PEAK PROFESSIONAL CONTRS INC | B= | C | 02/19/2019 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 6111220 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 02/14/2019 | corrections okay / pending other final inspections. Additional Inspections Required (computer generated): ELECTRIC TECH INC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 6107465 |
PEAK PROFESSIONAL CONTRS INC | B= | P | 02/01/2019 | missing door 101A at rear of unit 110 - see plan splice / missing (2) exterior landings at rear of unit 160 / parapet and canopy caps - roofing incomplete / need to complete other final final inspections including required external inspections / Core and Shell training with PPRBD inspector Lonny -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), ALPHALETE MECHANICAL LLC Plumbing Final Inspection is not Completed yet, ELECTRIC TECH INC. Electrical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection i | BRIANB | BRIANB | | B= | P | 6095473 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 01/15/2019 | received engineer observation letter for structural steel - components onsite / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 6079135 |
PEAK PROFESSIONAL CONTRS INC | BIN | P | 12/03/2018 | observed batt insulation at exterior walls / pending observation letter for structural components to complete frame inspection and other rough inspections / updated 12/4 - met with Peak superintendent Joe - need to revise core and shell design to reflect as built condition - to include new demising wall and interior light gauge wall framing installed / new interior wall framing needs to be inspected | BRIANB | BRIANB | | BIN | P | 6041219 |
PEAK PROFESSIONAL CONTRS INC | BFN | C | 12/03/2018 | all paper work on file | BRIANB | BRIANB | | BFN | C | 6041218 |
PEAK PROFESSIONAL CONTRS INC | BFT | C | 12/03/2018 | all paper work on file | BRIANB | BRIANB | | BFT | C | 6041212 |
PEAK PROFESSIONAL CONTRS INC | BIN | R | 11/16/2018 | PARTIAL / NORTH UNITS - GRID LINE 1 - 4 / insulation incomplete in spots at stud cavities along tops of north and east exterior walls / pending other rough inspections | BRIANB | BRIANB | | BIN | R | 6028325 |
PEAK PROFESSIONAL CONTRS INC | BFR | P | 11/16/2018 | met with Peak superintendent Joe - observation letter for all structural components from Michael Orsillo to follow | BRIANB | BRIANB | | BFR | P | 6028315 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 09/11/2018 | observed R-23.6 insulation at roof deck / Training with PPRBD inspector Lonny / core and shell training / VB construction / proposed M - A-2 occupancies / discussed inspections and inspection scheduling for core - shell including final inspection for core - shell prior to final for TI / discussed pre-insulation at box headers, stl framing (i.e stud gauges - deflection clips -tracks per approved design) at exterior walls, demising walls - rated if required - mixed occupancies and fire barriers | BRIANB | BRIANB | | BSP | P | 5961882 |
PEAK PROFESSIONAL CONTRS INC | BSP | P | 09/11/2018 | core and shell training with inspector Brian / reviewed framing requirements - 3rd party inspections for red iron , footing , foundation - reviewed com-check for roof insulation R-values - reviewed box headers and insulation for stud cavities | LONNYS | LONNYS | | BSP | P | 5961854 |
PEAK PROFESSIONAL CONTRS INC | BFR | R | 08/21/2018 | courtesy visit only / met with Peak superintendent Joe / reviewed construction progress and inspections required / discussed insulation at box headers and insulation R-values at roof deck per approved ComCheck - will need to verify r-value of insulation at roof deck / training with PPRBD inspector Chuck | BRIANB | BRIANB | | BFR | R | 5940749 |
