CMG CORP | B= | C | 04/18/2019 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6169802 |
CMG CORP | BE | P | 03/26/2019 | | MATTHEWM | MATTHEWM | | BE | P | 6145067 |
CMG CORP | B= | P | 09/26/2018 | Building final inspection pending MEP final inspections / demising walls and accessible restrooms completed per approved plans / training with Chuck. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 5977837 |
CMG CORP | BFR | P | 07/17/2018 | Framing OK pending other Roughs / discussed accessible elements | RICHB | RICHB | | BFR | P | 5905429 |
EL PASO ELECTRIC, LLC. | E= | C | 09/27/2018 | | GARYL | GARYL | | E= | C | 5979207 |
EL PASO ELECTRIC, LLC. | E= | P | 08/09/2018 | Label breaker feeding LHT----Panel LGT needs overcurrent protection and KO filler----Transformer LHT okay. | JOHNN | JOHNN | | E= | P | 5929399 |
EL PASO ELECTRIC, LLC. | E= | P | 08/07/2018 | need POC on site, open relocated transformer and panels,check steel/water bond, and new panel | JOHNN | JOHNN | | E= | P | 5925945 |
EL PASO ELECTRIC, LLC. | ER | C | 08/06/2018 | grid | JOHNN | JOHNN | | ER | C | 5924645 |
EL PASO ELECTRIC, LLC. | ER | P | 07/17/2018 | Wall rough ok / Discussed accessibility requirements with contractor / | ROB | ROB | | ER | P | 5905135 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 04/18/2019 | | JERRYF | JERRYF | | H= | C | 6169801 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 11/06/2018 | OK TO RELEASE LOW PRESSURE METER | JERRYF | JERRYF | | HC | C | 6017694 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 11/06/2018 | OK FOR METER RELEASE - STILL NEED REVISE PLAN | JERRYF | JERRYF | | HI | P | 6017686 |
LANDMARK PLUMBING AND HEATING, INC. | HI | R | 11/02/2018 | WAIVED TRIP FEE - NO CORRECTIONS MADE - CALLED MIKE AT LANDMARK NO ANSWER | JERRYF | JERRYF | | HI | R | 6014683 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 10/18/2018 | NEED CONTRACTOR VERIFY PROPER METER LOCATION AND REVISE PLANS - STOPPED INSPECTION | JERRYF | JERRYF | | HI | P | 5999094 |
LANDMARK PLUMBING AND HEATING, INC. | HI | L | 10/17/2018 | AUTO CALL COMPLETE AT 10:20 - ARRIVED 10:52 - NO ONSITE PERSONNEL - CANCELED BY CONTRACTOR - CONTRACTOR MEET INSPECTOR FOR NEXT INSPECTION | JERRYF | JERRYF | | HI | L | 5997139 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 09/07/2018 | TAG LINE WITH UNIT SERVED - LOST TEST - NEED PLAN REVISED TO MATCH INSTALLED OK TO COVER INTERIOR | JERRYF | JERRYF | | HI | P | 5958785 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 08/16/2018 | ENGINEER LETTER RECEIVED | JERRYF | JERRYF | | H= | C | 5935852 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/16/2018 | READINGS OUTSIDE +/- 10% NEED ENGINEER LETTER APPROVING THESE READINGS | JERRYF | JERRYF | | H= | P | 5935786 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 08/03/2018 | PARTIAL PENDING TAB REPORT - ALL GRILLES AND ROOF OK | JERRYF | JERRYF | | H= | P | 5923817 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 07/18/2018 | ROUGH SUPPLIES AND RETURNS OK. NO DIFFUSERS OR ROOF TODAY. | NANCY | NANCY | | HD | P | 5906374 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 10/10/2018 | Correction made | SHANEN | SHANEN | | P= | C | 5990920 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 10/02/2018 | Drinking fountain does not meet minimum accessibility center to side clearance requirements, rest OK | SHANEN | SHANEN | | P= | P | 5983146 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 07/17/2018 | Corrections made | SHANEN | SHANEN | | PTO | C | 5905073 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 07/12/2018 | Low test on water gauge and DWV gauge at drinking fountain, secure closet flanges, rest OK, check water tie-ins at final | SHANEN | SHANEN | | PTO | P | 5900883 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 06/15/2018 | Underground DWV to restrooms and drinking fountain test OK | SHANEN | SHANEN | | PB | C | 5876264 |
RIAL HEATING AND AIR CONDITIONING, INC. | XMS | P | 11/13/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | XMS | P | 6024500 |