LEADERSHIP CONSTRUCTION INC. | B= | C | 12/06/2018 | | NICK | NICK | | B= | C | 6044261 |
LEADERSHIP CONSTRUCTION INC. | BFR | C | 12/06/2018 | Eng observation on file for structural steel / Eng letter on file for canopy framing | NICK | NICK | | BFR | C | 6044260 |
LEADERSHIP CONSTRUCTION INC. | BFT | C | 12/06/2018 | Open hole on file / Eng observation on file | NICK | NICK | | BFT | C | 6044259 |
LEADERSHIP CONSTRUCTION INC. | B= | P | 12/04/2018 | Still need 3rd party observation reports for footings/foundation/ and structural steel / Still need open hole report / All other aspects of final OK / Need zoning complete -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by WOODLAND PARK is not Completed yet (Contact: Dave Burgess at 719-687-5202). | NICK | NICK | | B= | P | 6041984 |
LEADERSHIP CONSTRUCTION INC. | BLA | C | 09/11/2018 | | NICK | NICK | | BLA | C | 5960979 |
LEADERSHIP CONSTRUCTION INC. | BIN | C | 09/11/2018 | All box headers insulated / All exterior wall insulation OK | NICK | NICK | | BIN | C | 5960977 |
LEADERSHIP CONSTRUCTION INC. | BIN | P | 09/06/2018 | Upon review insulation requirements are located on G2 / R-27 OK for exterior walls throughout except for storage/receiving area / Still need to inspect insulation in exterior box headers | NICK | NICK | | BIN | P | 5957131 |
LEADERSHIP CONSTRUCTION INC. | BFR | P | 09/06/2018 | Need to complete items for canopy frames / All backing installed for grab bars throughout / All dropped frame lids OK throughout / Reviewed accessible elements / Need all MEP's complete | NICK | NICK | | BFR | P | 5957122 |
LEADERSHIP CONSTRUCTION INC. | BFR | P | 08/16/2018 | Frame inspection for steel canopy framing / Approved plans call for LS50 hangers at base of canopy framing, all other elements of canopy framing OK per approved design / Still need to install backing for restroom grab bars | NICK | NICK | | BFR | P | 5936797 |
LEADERSHIP CONSTRUCTION INC. | BSP | P | 08/14/2018 | Continuous rigid insulation installed at exterior 7.5 R value | NICK | NICK | | BSP | P | 5933288 |
LEADERSHIP CONSTRUCTION INC. | BFR | P | 08/14/2018 | Frame inspection for all interior framing and exterior beauty canopy / Need to install backing for all grab bars throughout / Need to complete all other rough inspections / Need to install A35 clips both sides of canopy to wall locations or provide letter for use of timber lock screws / Need to pre insulate exterior headers / Need Comm check for insulation values of job | NICK | NICK | | BFR | P | 5933285 |
LEADERSHIP CONSTRUCTION INC. | BSP | P | 08/10/2018 | No com check for insulation requirements on approved plan images, need to splice into approved plans | NICK | NICK | | BSP | P | 5930427 |
LEADERSHIP CONSTRUCTION INC. | BSP | P | 08/06/2018 | Walked job site with Gerry / Exterior parapet wall framing covered prior to inspection, need to remove or provide 3rd party observation report. Gerry said that black rock eng did inspection of parapet walls / All other exterior wall framing that is installed at time OK per plans, need to insulate headers | NICK | NICK | | BSP | P | 5924673 |