PEAK PROFESSIONAL CONTRS INC | BFT | P | 08/21/2018 | received stamped open hole letter, foundation observation letter including letter addressing cold joint / pending splice for revised foundation design at grid line 9 | BRIANB | BRIANB | | BFT | P | 5940634 |
PEAK PROFESSIONAL CONTRS INC | BFI | P | 06/27/2018 | pending all paper work to complete foundation inspections / 2" vertical foam at exterior walls okay | BRIANB | BRIANB | | BFI | P | 5887550 |
PEAK PROFESSIONAL CONTRS INC | BFN | P | 06/15/2018 | AUTHORIZED INSPECTION BY ENGINEER / met with Joe from Peak - will need to provide engineering for revised foundation wall and footing along the south elevation / observation letter for wall footing and walls to follow / engineering for cold joint in footing noted from previous inspection to follow as well | BRIANB | BRIANB | | BFN | P | 5875727 |
PEAK PROFESSIONAL CONTRS INC | BFT | P | 06/07/2018 | pending engineering for cold-joint in footing at grid line 6 / remaining wall footing okay / still need to inspect exterior pads / eufer okay | BRIANB | BRIANB | | BFT | P | 5868050 |
PEAK PROFESSIONAL CONTRS INC | BFT | P | 06/01/2018 | PARTIAL / WALL FOOTINGS / wall footings at grid lines F - 1 to 6 / C - 1 to 6 / 1 F to C okay only / footings inspected are highlighted on sheet S1.0 of approved design in office / field copy of open hole from Entech onsite / 2400 psf / stamped open hole letter to follow | BRIANB | BRIANB | | BFT | P | 5861790 |
ELECTRIC TECH INC. | E= | C | 02/19/2019 | Complete / | ROB | ROB | | E= | C | 6111219 |
ELECTRIC TECH INC. | E= | P | 02/15/2019 | Electrical complete for building with the exception of labeling fault current on MDP and removing temp. wire from house panel / Need to check pole lights and landscape receptacles / | ROB | ROB | | E= | P | 6108427 |
ELECTRIC TECH INC. | E= | P | 02/01/2019 | exterior receptacles and wall pack lights okay | CHIPO | CHIPO | | E= | P | 6095269 |
ELECTRIC TECH INC. | ER | P | 01/18/2019 | south east soffit can lights | CRAIGS | CRAIGS | | ER | P | 6082858 |
WESTERN STATES FIRE PROTECTION COMPANY | E= | C | 01/04/2019 | FIRE ALARM INSPECTION: FA complete / | ROB | ROB | | E= | C | 6068109 |
WESTERN STATES FIRE PROTECTION COMPANY | ER | P | 01/03/2019 | Rough ok / Permit transferred from M05418 to Core and Shell L50261 / | ROB | ROB | | ER | P | 6067689 |
ELECTRIC TECH INC. | ES | P | 12/12/2018 | Commercial Service: 3000 amp 4 wire 120/208 UG New---Ok to energize and and set House Panel Meter / | ROB | ROB | | ES | P | 6050910 |
ELECTRIC TECH INC. | ES | R | 12/11/2018 | Commercial Service: Need to have plans submitted and spliced for revised switchgear---Need jumper for water meter and pressure valves---Need green tape on GEC conductors----#4 sol to ufer, 250kcmil tosteel and water pipe / | ROB | ROB | | ES | R | 6049733 |
ELECTRIC TECH INC. | EUG | P | 11/27/2018 | EUG ok for northeast corner of building for Bollards and Poles / | ROB | ROB | | EUG | P | 6035555 |
ELECTRIC TECH INC. | ESL | P | 11/13/2018 | 4-21/2" stub ups for 800 amp panel--2-3" from 800 amp panel to panels A & B / | ROB | ROB | | ESL | P | 6024280 |
ELECTRIC TECH INC. | ER | P | 11/08/2018 | Rough ok for sofiits in front of #100 & # 200 on west side, 8 recess cans----MC cable installed for fixtures on east and west sides of #300, #400, #500--Fixtures to be recessed cut in type and will need to see fixtures when being installed / | ROB | ROB | | ER | P | 6020241 |
