SAUNDERS CONSTRUCTION, INC. | B= | C | 11/06/2019 | All other required Final inspections are complete. (This is a computer generated result) | RICHB | RICHB | | B= | C | 6389637 | SAUNDERS CONSTRUCTION, INC. | BE | C | 10/22/2019 | Renewed for No Fee at 10/22/2019 8:57:48 AM | BECKYA | BECKYA | | BE | C | 6376019 | SAUNDERS CONSTRUCTION, INC. | B= | P | 12/28/2018 | 1st & 2nd Floor - previous items complete in all (3) rooms //// remodel complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | RICHB | RICHB | | B= | P | 6065138 | SAUNDERS CONSTRUCTION, INC. | B= | P | 12/27/2018 | 1ST AND 2ND FLOOR FINALS -- Room 225 - Need knee protection at both sinks in unit -- Room 223 - Need knee protection at both sinks in unit -- 121 - Need knee protection at both sinks in unit -- All other units on 1st and 2nd floor OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | DAKOTAB | DAKOTAB | | B= | P | 6063780 | SAUNDERS CONSTRUCTION, INC. | B= | P | 12/13/2018 | 5th floor - Complete pending other Finals / 4th floor - Complete pending other Finals / 3rd floor - Complete pending other Finals //// discussed accessible units (223, 225 &121) -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), HARMON-BONDED PLUMBING & HEATING INC Plumbing Final Inspection is not Completed yet, RIVIERA ELECTRIC, LLC Electrical Final Inspection is not Completed yet. | RICHB | RICHB | | B= | P | 6052123 | SAUNDERS CONSTRUCTION, INC. | BSP | P | 10/31/2018 | Drywall for walls in restrooms, 1st & 2nd floors - 1st layer OK, stagger at the start of 2nd layer OK, firestopping at the above-ceiling locations OK ///// Drywall for walls in restrooms, all floors - 2nd layer OK //// NOTE: These are wall type 1 on Sheet A2.0, not a listed assembly and not required to be rated - Contractor is installing 2 layers with staggered seams and firestopping all penetrations not as an IBC requirement | RICHB | RICHB | | BSP | P | 6012123 | SAUNDERS CONSTRUCTION, INC. | BSP | P | 10/26/2018 | Drywall for fire resistance rated walls in restrooms, 3rd floor only - 1st layer OK, stagger at the start of 2nd layer OK, firestopping at the above-ceiling locations OK | RICHB | RICHB | | BSP | P | 6007190 | SAUNDERS CONSTRUCTION, INC. | BSP | P | 10/24/2018 | Drywall for fire resistance rated walls in restrooms, 4th floor only - 1st layer OK, stagger at the start of 2nd layer OK, firestopping at the above-ceiling locations OK | RICHB | RICHB | | BSP | P | 6004759 | SAUNDERS CONSTRUCTION, INC. | BSP | P | 10/23/2018 | Drywall for fire resistance rated walls in restrooms, 5th floor only - 1st layer OK, stagger at the start of 2nd layer OK, firestopping at the above-ceiling locations OK | RICHB | RICHB | | BSP | P | 6003498 | SAUNDERS CONSTRUCTION, INC. | BSP | P | 10/09/2018 | Training with Justin - fire resistance rated assemblies (including continuity, penetrations and integration with existing conditions) and modifications to existing stairs/walkways | RICHB | RICHB | | BSP | P | 5990436 | SAUNDERS CONSTRUCTION, INC. | BFR | P | 10/08/2018 | Framing in all guest rooms OK pending other Roughs / discussed accessible elements / reviewed firestopping details / discussed overall project scope and existing fire resistance rated walls (including required firestopping and existing mechanical) | RICHB | RICHB | | BFR | P | 5988861 | RIVIERA ELECTRIC, LLC | E= | C | 12/18/2018 | | GARYL | GARYL | | E= | C | 6057216 | RIVIERA ELECTRIC, LLC | E= | P | 12/17/2018 | UNIT: 225, gfci in bathroom not working, | GARYL | GARYL | | E= | P | 6055105 | RIVIERA ELECTRIC, LLC | E= | L | 12/13/2018 | could not find anyone on site --- call a head number is the wrong number | CRAIGS | CRAIGS | | E= | L | 6052179 | RIVIERA ELECTRIC, LLC | E= | P | 12/12/2018 | UNITS: 220, 222, 224, 226, 228, 230 231, 229, complete | GARYL | GARYL | | E= | P | 6050891 | RIVIERA ELECTRIC, LLC | E= | P | 12/10/2018 | ALL of third floor | GARYL | GARYL | | E= | P | 6047754 | RIVIERA ELECTRIC, LLC | E= | P | 11/26/2018 | UNITS: 420, 422, 424, 426, 428, 430, 431, 429, 425, 423, 421, complete | GARYL | GARYL | | E= | P | 6033686 | RIVIERA ELECTRIC, LLC | E= | P | 11/19/2018 | UNITS: 520, 522, 524, 526, 528, 530 | GARYL | GARYL | | E= | P | 6029339 | RIVIERA ELECTRIC, LLC | ES | P | 10/31/2018 | Commercial Service: pre-release ok to energize when