LEADERSHIP CONSTRUCTION INC. | BSP | P | 08/01/2018 | Met on site with point of contact / Reviewed need to pre insulate headers and trimmers throughout / Reviewed accessible element for job / Reviewed need for welding and bolting reports | NICK | NICK | | BSP | P | 5920438 |
LEADERSHIP CONSTRUCTION INC. | BSP | P | 07/19/2018 | Met on site with Gerry Domino / Reviewed need to have approved plans on site at all times for inspections and in same location in trailer / Reviewed need to have RBD binder for all Eng reports / Reviewed required inspection to be had for project | NICK | NICK | | BSP | P | 5908545 |
LEADERSHIP CONSTRUCTION INC. | BSP | P | 07/02/2018 | Called Patrick from Leadership construction to exchange contact information / Gave OK to use 3rd party for footing/foundation/bond beams | NICK | NICK | | BSP | P | 5891268 |
BERTANZETTI ELECTRIC LLC. | E= | C | 12/03/2018 | | JOHNN | JOHNN | | E= | C | 6041673 |
BERTANZETTI ELECTRIC LLC. | E= | P | 11/30/2018 | site light poles need to be grounded to EGC, FA cb needs to be red with lock on device, sprinkle box cord outside needs to be sunlight resistant, 3 outdoor gfci outlets need cb, multiple power source label: gen/set, utility on service,panels,transfer switches,...close up main service gear panels and label AIC,and date, -------------previous corrections not made: mc at slab,needs protection, 4/s plate at ceiling near carts, | JOHNN | JOHNN | | E= | P | 6040372 |
BERTANZETTI ELECTRIC LLC. | E= | P | 11/29/2018 | did not check for any corrections from 11/28/18, add 2 service outlets on top of coolers, tighten all sealtite connectors on top of coolers, strap sealtite inside coolers, protect mc at slab/end cap, mount 2 4/s boxes at slab/end caps, few open mc cables laying on slab,south side,need boxes, ceiling missing 4/s plates near carts, exit light is switched, need few ko seals on ceiling 4/s boxes, open kick plate access on island floor cooler, gfci within 6' of sink, top of cooler on south side:E j box,flex connector not in, break room: gfci within 6' of sink, | JOHNN | JOHNN | | E= | P | 6038812 |
JDE FIRE & SECURITY | E= | C | 11/28/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 6037301 |
BERTANZETTI ELECTRIC LLC. | E= | P | 11/28/2018 | handle ties panels:B,C,G, mez cond room: label decora sw disco, add disco on exhaust fan, roof top: need 2 WR gfci outlets, strap emt on low and high temp units, tighten sealtite connectors, med temp: close holes,------------------all panels,ok,transfer switches,ok,all roof top equip ok,except noted corrections, | JOHNN | JOHNN | | E= | P | 6037219 |
BERTANZETTI ELECTRIC LLC. | ES | C | 11/19/2018 | Commercial Service: 1200A 4w bonding ok / | MIGUEL | MIGUEL | | ES | C | 6029380 |
BERTANZETTI ELECTRIC LLC. | EP | P | 11/19/2018 | panels A and B ok---will need labeling on final / | MIGUEL | MIGUEL | | EP | P | 6029373 |
JDE FIRE & SECURITY | ER | P | 10/24/2018 | FIRE ALARM INSPECTION: all grid,ok | JOHNN | JOHNN | | ER | P | 6004858 |
BERTANZETTI ELECTRIC LLC. | ER | P | 10/24/2018 | all grid,ok | JOHNN | JOHNN | | ER | P | 6004857 |
