on file -- listing and letter on file for front of elevator shaft infill | SCOTTS | SCOTTS | | BSP | P | 6244108 |
TIMBERLINE LANDSCAPING, INC. | B= | P | 06/21/2019 | provide landings at stairs on south side deck -- provide pier observation and weld observation for south deck installed after submission of 3rd party observations -- thermostats along accessible route do not meet accessibility/currently at 59" aff -- stall lock on mens bathroom 1st floor rear can not be tight grasping -- accessibility signage to be placed on wall of door at strike side for bathrooms -- seal exterior penetrations -- fireblock floor penetrations above data room to storage room above -- listing on file for infill at front of elevator -- complete other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300), DOUBLE E SERVICES Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, TIMBERLINE LANDSCAPING, INC. Plumbing Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6239355 |
TIMBERLINE LANDSCAPING, INC. | BSP | P | 06/21/2019 | open ex on file | SCOTTS | SCOTTS | | BSP | P | 6239102 |
TIMBERLINE LANDSCAPING, INC. | BSP | R | 06/04/2019 | Elevator shaft inspection for penetrations and finish layer on 3rd face layer of horizontal assembly per UL L506 -- provide letter on how to address void along front of shaft between floors from end to end of shaft -- seal jamb of doors both floors | SCOTTS | SCOTTS | | BSP | R | 6218787 |
TIMBERLINE LANDSCAPING, INC. | BSP | P | 05/31/2019 | infill at front of elevator shaft constructed per UL U415 -- elevator horizontal assembly framing ok per UL L506 -- still need to see face layer/elevator shaft penetrations | SCOTTS | SCOTTS | | BSP | P | 6216189 |
TIMBERLINE LANDSCAPING, INC. | BFT | P | 05/31/2019 | provide open hole observation -- footing/foundation observations on file -- 3rd party summary letter on file | SCOTTS | SCOTTS | | BFT | P | 6216164 |
TIMBERLINE LANDSCAPING, INC. | BSP | R | 05/13/2019 | inspection request for elevator infill and horizontal assemblies/splice is still not complete/no splice available on site -- provide all 3rd party paperwork for footing/foundation/masonry/steel framing per previous inspection notes | SCOTTS | SCOTTS | | BSP | R | 6197085 |
TIMBERLINE LANDSCAPING, INC. | BFR | R | 03/22/2019 | inspection request for elevator infill and horizontal assembly on top of elevator/splices not submitted/no inspection | SCOTTS | SCOTTS | | BFR | R | 6140814 |
TIMBERLINE LANDSCAPING, INC. | BFR | R | 02/25/2019 | shaft liner installed at elevator shaft face on 2nd floor not per plan/plan shows block/provide listing -- roll in shower width corrected from last visit -- need to see horizontal assembly framing at top of elevator shaft | SCOTTS | SCOTTS | | BFR | R | 6116260 |
TIMBERLINE LANDSCAPING, INC. | BFR | P | 02/06/2019 | partial frame inspection for interior framing -- 1st and 2nd floor interior framing ok/reviewed accessibility -- roll in shower on 1st floor framing does not allow for 60" required inside dimension with finish of roll in shower/discussed cane rails on open stariways by final -- elevator shaft does not extend to roof deck/splice in horizontal assembly that meet or exceeds shaft -- provide plan splice for framing change in shop area rooms for wall and lids -- provide letter for high tension bolting and welding for roof and exterior walls -- provide ES report for spray foam insulation along exterior walls -- provide 3rd party summary letter for footing/foundation -- provide 3rd party observation for install of insulated panels on exterior complying to ComCheck | SCOTTS | SCOTTS | | BFR | P | 6099397 |
