COLORADO STRUCTURES INC | B= | C | 08/12/2019 | final of remainder of all units and garages and exterior OK pending other finals | DANE | DANE | | B= | C | 6297753 |
COLORADO STRUCTURES INC | B= | R | 08/09/2019 | west tower units and breeze ways and all garages except the 4 east bays (garages 1 2 3 an 4) / all west tower units on 3rd 2nd and 1st floors and garages and breeze ways OK pending other finals / still need to inspect all east tower units and garages 1 2 3 and 4 and all of exterior | DANE | DANE | | B= | R | 6295833 |
COLORADO STRUCTURES INC | BSP | P | 07/29/2019 | new rock and attachments of rock OK at rear ceiling of garage 6 (6th from east end) - rock was removed to fix leak and new has been installed OK | DANE | DANE | | BSP | P | 6280619 |
COLORADO STRUCTURES INC | BSP | P | 07/08/2019 | fire protection at the PVC pipes in all the garages OK | DANE | DANE | | BSP | P | 6256199 |
COLORADO STRUCTURES INC | BSP | P | 06/07/2019 | Engineer judgement for floor drain penetration at cantilever above garage received -- Firestopping at floor drain per EJ OK | DAKOTAB | DAKOTAB | | BSP | P | 6224144 |
COLORADO STRUCTURES INC | BSP | P | 03/26/2019 | revised drywall wrap design for ledger on file | DANE | DANE | | BSP | P | 6144023 |
COLORADO STRUCTURES INC | BSP | P | 03/20/2019 | drywall and attachments at breezeway ceilings at level 3 OK per UL P545 | DANE | DANE | | BSP | P | 6138951 |
COLORADO STRUCTURES INC | BSP | P | 03/20/2019 | dropped ceiling framing at east breezeway at level 1 OK pending other roughs | DANE | DANE | | BSP | P | 6138946 |
COLORADO STRUCTURES INC | BFR | P | 03/12/2019 | engineering received for cut roll trusses in unit 108 / engineering received for post under girder in garage wall received and correction OK / this completes the framing inspections for this building pending other roughs | DANE | DANE | | BFR | P | 6132010 |
COLORADO STRUCTURES INC | BSP | P | 03/12/2019 | drywall and attachments OK at all 1st floor unitts and garages | DANE | DANE | | BSP | P | 6131998 |
COLORADO STRUCTURES INC | BSP | P | 03/08/2019 | 2nd floor both towers drywall and drywall attachments at rated assemblies OK per UL L574 UL U341 GA WP 3370 and GA WP 8130 | DANE | DANE | | BSP | P | 6128584 |
COLORADO STRUCTURES INC | BSP | P | 03/04/2019 | 3rd floor RC and attachments at rated assemblies - RC and attachments at rated assemblies OK at all units at 3rd floor at both towers // NOTE: 3/34/19 - inspection was for attachments at rated assemblies only as RC is behind rock | DANE | DANE | | BSP | P | 6123718 |
COLORADO STRUCTURES INC | BSP | R | 03/01/2019 | RC and insulation at 1st floor units and garages OK pending completion of framing items in 2nd garage from west end and in unit 108 / training with Tim | DANE | DANE | | BSP | R | 6122189 |
COLORADO STRUCTURES INC | BFR | R | 03/01/2019 | still need stamped letter for no fix at roll trusses over west wall / still need stamped letter for fix in garage with girder not bearing on wall / training with Tim | DANE | DANE | | BFR | R | 6122188 |
COLORADO STRUCTURES INC | BSP | P | 03/01/2019 | ceiling drop framing and membrane penetrations above drops OK at all units throughout / training with Tim | DANE | DANE | | BSP | P | 6122187 |