contractor is ready 1000 amp service installing 400 amp switch to mdp will be fused at 225 | BRET | BRET | | ES | P | 6011409 | RIVIERA ELECTRIC, LLC | ER | P | 10/12/2018 | UNITS: 222, 224, 226, 327- rough okay, UNITS: 225, 223, 121 accessible okay | GARYL | GARYL | | ER | P | 5993294 | RIVIERA ELECTRIC, LLC | ER | P | 10/10/2018 | 220,227 ok, 121 223,225 accessible units must have all devices at required height for accessible units this includes existing receptacles and installing microwave receptacle at counter top height , | BRET | BRET | | ER | P | 5990810 | RIVIERA ELECTRIC, LLC | ER | P | 10/05/2018 | UNITS: 129, 131, 220, 221, 228, 229, 230 | GARYL | GARYL | | ER | P | 5987447 | RIVIERA ELECTRIC, LLC | ER | P | 10/02/2018 | all of 3rd, EXCEPT unit 327--NOT READY | GARYL | GARYL | | ER | P | 5983000 | RIVIERA ELECTRIC, LLC | ER | P | 09/28/2018 | all of 4th floor okay, 3rd floor: 327 NOT READY, units complete: 321, 323, 325, 329, 331 | GARYL | GARYL | | ER | P | 5980103 | RIVIERA ELECTRIC, LLC | ER | P | 09/27/2018 | 5th floor rough-in okay, 4th floor these units:420, 422, 424, 426, 428. 430 | GARYL | GARYL | | ER | P | 5978932 | HVAC SOLUTIONS, INC. | H= | C | 10/24/2018 | HEAT FINAL OK | LIDO | LIDO | | H= | C | 6004172 | HVAC SOLUTIONS, INC. | HSP | P | 10/18/2018 | SCOPE OF WORK WILL NEED TO BE CHANGED TO SHOW TOTAL OF 26 EXHAUST FANS INSTALLED. | LIDO | LIDO | | HSP | P | 5998098 | HVAC SOLUTIONS, INC. | H= | P | 10/17/2018 | NEED REVISED AND APPROVED PLANS FOR EXHAUST FANS AND DUCT INSTALLED IN ADDITION TO WHAT SHOWN ON PLANS .
| LIDO | LIDO | | H= | P | 5997650 | HVAC SOLUTIONS, INC. | HD | C | 10/17/2018 | EXHAUST FAN AND DUCT ROUGH INSTALL ABOVE BATHROOM HARD LIDS AND INTO SHAFT PER CODE 607.5.5 (1.1) FOR ROOM # 121,129,131,221,223,225,229,231,220,222,224,226,320,322,326,327,325,323,321,329,422,423, 425,430,522,528 OK. | LIDO | LIDO | | HD | C | 5997643 | HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 12/21/2018 | Ok. | DANR | DANR | | P= | C | 6060891 | HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 12/19/2018 | Unit 225 toilet over 18" off side wall at 18-1/2", rest ok this unit.
| DANR | DANR | | P= | P | 6057697 | HARMON - BONDED PLUMBING & HEATING, INC. | P= | P | 12/12/2018 | Still need inspection 1st floor, 2nd floor units 220-223-225, both gas water heaters 4th floor, need to add both gas water heaters to scope of work, need plan splice on 5th floor water piping tie in changes, rest ok this building. | DANR | DANR | | P= | P | 6050594 | HARMON - BONDED PLUMBING & HEATING, INC. | PTO | C | 10/05/2018 | Ok. Note: by final need engineer approval on room aav's on sinks and domestic water tie ins 5th floor with splice (drawing P0.1 shows 1" off main to each stub - currently tied 1-1/4" off main to catch 2 - 1" stubs. | DANR | DANR | | PTO | C | 5987256 | HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 09/25/2018 | 1st and 2nd floor dwv and water to sinks ok, South side domestic water ok. Note: need engineer approval and plan splice for water main tie in changes on 5th floor. | DANR | DANR | | PTO | P | 5975518 | HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 09/07/2018 | This inspection for 3rd and 4th floor waste to new sinks, need engineer approval on changes from 2" to 1-1/2" and aav on sinks. Note: check nail protection with domestic water inspection. | DANR | DANR | | PTO | P | 5958048 | SAUNDERS CONSTRUCTION, INC. | XBS | T | 12/18/2018 | PAID (REC#1564736) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Penetration detail | MICHAELA | MICHAELA | | XBS | T | 6056231 | HARMON - BONDED PLUMBING & HEATING, INC. | XPS | T | 12/18/2018 | PAID (REC#1564739) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 12/18/18 Delta 3 | SHANEN | SHANEN | | XPS | T | 6056217 | SAUNDERS CONSTRUCTION, INC. | XBS | P | 11/02/2018 | PLAN SPLICE: (No Fee) by: LBENNETT for Construction: Revised stair repair drawings | LBENNETT | LBENNETT | | XBS | P | 6014271 | HVAC SOLUTIONS, INC. | XMS | P | 10/23/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: see splice plan comments | JUSTINC | JUSTINC | | XMS | P | 6003918 | SAUNDERS CONSTRUCTION, INC. | XMS | T | 09/17/2018 | PAID (REC#1537943) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: exhaust fans | DALEH | DALEH | | XMS | T | 5967298 |
|
|