BERTANZETTI ELECTRIC LLC. | ER | P | 10/22/2018 | all grid except food prep rm, need to call in FA inspection, | JOHNN | JOHNN | | ER | P | 6002022 |
BERTANZETTI ELECTRIC LLC. | ER | T | 10/18/2018 | PAID (REC#1549342): corrections not made: told GC on 10/17/18 to remove tiles on both sides of each fixture, open j boxes, conduit hanging not supported, open mc cables hanging need to be in box, FA in grid not complete, some fixtures not clipped or support wires,---------------complete lights in all grid and FA before re calling inspection, | JOHNN | JOHNN | | ER | T | 5999296 |
BERTANZETTI ELECTRIC LLC. | ER | R | 10/17/2018 | remove tiles on both sides of each light for inspection, some grid is not complete, could not inspect any lights | JOHNN | JOHNN | | ER | R | 5998047 |
BERTANZETTI ELECTRIC LLC. | ES | P | 10/02/2018 | Commercial Service: 1200 amp,4w, new commercial, ok to energize, ----------------fuses ok, still need to check bond jumper from 9/28/18, | JOHNN | JOHNN | | ES | P | 5983220 |
BERTANZETTI ELECTRIC LLC. | ES | R | 09/28/2018 | Commercial Service: 1200a mp fuses not installed-------need to be 65k or greater, -------bondbushing jumper to feeder conduits in MDP need larger wire,#2cu to each pipe,-------steel,water,ufer,ok | JOHNN | JOHNN | | ES | R | 5982291 |
BERTANZETTI ELECTRIC LLC. | ER | P | 09/18/2018 | shower wall outlet,ok---------prep produce outlet not in, | JOHNN | JOHNN | | ER | P | 5968579 |
JDE FIRE & SECURITY | ER | P | 09/18/2018 | FIRE ALARM INSPECTION: walls, hard lids ok, | JOHNN | JOHNN | | ER | P | 5968571 |
BERTANZETTI ELECTRIC LLC. | ER | P | 09/17/2018 | NO FA PERMIT PULLED YET, do not close hard lids ------------electrical in all hard lids,ok-----still need shower wall outlet installed and produce prep wall built before all walls are ok, | JOHNN | JOHNN | | ER | P | 5967553 |
BERTANZETTI ELECTRIC LLC. | EUG | P | 09/14/2018 | see plan, site lights from rear of building | JOHNN | JOHNN | | EUG | P | 5966261 |
BERTANZETTI ELECTRIC LLC. | ER | P | 09/14/2018 | some hard lids, see plans, main open ceiling area,see plan, not produce lid, need FA permit, do not close lids with FA,----------still waiting on 2 small walls, 1 can needs j box cover, mc at top plate in bath rm, | JOHNN | JOHNN | | ER | P | 5966246 |
BERTANZETTI ELECTRIC LLC. | ER | P | 09/11/2018 | all walls, except 1 outlet in bath rm, 1 outlet in shower, | JOHNN | JOHNN | | ER | P | 5961790 |
BERTANZETTI ELECTRIC LLC. | ER | P | 09/10/2018 | see plans, walls | JOHNN | JOHNN | | ER | P | 5960308 |
BERTANZETTI ELECTRIC LLC. | ER | P | 09/05/2018 | see plans, walls, discussed ansi requirements, no FA in yet, discussed with EC. | JOHNN | JOHNN | | ER | P | 5955892 |
BERTANZETTI ELECTRIC LLC. | ER | P | 08/29/2018 | see plans, walls, missing few grd tails on front wall up high, check next trip out, | JOHNN | JOHNN | | ER | P | 5950387 |
BERTANZETTI ELECTRIC LLC. | ESL | C | 07/12/2018 | | JOHNN | JOHNN | | ESL | C | 5901413 |
BERTANZETTI ELECTRIC LLC. | ESL | P | 07/10/2018 | 3/4's of slab on south side, still need north side , | JOHNN | JOHNN | | ESL | P | 5898413 |