ELECTRIC TECH INC. | ESL | P | 10/30/2018 | EUG for 5 floor boxes, tied together with 1" and stopped appx. 10' short of east wall---2-1" stubbed short 4' of east wall / CORE AND SHELL OR TENANT FINISH ? | ROB | ROB | | ESL | P | 6010716 |
ELECTRIC TECH INC. | ESL | P | 10/29/2018 | 1-2" turned up to House Panel----1-21/2" turned up for Yogurt Shop----2-3" extended appx. 20' and still needs to be completed / | ROB | ROB | | ESL | P | 6008935 |
ELECTRIC TECH INC. | ER | P | 10/22/2018 | Rough ok for o/s lights and recpts only, north end exterior walls--Nobody on site / | ROB | ROB | | ER | P | 6001796 |
ELECTRIC TECH INC. | EUG | P | 09/26/2018 | EUG for open trenches to pole lighting on south end of bldg. ok--Nobody on site--GC wan't sure of total scope needing inspection / | ROB | ROB | | EUG | P | 5977764 |
ELECTRIC TECH INC. | EUG | P | 09/24/2018 | north and west site lighting trenches okay | CHIPO | CHIPO | | EUG | P | 5974516 |
ELECTRIC TECH INC. | ESL | P | 06/27/2018 | south running north to the jog east in the foundation | CRAIGS | CRAIGS | | ESL | P | 5886995 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 02/15/2019 | CORRECTIONS MADE. | LIDO | LIDO | | H= | C | 6108948 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/13/2019 | PARTIAL PENDING: MISSING THE REGULATOR SCREENS FOR RTU -1 AND RTU -1A ,OK FOR CONTRACTOR TO ATTACH PICTURES TO NEXT INSPECTION REQUEST. | LIDO | LIDO | | H= | P | 6106708 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/07/2019 | ADJUSTED NOTES (LM) 2/13/19 COMMUNICATED THIS WITH THE CONTRACTOR .RTU-10 , 11, 12, 13 GAS FOR THESE UNITS ARE INSTALLED UNDER THE INTERIOR FINISH PERMIT # M00887 AND ARE SHOWN ON THE PLANS FOR THIS PERMIT. CORE AND SHELL PLANS FROM PERMIT # L50261 WILL NEED TO BE REVISED AND APPROVED SHOWING THE GAS AS MEDIUM PRESSURE GAS. STILL MISSING THE REGULATOR SCREENS FOR RTU -1 AND RTU -1A , CORRECT SCOPE OF WORK TO SHOW THE CORRECT NUMBER OF GAS OUTLETS | LIDO | LIDO | | H= | P | 6100788 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/05/2019 | 1/2 " X 24" LONG GAS FLEX CONNECTOR FOR RTU-1A IS TOO SMALL FOR 250k BTU'S. MISSING THE GAS REGULATOR SCREENS FOR RTU-1 AND RTU-1A. ON THE GAS REGULATOR REMOVE THE BEEBE FROM THE VENT LIMITER AND PIPE THE VENT FOR THE REGULATOR . ADD MEDIUM PRESSURE LABELS. | LIDO | LIDO | | H= | P | 6098263 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 02/04/2019 | FIELD CANCELLED BY CONTRACTOR .( MIKE) | LIDO | LIDO | | H= | P | 6096416 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 01/03/2019 | OK TO RELEASE FIVE LOW PRESSURE METERS FOR UNITS 100, 110, 120, 150,160 . ONE MEDIUM PRESSURE METER.THE TENANT FINISH INFORMATION I HAVE THE MEDIUM PRESSURE METER WILL BE FOR UNIT ADDRESS # 140 . | LIDO | LIDO | | HC | C | 6067125 |
AIRTECH MECHANICAL, INC. | H= | C | 12/18/2018 | ALL REQUIRED DUCT DETECTORS IN PLACE. | LIDO | LIDO | | H= | C | 6056455 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 12/13/2018 | ALL SIX 10 lb TEST OK / INSTALLED PER PLAN (( CAN NOT RELEASE METERS)) IF GAS FOR UNIT 140 IS CHANGING FROM LOW PRESSURE TO MEDIUM PRESSURE REVISED AND APPROVED PLANS ARE REQUIRED BEFORE I CAN RELEASE THE METERS .NEED TO SEE ALL FINAL CONNECTIONS TO EQUIPMENT | LIDO | LIDO | | HI | P | 6052316 |
AIRTECH MECHANICAL, INC. | H= | P | 12/13/2018 | NEED ALL ROOF TOP UNITS LABELED FOR THE ADDRESS THEY SERVE . | LIDO | LIDO | | H= | P | 6052266 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 12/12/2018 | ADDED TO NOTES 12/13/18 (LM) 1-1/2 GAS PIPE TAGGED # 140 WILL NEED TO BE CHANGED TO 2" PER PLAN -NOTIFIED CONTRACTOR OF ADDED NOTES . GAS LINE TAGGED UNIT #140 IS A LOW TEST/ NEED TO RESEARCH 1 -1/2" GAS INTO BUILDING PLAN SHOWS 2" WILL ADD TO NOTES IN THE MORNING.BUILDING LOCKED AND NO ACCESS TO ROOF/ NEED TO INSPECT GAS INSTALL.CONTRACTOR WILL NEED TO MEET INSPECTOR ON SITE FOR INSPECTION . (FIVE - 10 lb TEST OK .) | LIDO | LIDO | | HI | P | 6051244 |