COLORADO STRUCTURES INC | BSP | P | 03/01/2019 | Training with Dane - Insulation inspection and RC inspection - Truss repair inspection - Frame inspection training | TIMOTHYS | TIMOTHYS | | BSP | P | 6122185 |
COLORADO STRUCTURES INC | BIN | P | 02/27/2019 | 2nd floor RC and insulation / RC and thermal insulation OK at all 2nd floor units in both towers / still need to inspect all drop framing and all penetration fixes above drops | DANE | DANE | | BIN | P | 6119529 |
COLORADO STRUCTURES INC | BFR | P | 02/27/2019 | 1st floor frame reinspection of units and garages / 2nd garage from west end still need letter for RF05 not bearing on post / unit 107 - still need to complete rock under and around floor trusses at fire barrier / 108 - still need fix for roll trusses that have been cut that bear over west wall / all other items in units and garages have been corrected / stamped truss repair received for F40A in unit 108 received | DANE | DANE | | BFR | P | 6119521 |
COLORADO STRUCTURES INC | BFR | P | 02/26/2019 | frame inspection of garages / 2nd garage from west end -need letter for RF05 girder is not bearing over 6x8 post in east wall / 3rd garage from east end - missing block between floor trusses in center to garage / truss repairs received for F48 FB2 and F51 - repairs OK | DANE | DANE | | BFR | P | 6118287 |
COLORADO STRUCTURES INC | BFR | P | 02/25/2019 | frame inspection 1st floor dwelling units only - still need to do garages / unit 107 - missing drywall behind floor trusses at fire barrier / 108 - need fix for F40A over entry - need fix for drag trusses over west wall that have been cut up | DANE | DANE | | BFR | P | 6116936 |
COLORADO STRUCTURES INC | BIN | P | 02/25/2019 | 3rd floor thermal insulation OK at all dwelling units walls | DANE | DANE | | BIN | P | 6116929 |
COLORADO STRUCTURES INC | BFR | P | 02/22/2019 | FRAME INSPECTION -- 2ND FLOOR -- Engineer letter for floor truss for F12, F12-3, F12-4, F12-5, F52, F65 received, repairs OK -- 2nd floor Frame OK | DAKOTAB | DAKOTAB | | BFR | P | 6115119 |
COLORADO STRUCTURES INC | BSP | P | 02/21/2019 | drywall install on ceilings of all bathrooms per UL L 574 okay | BOBF | BOBF | | BSP | P | 6113431 |
COLORADO STRUCTURES INC | BSP | P | 02/21/2019 | RC channel per UL P 522 install at 3rd floor all units and stairway okay | BOBF | BOBF | | BSP | P | 6113425 |
COLORADO STRUCTURES INC | BFR | P | 02/21/2019 | letters for truss repairs in corridors for trussesR-74a. Rp8A received and repairs complete, letter for notched gable trusses received, no repair required | BOBF | BOBF | | BFR | P | 6113416 |
COLORADO STRUCTURES INC | BSP | P | 02/20/2019 | Rc channel in bathroos of units 210, 203 and 108 okay | BOBF | BOBF | | BSP | P | 6112491 |
COLORADO STRUCTURES INC | BFR | P | 02/20/2019 | frame inspection in units 310, 302, 303, 304, 305, 306, 307 and 308 - provide eng letter for 1 1/2" hole in lvlv header over door going to deck, / unit 304 and 307 provide eng letter for notched verticle leg at gable that intersects windows, need to draftstop atsame location / units 302, 303, 305, 306 and 308 okay, eng letters and repairs complete for trusses F 45, R102a, R102a-2, R93, R92g, R106, R100a | BOBF | BOBF | | BFR | P | 6112489 |