BERTANZETTI ELECTRIC LLC. | ESL | P | 07/09/2018 | south side of slab | JOHNN | JOHNN | | ESL | P | 5897057 |
BERTANZETTI ELECTRIC LLC. | EUG | L | 07/06/2018 | contractor had to reschedule. | JOHNN | JOHNN | | EUG | L | 5895854 |
PARKER SERVICES, LLC. | H= | C | 11/30/2018 | ALL ALARMS AND DRAINS ARE COMPLETE | JERRYF | JERRYF | | H= | C | 6039247 |
BRUNO'S MECHANICAL INC. | H= | C | 11/30/2018 | TAB REPORT RECEIVED AND VENT CORRECTION HAS BEEN MADE | JERRYF | JERRYF | | H= | C | 6038889 |
BRUNO'S MECHANICAL INC. | H= | P | 11/29/2018 | PARTIAL PENDING THE FOLLOWING - TAB REPORT - SUPPORT FURNACE VENTS AT NORTH EAST FURNACE ATTACH PICTURES TO NEXT INSPECTION REQUEST | JERRYF | JERRYF | | H= | P | 6037961 |
BRUNO'S MECHANICAL INC. | H= | P | 11/26/2018 | NEED THE FOLLOWING - 2" TO 3" INCREASERS AT ALL FURNACE VENTS NEED TO BE INSTALLED IN VERTICAL POSITION PER INSTALL MANUAL - TAB REPORT - SUPPORT NORTH WEST FURNACE VENT WHERE ELBOW TURNS VERTICAL - TAG CONDENSERS TO UNITS SERVED - WEATHER PROTECT EXTERIOR OPENINGS ABOVE ROOF AT MACHINE ROOM EXHAUST AND INTAKE - COULD NOT LOCATE CO SENSORS AT RTU'S PER EQUIPMENT SCHEDULE - FURNACE DRAIN LEAKING AT NORTHWEST FURNACE | JERRYF | JERRYF | | H= | P | 6033718 |
PARKER SERVICES, LLC. | HRP | C | 11/19/2018 | PRESSURE TESTS OK ON ALL LINES - AT FINAL VERIFY 2 DRAINS AT REACH IN BEER AND SOUTH END REACH IN - VERIFY ALL ALARMS PER PLAN AND ALL DRAINS AT WALK INS | JERRYF | JERRYF | | HRP | C | 6029362 |
PARKER SERVICES, LLC. | HRP | P | 10/30/2018 | 10 PRESSURE TESTS OK AND OVER HEAD PIPING OK TO SOUTH AND EAST SIDE PENDING REVIEW OF SUBMITTED PLANS - STILL NEED NORTH AND WEST HRP INSPECTIONS - NO REFRIGERATION PLANS ONSITE OR IN COMPUTER - CONTRACTOR PROCEEDING AT OWN RISK - NEED FURTHER RESEARCH ((((((TRAINING WITH DAVE H.)))) | JERRYF | JERRYF | | HRP | P | 6009915 |
BRUNO'S MECHANICAL INC. | HD | P | 10/12/2018 | NEED THE FOLLOWING - PROPER SUPPORT OF ALL LINE SETS CANNOT USE ZIP TIES - PIPING COMPLETED TO HEATING COIL - NEED CONDENSATE DRAINS CORRECTED AT FURNACES AND COILS - REMOTE INDICATORS FOR SMOKE SHUTDOWN OR LETTER VERIFYING SMOKE IS MONITORED BY FIRE PANEL - FURNACE VENTS - SOMEONE TO CLAIM AIR DOOR AT ENTRY WAY ON PERMIT - STOPPED INSPECTION (((( CONTRACTOR WHEN CALLING INSPECTION PLEASE PUT IN NOTES AS TO WHAT IS TO BE INSPECTED)))) TRAINING WITH DAVE H. | JERRYF | JERRYF | | HD | P | 5993151 |
BRUNO'S MECHANICAL INC. | HC | C | 10/11/2018 | RELEASE METER | JERRYF | JERRYF | | HC | C | 5992285 |
BRUNO'S MECHANICAL INC. | HI | C | 10/11/2018 | PRESSURE TEST OK AND PIPING PER PLAN - BY FINAL NEED CLAMP AT 3" LINE ON ROOF AT PARAPET - ADD 2 STUBS TO PERMIT AND SOMEONE NEEDS TO CLAIM GENERATOR | JERRYF | JERRYF | | HI | C | 5992233 |
BRUNO'S MECHANICAL INC. | HI | L | 10/10/2018 | NOTIFIED CONTRACTOR AND CANCELED INSPECTION FOR ROOF GAS DUE TO WEATHER ALREADY RESCHEDULED FOR 10/11 | JERRYF | JERRYF | | HI | L | 5990568 |