ALPHALETE MECHANICAL LLC | P= | C | 02/05/2019 | base for restaurant in unit 190 | TED | TED | | P= | C | 6097843 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 02/05/2019 | correction made | TED | TED | | P= | C | 6097836 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/04/2019 | still need trap guard on meter room floor drain, can down load picture rest ok | TED | TED | | P= | P | 6096662 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 12/11/2018 | Need trap guard water entry floor drain (picture ok), need to complete roof drain inspection notes, rest ok for core and shell. | DANR | DANR | | PTO | P | 6049026 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 11/14/2018 | Need drawings showing pipe sizing and routing on canopy drains columns A-7 and B-3. Test ok 2" roof drains installed. | DANR | DANR | | PRD | P | 6025631 |
ALPHALETE MECHANICAL LLC | PB | C | 10/30/2018 | restaurant base complete | TED | TED | | PB | C | 6010017 |
ALPHALETE MECHANICAL LLC | PB | P | 10/29/2018 | south store, restaurant north side kitchen area and mech. room floor drain ok to cover | TED | TED | | PB | P | 6008772 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 08/30/2018 | sanitary and grease deep mains and risers, water meter room floor drain and copper water main, test and design ok, plan marked | TED | TED | | PB | P | 5950923 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 08/14/2018 | Test ok for 6" grease and sanitary lines columns 6-9, drawings highlighted. Note: grease line West side. | DANR | DANR | | PB | P | 5934034 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | P | 02/13/2019 | PLAN SPLICE FEE: $0 by: JUSTINC for Mechanical: Revised to indicate RTU's 10,11,12,13 installed with shell and gas to these units are shown on finish permit # M00887 | JUSTINC | JUSTINC | | XMS | P | 6105706 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | T | 02/01/2019 | PAID (REC#1573481) PLAN SPLICE FEE: $50 by: SHANEN for Plumbing: Plumbing splice 2/1/19: Added canopy roof drains. | SHANEN | SHANEN | | XPS | T | 6094550 |
PEAK PROFESSIONAL CONTRS INC | XBS | T | 01/11/2019 | PAID (REC#1568923) PLAN SPLICE FEE: $50 by: BPHILLIPS for Construction: Added demising wall and revised door schedule. | BPHILLIPS | BPHILLIPS | | XBS | T | 6075813 |
LANDMARK PLUMBING AND HEATING, INC. | XMS | T | 01/02/2019 | PAID (REC#1566694) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: delta 4 | DALEH | DALEH | | XMS | T | 6066552 |
ELECTRIC TECH INC. | XES | T | 12/12/2018 | PAID (REC#1563048) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line ( Three 1200 amp services to one 3000 | SHELBY | SHELBY | | XES | T | 6050262 |
AIRTECH MECHANICAL, INC. | XMS | T | 11/13/2018 | PAID (REC#1555823) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised gas plan and RTU layout | JUSTINC | JUSTINC | | XMS | T | 6023593 |
LANDMARK PLUMBING AND HEATING, INC. | XPS | P | 09/20/2018 | PLAN SPLICE: (No Fee) by: DALEH for Plumbing: underground only | DALEH | DALEH | | XPS | P | 5971730 |
PEAK PROFESSIONAL CONTRS INC | XBS | T | 09/20/2018 | PAID (REC#1539542) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise door sizes and locations | MICHAELA | MICHAELA | | XBS | T | 5971668 |
PEAK PROFESSIONAL CONTRS INC | XBS | T | 08/22/2018 | PAID (REC#1529753) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Revised IECC and structural | SHELLEY | SHELLEY | | XBS | T | 5942535 |