COLORADO STRUCTURES INC | BSP | P | 02/15/2019 | floor truss repairs at units 201 and 203 OK above bathroom where air handlers will be installed and OK to install RC - truss repairs received for floor trusses F36 and F58 | DANE | DANE | | BSP | P | 6109254 |
COLORADO STRUCTURES INC | BSP | R | 02/15/2019 | RC at 3rd floor corridor ceilings - need to complete all framing items before RC can be inspected / no RC installed at balcony roofs at time of inspection | DANE | DANE | | BSP | R | 6109245 |
COLORADO STRUCTURES INC | BFR | R | 02/15/2019 | 3rd floor corridor truss framing and above ceiling and truss framing at balconies / east breezeway - need fix for R110A outside of door to 306 - need to nail off repair per design on R100 need 3 rows 4" OC - need minimum of 1 1/2" of bearing at R99A trusses at girder end - need to complete fire stopping above ceiling - several areas where the annular space at wood members is too large per the EJ design // west corridor - need stamped fix for R74A with loose gusset at bottom cord by girder - need to nail off fix for R75 per design need 3 rows 4" OC - need to complete all fire stopping above ceiling - need to complete prerock above ceiling / all balcony roofs OK / truss repairs received for R11 R75 F58 F36 | DANE | DANE | | BFR | R | 6109237 |
COLORADO STRUCTURES INC | BSP | P | 02/14/2019 | RC at ceilings of bathrooms where air handlers will be installed only at all units in both towers except units 201 203 and 108 OK pending other roughs / no RC installed at units 108 201 and 203 | DANE | DANE | | BSP | P | 6107751 |
COLORADO STRUCTURES INC | BFR | P | 02/12/2019 | framing at ceilings of bathrooms where air handlers will be installed OK at all units on 2nd and 1st floors and OK to install RC pending other roughs / framing OK at all areas where fur out walls are installed against unit separation walls at all units at 1st 2nd and 3rd floors and OK to pre-rock pending other roughs | DANE | DANE | | BFR | P | 6105142 |
COLORADO STRUCTURES INC | BSP | P | 02/11/2019 | truss framing above bathrooms where air handlers will be installed OK - OK to prerock ceiling areas where air handlers will be installed pending other roughs / truss fix for R120GE received and fix is OK | DANE | DANE | | BSP | P | 6103836 |
COLORADO STRUCTURES INC | BSP | P | 12/12/2018 | 5/8" type X rock at corridor side of walls common to all units - screws and rock OK GA WP 8130 - still need to inspect inside of all units after frame inspection | DANE | DANE | | BSP | P | 6051011 |
COLORADO STRUCTURES INC | BSP | P | 11/19/2018 | framing at unit walls common to breeze ways at floor truss bearing top of wall to bottom of floor trusses OK in all units (OK to prerock to under side of floor deck) and OK at 3rd floor to prerock above walls to under side of roof deck | DANE | DANE | | BSP | P | 6029746 |
COLORADO STRUCTURES INC | BFR | P | 11/01/2018 | exterior sheer and hold downs OK | DANE | DANE | | BFR | P | 6013639 |
COLORADO STRUCTURES INC | BFN | C | 08/22/2018 | Engineers observation Letter on file / Eufer OK | DANE | DANE | | BFN | C | 5941755 |