TIMBERLINE LANDSCAPING, INC. | BBB | P | 09/13/2018 | bond beam inspection for elevator at 106'/ missing 3 #4 at corners per detail 1 on S4.0/provide stamped RFI addressing vertical dowels for corners and vertical reinforcement in walls -- discussed 3rd party weld observations and bolt torque -- discussed obtaining and attaching electrical and mechanical permits -- provide roof warranty and 3rd party observations by final | SCOTTS | SCOTTS | | BBB | P | 5963816 |
TIMBERLINE LANDSCAPING, INC. | BFT | P | 06/04/2018 | AUTHORIZED INSPECTION BY ENGINEER | JLANE | JLANE | JLANE | BFT | P | 5862860 |
TIMBERLINE LANDSCAPING, INC. | BFN | P | 06/04/2018 | AUTHORIZED INSPECTION BY ENGINEER | JLANE | JLANE | JLANE | BFN | P | 5862859 |
TIMBERLINE LANDSCAPING, INC. | BSP | R | 05/22/2018 | DWV below slab requested as a BSPinspection / call with Matt from Timberline from office - will reschedule as PB inspection | BRIANB | BRIANB | | BSP | R | 5851823 |
DOUBLE E SERVICES | EP | C | 06/24/2019 | PP1 600 amp 2 set 350 mcm cu 4/w ok LP1 and LP4 both 100 amp 4/w both ok | CRAIG | CRAIG | | EP | C | 6241922 |
DOUBLE E SERVICES | E= | C | 06/24/2019 | cu 1 and cu 2 both ok both 110 amp warehouse ok note both hoists in warehouse will be on permitted later | CRAIG | CRAIG | | E= | C | 6241918 |
DOUBLE E SERVICES | EUG | P | 06/20/2019 | Underground to six light poles (5 on the East side & one on the West side) | JOSEPH | JOSEPH | | EUG | P | 6237620 |
DOUBLE E SERVICES | E= | P | 06/18/2019 | 2nd fl ok---corrections on 1st made | RANDY | RANDY | | E= | P | 6235666 |
DOUBLE E SERVICES | E= | P | 06/17/2019 | 1st level office area ok with the exception of Cubicles not connected in 110, Need GFCI protection for TV recpts. in 103 and 127 / | ROB | ROB | | E= | P | 6233464 |
DOUBLE E SERVICES | ER | P | 06/04/2019 | relocate elevator light to the side of elevator pit ---------- label disconnect were it's fed from and label panels | CRAIG | CRAIG | | ER | P | 6218780 |
DOUBLE E SERVICES | EUG | P | 06/03/2019 | south side outlets ok | RANDY | RANDY | | EUG | P | 6218572 |
SPECIAL SYSTEMS DESIGN,LLC | E= | C | 05/22/2019 | FIRE ALARM INSPECTION: | CRAIG | CRAIG | | E= | C | 6207518 |
SPECIAL SYSTEMS DESIGN,LLC | ER | C | 05/22/2019 | FIRE ALARM INSPECTION: fire alarm is complete | CRAIG | CRAIG | | ER | C | 6207514 |
DOUBLE E SERVICES | ER | P | 05/16/2019 | Above ceilings in 3 drop ceiling areas of upstairs okay | CHIPO | CHIPO | | ER | P | 6201442 |
DOUBLE E SERVICES | EP | P | 05/16/2019 | Panel LP3 100 amp okay | CHIPO | CHIPO | | EP | P | 6201432 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 04/25/2019 | FIRE ALARM INSPECTION: Pit room / Equipment area Not Ready all others ok | CRAIG | CRAIG | | ER | P | 6178234 |
DOUBLE E SERVICES | EP | P | 04/25/2019 | panels PP2 600 amp 4/w with 2 sections and LP 100 amp 4/w both ok | CRAIG | CRAIG | | EP | P | 6178232 |
DOUBLE E SERVICES | EUG | P | 04/10/2019 | EUG OK ----2--11/4 PVC------ | GREGM | GREGM | | EUG | P | 6161274 |
DOUBLE E SERVICES | ES | C | 03/11/2019 | Commercial Service: 2 - 600 - amp 4 Wire New Commercial building ok to set meter. / note up to main disconnects only | CRAIG | CRAIG | | ES | C | 6130646 |
DOUBLE E SERVICES | EUG | P | 03/04/2019 | 4 - 4" pvc from xfmr to disconnects on east side of building | CRAIG | CRAIG | | EUG | P | 6123843 |
DOUBLE E SERVICES | ER | P | 02/25/2019 | FOREMEN BREAK ROOM / SHOP MANAGER OFFICE / SHOP BREAK ROOM / BATHROOMS / SMALL STORAGE ROOM ------------ STILL WAITING ON PAPERWORK FROM ENGINEER ABOUT THE UFER -------------- NOTE NEED TO CALL IN ROUGH FOR FIRE ALARM FOR SECOND FLOOR | CRAIG | CRAIG | | ER | P | 6116851 |
DOUBLE E SERVICES | ER | P | 02/22/2019 | parts room in the warehouse ok --------------- need letter from engineer about the ufer | CRAIG | CRAIG | | ER | P | 6114957 |
DOUBLE E SERVICES | ER | P | 02/15/2019 | walls and hard lid ceilings in breaker room / hallway / bath rooms ok on second floor | CRAIG | CRAIG | | ER | P | 6108288 |