BRUNO'S MECHANICAL INC. | HD | P | 10/09/2018 | ABOVE CEILING SA / RA AND EXHAUST OK TO WRAP AND FINAL CONNECTIONS AND GRILLES ARE COMPLETE IN BACK AREA HARD LID AND LAY IN AREA'S ONLY - STILL NEED F4 COMPLETED AND ALL DRAINS AND ROOF INSPECTION | JERRYF | JERRYF | | HD | P | 5989646 |
BRUNO'S MECHANICAL INC. | HD | R | 09/28/2018 | scope of work has still not been corrected as per last inspection. exhaust fan-2 not complete, r/a in accounting office goes nowhere rocked to lid. sd-2 needs to be relocated to proper location. no roof today | DAVIDH | DAVIDH | | HD | R | 5980086 |
BRUNO'S MECHANICAL INC. | HD | P | 09/20/2018 | PERMIT FEE DOES NOT COVER WORK SCOPE - ADD THE FOLLOWING TO PERMIT - 4 FURNACES - 4 AC COILS - 5 CONDENSERS - AIR DOOR HEATING COIL - 9 AIRIUS INTAKE FANS - 4 FURNACE VENTS - 4 GAS OUTLETS - SOMEONE NEEDS TO CLAIM GENERATOR NOTES: SA / RA MAINS AT THE FOLLOWING AREA'S OK BREAK ROOM - BUYERS AREA - HABA AREA - ALL EXPOSED - ALL OK TO WRAP - STILL NEED ALL SA / RA AND EXHAUST RUN OUTS COMPLETED AND INSPECTION CALLED | JERRYF | JERRYF | | HD | P | 5971274 |
BRUNO'S MECHANICAL INC. | P= | C | 11/30/2018 | Corrections made, images received | SHANEN | SHANEN | | P= | C | 6039001 |
BRUNO'S MECHANICAL INC. | PRD | C | 11/29/2018 | | SHANEN | SHANEN | | PRD | C | 6037764 |
BRUNO'S MECHANICAL INC. | P= | P | 11/29/2018 | Need loop in water heater condensate line, hole in pan does not meet requirement for minimum opening, rest OK | SHANEN | SHANEN | | P= | P | 6037761 |
BRUNO'S MECHANICAL INC. | P= | P | 11/26/2018 | Complete PRD, accessible drinking fountain minimum knee space requirements not met, need discharge for water heater pan, need condensate loop for water heater exhaust, water crossed at kitchen sink in retail area, need dome strainers for east side coolers, rest OK | SHANEN | SHANEN | | P= | P | 6033428 |
BRUNO'S MECHANICAL INC. | PTO | C | 09/26/2018 | Test OK | SHANEN | SHANEN | | PTO | C | 5977374 |
BRUNO'S MECHANICAL INC. | PTO | R | 09/24/2018 | not ready | JOEL | JOEL | | PTO | R | 5974027 |
BRUNO'S MECHANICAL INC. | PTO | P | 09/20/2018 | Low test #40, overhead water distribution design OK, check - insulation, re-circ and water entry in back-room, need to complete DWV and PRD inspection | SHANEN | SHANEN | | PTO | P | 5971268 |
BRUNO'S MECHANICAL INC. | PTO | P | 09/11/2018 | In wall DWV and water distribution test OK, check shower valves at next inspection | SHANEN | SHANEN | | PTO | P | 5961091 |
BRUNO'S MECHANICAL INC. | PB | C | 07/09/2018 | Sanitary underground test OK, water service under footer | SHANEN | SHANEN | | PB | C | 5896393 |
BRUNO'S MECHANICAL INC. | PRD | P | 07/05/2018 | 6" stack to under footer test OK | SHANEN | SHANEN | | PRD | P | 5893968 |
BRUNO'S MECHANICAL INC. | PB | P | 07/05/2018 | Need to pipe and test underground DWV on northwest corner line 4 - 5, column C - E, rest OK | SHANEN | SHANEN | | PB | P | 5893962 |
BRUNO'S MECHANICAL INC. | PB | P | 06/26/2018 | 4" main trunk line and risers test OK | SHANEN | SHANEN | | PB | P | 5885587 |
BRUNO'S MECHANICAL INC. | XMS | T | 11/14/2018 | PAID (REC#1556273) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 5 added refrigeration | DALEH | DALEH | | XMS | T | 6025049 |