COLORADO STRUCTURES INC | BFT | C | 08/22/2018 | Engineers observation Letter on file / Soils report on file / 2000 - no drain | DANE | DANE | | BFT | C | 5941749 |
COLORADO STRUCTURES INC | BFT | P | 07/05/2018 | Authorized 3rd party engineer inspection with all observation paperwork - ufer letter and open hole letter to be picked up by inspector @ BFI or BFD inspection or uploaded to online inspection request / met on site with superintendent and discussed job progress | DANE | DANE | | BFT | P | 5894406 |
BIBLE ELECTRIC, INC. | E= | C | 07/09/2019 | | BRET | BRET | | E= | C | 6256890 |
BIBLE ELECTRIC, INC. | E= | P | 07/02/2019 | pending service rating paper work uploaded to permit and handle ties for dish/disposal circuits | BRET | BRET | | E= | P | 6251263 |
BIBLE ELECTRIC, INC. | E= | P | 06/27/2019 | Need ty handles on DW/DISP breakers, 2 ckts on 1 yoke / rest of 205,206,207,208 ok / Need to check AC's 205,207 have 20/2--206,208 have 25/2 breakers /6.28.2019: 2nd and 3rd level corridor recpts ok / | ROB | ROB | | E= | P | 6247098 |
BIBLE ELECTRIC, INC. | E= | P | 06/26/2019 | 3rd fl units ok | RANDY | RANDY | | E= | P | 6244574 |
BIBLE ELECTRIC, INC. | E= | P | 06/24/2019 | first floor units ok except missing hall smoke in 108, | BRET | BRET | | E= | P | 6241189 |
BIBLE ELECTRIC, INC. | E= | P | 06/20/2019 | 2nd fl unit finals | RANDY | RANDY | | E= | P | 6238235 |
BIBLE ELECTRIC, INC. | E= | P | 06/19/2019 | 3rd fl unit finals | RANDY | RANDY | | E= | P | 6236550 |
COLORADO ELECTRICAL SYSTEMS, LLC | E= | C | 06/19/2019 | FIRE ALARM INSPECTION: | RANDY | RANDY | | E= | C | 6236516 |
BIBLE ELECTRIC, INC. | ES | P | 04/09/2019 | Commercial Service: Bldg 11345 --- units 103 , 104 , 107 , 108 , 201 - 208 , 301 - 308 , house --- ( 21 meters total ) | TOMC | TOMC | | ES | P | 6159780 |
BIBLE ELECTRIC, INC. | EUG | P | 03/28/2019 | site lighting conduits on East side | TOMC | TOMC | | EUG | P | 6147341 |
BIBLE ELECTRIC, INC. | ER | C | 03/21/2019 | | BRET | BRET | | ER | C | 6140112 |
BIBLE ELECTRIC, INC. | ER | P | 02/28/2019 | bath lids ok | BRET | BRET | | ER | P | 6119895 |
BIBLE ELECTRIC, INC. | ER | P | 02/25/2019 | corridors ok except first floor area where soffit to be built to protect ser cables | BRET | BRET | | ER | P | 6116226 |
BIBLE ELECTRIC, INC. | EUG | P | 02/14/2019 | n.w ug ok see plans for location | BRET | BRET | | EUG | P | 6107223 |
BIBLE ELECTRIC, INC. | EUG | P | 02/11/2019 | partial see site lighting plan for locations | BRET | BRET | | EUG | P | 6103189 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/28/2019 | FIRE ALARM INSPECTION: first floor ok | BRET | BRET | | ER | P | 6089731 |
BIBLE ELECTRIC, INC. | EP | P | 01/28/2019 | first floor unit panels | BRET | BRET | | EP | P | 6089730 |
BIBLE ELECTRIC, INC. | ER | P | 01/28/2019 | first floor units and garages | BRET | BRET | | ER | P | 6089729 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/24/2019 | FIRE ALARM INSPECTION: 2nd floor f.a ok | BRET | BRET | | ER | P | 6087367 |
BIBLE ELECTRIC, INC. | EP | P | 01/24/2019 | 2nd floor unit panels | BRET | BRET | | EP | P | 6087361 |