SPECIAL SYSTEMS DESIGN,LLC | ER | P | 02/11/2019 | FIRE ALARM INSPECTION: 14/2 and 18/2 flpl cable --------- 1 floor only ok | CRAIG | CRAIG | | ER | P | 6103783 |
DOUBLE E SERVICES | ER | P | 02/05/2019 | FIRST FLOOR WALLS AND BATHROOM CEILINGS OK---- | GREGM | GREGM | | ER | P | 6097654 |
HVAC SOLUTIONS, INC. | H= | C | 06/28/2019 | WATER HEATER SPLICE ON FILE | BILLS | BILLS | | H= | C | 6247410 |
HVAC SOLUTIONS, INC. | H= | P | 06/27/2019 | FINAL PENDING CONTRACTOR REQUESTING INSPECTION (SPLICE ON FILE) | BILLS | BILLS | | H= | P | 6247176 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 06/27/2019 | NOTE: ALL MEDIUM PRESSURE LABELS AND REGULATORS IN PLACE | BILLS | BILLS | | H= | C | 6247175 |
HVAC SOLUTIONS, INC. | H= | P | 06/26/2019 | FOR FINAL - Need approved splice for water heater on file. TEST AND BALANCE REVIEW COMPLETE. | MARKB | MARKB | | H= | P | 6244139 |
HVAC SOLUTIONS, INC. | H= | P | 06/24/2019 | Reviewing test and balance report. Still need plan splice for water heater - no evidence it was submitted to plan review. | MARKB | MARKB | | H= | P | 6240992 |
HVAC SOLUTIONS, INC. | H= | P | 06/21/2019 | FINAL PENDING - Being able to see approved splice and AM&M in system. Provide Test And Balance Report. | MARKB | MARKB | | H= | P | 6239075 |
HVAC SOLUTIONS, INC. | HV | C | 06/21/2019 | WATER HEATER VENT COMPLETE - CORRECTIONS MADE | MARKB | MARKB | | HV | C | 6239069 |
WESTERN FIREPLACE SUPPLY, INC. | H= | C | 06/20/2019 | MANTEL CLEARANCE WITHIN MANUFACTURER GUIDELINES | MARKB | MARKB | | H= | C | 6238848 |
HVAC SOLUTIONS, INC. | HD | C | 06/19/2019 | FOR FINAL - COMPLETE "HV" INSPECTION, NEED APPROVED SPLICES AND AM&M FOR RANGE HOODS ON FILE. PROVIDE TEST AND BALANCE REPORT.
DUCT SMOKE DETECTORS ARE TIED INTO FIRE ALARM PANEL PER MATT. | MARKB | MARKB | | HD | C | 6237319 |
HVAC SOLUTIONS, INC. | HV | P | 06/19/2019 | -----NEED PLAN SPLICE FOR WATER HATER VENT---- WATER HEATER VENT - Single wall material needs to be 26 gauge. TJ fan needs to be interlocked with water heater through a pressure switch which is not installed. AHU'S VENTING COMPLETE. | MARKB | MARKB | | HV | P | 6237318 |
HVAC SOLUTIONS, INC. | HRP | C | 06/19/2019 | Condensers, condensate and vehicle protection complete | MARKB | MARKB | | HRP | C | 6237315 |
LANDMARK PLUMBING AND HEATING, INC. | HO | C | 06/05/2019 | CORRECTIONS MADE | MARKB | MARKB | | HO | C | 6221519 |
LANDMARK PLUMBING AND HEATING, INC. | HO | P | 06/04/2019 | 10 PSI PRESSURE TEST OK BUT WILL NEED A NEW PRESSURE TEST ONCE CORRECTIONS ARE MADE. Need approved risers used at BBQ and Fire pit locations. Rest OK. Piping per plan and tracer wire installed. | MARKB | MARKB | | HO | P | 6220155 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 06/04/2019 | ELEVATOR COMPLETE | ERIC | ERIC | | HE= | C | 6218974 |
HVAC SOLUTIONS, INC. | HV | R | 05/10/2019 | AHU VENTING - CANNOT FIND MANUFACTURER INSTRUCTIONS ON SITE FOR HOW UNITS ARE TO BE VENTED. WATER HEATER VENT NOT COMPLETE. | MARKB | MARKB | | HV | R | 6195597 |
HVAC SOLUTIONS, INC. | HD | P | 04/29/2019 | ----WILL NEED A PLAN SPLICE FOR ENGINEERED WATER HEATER VENT SYSTEM---- STILL NEED - Water heater vent, AHU vents, warming placards, condensate disposal, condensers, labels, range hood ducts.... ABOVE CEILING DUCT - FLEX AND DIFFUSERS COMPLETE FOR FIRST AND SECOND FLOORS EXCEPT: MISSING SUPPLY AND TRANSFER IN ROOM 124 | MARKB | MARKB | | HD | P | 6181915 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 04/15/2019 | OK RELEASE 2 PSI METER | MARKB | MARKB | | HC | C | 6166429 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 04/15/2019 | STILL NEED - Underground piping installed and final connection to equipment. 2 PSI APPROVAL RECEIVED FROM CSU. PIPING MATCHES PLAN SPLICE. | MARKB | MARKB | | HI | C | 6166412 |