BIBLE ELECTRIC, INC. | ER | P | 01/24/2019 | 2nd floor units and corridors | BRET | BRET | | ER | P | 6087357 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | P | 01/23/2019 | FIRE ALARM INSPECTION: 3rd floor fire alarm rough ok | BRET | BRET | | ER | P | 6085591 |
BIBLE ELECTRIC, INC. | EP | P | 01/23/2019 | panels 3rd floor units. | BRET | BRET | | EP | P | 6085582 |
BIBLE ELECTRIC, INC. | ER | P | 01/23/2019 | 3rd floor units, | BRET | BRET | | ER | P | 6085576 |
COLORADO ELECTRICAL SYSTEMS, LLC | ER | R | 01/22/2019 | FIRE ALARM INSPECTION: no one on site at 10:14 | TOMC | TOMC | | ER | R | 6084269 |
BIBLE ELECTRIC, INC. | ER | L | 01/22/2019 | no one on site at 10:10 | TOMC | TOMC | | ER | L | 6084262 |
LDI MECHANICAL, INC. | H= | C | 08/09/2019 | BUILDING 1. MECHANICAL FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6295266 |
LDI MECHANICAL, INC. | H= | P | 08/08/2019 | BUILDING 1. MECHANICAL FINAL OK PENDING 305: NEED TO VERIFY INTERLOCKS. | DUSTINS | DUSTINS | | H= | P | 6293845 |
HORIZON LLC OF SOUTH CAROLINA | H= | C | 08/08/2019 | BUILDING 1. METER VERIFICATION LETTER RECEIVED, SEE IMAGES. GAS FINAL OK. | DUSTINS | DUSTINS | | H= | C | 6292957 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 08/05/2019 | BUILDING 1. GAS FINAL OK PENDING METER VERIFICATION LETTER. | DUSTINS | DUSTINS | | H= | P | 6288539 |
LDI MECHANICAL, INC. | H= | P | 07/30/2019 | BUILDING 1. MECHANICAL FINAL OK IN ALL APARTMENTS EXCEPT 305: NEED TO VERIFY INTERLOCKS. 205: NOT READY. | DUSTINS | DUSTINS | | H= | P | 6281949 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 07/26/2019 | BUILDING 1. GAS FINAL OK IN ALL APARTMENTS EXCEPT 206: WATER HEATER EXHAUST VENT HAS IMPROPER GLUE JOINTS. 207: APARTMENT WAS LOCKED, STILL NEED TO VERIFY CORRECTIONS TO CONDENSATE DRAIN LINE AND NEUTRALIZER. WATER HEATER EXHAUST VENT HAS IMPROPER GLUE JOINTS. NEED METER VERIFICATION LETTER. | DUSTINS | DUSTINS | | H= | P | 6278573 |
HORIZON LLC OF SOUTH CAROLINA | H= | P | 07/22/2019 | BUILDING 1. GAS FINAL OK EXCEPT ALL APARTMENTS NEED TO SECURE NEUTRALIZER AND PROPER SLOPE ON CONDENSATE DISPOSAL TO NEUTRALIZER. WATER HEATER EXHAUST VENT HAS IMPROPER GLUE JOINTS IN APARTMENTS 206 AND 207. NEED METER VERIFICATION LETTER. | DUSTINS | DUSTINS | | H= | P | 6271893 |
LDI MECHANICAL, INC. | H= | P | 07/22/2019 | BUILDING 1. EAST TOWER AND OUTSIDE MECHANICAL FINAL OK EXCEPT 305 AND 208: NEED TO SEE INTERLOCKS. 205: NOT READY. | DUSTINS | DUSTINS | | H= | P | 6271881 |
LDI MECHANICAL, INC. | H= | P | 07/19/2019 | BUILDING 1. WEST TOWER MECHANICAL FINAL OK EXCEPT 104, 203 AND 302 NEED TO SEE INTERLOCKS. STILL NEED TO SEE EAST TOWER AND OUTSIDE. | DUSTINS | DUSTINS | | H= | P | 6269650 |
LDI MECHANICAL, INC. | HD | C | 03/22/2019 | BUILDING 1. SHEET ROCK SPACING AROUND ALL SUPPLY OUTLETS OK. | DUSTINS | DUSTINS | | HD | C | 6141105 |
LDI MECHANICAL, INC. | HD | P | 03/20/2019 | BUILDING 1. WALKED THE FIRST FLOOR APARTMENTS ON EAST TOWER AND FOUND MULTIPLE SUPPLY OUTLETS WITH MORE THAN THE 1/8" GAP ALLOWED TO SHEET ROCK FROM DAMPER. CANCELLED BY JOSE TO LET THE CONTRACTOR FILL IN OPENINGS PER ENGINEER LETTER. | DUSTINS | DUSTINS | | HD | P | 6138227 |