HVAC SOLUTIONS, INC. | HRP | P | 04/08/2019 | 7 - 425 PRESSURE TEST ON LINESETS UNDERGROUND BACK TO MECHANICAL ROOM. UNDERGROUND INSULATION AND CONDUIT COMPLETE. Still need to finish insulation and support above ground. | MARKB | MARKB | | HRP | P | 6159274 |
WESTERN FIREPLACE SUPPLY, INC. | HV | C | 03/07/2019 | NOTE ADDED 3/8/19: FIREPLACE VENT SEALED AND INSTALLED PER MANUFACTURER INSTRUCTIONS FOR COMMERCIAL INSTALLATION. FIREPLACE CLEARANCES OK. Further research required on fireplace and vent being in or communicating with above ceiling plenum return. More notes to follow. | MARKB | MARKB | | HV | C | 6127185 |
HVAC SOLUTIONS, INC. | HV | P | 02/19/2019 | UNIT HEATER VENTS COMPLETE, Still need water heater vent. | MARKB | MARKB | | HV | P | 6111271 |
HVAC SOLUTIONS, INC. | HD | P | 02/19/2019 | ABOVE CEILING DUCT 1ST & 2ND FLOORS- MEDIUM/LOW PRESSURE SUPPLY/EXHAUST MAINS/BRANCHES INSTALLED PER PLAN SPLICE OK TO WRAP. Still need parts & mechanical room. No flex or diffusers installed. | MARKB | MARKB | | HD | P | 6111268 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 02/13/2019 | ----PLAN SPLICE REQUIRED - Meter location has changed, more gas appliances than approved plans and smaller pipe sizes installed---- WILL NEED RE INSPECT ONCE APPROVED SPLICE IS ON FILE WITH RBD. 10 PSI PRESSURE TEST ON 11/2" STUB OK. | MARKB | MARKB | | HI | P | 6106421 |
HVAC SOLUTIONS, INC. | HD | R | 12/07/2018 | -----PLAN SPLICE REQUIRED - NOTHING IS BEING INSTALLED PER THE APPROVED PLANS & APPROVED PLANS ARE MISSING EQUIPMENT SCHEDULES---- FIRST FLOOR: ABOVE CEILING DUCT - LOW PRESSURE MAINS/BRANCHES NOT PER APPROVED PLAN, INSPECTED OFF CONTRACTORS PLAN DATED 10/26/18, WRAP AT OWN RISK. No medium pressure or exhaust duct this inspection. | MARKB | MARKB | | HD | R | 6046432 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 06/05/2019 | R.P. irrigation backflow in water entree room | TED | TED | | P= | C | 6221120 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/31/2019 | need elevator sump pit drain run , rest ok | TED | TED | | PTO | P | 6093346 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/29/2019 | lost test on front bathroom group, install shower valve and test through, rest ok | TED | TED | | PTO | P | 6091599 |
TIMBERLINE LANDSCAPING, INC. | PB | P | 05/23/2018 | need floor drain in water entrance/fire riser room, test and design ok on rest | TED | TED | | PB | P | 5853269 |
WESTERN FIREPLACE SUPPLY, INC. | XMS | P | 06/27/2019 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Revised venting | JUSTINC | JUSTINC | | XMS | P | 6246902 |
TIMBERLINE LANDSCAPING, INC. | XBS | T | 05/29/2019 | PAID (REC#1602367) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Provided listed assemblies for elevator infill and lid. Revised framing sheet to reflect steel construction. Provided engineering observation letter. | BPHILLIPS | BPHILLIPS | | XBS | T | 6212653 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 02/28/2019 | PAID (REC#1579581) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas | JUSTINC | JUSTINC | | XMS | T | 6120680 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 02/14/2019 | PAID (REC#1579581) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: All new mechanical sheets provided - New design | JUSTINC | JUSTINC | | XMS | T | 6107731 |
SPECIAL SYSTEMS DESIGN,LLC | XES | T | 02/12/2019 | PAID (REC#1579582) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: New design professional/new electrical sheets | SHELBY | SHELBY | | XES | T | 6105466 |
TIMBERLINE LANDSCAPING, INC. | XBS | P | 02/08/2019 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: Mezzanine plan for verification of mechanical unit locations. | SHELLEY | SHELLEY | | XBS | P | 6101583 |