LDI MECHANICAL, INC. | HD | P | 01/31/2019 | BUILDING 1. CONTRACTOR STATED THAT THERE WILL BE A CHANGE TO SHUT THE UNITS DOWN SO NO LETTER FOR APPROVAL IN DYNAMIC SYSTEM REQUIRED. WILL NEED A PLAN SPLICE FOR THIS CHANGE. BUILDING 1. EAST TOWER. ALL APARTMENT ROUGH OK. NEED TO SEE SPACING AROUND SUPPLY OUTLETS WHEN SHEET ROCK INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6093847 |
HORIZON LLC OF SOUTH CAROLINA | HWP | C | 01/30/2019 | BUILDING 1. ALL APARTMENTS HOT WATER SUPPLY/RETURN PIPING OK. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HWP | C | 6092100 |
LDI MECHANICAL, INC. | HSP | P | 01/30/2019 | LETTER FROM ENGINEER ADDRESSING GAP AROUND DAMPERS RECEIVED, SEE IMAGES. | DUSTINS | DUSTINS | | HSP | P | 6091793 |
LDI MECHANICAL, INC. | HD | P | 01/28/2019 | BUILDING 1. LETTER FROM ENGINEER APPROVING CFD-15 IN RATED ASSEMBLIES RECEIVED, SEE IMAGES. CONTRACTOR STATED THAT THERE WILL BE A CHANGE TO SHUT THE UNITS DOWN SO NO LETTER FOR APPROVAL IN DYNAMIC SYSTEM REQUIRED. WILL NEED A PLAN SPLICE FOR THIS CHANGE. BUILDING 1. WEST TOWER. ALL APARTMENT ROUGH OK. NEED TO SEE SPACING AROUND SUPPLY OUTLETS WHEN SHEET ROCK INSTALLED. | DUSTINS | DUSTINS | | HD | P | 6090110 |
HORIZON LLC OF SOUTH CAROLINA | HC | C | 11/20/2018 | OK TO SET 20 METERS AT THIS ADDRESS. | DUSTINS | DUSTINS | | HC | C | 6031065 |
HORIZON LLC OF SOUTH CAROLINA | HI | C | 11/20/2018 | BUILDING 1. TWENTY 10 LB TEST OK. PIPING PER PLAN. CHECK CONNECTIONS TO EQUIPMENT AT FINAL. | DUSTINS | DUSTINS | | HI | C | 6031054 |
LDI MECHANICAL, INC. | HSP | P | 11/06/2018 | LETTER FROM ENGINEER APPROVING CEILING RADIATION DAMPERS IN DYNAMIC SYSTEM RECEIVED, SEE IMAGES. | DUSTINS | DUSTINS | | HSP | P | 6017996 |
HORIZON LLC OF SOUTH CAROLINA | P= | C | 08/06/2019 | corrections made | JOHNS | JOHNS | | P= | C | 6290996 |
HORIZON LLC OF SOUTH CAROLINA | P= | R | 08/05/2019 | **TRIP FEE waived this time
not all corrections made @ west tower, inspector stopped inspection after west tower
@ WEST TOWER @ 303 broken drain pan (back side), @ 203 cap unused aav @ hall and vacuum breaker to be above piping served, @ 201 broken seal @ drain pan discharge fitting and re attach straps @ mech, @ 103 flush handle on open side, @ 104 flush handle on open side, and route t&p to floor drain, rest ok for corrections made @ WEST TOWER ONLY
**STILL NEED above corrections, all EAST tower corrections, and water entry | JOHNS | JOHNS | | P= | R | 6287947 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 07/26/2019 | @ WEST TOWER, all 2nd / 3rd floor drain pans broken or back graded @ drain outlet, all vacuum breakers to be in vertical position and above piping served, @ 302 and 303 back grade @ drain pan piping, @ 204 secure piping @ mech, @ 203 need aav removal clearance, @ 103 vacuum breaker to be above piping served and need flush handle on open side, @ 104 need flush handle on open side, rest ok for west tower only **STILL NEED EAST TOWER AND WATER ENTRY | JOHNS | JOHNS | | P= | P | 6279135 |
HORIZON LLC OF SOUTH CAROLINA | P= | P | 07/23/2019 | @ EAST TOWER need to support water piping / expansion @ ALL mech rooms, ALL vacuum breakers to be above piping served per plans, need service clearance @ ALL lav aav's, @ 305 not ready, @ 306 and 308 no hot water, re inspect all, @ 206 need aav @ mech to be in vertical position, need aav in vertical position @ hall lav, and cap unused aav @ mstr, @ 208 need aav in vertical position @ hall lav, and cap unused aav @ mstr, @ 205 not ready, @ 207 air gap @ t&p, @ 107 strap vertical aav piping @ mech, water closet 18 1/2" off side wall, verify f.h. on open side, no hot water, re inspect all, and @ 108 strap vertical aav piping @ mech, cap unused aav @ mstr, and verify f.h. on open side, rest ok @ WEST TOWER need to support water piping / expansion @ ALL mech rooms, ALL vacuum breakers to be above piping served per plans, need service clearance @ ALL lav aav's, @ 302 back grade @ drain pan and t&p to discharge above drain pan, @ 303 back grade @ drain pan and need to caulk tub spout, @ 202 missing aav @ mech, strap vertical aav piping @ mech, and need air gap @ t&p, @ 204 need air gap @ t&p, @ 203 cap off unused aav @ mstr, @ 201 no hot water, re inspect all, furnace condensate kinked @ hall lav, and cap off unused aav @ mstr, @ 104 air gap @ t&p, strap vertical aav piping @ mech, and flush handle on open side @ hall, @ 103 leak @ t&p, route t&p towards drain, strap vertical aav piping @ mech, flush handle open side @ hall, and cap unused aav @ mech, rest ok **STILL NEED WATER ENTRY | JOHNS | JOHNS | | P= | P | 6274328 |
HORIZON LLC OF SOUTH CAROLINA | PTO | C | 05/23/2019 | contractor replaced shark byte fitting per engineers request | JOHNS | JOHNS | | PTO | C | 6208173 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 01/28/2019 | BY final need engineers letter allowing shark byte fittings underground. NOTE:this completes all PTO phases | JOHNS | JOHNS | | PTO | P | 6089805 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 01/25/2019 | ok for all main water / domestic waters / accessible measurements / and previous corrections MINUS FREEZE PRO (X2) @ WATER HTR DRAIN TRAPS @ GARAGE, 107 WATER CLOSET TO BE 16 - 18" OFF SIDE WALL **STILL NEED ABOVE CORRECTIONS | JOHNS | JOHNS | | PTO | P | 6088461 |
HORIZON LLC OF SOUTH CAROLINA | PTO | P | 01/24/2019 | ok for dwv / tubs only @ all rooms MINUS LOW DWV TEST THROUGH OUT, 206 HYDRO JUMP @ GARAGE 4", AND FREEZE PRO (X2) @ WATER HTR DRAIN TRAPS @ GARAGE, rest ok. NOTE: vtr, check unit shut offs w/ access panel @ final, aav @ all kitchens, concealed h.a.'s @ all hot kitchen lines, aav @ all 1st and 2nd floor lavs (up high under cab), aav @ all first floor w.h. closets, aav @ 202 water htr closet, aav @ 206 water htr closet, aav @ water entry, check for shut off @ water entry @ final, check all water htrs and water entry @ final ***STILL NEED MAIN WATER, DOMESTIC WATER, AND ALL ACCESSIBLE MEASUREMENTS INSPECTED** **ALL FIRST FLOOR HALL BATHS TYPE B OPTION B** | JOHNS | JOHNS | | PTO | P | 6087301 |
HORIZON LLC OF SOUTH CAROLINA | PB | C | 08/30/2018 | | TAYLOR | TAYLOR | | PB | C | 5950620 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 08/01/2018 | all ok minus water service. | TAYLOR | TAYLOR | | PB | P | 5920344 |
HORIZON LLC OF SOUTH CAROLINA | PB | P | 06/05/2018 | no approved plans on site proceed at own risk deep base ok 6" main changing to 4" at marker 11-18.11 2" pex under breeze ways | JOSEPHD | JOSEPHD | | PB | P | 5864479 |